Photo apps that automatically record coordinates improve surveying accuracy and efficiency
By LRTK Team (Lefixea Inc.)
Table of contents
• What is an app that automatically records location information (coordinates) in photos?
• Needs for using photos with coordinates in surveying
• Benefits of automatically recording coordinates in photos
• Key points for using apps that obtain photo coordinates
• RTK is effective for high-precision positioning
• Simple surveying with LRTK
• Summary
• FAQ
What is an app that automatically records location information (coordinates) in photos?
An app that can automatically record location information in photos is, as the name implies, a smartphone application that can automatically attach coordinate data such as latitude and longitude to the photos you take. Normally, you can embed location information (geotags) into photos with a smartphone’s standard camera if you turn the setting on. However, for surveying and field work you may need more accurate coordinates or specialized data formats. For example, you might want to record in the site’s plane rectangular coordinate system instead of latitude and longitude. By using a dedicated app that can automatically record coordinates, you can record accurate position coordinates at the same time as taking the photo, and later use those photos on maps or incorporate them into surveying deliverables.
Such apps have a mechanism to automatically append position coordinates obtained by GPS positioning to the photo’s Exif (EXIF) information. Exif is metadata embedded in photo files that can include not only shooting date and camera model but also location information (latitude, longitude, altitude). Using the smartphone’s GPS or GNSS sensor, the app measures the current location at the instant the shutter is pressed and saves it as coordinates. Because coordinates are recorded for each photo, you can later determine exactly where each photo was taken.
Needs for using photos with coordinates in surveying
In civil engineering, construction surveying, and construction management sites, photo documentation of site conditions is performed routinely. Photo records are required in many situations—before-and-after shots of construction sites, sharing progress, checking as-built conditions (post-construction shapes), and so on. Traditionally, to know “where a photo was taken,” people had to plot the shooting location on drawings or leave handwritten notes, so linking photos to locations was a time-consuming task.
For example, when creating a “photo location map” to attach to a surveying report, you must indicate each photo’s shooting location on a map or drawing. If a photo does not have recorded location information, you have to mark the location later from memory, which can lead to memory errors or record mistakes. When multiple people are responsible for a site, there are often cases of confusion during photo organization and sharing—“Where was this photo taken?” From these field problems, the demand for automatically attaching coordinates to photos has been rising.
Furthermore, in recent years initiatives such as the Ministry of Land, Infrastructure, Transport and Tourism’s *i-Construction* have promoted ICT use in the construction industry, increasing the importance of managing photos combined with location information as digital data. If photos taken on site include accurate coordinate information, they can be smoothly imported into construction management systems or GIS (geographic information systems) and used to improve information sharing and reporting efficiency on site.
Benefits of automatically recording coordinates in photos
Automatically recording coordinates when taking photos offers two major benefits: improved accuracy and increased efficiency.
• Improved accuracy of location records: It prevents human recording errors and leaves objective location data. There is no need to estimate locations with a tape measure or by viewing photos later. Coordinates embedded in photos come from GPS positioning and, if not affected by buildings or trees, can be expected to have accuracy on the order of several meters (several ft). This allows survey points and construction locations to be identified more precisely, improving quality control accuracy. Also, if multiple photo data are plotted on a map, you can see at a glance what area was covered, helping to prevent missed measurements.
• Increased work efficiency: It can greatly reduce the time needed for photo management and reporting. Because location information is attached at the time of shooting, there is less need to take notes on site. When organizing photos after returning to the office, it is easy to sort files or map them using the automatically recorded date/time and coordinates. For example, if you use a tool that automatically creates a “photo location map” from coordinate-tagged photos, there is no need to manually place points on a map. When sharing via email or cloud services, recipients can load photos into mapping software to understand site conditions without extra explanation, saving time. For site supervisors and surveyors, reducing the burden of photo management and improving communication efficiency are significant advantages.
In this way, photos with location information are not just simple records but can be used as spatial information. For instance, in disaster site investigations, you can map damage by shooting point to enable rapid situation assessment and countermeasure planning. In structure inspections, you can accurately relay the location of defects by using latitude and longitude recorded in photos. Recording photos together with coordinates is an important step in advancing on-site DX (digital transformation).
Overall, the mechanism for automatically recording coordinates in photos is transforming how field information is managed and shared.
Key points for using apps that obtain photo coordinates
To automatically record coordinates in photos in practice, you need to enable the device’s location services on your smartphone or tablet. Before shooting, make sure the device’s GPS is on and that the app you will use has permission to access location information. For general camera apps, enable options such as “Save location to photos” in the settings menu. For dedicated surveying support apps, granting location access on first launch will enable automatic recording.
For obtaining location-tagged photos with high accuracy, pay attention to the shooting environment. GPS positioning accuracy depends on satellite signal reception. Accuracy is better in open skies but tends to worsen in urban canyons, mountainous areas, or under trees. Therefore, when taking important surveying photos, it is effective to choose locations and times with good sky visibility and to remain still for a while until the phone’s positioning stabilizes before pressing the shutter. Also, if the app can record the shooting direction, you can later confirm which direction the photo was taken toward, which helps reproduce the site in three dimensions.
Below is a basic workflow for using a coordinate-obtaining app.
• Device and app preparation: Prepare a smartphone/tablet capable of positioning and install a camera app or surveying support app that supports automatic coordinate recording. Check in the app’s settings that saving location information is enabled.