Converting Photo Geotags to cm level accuracy (half-inch accuracy) with LRTK: A New Method That Changes Surveying Sites
By LRTK Team (Lefixea Inc.)
Table of Contents
• Issues with photo geotags and accuracy
• Why centimeter-level accuracy is required in surveying
• What is RTK (Real Time Kinematic)
• How to replace photo geotags with cm level accuracy (half-inch accuracy)
• Features and benefits of LRTK
• Use cases of LRTK that change surveying sites
• Realizing simple surveying with LRTK
• FAQ
Issues with photo geotags and accuracy
In recent years, adding location information (geotags) to photos taken with smartphones or digital cameras has become common. It is convenient to be able to check on a map where landscape photos from trips or record photos from construction sites were taken. Features to share or organize the shooting locations of photos are widespread on SNS and cloud services. For that reason, the demand to replace photo geotags with cm level accuracy (half-inch accuracy) is also increasing.
However, there are major issues with the accuracy of the location information recorded in photo files. Typically, positioning using the GNSS receiver built into a smartphone results in errors on the order of several meters to about 10 m (32.8 ft). For example, even photos taken at the same actual spot often have slightly different recorded latitude and longitude each time, and the location displayed on a map can be offset. A few meters of offset may not be a problem for everyday uses, but it is insufficient for sites that require high accuracy such as surveying and construction management. If positions are off by several meters, there is a risk of misidentifying the location of important structures or misrecognizing property boundaries.
If photo geotags can be recorded more accurately, various tasks using photos can be dramatically streamlined and advanced. So how can we raise photo geotag accuracy to centimeter-level precision? The key is the high-precision positioning technology RTK (Real Time Kinematic), described next.
Why centimeter-level accuracy is required in surveying
On civil engineering, construction sites, and in surveying work, the accuracy of location information determines the reliability of results. For example, in constructing buildings or roads, precise alignment that does not tolerate deviations of a few centimeters is required. Determining the positions of underground utilities or confirming property boundaries also cannot be accurately judged with errors measured in meters. The several-meter errors from general GPS become significant mistakes in these contexts.
Traditionally, high-precision measurements like these have used specialized surveying instruments (total stations and high-performance GNSS receivers) and required time and manpower. However, ICT and DX trends have reached the construction industry, and methods to acquire and manage data more efficiently and digitally are in demand. As promoted by initiatives such as the Ministry of Land, Infrastructure, Transport and Tourism’s “i-Construction,” centimeter-level position information is starting to be used in 3D surveying and as-built management on construction sites. With high-precision position data, it becomes possible to accurately calculate volumes from 3D models generated from photos, or to detect changes by precisely comparing past and current photos, enabling higher-level operations.
Thus, centimeter-level high-precision positioning is becoming indispensable in surveying and site management. One technology attracting attention is RTK (Real Time Kinematic), which can dramatically reduce GPS positioning errors.
What is RTK (Real Time Kinematic)
RTK (Real Time Kinematic) is a positioning method that performs simultaneous GNSS observations at a reference station (a fixed reference point) and a rover (the device to be positioned), and derives high-precision coordinates from the differences between them. Simply put, by using a “stationary receiver” and a “moving receiver” and calculating the discrepancies in the satellite signals they receive, RTK largely cancels out satellite positioning errors. Orbital errors of satellites and atmospheric delay errors that were unavoidable with standalone GPS are canceled out by relative comparison with the reference station, resulting in markedly improved positioning accuracy.
RTK further analyzes the phase of the carrier signal received from satellites to detect minute differences at the centimeter level. This makes it possible to shrink positioning errors that were previously several meters down to a few centimeters. However, performing RTK positioning requires the rover to receive observation data and correction information captured by the reference station in real time. Traditionally, this meant connecting the rover and the reference station via radio or the Internet, but in recent years network RTK (such as VRS) using nationwide networks of reference stations has become widespread, enabling rover devices to receive reference station data over mobile communications. In Japan, the Quasi-Zenith Satellite System Michibiki (QZSS) also provides a centimeter-level augmentation service (CLAS), and with a compatible receiver it is possible to achieve high-precision positioning comparable to RTK using satellite augmentation signals alone even outside mobile network coverage.
With these advanced mechanisms, RTK can typically achieve horizontal positioning accuracy of about 2-3 cm (0.8-1.2 in) and vertical errors within several centimeters. This is an order-of-magnitude improvement over conventional GPS, but it has historically been a technology with operational hurdles such as the need for dedicated equipment and communication setup. This led to the development of new solutions designed to make RTK more accessible.
How to replace photo geotags with cm level accuracy (half-inch accuracy)
How can we apply high-precision positioning technologies like RTK to photography so that photo geotags reach centimeter-level accuracy? The answer is to integrate RTK positioning into the camera (shooting device) itself. Recently, some drones and survey cameras have RTK-capable models, but general smartphones and consumer cameras cannot achieve RTK-level positioning. That is where a small GNSS receiver that can be retrofitted to smartphones—called “LRTK”—comes in.
By attaching an LRTK to a smartphone and using the dedicated app, anyone can easily obtain centimeter-level position information. LRTK performs high-precision real-time positioning for the device using network RTK or satellite augmentation signals, and links those coordinates to the smartphone’s camera app. Users simply take photos with their phones as usual, and the latitude and longitude recorded in the Exif data are updated to cm level accuracy (half-inch accuracy). The time of positioning at the moment of capture and simple memo information are also automatically recorded, so for each photo you get an accurate record of “when, where, and what” was photographed.
In this way, LRTK has made it possible to replace photo geotags from the traditional meter-level errors to centimeter-level precision. No complicated manual work is required, and photos taken on site can be treated as precise surveying data as-is. When plotting photo locations on a map later in the office or sharing them with other team members, you no longer need to worry about location offsets. Photos with high-precision coordinates are highly valuable and can be used directly for drawing creation, 3D modeling, and asset management systems.
Features and benefits of LRTK
By using LRTK, high-precision positioning that once required specialized surveying equipment can be realized with surprising ease. The main features and benefits are summarized below.
• Compact and lightweight: LRTK devices are compact enough to fit in the palm of your hand and don’t add bulk when attached to a smartphone. For example, eliminating the need for long surveying poles or external batteries alone makes handling on site significantly easier.
• Easy connection and one-touch positioning: Connecting to a smartphone and starting positioning is intuitive and simple. By tapping a button in the dedicated app, high-precision positioning starts within seconds. No complicated settings or specialized knowledge are required, so site personnel can operate it like using a smartphone. Even first-time users can start positioning without confusion.
• “Anytime, anywhere” positioning: LRTK can obtain correction information from nationwide reference station networks via the internet, and in areas without mobile coverage it can position using satellite augmentation signals (Michibiki’s CLAS). It truly enables “anyone, anywhere, anytime” high-precision positioning. Even in mountainous areas or sites with poor radio reception, centimeter-level accuracy can be maintained stably.
• Cloud integration and data sharing: Position information and photo data can be automatically synchronized to the LRTK cloud. High-precision geotagged photos taken on site can be viewed immediately on an office PC and easily shared with stakeholders. Real-time communication from the field to the office accelerates decision-making. Data can be managed on the cloud together with maps, and comparisons with past records can be performed smoothly.
• Multifunctional surveying support: In addition to photo positioning, LRTK offers navigation (coordinate guidance) that guides workers to specified coordinates, point cloud scanning to quickly measure surrounding terrain, and AR-based virtual stakeout display, among other features—an all-in-one surveying tool. This flexibility allows a single device to handle a variety of on-site tasks.
• Affordable adoption cost: While high-precision GNSS traditionally evokes images of expensive equipment, LRTK has a lower initial cost compared to conventional surveying-only devices, making it easier for more sites to adopt. This makes it feasible for small and medium enterprises and local governments to consider implementation. It is expected to improve productivity through reduced large-scale equipment needs and labor costs while obtaining high-precision data.
Use cases of LRTK that change surveying sites
When LRTK enables photo geotags to be recorded with cm level accuracy (half-inch accuracy), it opens up innovative uses across many on-site operations. Here are some concrete examples.
• Surveying on civil engineering and construction sites: Tasks such as setting reference points, checking batter boards, and recording as-built shapes that were traditionally performed carefully by surveying teams can be recorded quickly with a smartphone equipped with LRTK. Since accurate coordinates can be obtained simply by photographing structures during construction, management of construction progress and measurement of completed quantities can be made more efficient. It also supports the creation of 3D data compatible with i-Construction, contributing to DX promotion on site.
• Infrastructure inspection and maintenance: LRTK is powerful for inspection work of infrastructure assets such as road signs, utility poles, and piping. Workers can take photos of equipment and have the position and time recorded accurately and saved to the cloud. On the next inspection, the same location can be easily identified and past and current photos compared in detail. Maintenance management that relied on paper logs or verbal location reports is dramatically improved by precise digital archives.
• Disaster response and surveys: At disaster sites such as earthquakes or heavy rains, it is important to rapidly record and share damage status. With LRTK, photographing damaged locations produces records with accurate geotags. If multiple responders upload their photos to the cloud, a wide-area damage map can be generated immediately. Even in emergencies, reliable, non-offset location information can be shared with relevant agencies to support quick decision-making.
• Photogrammetry and 3D model generation: High-precision location information is a major advantage when creating 3D models from drone or ground photogrammetry. When a set of photos geotagged by LRTK is analyzed in photogrammetry software, high-precision composites can be achieved with fewer control points. Having each photo’s position within a few centimeters reduces scale errors in the generated point cloud model and improves accuracy in volume and dimension calculations. This enables simple, high-precision surveying of small sites and modeling of existing structures that was previously difficult.
Realizing simple surveying with LRTK
The centimeter-level positioning enabled by LRTK is rewriting the conventional wisdom of surveying sites. Surveying tasks that used to require specialists or expensive equipment can now be performed as “simple surveying” by site personnel with just a smartphone. Complex GPS configuration and tedious data processing are automated with a single button in LRTK, transforming it into technology anyone can use.
Because position information can be obtained in far less time and with far less effort than traditional methods, site productivity skyrockets. For example, recording surveying points that once took hours can be completed in minutes simply by taking photos with LRTK. As high-precision data acquisition becomes easier, it expands the range of processes that previously compromised on accuracy, leading to improved construction quality and management precision.
The new method using LRTK can be seen as the democratization of high-precision positioning. Not only large contractors but also small construction companies, local governments, and even individuals can now handle centimeter-level position information easily. The barriers to “measuring and recording” on site are lowered, and future surveying styles will become smarter and more efficient. LRTK is likely to be a reliable partner in on-site DX. Why not experience the innovation in your operations by adopting new surveying methods using LRTK?
FAQ
Q: What is the difference between a smartphone’s GPS and LRTK? A: Smartphone GNSS typically has positioning errors on the order of several meters, whereas LRTK, using RTK technology, can reduce those errors to a few centimeters. LRTK uses correction information from reference stations and advanced satellite signals, resulting in dramatically higher positional accuracy. It also employs a high-performance antenna that receives multiple satellite systems, enabling stable positioning in places where a smartphone alone would tend to be unreliable.
Q: Do I need specialized knowledge to use it? A: No. LRTK is designed to be usable without being a professional surveyor. By following the guidance in the app, high-precision positioning starts automatically and complex settings are unnecessary. You do not need to understand the detailed theory of RTK or GNSS. The ease of use, allowing site staff to operate it as an extension of everyday smartphone use, is a key feature of LRTK.
Q: Can centimeter-level positioning be achieved without reference stations or communication? A: LRTK normally achieves centimeter-level accuracy by receiving reference station data over a network, but it can also work in areas with poor communications. It supports the Quasi-Zenith Satellite System Michibiki’s CLAS satellite augmentation service, allowing it to receive correction information directly from satellites and perform high-precision positioning even outside mobile coverage. Therefore, with LRTK you can obtain cm-level position information even in mountainous areas or environments where base stations or communications are unavailable.
Q: Can accuracy be maintained in places with many obstructions such as urban canyons or under trees? A: Satellite positioning achieves better accuracy when the sky is open, so precision may degrade in urban canyons or forests where satellite signals are blocked. However, LRTK supports multiple frequencies and multiple GNSS constellations, making it easier to capture satellites even in partially obstructed environments. While it is difficult in situations with no sky view at all, LRTK performs better than conventional methods and can often regain centimeter-level “fixed solution” accuracy when conditions improve. That said, obstructions may temporarily reduce accuracy to several tens of centimeters or interrupt positioning. In short, open-sky use is ideal, but LRTK can perform robustly in somewhat obstructed environments.
Q: How can the obtained photo data and positioning information be used? A: Photos obtained with LRTK are saved as high-precision, geotagged digital records. Because high-precision latitude and longitude are embedded in the photo files (Exif data), their locations can be accurately displayed in general map software or GIS. These data can be managed on the LRTK cloud together with maps, and exported as CSV or GIS formats for import into other systems if needed. They can be used for creating construction photo logs, plotting on CAD drawings, asset management in GIS software, and generating 3D models with photogrammetry software, among many other applications. Sharing data within a team enables real-time progress tracking, and archiving for future analysis turns them into an information backbone connecting field and office.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.


