The Site Is Changing! Photogrammetry Implementation Case Studies: Construction DX Realized with Smartphone RTK

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

At construction sites today, a moment is arriving when digital technologies are literally "changing the site." From field engineers at major general contractors to executives at regional construction firms, surveying companies, and municipal CIM managers, construction site DX (digital transformation) is a theme everyone faces. Photogrammetry—also known as photographic surveying—is attracting attention as a trump card. By using drones and smartphones for photographic surveying, surveying and management tasks that once relied on craftsmen’s experience and time can be dramatically streamlined, offering a way to address labor shortages and safety challenges. More recently, by combining smartphones with RTK technology (high-accuracy positioning), efforts have begun to enable centimeter-level 3D measurements on site without specialized equipment.


This article explains how on-site DX progresses in practice based on photogrammetry implementation cases at construction sites. From the perspectives of improved work efficiency, mitigation of labor shortages, BIM/CIM integration, remote management, and enhanced safety, we unravel the effects of photographic surveying and explore the changes it brings to the construction industry. At the end of the article, we also touch on simple surveying using the smartphone RTK device LRTK, introducing the latest technology that anyone can start using easily.


What is photogrammetry?

Photogrammetry is a technique that reconstructs three-dimensional shapes from a large number of photographs taken of an object from various angles using specialized software. Also called photographic surveying, it was traditionally used for creating topographic maps from aerial photos, but with the recent spread of digital cameras and drones and advances in computer performance, it has attracted attention as a method by which anyone can generate high-accuracy 3D models. Advances in the “Structure from Motion (SfM)” technique, which extracts feature points from multiple images and computes three-dimensional shapes, have made it possible to obtain detailed point cloud data (a collection of countless measurement points) from photographs. For example, if you take aerial photos of a construction site with a drone and process those images with specialized software, you can create accurate 3D models of terrain and structures in a short time.


A major feature of point cloud data generated by photogrammetry is that it can digitally record complex terrain and structural shapes that traditional drawings and 2D CAD cannot fully represent, preserving them as they are. You can obtain precise three-dimensional data that is like “a complete copy of the site,” and utilizing this data can dramatically improve the accuracy of design and construction management.


Main use cases for photographic surveying: Photographic surveying is active in various applications on construction sites.


• Current-condition surveying: Use drone aerial photography to create a complete 3D model of the pre-construction terrain for site understanding

• As-built management: 3D-scan completed structures and compare them with the design model to verify quality

• Earthwork volume calculation: Automatically calculate the volumes of fills and excavations from point cloud data and use them for rapid quantity estimation

• Infrastructure inspection: Remotely photograph bridges and slopes and analyze cracks and displacements in detail

• Disaster response: Safely photograph disaster sites with drones to quickly grasp collapse ranges and damage conditions


Expanding use of photogrammetry in construction

The Ministry of Land, Infrastructure, Transport and Tourism’s i-Construction initiative, launched in 2016, recommends the use of ICT technologies and three-dimensional data across the construction industry. This is driven by a worsening shortage of skilled workers and the on-site “3K problem” of work that is difficult, dirty, and dangerous, with the aim of achieving both productivity improvement and a more comfortable working environment through digitization. The government has set a target to increase construction site productivity by 20% by fiscal 2025 and is promoting DX from surveying to design, construction, and maintenance. Within this, point cloud measurement using drone photogrammetry and 3D scanners has rapidly spread, especially among major general contractors, as a method for current-condition surveying and as-built management.


Recently, this wave has started to reach small and medium-sized construction and surveying companies as well. There is a growing movement of “let’s try it with a small drone or smartphone even without expensive dedicated equipment.” In fact, one small civil engineering firm conducted trial drone photogrammetry and decided on full implementation after obtaining useful results in a short time. Some current smartphones also include LiDAR scanners (laser measurement), and the era in which a smartphone becomes a 3D measurement tool on site is beginning. By combining the smartphone in your hand with inexpensive apps and small GNSS receivers, anyone can routinely collect and utilize 3D data. Where measuring equipment once required an investment of several million yen, we now see low-cost ways to get started—such as smartphone-mounted LiDAR, GNSS receivers, and small drones. The key is to start small with the smartphone you already have and affordable equipment rather than purchasing an expensive full set upfront. More companies are verifying effectiveness with a small investment and moving to full implementation once convinced. The reach of point cloud technologies, including photogrammetry, is steadily expanding, benefiting not only specialized departments but various roles involved on site. Moreover, public sectors such as municipalities are developing regional 3D terrain models for disaster prevention and urban planning, positioning three-dimensional data as a DX foundation for social infrastructure. Going forward, efforts to build digital twins of the real world and advance urban planning and infrastructure management are also expected to accelerate.


Effects of introducing photogrammetry for construction DX

Introducing photogrammetry on site yields the following concrete effects:


• Dramatic improvement in work efficiency: Scanning a site with drones or smartphones can acquire a large amount of survey data in a short time. For example, at one construction site, drone photogrammetry produced a 3D model of the entire site in about 30 minutes and enabled on-the-spot earthwork volume calculations. Data processing that used to take several hours after shooting was completed instantly, significantly shortening the time from surveying to as-built confirmation. Because the site can be measured as a surface, the speed is orders of magnitude faster than traditional methods that painstakingly measure points and lines.

• Mitigation of labor shortages and reduced labor: Photographic surveying makes it possible for a single person to perform wide-area measurement and management, compensating for the lack of experienced surveyors. Automated 3D measurement reduces worker burden and eliminates the need to carry heavy equipment for long surveys. This improves the 3K (difficult, dirty, dangerous) working conditions and helps realize smart construction that appeals to younger generations. It also frees limited experienced technicians from routine tasks so they can focus on higher-value work such as data analysis and planning.

• Strengthened linkage with BIM/CIM: Point clouds obtained via photogrammetry are highly compatible with BIM/CIM digital models and strengthen data linkage between design and construction. For example, a major general contractor overlaid as-built point cloud data acquired by drone onto BIM design models and succeeded in detecting construction errors and dimensional deviations early during construction. This allowed corrections that used to be pointed out in post-completion inspections to be made in advance, greatly contributing to quality assurance and reducing rework. Furthermore, as-built 3D data can serve as CIM records and be used for future maintenance and renewal.

• Realization of remote management: Regularly captured point cloud data make it easy to grasp site conditions remotely. Visualizing construction progress on 3D models enables headquarters to check accomplishments and remote engineers to provide advice, realizing remote management. In one case, point clouds from drones and robots at a mountain tunnel site were shared with headquarters via satellite communication for real-time construction management. Because data can be shared instantly on the cloud, the client and partner companies can proceed with the project while sharing the same up-to-date information. Reducing site visits cuts travel time and business trip costs. During recent infectious disease outbreaks, this approach also drew attention as a way to proceed with construction while minimizing on-site personnel.

• Improved safety: Photogrammetry can obtain data non-contact in dangerous areas where people cannot enter. Steep slopes and areas at risk of collapse can be safely photographed from above by drone, and later the point cloud data can be used to analyze shapes and displacements. After disasters, drone aerial photography can quickly record conditions, minimizing hazardous on-site investigations. High-place measurements and as-built checks around heavy machinery can also be done remotely, reducing the risk of worker falls or contact accidents and offering major benefits for safety management.


Thus, the effects of photogrammetry implementation are diverse and can simultaneously raise on-site productivity and safety, making it a trump card for construction DX. Still, many feel anxious about how to start or whether expensive equipment is necessary. This is where easy, high-accuracy surveying methods using smartphones deserve attention.


Construction DX anyone can start with simple surveying using LRTK

LRTK is a pocket-sized RTK-GNSS receiver that attaches to a smartphone. Just connect it to your phone via Bluetooth and your everyday iPhone or Android device instantly becomes a surveying instrument with centimeter-class accuracy (cm level accuracy (half-inch accuracy)). Ordinary smartphone GPS positioning has errors of about 5-10 m (16.4-32.8 ft), but with RTK corrections this can be reduced to about 2-3 cm (0.8-1.2 in). There is no need to install specialized base stations or perform difficult settings; open the dedicated app and with a single tap you can achieve high-accuracy positioning. For example, when you take photographs of a structure with a smartphone equipped with LRTK, the photo file is immediately tagged with cm-level latitude, longitude, elevation (cm level accuracy (half-inch accuracy)), and shooting direction, and the site’s 3D record is automatically stored in the cloud. Tasks that previously required manual positioning, such as crack surveys and organizing as-built photos, are greatly streamlined because accurate location information is recorded at the time of shooting with LRTK.


With such smartphone RTK devices, anyone can start high-accuracy surveying with intuitive operation. There is no need to carry heavy tripods or surveying instruments, and the revolutionary ease of having machine operators or site supervisors “take a smartphone out of their pocket and measure immediately” is noteworthy. In addition, they offer functions ranging from point cloud measurement and layout (setting out) to AR (augmented reality) features that overlay design data on site, making them an all-purpose surveying tool for the field. They are also far cheaper than traditional surveying instruments, and the era of “one device per person” is not a dream. By introducing tools like LRTK, on-site staff can measure required points themselves and share data instantly even without dedicated surveying technicians on site. Coordinates and point cloud data obtained on site can be shared in real time with the office and clients via the cloud, enabling collaboration that transcends the boundary between field and office.


To maximize the benefits of photogrammetry, it is important to combine it with easy-to-use, high-accuracy positioning technologies like this. By utilizing LRTK, small construction sites and local government projects can start three-dimensional surveying and measurement at low cost. Solutions that combine photographic surveying and smartphone RTK are the key to making on-site DX accessible to everyone. Why not embrace cutting-edge technologies and realize construction DX at your site with photogrammetry?


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.