How the Arrival of LRTK Transforms Piling Guidance This Much! The Amazing Effects of a Field Surveying Revolution
By LRTK Team (Lefixea Inc.)
Table of Contents
• What is piling guidance?
• Traditional piling guidance and its challenges
• The field surveying revolution brought by RTK technology
• The emergence of LRTK and its innovative features
• The astonishing effects of introducing LRTK to piling guidance
• How the field changes! LRTK use cases
• Simple surveying anyone can do with LRTK
• FAQ
What is piling guidance?
"Piling guidance" is the guidance process used in civil engineering and construction to smoothly carry out the work of driving piles at the precise locations specified in the design drawings. In construction of roads, bridges and other structures, piles must be installed at predetermined coordinates such as foundation locations and structure endpoints. Pile-driving is a critical process that determines the overall accuracy of a structure; even a displacement of a few centimeters can lead to global distortion or construction mistakes, so extremely high accuracy is required.
Typically, piling guidance has relied on surveyors and site staff performing on-site surveys, marking the locations where piles should be driven, and guiding machine operators. For example, surveyors determine positions based on coordinates on the drawings using tape measures or total stations (optical surveying instruments) and mark the ground with stakes or paint. Machine operators then rely on those markers to drive piles, but this traditional method has several challenges.
Traditional piling guidance and its challenges
Because traditional piling guidance often relied on visual checks and manual surveying, it inevitably required significant time and labor. Accurate positioning required meticulous work by survey teams, typically performed by a two-person team measuring and marking pile locations. On large sites or where there are many points, the risk of errors in point setting or marking increases, and any mistakes can lead to rework from scratch. In addition, on complex terrain or in environments with poor visibility, guidance by visual observation from a distance is limited, making it difficult to guide machinery to the exact position. Furthermore, installing temporary structures to indicate pile positions (such as batter boards) or transferring survey results onto the site was inefficient, requiring personnel and time.
In short, traditional methods made it difficult to achieve both accuracy and efficiency, and a large part of the work depended on the experience and intuition of skilled surveyors. Against this background, there has long been strong demand on sites for a method to guide pile locations that is both more accurate and more efficient.
The field surveying revolution brought by RTK technology
In recent years, RTK technology has emerged as a dramatic solution to this problem, representing a revolution in field surveying. RTK stands for "Real Time Kinematic" and is a type of high-precision positioning technology using GNSS (satellite positioning). By receiving satellite signals simultaneously with two GNSS receivers—a base station and a rover—and correcting the positional errors between them in real time, RTK can reduce positioning errors that were several meters with standalone GPS to on the order of several centimeters. Using RTK, you can obtain coordinates almost exactly matching the design drawings on the spot, dramatically smoothing the process from surveying to construction.
This high-precision positioning by RTK truly constitutes a field surveying revolution. Applied to piling guidance, RTK allows pile positions to be determined with centimeter-level errors. Machine operators and workers equipped with GNSS-enabled devices can confirm their current position in real time while driving piles, enabling construction that does not deviate from the target point. Traditionally, operators relied on stakes and marks set by the survey team, but with RTK guidance the device screen displays the direction and distance to the target, allowing intuitive and precise positioning. As a result, rework is greatly reduced and consistently high-quality work is maintained. Accurate piling also prevents deviations in subsequent trades, contributing to overall quality assurance. RTK technology has fundamentally changed piling guidance, and with support from initiatives such as the Ministry of Land, Infrastructure, Transport and Tourism’s promotion of "i-Construction (ICT construction)," it is becoming an indispensable foundational technology on many sites.
The emergence of LRTK and its innovative features
Among the RTK systems gaining attention is LRTK, a high-precision positioning system developed by Reflexia. LRTK was created by a startup originating from the Tokyo Institute of Technology and offers innovative features that set it apart from conventional RTK equipment. Its greatest feature is the ability to achieve RTK positioning and AR guidance using a handheld smartphone.
Conventional high-precision positioning equipment required dedicated terminals or bulky devices, but LRTK delivers the convenience of "just one smartphone." By attaching the dedicated compact GNSS receiver "LRTK Phone" to an iPhone or iPad, the smartphone itself becomes a centimeter-class positioning terminal. This enables a wide range of tasks—surveying, pile position setting, point-cloud measurement, photo documentation, and AR display—to be handled by a pocket-sized device. The receiver is lightweight and compact at about 125 g and includes a built-in battery, so walking around the site for surveying is not burdensome. Moreover, the system price is very affordable compared to traditional specialized equipment, enabling a new style in which each site worker can carry a device. This is a major step toward distributing the benefits of RTK positioning across the entire site.
Another innovative point is the visual piling guidance using AR (augmented reality). The smartphone overlays design points and directional arrows on the camera feed to intuitively navigate users to the "next pile location." For example, LRTK’s "Coordinate Navi" feature guides workers to a target coordinate specified in the cloud with centimeter accuracy. On site, workers simply walk in the direction indicated by arrows on the phone screen, so even beginners can reach the target without getting lost. Particularly noteworthy is that the device guides fine position adjustments when approaching the target, helping users align positions so that only a few centimeters of error remain. Final adjustments of pile positions, which used to rely on veteran intuition and experience, can now be performed accurately with LRTK’s digital assistance.
LRTK also offers the capability to place virtual piles (AR piles) on site as an application of AR functionality. This allows a virtual pile to be displayed on the screen in locations where an actual pile cannot be driven (for example, areas covered by concrete or hazardous locations). Even in remote areas or on steep slopes where physical access is difficult, the system can acquire coordinates using photogrammetry and place a virtual pile via AR display. This is a groundbreaking function that enables guidance in situations where installing physical piles was previously difficult. By uploading 3D design data such as BIM/CIM to the LRTK cloud, you can also overlay the planned structure’s 3D model on the actual terrain by matching it with point-cloud data collected on site. Thanks to continuous high-precision self-positioning with GNSS, AR-displayed models remain fixed in the correct location even as the user moves. This non-shifting, high-precision AR display is unique to LRTK and is useful for on-site inspections with stakeholders and sharing completion images.
LRTK also excels in data management. Points and photo data measured and recorded on site are immediately saved and shared to the cloud, eliminating the need for manual data entry back at the office. Because data can be synchronized across multiple devices, it is easy for large teams on large sites to share the latest piling information while they work. As described above, LRTK is a next-generation piling guidance system that combines "ease of use, high accuracy, visual clarity, and cloud integration."
The astonishing effects of introducing LRTK to piling guidance
So what concrete effects can be expected by introducing these latest technologies? The main benefits that RTK-based piling guidance systems, including LRTK, bring to the field can be summarized as follows.
• Dramatic improvement in construction accuracy: GNSS-RTK vastly improves positioning accuracy. With LRTK, horizontal positioning errors are about 2-3 cm (0.8-1.2 in), and vertical errors about 3-4 cm (1.2-1.6 in), enabling real-time positioning using high-precision reference station networks. This allows piles to be driven exactly where the design specifies, directly improving the overall quality of structures and reducing rework. Even inexperienced workers can achieve professional-level piling accuracy by following device guidance, reducing variability in as-built results.
• Substantial reduction in work time: High-precision guidance greatly reduces the need for meticulous pre-marking and surveying. For example, one comparison reported that using a piling system with GNSS and AR reduced surveying time to about one-sixth compared with traditional optical surveying methods. Immediate positioning with RTK accelerates point setting, increasing the number of pile locations that can be processed in a day. This shortens overall schedules and significantly boosts on-site productivity.
• Labor reduction and cost savings: With RTK piling guidance, surveying and guidance of pile positions that previously required two or more people can often be completed by one person. Reducing required personnel cuts labor costs and fees for outsourced surveying services. Fewer mistakes also mean less wasted material and machine operating time. Overall, you can expect a twofold benefit of improving quality while lowering costs. Fewer workers required for guidance around machinery also contributes to improved safety.
• Intuitive operation anyone can use: Modern systems are user-friendly and can be handled with short training even by non-specialist staff. LRTK’s smartphone app features a refined UI that makes it easy for anyone on site to adopt. The simple operation—following arrows and distance information on the screen—means high-precision work can be achieved without relying on veteran skills, helping address labor shortages and easing worries about skill transfer.
• Data utilization and immediate sharing: A major advantage of digital surveying is the ability to record and share measurement data and piling results electronically on the spot. With cloud-enabled systems like LRTK, survey results and coordinates of installed piles can be shared in real time with the office and other teams. This smooths progress management and quality checks, streamlines report creation, and reduces communication losses. It helps close the information gap between site and office and accelerates the construction PDCA cycle.
How the field changes! LRTK use cases
What actual changes occur on sites that adopt RTK piling guidance? Here are several use cases.
• Eliminating batter boards in road construction: In new road construction, RTK guidance has been used for pile-driving tasks along route centerlines and property boundaries. Traditionally, temporary batter boards were installed to establish reference lines, but high-precision GNSS guidance allowed operators to perform cutting and filling to the specified elevation and position without installing batter boards. This greatly simplified preparation work, improving both efficiency and accuracy.
• Precise pile positioning for bridge construction: On long-span bridge sites, RTK piling guidance has been introduced to position pile foundations supporting piers and abutments. Instead of surveying and marking widely dispersed pile locations in advance, operators were guided directly to each pile location by GNSS-enabled terminals. As a result, accurate pile installation was achieved even in mountainous areas with poor sightlines, improving the accuracy of pier placement. Work that had been affected by weather and terrain became stable through digital guidance.
• Use in buried infrastructure work: RTK guidance is also proving effective in sewer, water, and conduit installation. When stakes or marks must be set at regular intervals along long runs according to design drawings, GNSS guidance enables workers to quickly and accurately find the next point. In some cases, workers use an AR piling function that overlays the camera view on their smartphones with the direction to the next excavation point, enabling intuitive location identification. Simply following on-screen guidance allows accurate placement of start and end points and bends for buried conduits, greatly reducing trenching mistakes. From general civil engineering to large-scale infrastructure, LRTK-based piling guidance is boosting site productivity and quality.
As these examples show, the adoption of RTK piling guidance technologies such as LRTK has transformed site work. Sites where machine operators can perform accurate work simply by following a tablet or smartphone display are becoming common, not just special advanced projects. Major contractors and surveying firms are rapidly adopting these technologies, accelerating digitalization and DX across the construction industry. In Japan, full operation of the quasi-zenith satellite system "Michibiki" (QZSS) and other improvements to high-precision GNSS infrastructure are also supportive factors, and smart piling guidance will likely spread to many more sites.
Simple surveying anyone can do with LRTK
LRTK, which enables high-precision piling guidance, is not limited to pile-driving applications. As a portable and easy-to-carry smartphone positioning system, it is also highly useful as an everyday simple surveying tool on site. For example, walking the site to measure coordinates of key points before setting heavy machinery makes subsequent work smoother. Because LRTK positioning errors are only on the order of a few centimeters, you can quickly confirm or set reference points and benchmarks at arbitrary locations. Minor surveying tasks that used to require calling in a specialist survey team can now be handled quickly by site staff with LRTK.
Additionally, LRTK’s cloud connectivity makes it easy to immediately share surveyed data on site and reflect it in design drawings. This mobility is advantageous for small sites or urgent measurements, eliminating waiting time and smoothing workflows. In short, LRTK supports the site as a simple surveying tool that lets you "measure whenever you want" even outside specialized piling scenarios. There is no need to rent expensive surveying equipment or halt craftsmen—the speed and flexibility of on-site response are major strengths.
Modern RTK systems have lowered the barrier to entry, and by using network-based reference station services (such as VRS leveraging national reference stations), you can operate without installing a dedicated base station. The necessary equipment is a compact GNSS receiver and a smartphone or tablet. After loading design coordinates into the app in the initial setup, you simply follow the on-screen instructions to be guided to points, so there is no difficult operation. With minimal training, site staff can handle these tools, enabling quick in-house handling of simple surveying tasks. Simple surveying with LRTK is a reliable ally that directly contributes to site efficiency and labor savings.
FAQ
Q: How accurate is positioning when using RTK or LRTK? A: RTK positioning typically reduces errors that were several meters with GPS to several centimeters. With LRTK, horizontal accuracy of about 2-3 cm (0.8-1.2 in) and vertical accuracy of about 3-4 cm (1.2-1.6 in) is achievable under good satellite reception conditions. This level of accuracy is sufficient for pile driving and reference point surveying, enabling construction management at a dramatically higher precision than traditional methods.
Q: Do I need specialist knowledge or special qualifications to operate LRTK? A: No. LRTK is designed to be user-friendly, and no special qualifications are required if you have basic surveying knowledge. The smartphone app is intuitive, and with a few hours to a few days of training, site staff can master it. Complex calculations are handled automatically by the system, so users simply follow on-screen guidance to move or set piles and obtain high-precision results.
Q: Can LRTK be used without a base station on site? A: Yes. LRTK supports network RTK. By receiving correction information (such as VRS services) distributed from national reference station networks over the internet, centimeter-level positioning is possible without installing your own base station. Therefore, in environments with mobile or internet connectivity, positioning can be completed with only a receiver and a smartphone. If network connectivity is difficult, there is also an option to deploy a portable base station.
Q: Can LRTK be used for purposes other than pile-driving? A: Absolutely. LRTK can be applied to any situation requiring precise position measurement. Examples include as-built management of earthworks by heavy machinery, cut-and-fill volume measurement for site formation, collaboration with RTK-equipped UAVs for aerial surveying, and subsidence monitoring for road maintenance. LRTK is a versatile tool for supporting all kinds of on-site "measurement" tasks.
Q: Does RTK piling guidance work effectively at night or in bad weather? A: Yes. RTK-GNSS maintains accuracy as long as satellite signals can be received, even in darkness. Night work can use the same on-screen guidance to locate pile positions, so accurate construction is possible even where lighting is limited. In foggy or rainy conditions with poor visibility, RTK guidance tends to be more stable than traditional visually based methods. However, extreme weather such as heavy rain or lightning can affect satellite reception, so situational judgment and safety considerations are necessary.
With the arrival of the advanced LRTK technology, piling guidance on site is undergoing a major transformation. In construction sites pursuing high accuracy and efficiency, the effects of the RTK-driven field surveying revolution are immense. Make use of LRTK, which is likely to become the standard for piling guidance, and experience its remarkable benefits on your site.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.