Turn Your Smartphone into a Surveying Instrument! Easy, High-Precision Surveying with LRTK—No Expertise Required
By LRTK Team (Lefixea Inc.)
Table of Contents
• What is a correction information service?
• Features of the satellite-based correction information service (CLAS)
• Features of network-based RTK services
• Is a position correction information distribution service necessary?
• The emergence and advantages of smartphone-integrated GNSS receivers
• Summary
• FAQ
What is a correction information service?
To achieve position accuracy of a few centimeters (cm-level accuracy (half-inch accuracy)) for surveying, drones, autonomous driving, and similar applications, error corrections using data called 'correction information' are indispensable. A standard smartphone's built-in GPS (GNSS) alone can have position errors of about 5–10 m (16.4–32.8 ft) due to slight disturbances or delays in satellite signals. This may show approximate locations on a map, but it cannot be used for precise tasks such as surveying or construction management. This is where position correction information distribution services come in. They observe error information at reference points (locations with known accurate coordinates), deliver that information in real time, and correct those errors on a receiver in motion (smartphone, etc.), thereby dramatically improving positioning accuracy.
For example, with classical RTK (Real Time Kinematic) positioning, you set up your own base station and send correction data from it to the rover, reducing errors that were several meters (several ft) when operating alone to several centimeters (several in). By using such correction-information services, anyone can benefit from high-precision positioning.
In recent years, with the nationwide establishment of the Geospatial Information Authority of Japan’s Continuously Operating Reference Station network and private reference station networks, an environment has been created in which users can obtain correction information without having to provide their own base (fixed) stations. There are two main methods of distributing correction information. One uses satellite communications, and the other uses Internet communications. A representative example of the former is Japan’s Quasi-Zenith Satellite System "Michibiki" satellite-based correction information service (CLAS), and the latter is network-based RTK services delivered via various networks. Let’s take a closer look at the characteristics of each.
Features of the Satellite-based Correction Information Service (CLAS)
In Japan, there is a centimeter-level (inch-level) positioning augmentation service (CLAS) that uses the Quasi-Zenith Satellite System "Michibiki." CLAS creates an error model applicable over a wide area based on data from electronic reference stations installed throughout Japan, and that model is transmitted directly from the Michibiki satellites to users' GNSS receivers. Provided the appropriate high-precision GNSS receiver is available, this revolutionary system can correct positioning errors to within a few centimeters (a few inches) simply by receiving satellite signals overhead. Positioning errors of several meters (several ft) that were unavoidable with standalone GPS can be reduced to just a few centimeters (a few inches) with CLAS-compatible equipment. A major advantage is that, without relying on communications infrastructure, anywhere in Japan you can achieve centimeter-level accuracy (half-inch accuracy) from satellite signals alone.
Users do not need to install base stations. Correction signals are transmitted from the Quasi‑Zenith Satellite “Michibiki” via L6‑band radio waves, and as an open service provided by the government no additional communication or usage fees are required and it can be used free (only the preparation of a compatible receiver is necessary). Even in mountainous areas and remote islands beyond mobile phone coverage, high‑precision positioning can be performed as long as the satellite is visible, making it useful as a means of positioning at sites with limited infrastructure and during disasters. In fact, there have been reports of cases where, at disaster sites where communication networks were severed, damage was precisely recorded using smartphones fitted with CLAS‑compatible devices.
One point to note about CLAS is that it can take about 30 seconds to 1 minute from the first error correction for accuracy to stabilize. Immediately after positioning begins the error can still be fairly large (on the order of tens of centimeters (several inches)), but if you wait a little it converges to an accuracy of a few centimeters (a few inches). By contrast, conventional RTK can achieve high accuracy almost immediately through relative positioning with a base station, so RTK has the edge in real-time responsiveness. CLAS's accuracy itself is said to be about 5 cm (2.0 in) in horizontal position error and about 10 cm (3.9 in) in vertical, which is slightly inferior to the ideal accuracy achievable by networked RTK (2–3 cm (0.8–1.2 in) horizontally, a few centimeters (a few inches) vertically), but is practically almost indistinguishable. Above all, the major advantage is that it is free and available anywhere in Japan, and with some ingenuity it can be used adequately for surveying and similar tasks. However, note that the service coverage is limited to within Japan (due to the satellite service area).
Features of Network RTK Services
A method that distributes correction information via an Internet connection rather than satellites is known as a network RTK service. Observation data from multiple GNSS reference stations installed in various locations (electronic reference points and privately operated fixed stations) are integrated and analyzed in the cloud, providing real-time error correction information to users (rovers). The user's receiver (rover) connects to the Internet via a smartphone or a dedicated terminal and receives correction data by accessing a correction-data distribution server with which the user has previously contracted. In the past, users had to set up their own base stations on site and could only perform RTK positioning within a range of several kilometers, but with network RTK, anywhere within the service area can achieve centimeter-level positioning (half-inch accuracy) without your own base station. There is also the advantage that a nationwide network of reference stations suppresses accuracy degradation over long distances, allowing surveying and construction work efficiency to be dramatically improved by eliminating the effort of installing base stations.
In Japan, major telecommunications companies and surveying equipment manufacturers provide commercial network RTK services, and within the covered areas these can be widely used from Hokkaido to Okinawa. For example, a mobile carrier may install numerous GNSS reference stations on its communication towers and other sites to build a correction-information network and deliver cm level accuracy (half-inch accuracy) information to users. By leveraging these services, not only large construction firms but also small and medium-sized enterprises and local governments are increasingly able to introduce high-precision positioning on site without having specialized survey teams or expensive equipment.
To use a network RTK service, a contract with the service provider is required. In many cases a monthly fee is charged (depending on the plan and region, it is common to be on the order of several ten-thousands of yen per month), and after contracting you set the ID and password issued to you in your positioning app or GNSS receiver to connect to the correction data server. As a caution, real-time reception of correction data is not possible unless you are in an area where your smartphone’s data connection is available. A disadvantage is that you cannot receive the service in places where mobile signals do not reach, such as deep mountains or at sea, but conversely, if a communications environment can be secured, high-accuracy positioning over wide areas is possible. Regarding accuracy, network RTK can achieve positioning with errors of several centimeters (several cm, about 1-2 in) almost instantly. There is also quality control of correction data and technical support provided, and as a paid service it is currently being introduced at many sites.
Are position correction information delivery services necessary?
So far, we have explained the two types of correction information delivery services for achieving high-precision positioning (satellite-based CLAS and network-based RTK). So, when actually performing centimeter-level positioning, are these position correction information delivery services really necessary?
In conclusion, if cm level accuracy (half-inch accuracy) is required, it is indispensable to use some form of correction information. However, how you obtain it can be chosen based on the application and the environment.
If you want to perform high-precision positioning within Japan, you can achieve it at no additional cost by using free-to-use CLAS. As long as you have a compatible receiver, you can receive correction data directly from the satellites without any special registration procedures, so there is no monthly usage fee.
On the other hand, if you prioritize more stable accuracy, faster initial convergence, and a solid support structure, there are advantages to contracting with a commercial network RTK service. Although a monthly fee applies, you can obtain near‑instant centimeter-level accuracy and receive professional support and data quality management, providing peace of mind for important projects.
In summary, it can be said that "correction information is necessary for high-precision positioning. However, paid services are not necessarily indispensable."
Depending on your budget and site conditions, it is advisable to consider whether to make the most of free CLAS available or to subscribe to a paid service that offers greater stability and support. You can also install and operate your own base station, but this requires advanced expertise and management costs, so nowadays it is more realistic to utilize external services like those mentioned above.
In any case, since positioning accuracy clearly differs greatly depending on the presence or absence of correction information, using some form of correction information is key in situations that require centimeter-level accuracy.
The Arrival of Smartphone-Integrated GNSS Receivers and Their Advantages
The barriers to adopting high-precision GNSS surveying have fallen dramatically in recent years. Previously, achieving centimeter-level positioning required an initial investment amounting to several million yen to assemble many pieces of equipment—such as large antennas and dedicated terminals—and specialized skills were required to operate them. This meant that only some large companies could adopt the technology, and high-precision techniques were not able to be fully utilized in the field.
However, compact GNSS receivers that can be paired with smartphones have appeared, making it easy for anyone to use high-precision positioning. By attaching a pocket-sized device that integrates an antenna, a high-precision GNSS chip, and a battery to a smartphone and simply connecting via Bluetooth, the smartphone instantly becomes a centimeter-level (half-inch) positioning system.
For example, by attaching a receiver weighing around 100 g to a smartphone and simply pressing the "Start Positioning" button in the dedicated app, the smartphone GPS error, which is normally 5-10 m (16.4-32.8 ft), instantly shrinks to a few centimeters (a few in). No complicated equipment operation or specialized knowledge of positioning is required at all, and the smartphone literally becomes a high-precision surveying instrument.
The biggest advantage of using a smartphone-integrated RTK-GNSS receiver is that the barrier to initial adoption is dramatically lowered. Because you only add a small device to the smartphone you already own, you can get started at a dramatically lower cost than procuring dedicated equipment from scratch. Many smartphone-linked solutions also provide positioning apps and cloud services; basic use of the apps is free, and you can opt to pay monthly only for cloud features as needed, allowing operational costs to be adjusted flexibly. The conventional belief that "high-precision positioning = high-cost investment" is being overturned, creating conditions that make it easier for small and medium-sized enterprises and local governments to adopt.
Furthermore, user-friendly operation that anyone can use is also a major attraction. Recent smartphone GNSS apps feature intuitive, easy-to-understand interfaces, and actions such as starting/stopping positioning and connecting to correction services can be done with a single tap. For example, in LRTK systems, you simply attach the device to your smartphone and press "Start Positioning" in the app, and it will automatically obtain the optimal correction information and perform positioning. Because they can be operated without complex settings or GNSS knowledge, field personnel can directly incorporate high-precision positioning into their workflows. Tasks that used to have to be left to experienced specialists are increasingly becoming something anyone can handle as long as they can operate a smartphone.
The use of such smartphone + GNSS devices directly contributes to improving the efficiency of on-site work. For example, the following benefits can be expected.
• Labor and manpower savings: With smartphone RTK, surveying tasks and the installation of batter boards that were traditionally performed by two-person teams can be carried out accurately by a single person. Positioning of heavy machinery and as-built control can also be done by a single operator, making it a valuable asset at sites with labor shortages.
• Advanced data recording: You can easily take geotagged photos with high-precision positional information and acquire point cloud data on site using a smartphone LiDAR scanner. Because high-accuracy positional digital records can be created on the spot, they can be used for later report preparation and infrastructure maintenance and management.
• Real-time information sharing: By linking a smartphone RTK app with the cloud, positioning data and photos obtained on site can be uploaded to the cloud immediately. The office can monitor site conditions in real time, helping prevent rework and enabling rapid decision-making.
• Improved reliability in emergencies: Even at disaster sites immediately after communication infrastructure has been disrupted, a CLAS-compatible smartphone RTK can continue high-precision positioning as long as satellites are visible. It proves to be a powerful means of recording accurate location data even in emergencies.
Summary
The position correction information services that support high-precision positioning come in two forms: CLAS via satellite and network RTK via the Internet. Each has its own characteristics and strengths, and by using them appropriately, an era has arrived in which centimeter-level positioning information can be obtained "anytime, anywhere".
In particular, the recent arrival of compact GNSS receivers integrated with smartphones (e.g., LRTK) has made it easy to utilize these correction data without specialized knowledge. Smartphone apps that can switch between network RTK mode and Michibiki CLAS mode with the push of a button have also been implemented, enabling high-precision positioning using the optimal method for the conditions on site. The era in which "the smartphone becomes a surveying instrument" is truly becoming a reality.
By making centimeter-level positioning (cm level accuracy (half-inch accuracy)) accessible to everyone, detailed surveying and measurement tasks that were previously abandoned because of the effort and cost can be performed routinely. High-precision position information enables increased productivity at construction sites, advanced infrastructure inspections, and automation in agriculture and logistics, creating new value across a wide range of fields.
If you feel that "high-precision positioning seems difficult" or "it's impossible without specialized technicians," please experience the latest surveying solution using a smartphone and LRTK for yourself.
You'll surely be surprised at how astonishingly easy and highly accurate it is to measure position, even without any special knowledge.
Your smartphone becomes a surveying instrument Now, why not harness its power at your site?
FAQ
Q: What is a correction information service? A: It is a service that provides error information of satellite signals to improve the positioning accuracy of GNSS (such as GPS). Based on error data measured at reference stations, it sends correction information to users' receivers to correct position errors in real time. This can reduce positioning errors that are typically several meters (several ft) down to the order of a few centimeters (a few in).
Q: What is the difference in accuracy between a smartphone's built-in GPS and when using a correction information service? A: If you rely only on a smartphone's built-in GPS, typical positional accuracy is about 5-10 m (16.4-32.8 ft). In areas surrounded by buildings it can deviate more than that. If you use a correction information service together with a receiver that supports high precision, GNSS positioning errors are corrected and you can obtain highly accurate positions with errors of several centimeters (a few inches). Put simply, a typical smartphone GPS shows your "rough current location," whereas using a correction information service lets you know a "survey-level accurate position."
Q: Is a communication line required to use CLAS? A: No. CLAS receives correction information directly from the Michibiki satellites, so it can be used without connecting to a mobile phone or the Internet. In extreme cases, even in remote mountains or offshore—areas outside communication coverage—you can receive CLAS signals and achieve centimeter-level positioning as long as the sky is visible. However, a CLAS-compatible high-precision GNSS receiver must be in an environment where it can pick up radio signals from the satellites. Note that it cannot be used in places where satellite signals do not reach, such as indoors or inside tunnels.
Q: Can high-precision CLAS positioning be achieved using only a smartphone? A: At present, a smartphone alone cannot directly receive CLAS radio signals (L6 band). Built-in GNSS chips in smartphones mainly receive basic signals and do not support Michibiki's CLAS signal. To use CLAS, you need to connect a compatible high-precision GNSS receiver to the smartphone. Recently, small receivers that can be attached to smartphones have become commercially available, and using those makes centimeter-level positioning with CLAS possible on a smartphone. In the future, smartphones themselves may include CLAS-compatible chips.
Q: How accurate is it when using correction information? A: Under good conditions, you can expect accuracy of about 2–3 cm (0.8–1.2 in) horizontally and 5–10 cm (2.0–3.9 in) vertically. When using network RTK services, this level of accuracy is obtained almost immediately upon the start of positioning. In the case of CLAS, the final accuracy level is equivalent, but immediately after positioning starts the errors begin at the order of tens of centimeters (several inches to a few feet) and tend to converge to a few centimeters (about 1 in) within one minute. In any case, positioning is orders of magnitude more precise than conventional standalone positioning (errors of 5 m or more (16.4 ft or more)).
Q: Can high-precision positioning be done anywhere in Japan? A: If you can receive satellite signals outdoors, it is possible in almost any location across Japan. CLAS is designed to cover the entire country, and even on remote islands and in mountainous areas you can obtain correction information from the Michibiki satellites overhead. Network-type RTK services are also deployed nationwide where mobile communications are available. However, both methods cannot be used in places where satellites are not visible, such as underground or indoors. Also, CLAS cannot be used overseas (because it is outside the service area), so please consider it a Japan-only service.
Q: How much does it cost to use? A: The cost of using correction information varies depending on the method. With CLAS, receiving signals from satellites is free. If any cost is incurred, it would be the purchase price of a compatible receiver; compact GNSS devices can be obtained from around ¥100,000. On the other hand, if you use a network RTK service, you need to enter into a contract with the service provider, and it is common to incur a monthly fee of tens of thousands of yen. Depending on your application and budget, you can either take advantage of CLAS, which can be used with zero additional cost, or subscribe to a paid service that offers greater stability and support.
Q: Can it be used without specialized knowledge? A: Yes, it can. Recent smartphone-connected GNSS systems are designed to be used without specialized knowledge. The dedicated app provides a simple, easy-to-understand interface, and with a single button you can complete everything from connecting to the correction service to positioning. For example, with LRTK, attach the device to your smartphone and press "Start Positioning" in the app, and it will automatically obtain correction information and begin high-precision positioning. Troublesome settings or GNSS knowledge are not required. As long as you remember the basic operations, field personnel can start using it right away.
Q: In what situations can it be used? A: The range of applications is very wide. For example, surveying tasks (precise measurement of boundary points and as-built control), machine guidance and progress/quantity management in construction works, accurate recording of deterioration locations during infrastructure inspections, and position control for autonomous tractors in agriculture. Municipalities have begun using it for the maintenance management of roads and bridges, and it also proves powerful for mapping disaster damage. In short, smartphone-integrated high-precision positioning technology can be used in any situation where positional accuracy is required. Measurement tasks that previously required manpower and time will be streamlined, and new data utilization will become possible.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.