PVsyst Japanese Translation Guide: Improving Power Production Prediction Accuracy with 3D Scan Data
By LRTK Team (Lefixea Inc.)
Accurate pre-estimation of power generation using simulation is indispensable in the planning and design of photovoltaic (PV) systems. Improving prediction accuracy enhances the reliability of investment decisions and operation plans. This article outlines the basic overview of the world-standard PV simulation software PVsyst and how to make use of a Japanese translation (Japanese commentary). It then organizes the main factors that affect the accuracy of power generation simulations and considers the significance of the increasingly notable 3D scan (point cloud) data. In particular, it explains how to utilize the smartphone-accessible point cloud acquisition technology LRTK to reflect detailed on-site terrain and surrounding structures in simulations, and the benefits of doing so. Let’s go through the points that help improve the accuracy of power production forecasts one by one.
Basic Overview of PVsyst (Including Use of the Japanese Translation)
PVsyst is PV simulation software developed in Switzerland and used worldwide. Its features include detailed power generation calculations using meteorological data (e.g., Meteonorm, SolarGIS, domestic NEDO data, etc.), and the ability to simulate the effects of shadows cast by panel specifications, layout, and surrounding buildings and trees. This enables accurate prediction of annual energy production, loss factors, performance ratio (PR), and more. PVsyst is an industry-standard tool used from large-scale mega-solar projects to small residential systems. For large projects, financial institutions often require submission of PVsyst-based generation forecasts, making it a de facto industry standard. PVsyst also supports probabilistic evaluation metrics such as P50 and P90, and is used for long-term risk analysis (achievement probability evaluation).
However, PVsyst’s interface and reports are basically provided in English, which can make technical terms difficult for Japanese users to understand. In such cases, utilizing a Japanese translation or explanatory materials is effective. For example, a [Japanese explanation page](https://www.lefixea.com/japan/pvsyst-jp) that interprets PVsyst’s simulation result reports in Japanese is available, allowing users to check the meaning of each item in their native language. By using such Japanese support, users can fully utilize PVsyst despite the language barrier.
Factors Affecting the Accuracy of Power Generation Simulations
To make generation forecasts closer to reality, attention must be paid to various elements. The main points that affect the accuracy of simulation results are as follows:
• Selection and accuracy of meteorological data: The quality of meteorological data such as irradiance and temperature directly affects simulation results. Since assumed annual irradiance values differ by data source, it is important to compare multiple sources—Meteonorm, SolarGIS, NEDO, etc.—and select the one closest to measured values.
• PV module and system specifications: Settings such as the PV module’s conversion efficiency and temperature characteristics, inverter performance, and system DC/AC ratio also affect accuracy. Accurately input the actual equipment specifications and design conditions, and appropriately set parameters for degradation rates and temperature-related generation losses.
• Layout conditions and installation angles: Layout conditions such as panel tilt, azimuth, and row spacing influence results. In addition to setting optimal tilt and azimuth, design must prevent inter-row shading (self-shading) caused by racking layouts. The simulation reflects these conditions and calculates associated losses.
• Near-field shading (shadows from surrounding objects): Shadows from nearby buildings, trees, and other objects significantly affect generation. Especially in the morning/evening and during winter when the sun’s altitude is low, shadows from adjacent buildings, trees, or even other panel rows can extend and cause larger-than-expected losses. Accurately considering such near-field shading in simulations is important.
• Terrain and horizon shading (distant obstructions): Terrain and elevation differences around a plant should not be overlooked. On sloped sites, panel heights and azimuths can vary slightly by location. If there are mountains or hills nearby, sunlight can be blocked by terrain during early morning and late afternoon, reducing irradiance. Such distant horizon-level shading affects simulation accuracy and is considered using horizon profile data (horizon elevation angles by azimuth).
• Availability and maintenance: Downtime due to equipment failure or routine maintenance affects generation. PVsyst allows annual availability to be set as a percentage, enabling simulations to account for unplanned outages and maintenance downtime in advance. Setting availability reflective of actual operation improves prediction accuracy.
• Other loss factors: Transmission losses due to wiring resistance, conversion losses, losses from temperature rise and soiling, and surface reflectivity (albedo) settings must be correctly evaluated—especially for bifacial modules, where rear-side reflected light (albedo) contribution should be properly assessed. Accurate estimation of various operational loss parameters based on experience and design conditions is essential for reliable forecasts.
Significance of 3D Scan (Point Cloud) Data and Using LRTK
Among the above factors, accurately understanding the influence of the surrounding environment and terrain is extremely important for improving simulation accuracy. However, accurately modeling fine elevation differences and obstacles on an actual site requires detailed on-site data. Traditionally, there were cases where field shadow factors could not be fully captured and simple models that ignored some effects had to be used. Recently, using site-scanned 3D point cloud data has attracted attention.
A point cloud is three-dimensional data that captures surfaces of buildings and terrain as countless points and is acquired using LiDAR (laser scanning) or photogrammetry. Historically, obtaining such detailed information required on-site surveys by surveyors or drone photogrammetry, which involved time and cost. Nowadays, however, solutions that allow easy acquisition of point clouds using a smartphone have emerged. One such solution is LRTK (a measurement technique that combines smartphones with high-precision GNSS positioning (RTK, centimeter-level positioning (cm level accuracy (half-inch accuracy)))) . While drone photogrammetry is effective for surveying large sites, LRTK is superior in being able to perform agile measurements in smaller sites or urban areas.
With LRTK, you can collect three-dimensional data of the surroundings simply by walking around the site while pointing a smartphone camera, similar to recording a video. All captured point cloud points are georeferenced, and the site’s terrain and structural shapes are precisely recorded. For example, even a large site extending several hundred meters (several hundred ft) can be scanned in a short time, and the resulting point cloud allows detailed understanding of ground elevation differences and the height and positions of obstacles (trees, utility poles, etc.). Moreover, because the captured point cloud data include absolute coordinates, they can be easily overlaid onto design drawings or maps for review.
By incorporating such 3D point cloud data into simulations, the model can reflect actual site conditions with high accuracy. This enables consideration of the effects of small obstacles and gentle terrain undulations that were previously overlooked, greatly improving the reliability of power generation forecasts.
How to Reflect Terrain, Structures, and Installation Conditions in PVsyst
Once detailed on-site data are acquired, the next step is to reflect them in the simulation. By incorporating accurate site information into the model, simulation results can be brought closer to reality. PVsyst provides several functions to account for terrain and shading objects.
• Setting horizon data (shading from distant terrain): For solar shading by distant mountains or hills, you can input the horizon definition as obstruction angles of solar elevation (horizon elevation by azimuth). For example, if there is a mountain shadow of 5° toward the northwest, set that angle to reflect the effect of reduced irradiance in early morning and late afternoon.
• 3D modeling of near-field obstructions: For buildings, trees, and other objects within and around the plant site, PVsyst’s near shading simulation function allows registration as three-dimensional models. Using PVsyst’s 3D editor, you can place simple shapes representing buildings, walls, and trees, or import designed panel layout data to evaluate inter-row shading. This enables detailed reproduction of shading between racks and from surrounding structures.
• Importing terrain data: From PVsyst ver.8 onward, features are available to retrieve terrain elevation from satellite data. If more precise terrain information is required, externally created digital terrain models or 3D CAD models can be imported into PVsyst. For example, by converting a ground surface model generated from point cloud data into DAE format and importing it into PVsyst’s shading scene, site undulations can be faithfully represented.
• Detailed panel installation settings: You can reproduce on-site installation conditions by finely setting panel tilt, azimuth, ground clearance, and layout patterns (e.g., alignment along contours). For sloped sites, dividing the area into several sub-arrays and assigning different tilt/azimuth settings to each allows construction of an overall simulation that follows the terrain.
PVsyst can also animate shadow movement over time, making it possible to visually confirm which areas are shaded at which times.
By leveraging these functions, detailed terrain and structure information obtained with LRTK can be integrated into PVsyst models to accurately estimate shading losses. As a result, high-precision generation forecasts that reflect actual site conditions can be achieved.
Practical Scan Cases and Benefits of Introducing LRTK
Let’s look at examples of how using 3D point cloud data leads to improved accuracy in generation forecasts using LRTK. For example, when planning a mega-solar project on sloped terrain, panel tilt and inter-row distances may vary locally due to terrain undulations, resulting in greater-than-expected shading losses. Traditionally, designs were advanced based on drawings or limited survey data, but by scanning the entire site in advance with LRTK, elevation differences could be accurately understood. Consequently, PVsyst simulations could precisely predict winter evening shading, and optimizing rack placement beforehand avoided annual generation losses. In one case, revising the design based on scan data improved annual generation by about 3%. In sites where tall trees are scattered nearby, accurately capturing each tree’s height and position in the point cloud allows precise prediction of the shading extent on panels during foliage-rich summer months.
Detailed on-site data acquisition with LRTK brings significant benefits to plant design. Major introduction benefits are summarized below.
• Easy measurement and labor savings: High-precision surveying is possible with simple smartphone operation even without specialized surveying skills. LRTK can be handled by anyone after short training, significantly lowering the barrier to field surveys.
• Rapid data acquisition: Tasks that used to take several days to several weeks to obtain detailed data can be digitized immediately after scanning on-site with LRTK. Getting the necessary information early in planning shortens the design cycle.
• High-precision and comprehensive information: Point clouds consist of countless points and are far more detailed than traditional partial surveys. Subtle ground undulations and small obstacles are thoroughly recorded; because data include absolute coordinates, positional accuracy is very high and the data can be used in simulations with confidence.
• Contribution to design optimization: By correctly estimating shading effects based on precise site information, layouts can be planned without waste. For example, panel layouts can be adjusted as needed, or informed decisions can be made about tree removal, leading to improved actual generation and reduced unnecessary costs.
• Safety and data retention: Compared with manual surveying, LRTK scanning requires less entry into hazardous areas, allowing safe data collection. Acquired data are stored in the cloud, making it easy to keep records and review them later.
• Additional use value: Point cloud data can be used for purposes beyond generation simulation, such as earthwork volume calculations before site preparation and as-built management after construction. LRTK also provides cloud functions to measure distances, areas, and volumes, allowing various information to be extracted from a single scan.
Conclusion
Improving the accuracy of generation simulations requires not only software utilization but also precise acquisition and reflection of on-site data. Combining detailed simulations using PVsyst with technologies like [LRTK](https://lrtk.lefixea.com) that enable anyone to easily acquire on-site point cloud data has dramatically increased the reliability of forecasts. High-accuracy forecasts directly affect the profitability evaluation and investment decisions of generation projects, so their importance will only grow. High-precision simulations minimize divergence from actual generation results and reduce the risk of unmet plans during operation. 3D scan technology will become increasingly commonplace and will be used in more PV projects. Proactively and systematically adopting such tools will help advance planning and operation of PV projects based on high-accuracy generation forecasts.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.