When starting shading analysis in PVSyst, a common initial mistake is to jump straight into building a detailed 3D scene. In practice, however, the accuracy of shading analysis depends less on how much you manipulate the screen and more on whether you have first organized which shadows you will treat and by what method. Far-off mountains or buildings produce fundamentally different types of shading than nearby racks, fences, or trees, and shading losses can range from a simple irradiance shortfall to causes of electrical output reduction. PVSyst treats shading separately for the beam component, diffuse component, and reflected component, and near-field shading requires detailed 3D description; if you adopt the wrong conceptual approach at the outset, subsequent settings and result interpretation will drift. ([pvsyst.com][1])


What practitioners who want to perform shading analysis in PVSyst most need is not exhaustive theory but practical guidance: where to start, which settings affect results, and what kinds of oversights commonly occur. Therefore, this article distills five basics to grasp before starting shading analysis in PVSyst, organized in a form usable on site. More modeling does not always mean greater accuracy. In fact, those who can distinguish cases that only need a simple evaluation from those that require detailed refinement can achieve high-quality assessments in less time. After reading this article, you should be able to move from “just experimenting with PVSyst shading” to “setting things with intent.”


Contents

• Prerequisites to understand first for shading analysis in PVSyst

• Basic 1: Distinguish near-field shading from far-field shading

• Basic 2: Decide what to evaluate simply and what to reproduce in 3D

• Basic 3: Understand the difference between linear losses and electrical losses

• Basic 4: Ensure consistency between the 3D scene and system conditions

• Basic 5: Read results by time of day and season, not only annual values

• Common mistakes when starting shading analysis in PVSyst

• Summary


Prerequisites to understand first for shading analysis in PVSyst

PVSyst’s shading analysis is not merely a function to check whether shadows exist or not. It is a mechanism to evaluate the reduction in irradiance received by the PV surface and the resulting output reduction, based on the position, time, and extent of shading. Therefore, the first point to understand is that PVSyst’s shading analysis aims to reproduce losses, not just visual appearance. Even if you create a 3D model that looks plausible on screen, if azimuth, tilt, row spacing, racking height, or the relative positions of surrounding obstacles differ from reality, results will easily diverge.


Shading analysis is not a standalone setting; it makes sense only in conjunction with layout conditions, azimuth settings, system configuration, and, where necessary, electrical connection conditions. PVSyst official documentation also notes that near-field shading is one of the most difficult areas in the software, and that the per-time calculations apply different approaches to beam, diffuse, and reflected components. In other words, it is not a matter of placing obstacles and pressing the calculate button. Deciding “what you want to know” at the outset is actually most important. ([pvsyst.com][1])


In practice, the required shading analysis accuracy varies depending on whether you are at an initial scoping stage or approaching detailed design. For initial studies, being able to quickly compare the reasonableness of row spacing and tilt may be sufficient. Conversely, if you will use the analysis for formal energy yield evaluation or final layout decisions, you need to verify surrounding obstacles, row-end shading effects, and electrical impacts in detail. Defining the study stage in advance prevents wasting time building an overly detailed model or oversimplifying and missing important losses.


Basic 1 Distinguish near-field shading from far-field shading

The most important thing to do before starting shading analysis in PVSyst is to distinguish near-field shading from far-field shading. Official documentation treats far-field shading as represented by the horizon profile: objects that are sufficiently distant and that at certain times either block the sun for the entire PV surface or do not are handled as an aggregate shading effect. As a rule of thumb, objects causing shading that are roughly ten times or more the size of the PV surface away should be considered far-field shading. In contrast, near-field shading is caused by nearby objects that cast visible shadows on parts of the PV surface; they are treated based on a shading factor showing the fraction shaded and require detailed 3D description. ([pvsyst.com][1])


Practically speaking, mountain ridgelines and distant buildings are far-field shading, while fences, utility poles, nearby buildings, trees, and adjacent-row racking shadows are near-field shading. Misclassifying these can lead to treating a nearby obstacle as horizon shading and overlooking the electrical effects of partial shading. Conversely, trying to model distant ridgelines in detailed 3D increases workload without materially improving accuracy.


If you are unsure how to classify a shadow, consider whether it affects the whole PV surface uniformly at a given moment or whether it crosses only part of the surface. If it is the former, treat it as far-field shading; if the latter, as near-field shading. Also, if the shading pattern can differ by row or by module, it should be treated as near-field shading. To improve accuracy in PVSyst shading analysis, start by correctly classifying the type of shading rather than focusing immediately on software operations.


Basic 2 Decide what to evaluate simply and what to reproduce in 3D

Next, it is important to decide in advance what you will evaluate using a simple method and what you will reproduce in 3D. PVSyst offers both a simplified model equivalent to an “infinite-length row” on the azimuth setting side to handle inter-row mutual shading in regularly spaced arrays, and an explicit method of creating rows in the near-field 3D scene. The former is a two-dimensional approximation assuming regular row layouts, and is fast to compute and suitable for initial studies, but ignores row-end effects. The latter can represent row ends and surrounding obstacles on the 3D scene but requires more modeling effort and heavier computation. Moreover, using both methods simultaneously risks evaluating the same shading twice, so they should not be combined. ([pvsyst.com][2])


In other words, decide first whether you want to understand trends of regular inter-row shading or detailed impacts that reflect the actual site layout. For example, for ground-mounted, regularly spaced arrays where you want to compare row spacing and tilt balance, the simplified model may be sufficient. On the other hand, if the site shape is complex and row-end shading, nearby obstacles, terrain differences, paths, or local obstructions matter, reconstructing the layout in a 3D scene from the start will make decisions easier.


This approach is even more important for tracker projects. PVSyst official materials state that constructing a 3D scene is essential for calculating mutual shading in tracker arrays. Even when using backtracking, not everything is resolved automatically: if the ratio of reference row width to pitch is not consistent, some areas may still experience mutual shading while others backtrack unnecessarily early. Thus, it is not enough to set trackers and be done; decide in advance how much of the site’s inconsistencies to reflect. ([pvsyst.com][3])


Before starting shading analysis, separating the scope that can be covered by simple evaluation from that which can only be seen in 3D will help you balance speed and accuracy. Without this decision, you may spend time modeling unnecessary details or simplify too much and miss important losses.


Basic 3 Understand the difference between linear losses and electrical losses

One of the most frequently misunderstood aspects of PVSyst shading analysis is the difference between linear losses and electrical losses. Official documentation positions linear losses as those caused by a reduction in irradiance reaching the PV surface and as a lower bound that excludes electrical effects. Electrical losses, on the other hand, include phenomena in which partial shading disrupts current balance within modules or strings, causing output to drop more than would be expected from the shaded area alone. Thus, identical shaded areas do not necessarily translate to proportionate impacts on energy yield. ([pvsyst.com][4])


If you do not understand this difference, you may assume “small shaded area means small impact.” In reality, the loss magnitude depends strongly on which cell columns or which strings are shaded, whether the shading is regularly positioned by row or irregularly crossing modules, etc. PVSyst’s partition model provides coefficients to adjust for electrical effects; for regular row shading the coefficient can be near 100%, while for irregular building or tree shading it may be around 60–80%. In short, electrical losses cannot be judged by visual shadow area alone and are heavily influenced by shading regularity and wiring conditions. ([pvsyst.com][5])


Therefore, when starting shading analysis in PVSyst you should decide at which stage to include electrical losses. For initial comparisons, it is acceptable to assess candidate options using linear losses. However, for final layout decisions or projects where shading is biased in certain ways or string configurations are likely to matter, you must include electrical losses. The module layout function is particularly useful for evaluating detailed electrical shading effects reflecting each module position and string connection, and is typically used after 3D layout and system definition are finalized. PVSyst’s documentation also recommends treating module layout as a final step in the system study. ([pvsyst.com][6])


A practical tip is to first compare using linear losses and then deep-dive into electrical losses only for suspicious or important areas. Following this sequence improves accuracy without unnecessary work. Trying to run everything with a full electrical model from the start increases workload and does not improve result reliability unless input conditions are already solid.


Basic 4 Ensure consistency between the 3D scene and system conditions

Many failures in shading analysis stem not from how the 3D scene is modeled but from inconsistency between the 3D scene and system conditions. Examples include setting a fixed south-facing racking in the azimuth configuration while the 3D scene is slightly different in azimuth, row spacing numbers that differ from drawings, module string lengths not matching the system definition, or racking height and ground elevation differences not reflected. These mismatches may look small on screen but affect low-sun-angle shading onset times and mutual shading start times.


Moreover, to speed up calculations, PVSyst precomputes a shading factor table for fast computation. Official documentation explains that this table is based on precomputed values at 10-degree solar altitude increments and 20-degree azimuth increments and is interpolated; for relatively small systems there is also a slow mode that computes exact values for each time step. This means that if you change shapes or layouts and do not recompute the table before comparing results, you may not correctly see the impact of the changes. When progressing shading analysis, habitually confirming that “calculation conditions are up to date” after shape modifications is important. ([pvsyst.com][7])


For tracker projects, consistency is even more critical. PVSyst assumes trackers within the same azimuth group move at the same tracking angle, and that angle is calculated based on the reference width-to-pitch ratio, i.e., the GCR. If the actual GCR differs by row, some rows may still remain shaded while others may backtrack unnecessarily. In tracker shading analysis, you must examine not only the 3D scene but also which row is considered the reference condition. ([pvsyst.com][8])


In practice, first organize azimuth, tilt, row spacing, racking width, number of modules per row, and terrain conditions; then build the 3D scene, check shading animations and views for representative dates and times, and finally recompute the shading factor table and run simulation comparisons. Rather than touching fine details immediately, methodically checking consistency points in order will produce an accurate model faster.


Basic 5 Read results by time of day and season, not only annual values

Do not judge PVSyst shading results solely by the annual loss percentage. Official documentation introduces the iso-shading curve as a powerful verification tool that overlays shading impact on the sun-path diagram. Shading coefficients apply differently to beam, diffuse, and reflected components. Hence, simply seeing the annual percent loss does not tell you when, under what conditions, or which shadows are at work. ([pvsyst.com][9])


In practice, large shadows that appear in winter mornings or evenings may have limited annual energy impact. Conversely, repeated inter-row shading that occurs during daytime or partial shading that easily causes electrical imbalance can have a larger effect than they appear. Therefore, when reviewing results you should check not only “what percent was lost annually” but also “during which months and what hours is shading occurring,” “which rows or surfaces are predominantly affected,” and “are losses only linear or do electrical losses appear as well.”


A recommended approach is to create multiple comparative cases. For example, compare (1) no near-field shading, (2) near-field shading with linear losses only, and (3) near-field shading including electrical losses. This three-stage comparison makes it easier to see which effects reduce energy yield and by how much. For tracker projects, comparing with and without backtracking is also useful, but compare actual energy production or specific yield rather than PR alone. PVSyst also recommends looking at specific yield when comparing backtracking cases. ([pvsyst.com][10])


Annual values are necessary for final decisions, but improvement hints lie in time-of-day and seasonal details. If you truly want to use PVSyst shading analysis to improve design, don’t stop at annual loss rates—analyze which times of day and which shadows to reduce to achieve meaningful gains.


Common mistakes when starting shading analysis in PVSyst

A frequent stumbling block for those starting shading analysis in PVSyst is beginning modeling without organizing shading types. Over-modeling distant shading in 3D while treating nearby obstacles as horizon features upends the balance between workload and accuracy. Also, evaluating regular inter-row shading with the simplified model while simultaneously creating the same rows in a near-field 3D scene risks double-counting mutual shading. Official guidance explicitly warns against using the azimuth-side row-shadow model and the near-field scene row definitions simultaneously. ([pvsyst.com][2])


Another common issue is being reassured by looking only at linear losses. Small shaded area does not guarantee small electrical losses. Especially for regular row shading or string-biased shading, output reduction can be greater than it appears. Conversely, skipping coefficient adjustments or module layout checks for irregular shading leads to ambiguous interpretation.


Insufficient review after changing system conditions is also typical. If you change module row count, string grouping, azimuth, tilt, or tighten row spacing but do not update the 3D scene, module layout, or shading factor table before comparison, you will not know which condition differences you are observing. Official materials also state that module layout should be handled after 3D placement and system definition are finalized, and if these are changed later, you must recheck. ([pvsyst.com][6])


One more often-overlooked point is deciding good or bad based solely on the annual loss rate. A design with small annual differences but shading concentrated in certain seasons’ mornings and evenings can be difficult to operate and explain. Conversely, visually large shading may have limited annual impact, and expanding row spacing to reduce it could worsen land-use efficiency. Understand that shading analysis is about balancing losses and layout efficiency, not eliminating losses entirely; this perspective helps you avoid being swayed by settings or raw results.


Summary

The five basics to grasp before starting shading analysis in PVSyst are: distinguish near-field shading from far-field shading; separate the roles of simple evaluation and 3D reproduction; understand the difference between linear losses and electrical losses; ensure consistency between the 3D scene and system conditions; and read results by time of day and season as well as by annual values. Understanding these five points in advance makes PVSyst shading analysis not a difficult function but a practical tool to support design decisions.


Also remember that shading analysis accuracy is not determined solely by software operations. If rack positions, row spacing, and obstacle positions and heights are ambiguous to begin with, even the most careful PVSyst settings will produce variable results. In situations where you need to capture site relationships quickly and accurately, using an iPhone-mounted high-precision GNSS positioning device such as LRTK to obtain coordinates for racking rows and surrounding obstacles can improve the quality of input data before importing into PVSyst. To conduct shading analysis correctly, pay attention not only to software operation but also to the quality of information collected on site.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page