top of page

When looking at PVSyst results, many people first check the annual energy production and PR values. However, what is truly important in planning and design reviews of a solar power plant is interpreting how those figures arise from seasonal variations, loss structures, and output characteristics. The various graphs displayed in PVSyst are useful for that purpose.


PVSyst's graphs are not merely for visually checking trends. By reviewing monthly energy production, solar irradiation, temperature effects, breakdown of losses, power clipping, and changes in performance ratio, you can verify whether the design conditions are appropriate, whether the energy production has been over- or under-estimated, and whether the site conditions match the simulation conditions.


Especially in commercial solar power, judging solely by the magnitude of annual power generation can lead to misidentifying the cause. For example, even if annual generation is lower than expected, the countermeasures differ completely depending on whether the cause is lower solar irradiance, significant shading effects, large temperature-related losses, or PCS output limitations being in effect. Conversely, even if generation appears high, there may be issues such as overly lenient loss settings, dirt or snow not being adequately considered, or overloading being treated more favorably than in reality.


This article lays out six key perspectives to keep in mind when reading PVSyst graphs, from the viewpoints of monthly trends, losses, and performance. It is useful not only for those reading PVSyst for the first time, but also for people comparing reports, preparing documents for bank submissions, conducting design consultations with EPCs, and comparing operational results during O&M.


Table of Contents

• Read PVSyst graphs to verify the reasons for annual values

• How to read 1: Confirm seasonal variations using the monthly energy production graph

• How to read 2: Check assumptions using the monthly solar irradiation graph

• How to read 3: Use the loss graph to see where generation is being reduced

• How to read 4: Assess performance stability from month-to-month changes in PR

• How to read 5: Check graphs for output limiting and clipping

• How to read 6: Separate the effects of temperature, shading, and soiling by month

• Comparison methods to watch for when viewing PVSyst graphs

• Approach for comparing measured data with PVSyst graphs

• Summary


Read PVSyst graphs to confirm the reasons for annual values

The purpose of reading PVSyst graphs is not to look at a pretty chart but to be able to explain the reasons for annual energy production and PR. The annual energy production shown as a simulation result is the outcome of many stacked conditions, such as irradiance, temperature, module characteristics, wiring losses, PCS efficiency, shading, soiling, snow, output limitations, and so on.


Therefore, if you only look at the annual energy production at first glance, you can tell whether the overall performance is good or bad, but you cannot understand why that value was reached. PVSyst's graphs are used to interpret this "why."


For example, even with the same annual energy production, the risks differ between a project that drops sharply in winter and performs strongly in summer and one that is stable throughout the year. If output drops in winter, it is necessary to check snowfall, low solar altitude, topographic shading, morning and evening shadows, and regional differences in irradiance data. If output drops in summer, it is necessary to check temperature losses, PCS limits, clipping due to overloading, soiling, and thermal design.


Also, PVSyst graphs are important when comparing multiple scenarios. When comparing proposals that change the racking tilt angle, PCS capacity, azimuth, or wiring losses, annual energy production alone does not explain the reasons for differences. By looking at monthly graphs and loss graphs, you can see in which seasons the differences occur and which loss items are increasing or decreasing.


When reading PVSyst, first check the annual values, then view the graphs in the order of monthly values, losses, PR, output limitation, and temperature effects to make them easier to understand.


How to read 1: Check seasonal variations using the monthly power generation graph

The first thing to look at in PVSyst's graphs is the monthly energy production chart. By looking at the monthly production, you can understand during which seasons the plant performs well and during which it performs poorly.


Generally, solar power generation in Japan tends to be higher from spring through early summer and to decline during the rainy season, the high-temperature summer period, and in winter. However, these trends vary greatly by region. In Hokkaido and Tohoku, winter snowfall and low solar altitude tend to have a strong impact, while in Kyushu and Shikoku, although summer solar radiation is strong, it is necessary to consider temperature-related losses and the effects of output control.


When looking at a monthly generation graph, it is not sufficient to simply check which month is the highest and which is the lowest. For months with high generation, check whether the irradiance is high, whether low temperatures improve module efficiency, or whether there is little shading. For months with low generation, check whether the irradiance is low, whether temperature losses are large, or whether snow or soiling are being reflected.


What you should be particularly careful about is not judging a month as “bad” solely by looking at the monthly power generation graph. Because power generation is strongly influenced by solar irradiance, it is natural for generation to be low in months with little irradiance. What you should actually look at is whether the power generation is reasonable given the amount of irradiance. Therefore, the monthly generation graph needs to be checked together with the monthly irradiance graph and the PR graph.


Also, when comparing multiple PVSyst reports, exercise caution if the monthly generation profiles differ greatly. For the same location and the same plant capacity, the basic pattern of seasonal variation should be similar. If a large discrepancy appears in only certain months, it may be due to differences in the meteorological data, shading settings, snow settings, soiling settings, availability, output control, or PCS limits.


The monthly generation graph is an entry point for intuitively understanding the results from PVSyst. However, you should not draw conclusions from it alone; it is important to verify the causes by comparing it with the following graphs.


How to Read 2: Confirm Assumptions with the Monthly Solar Radiation Graph

When interpreting PVSyst's energy production, the solar irradiance graph is one of the most important assumptions. Because energy production depends heavily on solar irradiance, if the irradiance assumptions change, the energy production will also change significantly.


In PVSyst, irradiance values are handled in several forms, such as global horizontal irradiance, tilted plane irradiance, and effective irradiance. In particular, the irradiance incident on the module surface is what is directly related to photovoltaic panel power generation. Therefore, it is necessary not only to look at the global horizontal irradiance in the meteorological data, but to examine the effective irradiance after accounting for tilt angle, azimuth, shading, reflection, IAM losses, and so on.


When looking at a monthly solar radiation graph, first check whether the seasonal variation is natural for the region. In Japan, in many areas solar radiation increases from spring into summer, but it may dip in June or July due to the rainy season. In winter, because the sun’s altitude is low and daylight hours are short, solar radiation tends to be low.


Next, when comparing multiple meteorological datasets for the same project, check the differences in monthly solar irradiation. Even if the annual solar irradiation is similar, the monthly distribution can differ. For example, if one dataset shows higher irradiance in winter while another shows higher irradiance in summer, the annual energy production may be similar, but the monthly generation and how PR appears will change.


Also, if solar irradiance on the tilted surface is lower than expected, check whether the mounting tilt and azimuth are appropriate. A design that is close to south-facing will receive relatively stable solar irradiance throughout the year. In contrast, east–west orientations or low-tilt designs change the timing of peak power generation and seasonal variability. If the azimuth is shifted due to land constraints, you can check the extent of the generation decrease using monthly solar irradiance.


What matters in a solar irradiance graph is distinguishing whether low power generation is due to equipment-side issues or to meteorological conditions. If the irradiance itself is low, low power generation is natural. On the other hand, if irradiance is high but power generation does not increase, suspect equipment-side factors such as temperature-related losses, shading, PCS limitations, wiring losses, or module mismatch.


When reading PVSyst graphs, always check the solar irradiance graph immediately after the energy production graph; this makes it easier to assess the validity of the assumptions.


How to Read 3: Use the Loss Graph to See Where Power Generation Is Reduced

In PVSyst's graphs, the graphs showing losses are particularly important. In power plant design reviews, it is necessary to check not only the final energy production but also how much energy is being lost at each stage.


In PVSyst, losses are organized into those occurring before sunlight reaches the modules, losses during the stage when modules convert sunlight into electricity, DC-side losses, losses during PCS conversion, and AC-side losses. By looking at the loss graph, you can identify where the causes of reduced power generation lie.


First, what needs to be checked is losses due to shading. If there is terrain, surrounding buildings, trees, or front‑and‑back shading between mounting racks, power generation will drop at certain times of day or seasons. When shading losses are large, monthly graphs also tend to show reduced generation in winter and in the mornings and evenings. In assessing the feed‑in tariff (FIT) system or the project's financial viability, underestimating shading losses can lead to overestimating power generation.


Next, we check IAM losses. IAM is the loss caused by the angle of incidence; as sunlight strikes the module surface more obliquely, usable irradiance is reduced by effects such as reflection. It tends to have an impact in winter and at dawn and dusk, and is also affected by the mounting tilt and azimuth. When IAM losses are large, reductions in energy generation can occur that cannot be explained by irradiance alone.


Furthermore, temperature losses are also important. The output of solar modules decreases as temperature rises. If power generation does not increase as much as expected in summer despite high solar irradiance, temperature losses may be involved. In particular, roof-mounted installations, poorly ventilated installations, and even ground-mounted installations where heat dissipation from the module's rear is poor can experience large temperature losses.


DC wiring losses, AC wiring losses, and transformer losses are also items that should be checked. In projects with long wiring distances, projects where the distance from the junction box to the PCS is long, or projects where the distance to the step-up equipment is long, wiring losses can become non-negligible. Because PVSyst displays them as loss rates, it is necessary to verify whether the configured values are realistic.


When looking at loss graphs, it's important not to view each item's figures in isolation but to compare them against the design conditions. If DC wiring losses are large even though PCS are distributed across a wide site, the settings may be too high. Conversely, if the losses are extremely small despite long wiring distances, they may be underestimated.


The loss graph is the graph in PVSyst that most directly confirms the validity of a design. It is an item that should always be checked when explaining variations in energy production.


How to read 4: Evaluate performance stability using monthly PR variations

One of the indicators commonly used in PVSyst is PR. PR stands for Performance Ratio and is an indicator used to assess how efficiently a plant generates electricity relative to solar irradiance. While people often look only at annual PR, viewing monthly PR on a graph enables deeper analysis.


If the monthly PR is stable, the power plant can be considered to have relatively consistent performance across seasons. On the other hand, if PR drops significantly in only certain months, there may be losses specific to those months.


For example, if PR is declining in summer, losses due to temperature and output limits of the PCS may be the cause. Months with higher solar irradiance produce more power, but module temperature also tends to rise, and in oversized designs the PCS can reach its upper limit and clipping is more likely to occur. As a result, PR as the power generation efficiency relative to solar irradiance can decrease.


If PR decreases in winter, it may be caused by snow accumulation, low solar altitude, shading, or IAM losses. In particular, in cold climates, lower module temperatures would normally increase efficiency, but heavy snow or significant shading can reduce PR. If winter PR is extremely low, you should check the handling of snow losses and terrain shading.


Also, caution is needed if the monthly PR is unnaturally high. If the solar irradiance settings, loss settings, soiling settings, availability, or the handling of output control are lax, the PR can appear higher than reality. Especially in reports prepared for bank submission or for investment decisions, it is important not to regard a high PR itself as a good result, but to verify what assumptions the PR was calculated from.


The PR graph provides a different perspective than the power generation graph. While power generation is strongly affected by solar irradiance, PR is a metric that measures performance relative to solar irradiance. Therefore, if a month shows low power generation but high PR, it may simply mean there was little solar irradiance and the system’s performance is not necessarily poor. Conversely, if a month shows high power generation but low PR, the system may not be generating sufficiently given the solar irradiance.


When reading PVSyst graphs, be sure to check not only the annual PR but also the shape of the monthly PRs to understand performance stability and seasonal risks.


How to Read 5: Viewing Graphs of Output Limiting and Clipping

One graph that's easy to overlook in PVSyst is the one related to output limits and clipping. In solar power generation, it is common to design with oversizing so that the DC-side solar panel capacity is larger than the PCS capacity. In this case, during periods of strong irradiance the power the modules can produce may exceed the PCS output limit. The excess cannot be sold and is treated as clipping loss.


Clipping is not necessarily a bad thing. It is common to design with oversizing to increase generation in the mornings, evenings, and during cloudy conditions, thereby boosting annual energy production. What matters is whether the clipping losses are within the intended design range.


When examining output limitations on PVSyst graphs, first check which months show the most clipping. Generally, clipping tends to occur in spring and early summer, when irradiance is high and temperatures are relatively low. In summer, although irradiance is also high, module temperatures rise, so DC output is curtailed by temperature and clipping may be less pronounced than in spring.


Next, look at how clipping occurs over time. If it happens only briefly around midday versus if the output remains stuck at the limit for a long period, the implications are different. If the PCS limit is reached for an extended period, the oversizing ratio may be too high. On the other hand, if clipping is only brief, it may be acceptable when maximizing annual energy production.


Also, output restrictions may not only be due to PCS capacity but can also involve grid-side constraints or contractual limits. If you do not check what restriction conditions are set in PVSyst, you cannot correctly explain differences in generation. For example, simulation results can change depending on how the PCS rating, interconnection output, power factor settings, apparent power limit, and active power limit are handled.


The output-limitation graph is important for assessing the validity of an oversized system design. Low generation can sometimes be caused not by losses but by an intentional output cap. Therefore, when reading PVSyst graphs, you need to check how much clipping and output limiting occur over the year and which seasons they are concentrated in.


Reading 6: Separate the Effects of Temperature, Shadows, and Dirt by Month

When reading PVSyst graphs in practice, it is important to break down multiple loss factors month by month. Even if there is a month with low generation, the cause is not necessarily a single one. Temperature, shading, soiling, snow, IAM, wiring, and PCS limits may overlap.


Temperature loss tends to be larger mainly in summer. Solar modules’ output decreases as cell temperature rises. Therefore, even in summer when solar irradiance is high, if the ambient temperature or module temperature is high, the generated power may not increase as much as expected. If the monthly graph shows a drop in PR during summer, check the temperature loss.


Shading loss varies with season and time of day. In winter, the sun’s elevation is lower, so the shadows cast by the same obstacles are longer. If the front-to-back rack spacing is narrow or there are terrain features, buildings, or trees on the south side, winter shading loss will be larger. If monthly graphs show a drop in energy production or PR only in winter, you need to check the shading settings.


Soiling losses vary depending on the region and maintenance conditions. In areas with little rainfall, places with high dust levels, sites immediately after land development, and locations near farmland or construction sites, soiling losses can be larger. PVSyst allows soiling losses to be set on a monthly basis, so check whether the assumptions are realistic for each season.


In snowy regions, how snow losses are handled is also important. When snow remains on the panels, power generation is greatly reduced during that period. On the other hand, snow-surface reflection raises the albedo, and under certain conditions the reflected light can contribute to generation. Depending on how snow losses and albedo are set, winter power output can vary significantly.


What's important here is not to look at each graph independently, but to view monthly generation, irradiance, PR, and losses across them. For example, if generation is low in winter, distinguish whether it's simply due to low irradiance, large shading losses, or the impact of snow. If PR is low in summer, isolate whether it's temperature losses, clipping, or soiling.


PVSyst's graphs do not instantly reveal the cause. However, by combining multiple graphs, you can explain the reasons for a decline in energy production quite specifically.


Comparison methods to pay attention to when viewing PVSyst graphs

When comparing PVSyst graphs, it is very important to standardize the comparison conditions. When looking at different reports, you must verify whether differences in energy production or PR are truly due to design differences or are the result of differences in assumptions.


The first thing to check is the system capacity. If DC capacity, AC capacity, PCS capacity, or the oversizing ratio (DC/AC ratio) differ, the energy output and clipping behavior will change. Rather than simple annual generation, a fairer comparison can be made by looking at annual generation per DC 1 kW and by examining how the output is utilized relative to AC capacity.


Next, review the meteorological data. Even at the same site, the monthly solar radiation and temperatures can change depending on the meteorological data used. If the monthly solar radiation shown in PVSyst’s graphs differs significantly, the difference in energy production may be caused by differences in the meteorological data rather than by design differences.


Furthermore, comparing loss settings is also important. If DC wiring losses, AC wiring losses, transformer losses, IAM, soiling, snow, degradation rate, availability, etc. differ, the annual energy production will change. In particular, soiling and snow settings tend to be treated differently from project to project and are items that often cause differences when making comparisons.


Also, pay attention to the graph axes and units. Some graphs are displayed in kWh, while others are shown in kWh/kWp. When looking at monthly values, simple monthly totals can change due to differences in the number of days, so it can be useful, where appropriate, to compare daily averages or values per capacity.


When comparing graphs in PVSyst, it is important not to judge them by appearance alone, but to read them only after aligning the assumptions, units, capacity, and loss settings.


Considerations for Comparing Measured Data and PVSyst Graphs

The graphs in PVSyst represent planned values and do not necessarily match measured data. In actual power plants, factors such as weather, outages, output curtailment, equipment failures, communication data loss, snow accumulation, soiling, vegetation growth, and grid constraints can occur, and these factors cannot be fully reproduced in simulations.


When comparing measured data with PVSyst, you first need to align the items being compared. Confirm whether PVSyst’s generation refers to AC output, the power transmitted at the grid interconnection point, or the value shown by the export meter. On the measured side as well, the comparison results will vary depending on which point’s value—PCS output, point of supply, VCT, export meter, etc.—is used.


Next, when measured solar irradiation is available, compare not only the generated energy but also the solar irradiation. If the actual annual solar irradiation is lower than the PVSyst meteorological data, a lower measured generation does not necessarily indicate an anomaly. Conversely, if the actual solar irradiation is higher but generation is low, you should suspect system losses or shutdowns.


It is also important to compare on a monthly basis. If you look only at annual values, a shortfall in one month can be offset by strong performance in another month. By looking month by month, you can more easily separate the rainy season, summer temperature-related losses, winter snowfall, and periods with frequent output curtailment.


When comparing measured results, it is effective to use the PVSyst graph as a baseline and decompose the differences with actual performance by cause. If a discrepancy appears, rather than immediately concluding that PVSyst is wrong, check in order for weather deviations, stoppages, output control (curtailment), soiling, snow accumulation, and differences in measurement points.


Furthermore, combining this with on-site inspections improves accuracy. For example, when there are strings or areas with low power generation, comparing the positions on the drawings with on-site conditions allows you to identify shading, soiling, panel faults, and wiring faults. Using an iPhone-compatible high-precision GNSS such as LRTK lets you record equipment locations and inspection points on site with high accuracy, making it easier to overlay and verify them with drawings and information in the cloud. By linking trends seen in PVSyst graphs with on-site location data and inspection records, you can reduce the gap between desk analysis and field judgment.


Summary

PVSyst's graphs are key clues for understanding annual energy production and PR results. Instead of looking only at the numbers, by checking monthly energy production, irradiance, losses, PR, power curtailment, and the effects of temperature and shading in sequence, you can explain the reasons behind the simulation results.


First, check the seasonal variations on the monthly power generation graph. By seeing which months have high generation and which months have low generation, you can grasp the basic characteristics of the power plant. However, do not judge based on generation alone; it is important to read it in combination with the solar irradiance graph.


Next, confirm the assumptions using the monthly solar irradiation graph. Since changes in irradiation data will affect power generation, it is necessary to verify the validity of the meteorological data and the seasonal irradiation trends. This provides the basis for distinguishing whether low power generation is due to the meteorological assumptions or to the equipment.


In the loss graph, check where energy production is dropping. By examining losses such as shading, IAM, temperature, wiring, PCS, transformers, soiling, and snow, you can identify the specific causes of reduced energy production. In design reviews, you should always verify that the loss settings are realistic.


Examining monthly changes in PR reveals the stability of performance. If PR drops in summer, suspect temperature losses or clipping; if PR drops in winter, suspect the effects of shading or snow. You can discern seasonal characteristics that are not apparent from annual PR alone.


In output-limiting and clipping graphs, verify whether the oversized design is appropriate. Clipping is not necessarily a bad thing, but you should look at which seasons and to what extent it occurs to judge whether it is within the intended design scope.


Finally, it is important to separate out the monthly effects of temperature, shading, soiling, and snow. A single PVSyst graph is not sufficient on its own. By reading multiple graphs together, you can more accurately explain the highs and lows of energy production and changes in PR.


Being able to read PVSyst’s graphs correctly lets you go beyond simply checking generation output and enables you to explain the validity of the design, the rationale for loss settings, the consistency with on-site conditions, and the causes of discrepancies with measured data. The ability to read PVSyst graphs is extremely important for the planning, design, review, and operational improvement of photovoltaic power plants.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page