8 Points to Understand How to Read Reports in the PVSyst Manual
By LRTK Team (Lefixea Inc.)
Table of Contents
• What is the PVSyst report intended to show?
• Point 1: Confirm the report's assumptions first
• Point 2: Assess the validity of the design conditions based on the system configuration
• Read Point 3 by treating Produced Energy and Specific Production separately
• Point 4: View PR as an indicator of the overall efficiency of the power plant.
• Point 5 Identify the location of losses using Normalized productions
• Point 6: Identify areas for improvement from the Loss diagram
• Point 7 Check monthly results and seasonal variations
• Point 8: Be aware of key precautions when comparing, outputting, and sharing
• Common misinterpretations of PVSyst reports
• Summary
What is the PVSyst report used for?
The PVSyst report is a document used to review the simulation results of a photovoltaic power generation system from the perspectives of design conditions, energy production, losses, and performance indicators. It is used not simply to see "how much annual energy is generated," but to determine which input conditions led to that generation, at what stages and to what extent losses occur, and whether the design proposal is reasonable.
PVSyst is PC software for the study, sizing, and data analysis of photovoltaic power systems, and is described as being able to handle systems such as grid-connected, stand-alone, pumped-storage, and DC grids. It also indicates that detailed simulations are calculated on an hourly or finer time step and can handle detailed conditions such as orientation, tilt, equipment configuration, temperature, wiring, mismatch, IAM, and far-field and near-field shading. In other words, when reading a PVSyst report, it is important not to extract only the numerical results but to check them together with the assumptions and the calculation process.
In practice, PVSyst reports are often used for design reviews, internal briefings, documents for financial institutions, generation forecasts, and aligning understanding with EPC and O&M. Therefore, readers must be able to explain “what these numbers mean,” “whether they are reasonable compared with other projects,” “whether they adequately reflect local conditions,” and “what the main causes of generation decline are.”
The PVSyst results screen includes loss diagrams, normalized energy production indicators by month or by day, the Performance Ratio, input–output diagrams, and distributions of incident energy and array output, among other items. When viewing the report, rather than looking at these items individually, it is easier to understand if you read them in sequence: assumptions, main results, losses, monthly trends, and comparison results.
Point 1: Confirm the report's assumptions first
What you should look at first in a PVSyst report is not the energy production or PR, but the assumptions such as the project name, Variant, simulation date, location, meteorological data, mounting method, azimuth, tilt angle, and system capacity. If the assumptions differ, no matter how convincing the results look, they cannot be used for comparison or decision-making.
For example, even with the same installed capacity, power generation can vary significantly depending on the choice of weather data, module tilt, array azimuth, shading settings, module model, inverter model, DC/AC ratio, wiring losses, temperature conditions, and soiling loss settings. When reading a PVSyst report, the first step is to confirm "whether it reflects the design conditions you want to evaluate."
A common practical mistake is to compare multiple options by presenting only their power generation figures. For example, even when comparing the annual power generation of Option A and Option B, if Option A uses the latest weather data while Option B uses different weather data, or Option A accounts for shading while Option B does not, that is not a fair comparison. When reading a report, you should first check whether the assumptions for each option are aligned and whether any differences are intentional.
PVSyst provides a feature that allows you, from the report preview screen, to compare reports from other projects or Variants and highlight the differences. When comparing multiple options, checking the differences in the input conditions themselves as well as the differences in energy production makes it easier to explain why the results differ.
Also, the assumptions documented in the report serve as the basis for any subsequent inquiries. In an internal review, if you are asked “Why did this PR occur?” or “Why was this loss included?”, you will not be able to explain the reliability of the results unless you can verify the configured conditions. When reading the report with reference to the PVSyst manual, it is important to make a habit of checking the consistency of the input conditions first, rather than the results.
Point 2: Evaluate the validity of the design conditions based on the system configuration
The next thing to check is the configuration of the PV array and inverters. The number of modules, number in series, number in parallel, array capacity, inverter capacity, number of units, DC/AC ratio, and so on all affect both energy production and losses. By reading the system configuration in the report, you can confirm whether the design is fundamentally feasible and whether the inputs match the actual design drawings.
For example, check whether the DC capacity calculated from module capacity and the number of modules matches the capacity on the drawings or in the quotations. For inverter capacity, you also need to verify that it corresponds to the assumed number of units and their capacities. If there is a mismatch here, subsequent analyses of energy production, PR, and losses will be of limited value.
String configuration is also important. If the number of modules in series is too high or too low, it can become inappropriate because of the relationship with the voltage range, temperature conditions, and the inverter’s MPPT range. While PVSyst may display design assistance or warnings, those reviewing the report should not simply accept the results; they need to verify that they align with the design intent.
Furthermore, for grid-interconnected projects, output to the grid, inverter limits, clipping, transformer losses, and the like also need to be checked. In self-consumption or battery-integrated systems, how load, charging/discharging, surplus, and unused energy are handled will affect the results. PVSyst is described as being able to handle, in addition to grid-connected systems, self-consumption, grid storage, peak shaving, weak island operation, transformer and grid constraints, and other scenarios. For such projects, the standard sell-to-grid perspective alone is insufficient.
When reviewing a report's system configuration, it is important to check, before asking whether the power generation is high or low, whether the design conditions that produce that power are actually constructible and whether they contradict the equipment specifications or the design drawings. PVSyst's figures are calculated based on the input assumptions, so if the assumptions are incorrect, the results will also reflect those errors.
Point 3: Read Produced Energy and Specific Production Separately
The first thing many people notice in a PVSyst report is the annual energy production. Values shown as Produced Energy or E_Grid are key figures for understanding how much electrical energy the project as a whole will generate. However, judging a project's merits solely by this value is risky.
Annual electricity generation increases as installed capacity grows. Therefore, when comparing projects or design proposals with different capacities, simple generation figures alone cannot be evaluated fairly. This is where Specific Production becomes important. On PVSyst’s main results page, Specific Production is described as the annual production per installed capacity, expressed in the unit kWh/kWp/year. This is a useful metric for comparing productivity per unit of capacity even when the sizes of power plants differ.
For example, even if Plan A produces 1,000 MWh per year and Plan B produces 800 MWh per year, Plan A’s larger capacity alone may mean that Plan B actually has better generation efficiency per unit of capacity. By looking at Specific Production, you can distinguish whether the higher output is simply due to larger scale or whether the design is truly more efficient.
Also, Specific Production is influenced by regional differences, solar irradiance, orientation, tilt, shading, and loss settings. Therefore, even with the same capacity, the values will vary if the region or installation conditions differ. When reviewing reports, you should not only compare Specific Production between projects but also consider it together with the meteorological and installation conditions.
In practice, Produced Energy is often used for business planning and forecasting power sales revenue, while Specific Production is a useful metric for comparing design proposals and validating their appropriateness. When learning how to read the reports in the PVSyst manual, it is important not to confuse the two and to read them separately as "total amount" and "amount per unit of capacity".
Point 4 View PR as an overall efficiency indicator for the entire power plant
PR, or Performance Ratio, is a particularly important metric in PVSyst reports. PR is used as an indicator of how much useful electrical energy was ultimately obtained relative to the incident solar energy and the installed capacity. In PVSyst's documentation, PR is described as the value of Yf divided by Yr, and is explained as representing the overall system efficiency with respect to the installed nominal capacity and the incident energy.
When evaluating PR, the key point is not to judge it simply as good when it’s high and bad when it’s low. PR is a useful indicator of a plant’s efficiency, but it varies with solar irradiance conditions, temperature, shading, design, loss settings, and system type. A PR that is too high may indicate that loss settings are insufficient. Conversely, a low PR can be reasonable if it appropriately reflects site conditions such as shading, high temperatures, snow, or strong output curtailment.
PVsyst explains that PR includes optical losses such as shading, IAM, and soiling; array losses such as temperature, degradation, module quality, mismatch, and wiring; and, for grid-connected systems, inverter efficiency, while for stand-alone systems it includes system losses such as batteries and unused energy. In other words, even though PR is a single number, it contains many loss components.
When reading PR, you must always view the assumptions and the loss diagram together. For example, if the PR is lower than expected, the appropriate improvement will be completely different depending on whether temperature loss, shading loss, inverter loss, or wiring loss is large. You cannot determine the cause by looking at PR alone.
Also, in cases where the timing of generation and consumption differ—such as systems that include batteries or are designed for self-consumption—it can be difficult to interpret short-term PR values as they are. PVsyst's documentation likewise explains that for systems including storage, PR values on a per-time-step basis can become less meaningful and should be aggregated and examined over larger time scales.
Therefore, PR is an entry point for viewing a power plant's condition at a glance, and it is not the final judgment. In a PVSyst report, after checking the PR, it is important to be able to explain why that value occurred by going back to Specific Production, the loss diagram, the monthly results, and the input conditions.
Point 5: Identify the Location of Losses Using Normalized productions
PVSyst reports may display "Normalized productions," that is, normalized generation indicators. These help to understand at which stages of the generation process energy is being lost while accounting for the effects of system capacity and solar irradiance conditions.
In the PVsyst documentation, Yr is described as the ideal reference yield with no losses, Ya as the yield corresponding to the array output, and Yf as the yield effectively obtainable by the system. Lc is the difference between Yr and Ya, representing array-side losses such as temperature losses, wiring losses, module quality losses, mismatch, IAM, shading, soiling, and MPP-related losses; Ls is the difference between Ya and Yf, and includes mainly inverter losses for grid-connected systems and battery efficiency for standalone systems.
Understanding this relationship will significantly change how you read a PVSyst report. Even when you simply feel that energy production is low, you will be able to distinguish whether the losses are concentrated on the array side or on the inverter/system side. If array-side losses are large, review temperature, shading, wiring, soiling, mismatch, and module characteristics. If system-side losses are large, check the inverter, transformer, output limits, battery storage, and load conditions.
Care must be taken with units when reading Normalized productions. In PVsyst’s documentation these metrics are expressed as kWh/kWp/day, and are explained as corresponding to the number of hours the system would operate under a constant irradiance of 1 kW/m² (1 kW/10.76 ft²). Also, the unit of Yr can be understood either as incident energy in kWh/m²/day (kWh/10.76 ft²/day) or as an ideal yield based on Pnom in kWh/kWp/day, which makes them easy to confuse.
In practice, Normalized productions are well suited for explaining design reviews. If you only present the annual energy production, listeners find it hard to understand "why that is the case," but explaining the sequence Yr, Ya, Yf, Lc, Ls reveals the flow: solar irradiation enters the array, is converted by the array, passes through the system, and becomes the final output. When reading reports in the PVSyst manual, keeping this energy flow in mind makes it easier to grasp the meaning of the numbers.
Point 6 Identify areas for improvement from the loss diagram
One of the most practically useful pages in a PVSyst report is the Loss diagram. The Loss diagram visually shows at which stages losses occur as the generated energy reaches the final output. In PVsyst’s documentation, the Loss diagram is described as a useful figure for understanding the quality of a PV system design and identifying the main sources of loss, and it is stated that it is always included in simulation reports as an annual figure.
When looking at a loss diagram, the basic approach is to follow the flow of energy from top to bottom. First there is solar irradiance and incident conditions, then optical losses such as shading, IAM, and soiling, followed by losses due to temperature, module quality, mismatch, wiring, inverters, transformers, and output limits. By seeing where the largest reductions occur, you can identify the areas with the greatest potential for improvement.
For example, if nearby shading losses are large, candidates for review include layout, spacing, racking height, row spacing, obstacles, module splitting, and string design. If temperature losses are large, check the installation method, ventilation, module temperature coefficient, and the distance to the roof surface. If wiring losses are large, review cable length, cross-sectional area, voltage design, and the placement of junction boxes and PCS. If inverter losses or clipping are large, check the DC/AC ratio, PCS capacity, and output limiting conditions.
However, the percentage values in the Loss diagram must not be simply added together. PVsyst's documentation explicitly states that each loss is defined as a percentage relative to the immediately preceding energy quantity, so the percentage values cannot be summed. It also explains that a precise assessment of individual losses is complex and that some contributions may be reallocated to other categories, although the energy values at the main steps are, in principle, calculated correctly.
This is very important. For example, even if Loss A is shown as 3%, Loss B as 4%, and Loss C as 5%, the total loss is not simply 12%. Each is calculated against the energy remaining after the previous stage. Saying "if you add up all the losses, what percent is it" when explaining the report can lead to misunderstanding.
The Loss diagram is best used as an entry point for design improvement. When a large loss is found, rather than immediately labeling it as "bad", check whether that loss is unavoidable due to site conditions, whether it can be reduced by design changes, or whether the input conditions are over- or under-estimated. When learning to interpret reports in the PVSyst manual, it is important to read the Loss diagram as a "map for finding causes".
Point 7 Check monthly results and seasonal variations
If you only look at annual generation and annual PR, you can miss seasonal issues. In a PVSyst report, checking monthly generation, solar irradiation, PR, losses, and Normalized productions lets you identify the characteristics of seasonal variations.
For example, if generation falls sharply in winter, you need to distinguish whether this is a natural variation due to reduced solar irradiance, an effect of shading from the low solar elevation, or caused by snow or soiling settings. If PR decreases in summer, high-temperature–induced thermal losses may be the primary cause. In regions with a rainy season or monsoon, irradiance and how soiling is handled should also be checked.
PVsyst's Loss diagram is included not only in the annual simulation report but, as explained, can also be used to evaluate monthly loss impacts from the predefined graphs in the detailed results. This is important for identifying seasonal effects that are difficult to detect from annual values.
When reviewing monthly results, check not only generation but also the trends in solar irradiation, PR, and losses. In months with low generation, PR may remain stable simply because solar irradiation is low; in that case, it does not necessarily indicate a major problem with the system itself. On the other hand, if there are months when PR or Specific Production drops significantly despite adequate solar irradiation, you should suspect shading, temperature, curtailment, equipment losses, or similar issues.
Also, monthly results are useful for comparing with measured data. When comparing actual generated energy after operation starts with PVSyst forecasts, examining monthly differences in addition to the annual total can help identify seasonal deviations. For example, if performance is low only in winter, shading or snow may be the cause; if low only in summer, temperature or curtailment may be responsible; if low in specific months, outages, maintenance, or communication loss could be possible.
When reviewing a PVSyst report, after confirming the annual values, it is essential to always move on to the monthly values. Even if the annual energy production matches expectations, significant risks can be hidden in particular seasons. Conversely, even if the annual figure appears somewhat low, it can be reasonable when taking regional characteristics and seasonality into account.
Point 8: Understand the precautions when comparing, outputting, and sharing
PVSyst reports are documents that are often shared both inside and outside the company, not just reviewed individually. Therefore, you need to be aware of the points to keep in mind when outputting, comparing, converting to PDF, and explaining the reports.
The explanations regarding PVsyst’s printing and preview functions indicate that, from the report preview you can save to PDF, print, copy to the clipboard, export results, compare with other projects or other Variants, navigate between pages, zoom in and out, and so on. It is also explained that the preview opens automatically when the simulation report is displayed.
When creating a report for sharing, it's important to first ensure the Variant name is easy to understand. For example, names like "case1" or "new variant" alone don't allow someone viewing it later to judge the content. Using names that convey the comparison intent, such as "with shadow", "without shadow", "south-facing 20°", or "PCS capacity change proposal", can reduce misreading of the report.
Also, when sharing multiple proposals, you need to make clear, for each report, which parts have different conditions. PVSyst lets you check differences with its comparison feature, but if the recipient only looks at the PDF, it is helpful to explain in the main text or supplementary materials which conditions were changed for the comparison. If you only present generation output, readers tend to focus solely on “which is better,” but in practice you need to judge based on cost, constructability, site constraints, grid constraints, maintainability, and so on.
When saving as a PDF, check after output to ensure there are no missing pages or a mix of old Variants. Even during internal reviews, people may think they are looking at the latest proposal but mistakenly attach a PDF containing outdated simulation results. It is important to standardize and consistently manage the simulation date, Variant name, and file name.
Furthermore, when submitting the report to external parties, you must clearly specify which figures are to be treated as guaranteed values and which figures are simulation reference values. PR and energy production are important indicators, but in actual operation they fluctuate due to various factors such as meteorological year, soiling, downtime, degradation, output curtailment, and maintenance conditions. The PVSyst report is a powerful explanatory document, but because it does not completely fix real-world energy production, it is important to share the assumptions and uncertainties together.
Common Misinterpretations in PVSyst Reports
One common misreading of PVSyst reports is to confuse PR with the “amount of generated energy.” PR is an efficiency metric, not the annual energy production itself. A project can have a high PR despite a small capacity, and another can have a low PR despite a large capacity. If you are considering revenue as a power generation business, Produced Energy is important, but if you are considering design efficiency, you should also look at PR and Specific Production.
The second issue is comparing Specific Production without accounting for regional conditions. Generation per unit of capacity is convenient for comparison, but simply comparing projects with different solar irradiance, temperature, snowfall, shading, and installation orientation can lead to misunderstandings. Even if Specific Production is low, it can be reasonable in regions with poor solar irradiance. Conversely, if it is too high, the loss assumptions may be too optimistic.
The third is summing the loss rates in the Loss diagram. As noted above, in PVsyst each loss is treated as a percentage of the energy at the previous stage, so you must not simply add the percentage values. The loss diagram is not intended for calculating the total by mental arithmetic; it is a tool to see at which stages large drops occur.
The fourth is judging solely by annual results. Even if the annual energy production looks good, there may be significant winter shading or summer temperature losses. By looking at monthly results and graphs, you can identify seasonal risks.
The fifth is skipping verification of the input conditions. PVSyst performs precise calculations based on the input conditions, but if the inputs are incorrect, the results will depend on that premise. In particular, azimuth, tilt angle, meteorological data, equipment models, capacity, shading, soiling, wiring, temperature, and output limits are items that are easy to overlook when reviewing a report.
The sixth is treating the report as "the correct numbers." PVSyst reports are simulation results useful for design decisions, but actual operation is affected by weather, downtime, maintenance, soiling, degradation, grid constraints, and other factors. It is important to read the report as a reasonable forecast based on its assumptions and to use it together with measured data and actual operating conditions.
Summary
Among the eight key points for reading reports in the PVSyst manual, the important thing is to read not only the numerical results but also the assumptions, losses, monthly trends, and comparison methods in a single flow. First, check the project, Variant, meteorological data, installation conditions, and system configuration, and then read Produced Energy, Specific Production, and PR. Additionally, use Normalized productions to grasp the flow of energy, confirm the main causes of losses in the Loss diagram, and examine seasonal variations in the monthly results.
A PVSyst report is not a document solely for power generation forecasts. It is a practical document for organizing whether the design conditions are appropriate, where losses originate, whether there is room for improvement, and how to explain differences among multiple proposals. In particular, representative indicators such as PR and Specific Production are useful, but judging based on them alone can lead to misunderstandings. It is essential to read them in conjunction with the input conditions, the loss diagram, and the monthly results.
Also, because PVSyst reports are often shared both internally and externally, it is necessary to properly manage the Variant name, simulation date, comparison conditions, and PDF output contents. When comparing multiple options, clarifying not only the differences in energy production but also what was changed to produce those differences will improve the quality of the explanations.
The purpose of learning how to read reports using the PVSyst manual is not simply to memorize how to operate the software’s screens. The goal is to understand simulation results in a form that can be used for design decisions, business decisions, and presentation materials. When reading a report, first question the assumptions, then check the key indicators, and finally look for opportunities for improvement from losses and seasonal variations. By following this order, you can turn PVSyst results into practical decision-making material that is easy to use in real-world work.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.