• Prerequisites for considering accuracy improvement in the PVSyst manual

• Accuracy Improvement 1: Clarify the selection criteria for meteorological data

• Accuracy Improvement 2 Adjust azimuth and tilt angles to local conditions

• Accuracy improvement 3: Do not underestimate the impact of shadows

• Accuracy Improvement 4: Carefully check the module and inverter settings

• Accuracy Improvement 5: Set wiring losses and temperature losses to realistic values

• Accuracy Improvement 6: Viewing Degradation Rate and Operating Rate from a Long-Term Perspective

• Accuracy Improvement 7: Verify the report results and reflect them in the next design

• Common Characteristics of PVSyst Settings That Tend to Reduce Accuracy

• How to Read the PVSyst Manual to Use It Effectively in Practice

• Summary


Prerequisites for Considering Accuracy Improvements in the PVSyst Manual

Many people who consult the PVSyst manual are not simply looking to learn how to operate the interface. In reality, they face challenges such as wanting to make photovoltaic system energy-yield simulations more realistic, preparing the rationale they can present to financiers and clients, and correctly assessing the impact of design changes. PVSyst is simulation software widely used for PV system design studies and energy-yield forecasting, but results can change significantly depending on how input values are selected and how loss conditions are specified. Therefore, the purpose of reading the manual is not only to know "where to click" but also to understand "which settings are likely to affect the results."


To improve simulation accuracy, the important thing is not to take PVSyst’s calculated results as absolute values. PVSyst is a tool that theoretically estimates energy production based on input conditions, and it does not automatically or fully reproduce all site factors such as on-site construction quality, operational status, interannual weather variability, soiling, equipment individual differences, or grid-side constraints. In other words, improving accuracy is not about using more features of the software, but about choosing input values that match the site conditions, keeping a record of the rationale for those settings, and ensuring the results can be verified.


When reading the PVSyst manual, it is important not to memorize each screen’s items in isolation, but to understand them as a sequence: meteorological data, azimuth, tilt angle, shading analysis, modules, inverters, losses, and reports. Even if you finely adjust just one setting, if the other assumptions are coarse the overall reliability of the results will not improve. Conversely, if you carefully align the basic conditions, you can achieve a simulation that is practical and easy to use without resorting to overly complex settings.


In this article, we summarize seven key considerations to keep in mind for improving simulation accuracy while using the PVSyst manual. From points where beginners are likely to stumble to items that practitioners often overlook, we explain, in order, the approaches to improve the quality of power generation forecasts.


Accuracy Improvement 1: Clarify the Selection Criteria for Meteorological Data

The first point for improving simulation accuracy in PVSyst is the selection of meteorological data. Because the power output of a photovoltaic system is strongly influenced by solar irradiance, if the assumptions behind the meteorological data are off, however detailed the equipment settings are, the reliability of the results will not improve. The PVSyst manual also treats importing and selecting meteorological data as one of the basic operations, but in practice it is essential to have the perspective to judge "which data should be used" and "whether the conditions can be considered close to the site."


When examining meteorological data, first check how far the observation points or representative locations are from the planned site. Even if they are nearby, solar radiation, temperature, and wind patterns can differ in mountainous areas, along the coast, in basins, or in urban areas. In regions prone to mountain shadow, sea fog, snow cover, or localized cloud formation, simply choosing the nearest station's data is not sufficient. While representative data may be used in preliminary assessments for power generation projects, for detailed design and profitability assessments you must be able to explain the source and validity of the meteorological data.


Also, meteorological data can be based on long-term averages or on data that closely matches the measured values of a specific year. Long-term averages are suitable for business planning, but they can differ from actual single-year results. Conversely, relying solely on data from a specific year can lead to overestimation or underestimation depending on whether that year was sunnier or rainier than average. When reviewing PVSyst results, it is important to be clear whether the simulated values represent "normal-year assumptions" or the "reproduction of specific conditions."


In meteorological data, not only solar irradiance but also temperature is important. Photovoltaic modules lose output as temperature rises, so in high-temperature regions temperature-related losses can be large even when irradiance is high. To avoid overestimating energy production, you need to check the relationship between temperature data and wind conditions and reflect the local thermal environment to some extent. When reviewing meteorological data settings in the PVSyst manual, the first step to improving accuracy is to determine not just whether the data loaded successfully but whether the assumptions are reasonable with respect to factors that affect generation.


Accuracy Improvement 2: Adjust azimuth and tilt angles to local site conditions

The second point is the settings for azimuth and tilt angles. In PVSyst, the amount of solar irradiation received is calculated by entering the array’s orientation and tilt. Whether south-facing, east–west-facing, low-tilt, or high-tilt, the layout conditions affect not only the annual energy yield but also the generation patterns in the mornings and evenings and across seasons. Therefore, to improve simulation accuracy, it is important not only to enter the values from the design drawings as-is but also to verify that they are consistent with the actual installation conditions.


For ground-mounted solar power plants, tilt and azimuth angles are typically managed fairly clearly, but roof-mounted projects require caution. When a roof has multiple slopes, the azimuth and tilt can vary by roof plane within the same building. Also, for existing buildings, the azimuth shown on drawings can differ from the measured azimuth. When handling multiple orientations in PVSyst, you must decide whether it is acceptable to consolidate them into a single representative value or whether you should configure separate arrays.


Azimuth and tilt not only affect annual energy yield but also the distribution of generation across the time of day. For example, a due-south orientation tends to prioritize annual energy yield, whereas east–west configurations tend to spread generation into the morning and evening. In self-consumption projects, alignment with the demand curve can be more important than simple annual energy yield. Therefore, even when configuring settings while reading the PVSyst manual, it is important not simply to look for "the angle that produces the most generation," but to reproduce a generation pattern that matches the project's objectives.


Also, on site the design angle and the as‑built angle may not match exactly. Slight differences can occur due to mounting-frame installation tolerances, ground unevenness, roof surface deformation, and constraints on the installation space. In large-scale projects even small deviations can affect energy yield, so in detailed studies it helps to clearly specify whether the design values, the as‑built values, or the measured values will be used, making later performance comparisons easier. To improve accuracy in PVSyst, azimuth and tilt should be treated not as mere input fields but as important site-defining conditions.


Accuracy Improvement 3: Do Not Underestimate the Impact of Shadows

The third point is shading analysis. In solar power generation, shading from buildings, trees, utility poles, fences, mountains, adjacent structures, and front-row modules affects power output. PVSyst can evaluate the impact of shading using nearby obstacles and 3D scenes, but if the inputs are coarse it may underestimate shading losses compared with reality. To improve simulation accuracy, shading should not be treated lightly as "a minor loss"; its importance must be assessed on a project-by-project basis.


Particular attention should be paid to shading caused by the low solar altitude in winter. Even if a site visit in summer suggests no issues, surrounding buildings and trees can cast long shadows in winter. The proportion of annual energy produced in winter varies by region and design conditions, but if shading effects are concentrated in specific time periods, losses at the string or MPPT level can become large. When reviewing shading analysis in the PVSyst manual, it is important to check not only the annual losses but also which seasons and times of day the shading occurs.


Shadows can be divided into far shadows and near shadows. Far shadows from mountains and terrain affect solar irradiance around sunrise and sunset. In contrast, near shadows from buildings and equipment cast partial shadows on module surfaces and can cause electrical mismatch losses. In PVSyst, there are situations where the geometric effects of shadows and their electrical effects are considered separately, but beginners often assume that simply creating a 3D model is sufficient. In practice, it is necessary to consider which module groups the shadows fall on and which string configurations are affected.


To improve the accuracy of shading analysis, the quality of on-site surveys and drawing information is also important. If the height, position, or distance of obstacles are inaccurate, the shading analysis in PVSyst will also be inaccurate. There are also factors that will vary in the future, such as growth of existing trees, buildings planned for future construction, and changes in reflection and shading during snowfall. Although it is difficult to predict everything completely, recording the shading assumptions makes it easier to perform root-cause analysis later when comparing with actual generation results. Shading losses are easy to overlook yet often draw scrutiny, and they are a very important area for improving accuracy in PVSyst.


Accuracy Improvement 4 Thoroughly verify module and inverter settings

The fourth point is the module and inverter settings. In PVSyst, you select photovoltaic modules and inverters from the database and, according to the system configuration, set parameters such as the number of strings, the number of modules in series, the number of parallel strings, and the inverter capacity. Because this part forms the basis for energy yield and loss calculations, mistakes in selecting model numbers or insufficient verification of specification values will directly affect the simulation results.


The first thing to check is whether the module model number you are using actually matches the product that was selected. Even closely related model numbers from the same manufacturer can differ in rated power, temperature coefficient, open-circuit voltage, short-circuit current, efficiency, and so on. During the design phase it is common to run calculations with candidate models and later switch to the final model, so there is a risk of producing a report with outdated settings. When working while referring to the PVSyst manual, make it a habit to confirm not only that you were able to select the module from the database, but also that it is consistent with the specification sheet.


For inverter settings, parameters such as capacity ratio, MPPT configuration, input voltage range, and maximum input current are important. In oversized designs, clipping losses can occur during periods of strong solar irradiance. Oversizing itself is not necessarily bad and may be adopted for economic reasons, but you need to correctly assess its impact in PVSyst. Rather than looking only at energy yield, checking how much clipping occurs and whether it is biased by season or time of day will improve the quality of design decisions.


Also, when pairing modules and inverters, you should account for voltage rises at low temperatures and voltage drops at high temperatures. In cold regions the open-circuit voltage increases and can exceed the equipment’s allowable range. In hot regions the voltage falls and can become problematic in relation to the inverter’s operating range. Carefully review PVSyst’s settings screens and warning messages, and do not assume there is no issue just because the simulation ran. Equipment settings may appear to be relatively straightforward within PVSyst, but in practice small differences in model numbers or configurations can lead to large discrepancies, so they must be handled carefully as a basic measure to improve accuracy.


Accuracy Improvement 5: Set wiring loss and temperature loss realistically

The fifth point is wiring losses and temperature losses. When calculating power generation in PVSyst, various losses are subtracted from the theoretical output obtained from irradiance. Among these, wiring losses and temperature losses are items that readily reflect site conditions and design quality. You can proceed with the standard or default values, but if you want to improve accuracy, you need to consider appropriate values for each project.


Wiring losses vary depending on cable length, thickness, material, current, voltage, and the wiring route. In particular, for large-scale ground-mounted projects, distances to junction boxes and power conditioners can become long, and it is necessary to consider DC-side and AC-side losses separately. Even in rooftop installations and self-consumption projects, wiring routes can become complex due to coordination with existing equipment. When setting wiring losses with reference to the PVSyst manual, it is advisable not to simply enter generic values, but to verify that they are consistent with the design drawings, single-line wiring diagrams, and cable selection.


Temperature loss refers to the phenomenon in which output decreases as the module temperature rises. Solar modules produce more power the stronger the solar irradiance they receive, but their temperature also tends to increase. While ground-mounted installations often have relatively good ventilation, roof-mounted installations, corrugated metal roofs, and installations close to the roof surface can have poorer heat-dissipation conditions. Because PVSyst handles temperature loss by reflecting installation type and thermal conditions, it is important to understand and configure the site’s ventilation conditions and racking structure.


Wiring losses and temperature losses are items that tend to be underestimated. This is because, in initial assessments, there is a psychological tendency to present a larger power output, and applying strict loss assumptions can make a project appear less viable. However, if actual generation after start-up falls below the simulation, it becomes difficult to explain the cause. If the goal is to improve accuracy, it is important to input realistic losses that reflect site conditions rather than optimistic values.


Also, wiring losses and temperature losses help identify opportunities for design improvement. By feeding simulation results back into the design—reviewing cable sizes and wiring routes, choosing well-ventilated racking configurations, and avoiding overly dense layouts—they become material for quality improvement rather than mere predictions. Practitioners who master PVSyst do not simply enter losses; they identify points for improvement from the breakdown of losses.


Accuracy Improvement 6: Viewing Degradation Rate and Operating Rate from a Long-Term Perspective

The sixth point is to set the degradation rate and availability from a long-term perspective. In solar power projects, not only the first-year generation but also long-term generation forecasts over 20, 25, and 30 years are important. When using PVSyst simulation results for business planning and revenue forecasting, a major issue is how to account for module aging, equipment downtime, maintenance inspections, failures, and output curtailment.


Module output gradually declines as the years of operation progress. You can refer to the degradation rates and output-warranty concepts indicated in manufacturer guarantees, but actual degradation varies depending on the product, installation environment, and operating conditions. In locations with severe environmental conditions such as high temperature, high humidity, salt corrosion, heavy snowfall, or sand and dust, it is necessary to consider whether general degradation assumptions are sufficient. When reviewing long-term simulations and loss conditions in the PVSyst manual, consider not only annual energy production but also the impact on long-term financial performance to use the tool in a manner closer to practical application.


Availability is also important. Simulations tend to assume that equipment is always operating normally, but in reality there are periods when generation is not possible or output is reduced due to inspections, equipment failures, communication faults, grid-side outages, natural disasters, vegetation overgrowth, snowfall, soiling, and so on. It can be difficult to reproduce all of these details precisely using only PVSyst, but it is important to clarify what level of losses and availability assumptions you expect.


Especially when presenting power generation simulations to financial institutions, investors, project owners, or internal approvers, what matters more than a high first-year generation is that the assumptions are reasonable and sustainable over the long term. Simulations built solely on optimistic assumptions may look good in terms of projected generation but can end up differing significantly from actual performance once operations begin. Improving accuracy is not about producing attractive short-term numbers, but about creating figures that can be explained and justified over the long term.


Degradation rates and availability are also linked to the operation and maintenance plan. Actual power generation will vary depending on how frequently regular inspections are carried out, how quickly the monitoring system can detect anomalies, and how grass cutting and cleaning are performed. By reviewing PVSyst simulation results together with the O&M plan, you can move from a mere design-stage estimate to a more accurate plan that looks ahead to the operational phase.


Accuracy Improvement 7: Validate report results and incorporate them into the next design

The seventh point is to verify the results of the PVSyst report and incorporate them into subsequent designs and simulations. In PVSyst you can review, in the final report, the energy production, loss breakdown, performance ratio, equipment configuration, and various assumptions. However, simply generating the report and being satisfied with it will not lead to improved accuracy. What matters is interpreting where differences in the results occur, which losses are large, and whether there are any inconsistencies between the input conditions and the output results.


The first thing to check is not to focus too much on annual energy yield alone. In the PVSyst report, by looking at monthly generation and the loss diagram you can understand at which stages and how much loss occurs. Losses accumulate as you move from irradiance to effective irradiance, module output, inverter output, and the grid connection point output. If a particular loss is larger than expected, you should recheck the design conditions and input values.


The performance ratio is also an important metric. The performance ratio is used as an indicator of how efficiently the system is generating power relative to solar irradiance conditions. However, a high performance ratio does not necessarily mean the design is good. The interpretation can change depending on weather conditions, temperature conditions, shading, overloading, and loss settings, so it is necessary to understand the assumptions for each project when making a judgment. When using the PVSyst manual, it is important to understand the meaning of the figures shown in the report and to check whether they align with the design intent rather than simply judging them as good or bad.


Furthermore, comparing actual performance data after the start of operation with PVSyst simulation results will improve accuracy for subsequent analyses. If the actual generation is lower than the simulation, it is necessary to distinguish whether the cause is interannual variation in solar irradiation, shading, temperature-related losses, equipment downtime, or soiling. Conversely, if actual performance exceeds the simulation, it is also important to confirm whether the settings were conservative or whether the meteorological conditions were favorable.


The accumulation of these validations transforms PVSyst from a mere data-entry task into a practical design support tool. By recording the rationale for settings on every project, reviewing the reports, and analyzing the differences from actual performance, a company’s and the individual practitioner’s own decision-making criteria are refined. Accuracy improvements that cannot be obtained by simply reading the PVSyst manual are achieved through this cycle of verification and improvement.


Common characteristics of PVSyst settings that tend to lower accuracy

There are common factors that cause PVSyst simulation accuracy to decline. The most frequent is using initial or default values without giving them careful thought. When fields are filled in within the software, it can feel like they must be correct, but initial values are merely general assumptions and do not necessarily reflect the site-specific conditions of individual projects. In particular, loss conditions, thermal conditions, shading conditions, and degradation rates tend to vary between projects and therefore require careful attention.


Another common problem is forgetting to reflect design changes. In solar PV projects, module model numbers, inverter configurations, layouts, wiring routes, and tilt angles can change from the initial design through detailed design and construction stages. However, if the PVSyst project file remains set to outdated conditions, reports that differ from the latest design may end up being used. To maintain accuracy, it is important to clarify which design revision the simulation is based on and to organize file management and configuration history.


Also, relying only on the report figures without checking the input conditions is problematic. It’s easy to feel reassured when the annual energy production falls within the expected range, but in reality shadow losses may have been omitted, wiring losses may be set too low, or the temperature conditions may not match the site. Even if the results appear plausible, if you do not verify the consistency of the input conditions, there is a risk the simulation will become something you cannot explain later.


Furthermore, including too many complex settings can also lead to decreased accuracy. Entering detailed information itself is not bad, but if you input fine-grained values with weak justification, you may end up with a model that appears precise on the surface but does not reflect reality. What matters in PVSyst is not the level of detail but the validity of the inputs. It is desirable to enter detailed settings where there is justification, treat settings with weak justification conservatively, and clearly state your assumptions.


How to Read the PVSyst Manual for Practical Use

To effectively use the PVSyst manual in practice, it’s important not to try to learn all of its features from the start. PVSyst has many configuration items, and if a beginner attempts to understand everything at once, they can’t tell what’s important. First, grasp the basic workflow—project creation, meteorological data, system settings, array settings, shading analysis, loss settings, and report review—and then, for each project, dive deeper into the items that matter.


When reading a manual, it becomes easier to understand if you separate explanations of screen operations from explanations of design judgments. Screen operations can be learned as procedures, whereas design judgments require an understanding of site conditions and project objectives. For example, the operation of loading meteorological data is the same for anyone, but which meteorological data to adopt varies depending on the project. The procedure for creating a shadow model is also common, but which obstacles to include and at what level of accuracy depends on the site conditions.


In practice, it is also effective to use the PVSyst manual like a checklist. After creating the simulation, check in order whether the meteorological data are reasonable, whether the azimuth and tilt match the latest drawings, whether the module part numbers are correct, whether the inverter configuration matches the design, whether shading conditions are consistent with the on-site survey, whether the loss settings are not overly optimistic, and whether there are no unnatural losses in the report. Simply making this verification a habit can significantly reduce missing settings and input errors.


Also, it is important to compare multiple scenarios. Not only the standard case, but comparing cases with heavier shading, cases with stricter assumptions for temperature losses, cases with revised wiring losses, and cases with modified equipment configurations will reveal factors that tend to affect energy production. PVSyst is not software that provides a single answer; it is most effective when used as a tool to compare differences in design conditions and make more well-founded judgments.


Finally, it is important to organize PVSyst results in a form that can be explained to stakeholders. Rather than presenting only the energy production, make sure you can explain which weather data you used, what installation conditions you assumed, and how you estimated each loss; doing so increases credibility in internal reviews, customer presentations, and materials for financial institutions. The purpose of reading the PVSyst manual is not only to learn how to operate the software but also to acquire the ability to produce simulations that can be explained.


Summary

The key points for improving simulation accuracy, as understood from the PVSyst manual, are to clearly justify input values, carefully reflect site and design conditions, and validate the report results. Items such as meteorological data, azimuth, tilt, shading analysis, modules, inverters, wiring losses, temperature losses, degradation rate, and availability each affect energy production. Even if you set one of these in detail, if other assumptions remain ambiguous, the overall reliability of the simulation will not improve.


What is particularly important is not to accept PVSyst’s results as correct without question. PVSyst is a powerful simulation tool, but it does not automatically account for every aspect of the site. To improve accuracy, the person in charge must understand the local conditions, cross-check with design drawings and specifications, and verify the reasonableness of the input values. The manual serves as a guide for this purpose, and in practice you are expected to use operating procedures in combination with engineering judgment.


Covering seven perspectives for improving simulation accuracy will greatly change how you use PVSyst. When selecting meteorological data, verify the validity of irradiance and temperature, and for azimuth and tilt, reflect the site’s installation conditions. In shading analysis, do not overlook seasonal and time-of-day effects, and in module and inverter settings, carefully verify model numbers and configurations. For wiring losses and temperature losses, enter realistic values, and for degradation rate and operational availability, take long-term operation into account. Finally, interpret the report results and reflect the differences from actual performance in the next design to continuously improve accuracy.


The value of using the PVSyst manual lies not simply in learning how to operate the software, but in being able to explain the basis for energy production forecasts. In power generation projects and design work, what matters more than the numbers themselves is the assumptions from which those numbers are derived. By using PVSyst while organizing input conditions, loss settings, and validation results, the simulation becomes not just a rough estimate but a practical document that supports design quality and business decision-making.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page