Centimeter-Level RTK Revolutionizes Rail Distance Measurement – Latest Smartphone Positioning Technology with LRTK

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Importance of rail distance measurement and application scenarios

In railway infrastructure work, it is frequently required to accurately measure the distance between two points on the rail. For example, in railway construction work, it is necessary to confirm that the track length matches the design drawings, and in rail replacement/repair, new and old rails must be measured precisely and matched. During regular track inspections, it is important to check whether the length of a specific section has deviated from the design value or whether distortion or expansion/contraction has occurred. In post-construction as-built verification, the actual track length and sectional distances of the completed track are measured and the deviation from the design values is evaluated. The results of such rail distance measurements form the fundamental data for safe operation and high-quality maintenance planning, so their importance goes without saying.


However, railway tracks are long structures ranging from several hundred meters to several kilometers, and it is not easy to measure distances without error in sites that include curves and gradients. Even a few centimeters of error can sometimes lead to safety or equipment issues such as misalignment of signals or platforms and mismatch of joints. Therefore, rail distance measurement always requires high accuracy and efficiency, and technologies that realize this are eagerly awaited on-site.


Issues and error risks of conventional methods (tape/chain/ruler/TS)

Various methods have been used for rail distance measurement, but each has challenges and error risks. Let’s look at typical conventional methods and their problems.


• Manual measurement with tape measures or surveying chains: The most basic method uses steel tape measures or chains. Two or more workers extend the tape along the rail, read the length at regular intervals, and add them up. This method is simple, but measuring long distances is very labor-intensive. Each time the tape is joined, reading errors or alignment shifts can occur, and tape sag, thermal expansion/contraction, and friction with the ground also introduce errors. For example, if a 50 m (164.0 ft) tape is joined 20 times to measure a total of 1 km (3,280.8 ft), even a few millimeters of error per join can accumulate into a few centimeters of deviation. In curved sections it is also difficult to lay the tape along the rail and the difference from straight-line distance must be considered, making precision control even harder. Above all, the inefficiency of requiring 2–3 people and long hours of work was a major issue.

• Measurement with a measuring wheel: A measuring wheel can be used for paced distance measurement by one person. The wheel is rolled on the rail or ballast, and distance is measured from the wheel rotations. This allows easier measurement of long distances than tape, but it is prone to errors from wheel slippage or bumps. Wheels that run on the rail head can slip due to moisture or rust, or bounce at joint plates, causing counting errors. Accuracy is typically said to be about 0.5–1% over long distances, so on 1,000 m (3,280.8 ft) discrepancies of several meters can occur. Wheel-based methods also have the subtle problem that measured distance changes slightly depending on whether the wheel runs on the inner or outer rail in curves, so careful attention is needed for strict measurement.

• Measurement with rulers/straightedges: For very short sections under a few meters, straight rulers may be used—for example, to measure spacing of structures around the track or some dimensions of switches. However, they are not applicable to long track lengths like rail extension. Measuring by repeatedly using a ruler yields low accuracy and efficiency, so it is unsuitable for wide-area distance measurement.

• Measurement with a total station (electro-optical distance measurement): Modern surveying uses a total station (TS), an optical distance-measuring instrument, and it is also used for rail distance measurement. A TS on a tripod sends a laser or infrared beam to a prism and measures the returned time to obtain high-precision distance. A single distance measurement can achieve sub-millimeter to millimeter-level high precision, but measuring the entire length of a railway requires repeated repositioning and line-of-sight measurements. For example, if a prism is moved every 100 m while measuring, setup errors and resection/intersection positioning errors can accumulate, resulting in total deviations on the order of several centimeters. Especially on curves, measurement is done by dividing the straight-line segments and summing them, so calculating true along-track distance requires curve computations. TS surveying also generally requires two or more people (operator and prism holder), and setup/pack-up takes time. If there are no known reference points on-site, coordinate transformation calculations are also necessary, making the process inevitably laborious.


As described above, conventional methods involved significant manpower and time, and the risk of error increased the longer the measured distance, making rail distance measurement notoriously "difficult and troublesome" despite being fundamental to track maintenance.


Mechanism of high-precision distance measurement using GNSS and basics of RTK

In recent years, the use of GNSS positioning technology has been changing this situation dramatically. GNSS is a general term for global navigation satellite systems including GPS; ground position (longitude, latitude, altitude) is determined by receiving radio signals from satellites. Traditionally, standalone GNSS positioning had errors on the order of meters, but there has been ongoing exploration of its applicability in the railway field. In particular, in Japan, full operation of the Quasi-Zenith Satellite System "Michibiki" has reportedly improved accuracy of consumer smartphone GPS to about 5–10 cm in some cases. However, this is still insufficient for strict rail distance measurement, and the RTK method for centimeter-level positioning has emerged.


RTK (Real Time Kinematic) is a GNSS positioning technique in which a base station (with known coordinates) and a rover (the measurement unit) simultaneously observe GNSS signals, and the base station sends correction information to the rover to enhance its position in real time. Specifically, errors in satellite ranging (ionospheric delay, clock errors, etc.) are canceled by comparing observations at the base and rover, allowing the rover’s coordinates to be determined with relative accuracy on the order of centimeters. This reduces standalone GNSS errors of several meters to the order of several centimeters horizontally and several centimeters vertically (several centimeters (a few inches) horizontally and several centimeters (a few inches) vertically). RTK was originally used with survey-grade GNSS equipment, but recent advances in affordable receivers and communications infrastructure have made it more accessible.


A base station is essential for RTK operations, but fortunately electronic reference points (GNSS reference stations) are established across Japan, and network RTK services using these stations are widely available. With network RTK, you do not need to set up your own base station on-site; instead, you can obtain nearby reference data via the Internet. The rover receives correction information (NTRIP, etc.) via a mobile connection and automatically applies real-time corrections for positioning. This enables high-precision positioning based on the nearest reference station even along long railway corridors, making it suitable for wide-area distance measurement.


The advantage of GNSS + RTK for distance measurement is that the distance between two distant points can be obtained directly by coordinate calculation. For example, if you can acquire the coordinates of start point A and end point B on the track to cm level accuracy, you can easily compute the 3D distance between A and B as well as the horizontal distance. This allows what used to be measured piecewise with tape to be measured at once. Since RTK positioning yields results in an absolute geodetic coordinate system such as a global datum from the start, transformation to drawing coordinate systems or tying to reference points is also smooth. GNSS-specific limitations exist—for instance, measurement is impossible where satellite signals are blocked, such as in tunnels or under viaducts—but in generally open outdoor railway sections with clear sky view, it functions without issue. With the high-precisionization of satellite positioning, the style of rail distance measurement has undergone a major transition.


Practical method for centimeter-level distance measurement using smartphone + LRTK

The cutting-edge technology that maximizes the benefits of RTK is surveying that combines a smartphone with an RTK receiver. Where dedicated large equipment was formerly required for high-precision GNSS surveying, smartphones can now effectively become surveying instruments. Notably, small RTK-GNSS receivers called "LRTK" that attach to smartphones have become prominent. By attaching an LRTK device to a smartphone (for example, a commercial smartphone), positioning comparable to surveying-grade GNSS equipment costing millions of yen is achievable. A dedicated app on the smartphone receives correction information in real time and realizes centimeter-level positioning.


Smartphone distance measurement using LRTK is also simple to operate on-site. The basic procedure is as follows. First, carry the smartphone + LRTK to the measurement start point and use the app to position and register that point as the "start." Next, move the smartphone to the target point (the end) whose distance you want to measure. While moving, the app continuously records the device’s position, so whether you go straight or follow a curve, the entire path is recorded as data. Upon arriving at the end point, the point is positioned again and recorded as the "end." The app then instantly displays the 3D distance (actual distance including slope and elevation difference) from start to end. The horizontal distance (planimetric distance) and elevation difference between the two points are also calculated, so you can choose between horizontal projected distance and surface distance as needed.


For measuring long track sections, you can record the track by walking from start to end. Simply walk along the track with the smartphone in hand, and the LRTK obtains high-precision position points at set intervals. For example, if points are recorded once per second, the walked path is left as polyline data with point intervals on the order of several tens of centimeters (several tens of centimeters (several inches)). Summing the total length of this polyline yields the distance along the rail. Because the trajectory closely follows curves, the arc length of curves is accurately included. The app displays the total trajectory length such as “○○ m” upon completion, and the measurement is finished. There is no need to add up segment lengths by hand or compute curve corrections as in conventional methods.


Another convenient aspect of smartphone + LRTK measurement is that results can be confirmed on-site. If a point was missed, you can immediately add it; if data is unsatisfactory, it is easy to retake. Each acquired point is tagged with coordinates, so the record is not just a distance but a distance linked to specific location information—“from which point to which point”—which is highly useful for later data management.


Thus, LRTK-based smartphone surveying enables centimeter-level distance measurement by anyone with intuitive operation. Even without specialized training as a surveyor, on-site staff can complete measurements by following the app’s prompts to measure start and end points.


Case studies of measuring long straight sections, curves, and through distances on track segments

Using smartphone + LRTK, let’s look at some practical examples of how efficiency can be improved in real railway sites.


● Measurement of a long straight section: In one conventional line, about 1,200 m (3,937.0 ft) of straight rail was measured. A single worker walked along the trackside with a smartphone for about 15 minutes to complete the measurement. The measured distance matched the design value almost exactly, with an error of only a few centimeters. Performing the same task with tape would likely have required 2–3 people more than an hour, joining a 50 m (164.0 ft) tape 24 times. With smartphone surveying it was completed in one walk, and on-site staff praised it as “astonishingly fast and easy.”


● Measurement of a section including curves: In another case, a 500 m (1,640.4 ft) section including a curve of about 300 m (984.3 ft) radius was measured. Traditionally, knowing the length of such a curved section required separating straight and curved parts and calculating curve lengths. With smartphone + LRTK, simply walking along the track to collect data yielded the actual distance including curves. The measured along-track distance was several tens of meters longer than the sum of straight-line segments and matched the curve lengths shown in the design drawings. The person in charge commented that “there were no missed measurements or calculation errors in curved sections, and being able to confirm on-site was reassuring.” Because transition curves with varying curvature were captured as continuous data, arbitrary sub-section distances within the segment can be computed later if needed.


● Measurement of through distance (running distance): At another site, actual track length (train running distance) was measured over a roughly 3 km (3,000 m (9,842.5 ft)) section that included multiple curves and gradients. A worker carrying a smartphone + LRTK walked the applicable section and the distance was calculated at around 3,005 m (9,854.3 ft). The route chart showed 3,000 m (9,842.5 ft), so a discrepancy of about 5 m was confirmed. This difference was presumed to be due to long-term rail expansion/contraction or track displacement, and the data was used to revise maintenance planning. Previously, this task would have involved estimating from old drawings or deploying a surveying team to measure the distance piecemeal over several days, but it was completed in half a day with smartphone RTK surveying. This case demonstrates that extensive through distances can be measured accurately in a single pass using smartphone RTK.


These examples show that smartphone + LRTK measurement of rail distances combines long-range capability and high accuracy, greatly reducing labor. Walking-based measurement follows the actual path of the track, making it useful for detecting subtle differences from design values and existing data. These practical examples provide insights for railway operators and contractors aiming to streamline future maintenance operations.


Streamlining distance records, reporting, and drawing updates via cloud integration

Data obtained with smartphone + LRTK can be significantly more efficient to process and use when integrated with cloud services. Conventionally, distances measured with tape or TS were recorded by hand by workers and later compiled into reports and reflected in CAD drawings at the office, and manual transcription was time-consuming and error-prone.


In contrast, data measured with the LRTK app is digitally recorded on the smartphone and can be uploaded to a cloud server with one tap. On the cloud, measured trajectories and points are plotted on a map and distance information is linked and stored. When multiple sections are measured, they are automatically organized, making it easy to search and confirm “which section had what distance” later. Measurement date/time, personnel, and notes can also be attached to the data, enabling construction of a reliable measurement record ledger.


Another major advantage is that positioning data uploaded to the cloud can be shared in real time among stakeholders. Data measured on-site can be viewed from the office PC immediately, allowing supervisors or designers to check results and provide feedback on the spot. Instructions such as “this section is longer than the design value and requires additional investigation” can be issued the same day, preventing rework later. Instead of waiting for handwritten notes or Excel sheets to be returned from the field, cloud integration removes time lags.


Reflecting acquired data into drawings and reports is also easy. Coordinate data for measured points and trajectories can be downloaded from the cloud and opened directly in CAD software to draw the actual measured rail length on plans. Overlaying the design track and measured track makes visual checks for deviations straightforward. For as-built management, measured values need to be reflected in electronic deliverables; using cloud data enables distance values to be reflected with no double entry. For example, a reporting item such as “as-built length of this construction section: ○ m” can be auto-calculated from the measurement database and transferred to the report. If photos are taken, they are stored in the cloud with position tags so there is no confusion about “where the photo was taken.”


By combining smartphone + LRTK measurement results with the cloud, digitization of records and speed of utilization are realized. Compared to relying on paper field books, data management and sharing are dramatically improved, and coordination between field and office is smoother. Such digital linkage will become increasingly important in railway infrastructure maintenance.


Workflow that contributes to improved inspection accuracy through automation and labor saving of records

Distance measurement with smartphone + LRTK not only simplifies the measurement itself but also revolutionizes the overall workflow of railway track maintenance. Traditionally, distance measurement relied on the manual work and experience of skilled personnel, but the introduction of digital technology brings the following changes.


• Shorter work time and reduced manpower: As mentioned, labor- and time-consuming measurement tasks are greatly streamlined. One person can measure a wide area, eliminating the need for survey team formation and long work hours. In extreme summer or winter conditions, staff appreciate that tasks finish quickly, reducing physical strain. Personnel such as lookout staff (for trains) can be minimized, easing safety management burdens.

• Improved safety: Faster measurements reduce the amount of time personnel are exposed on the track to passing trains. For example, in one maintenance section, a distance measurement that previously took half a day was completed in one hour, greatly reducing time spent at risk from approaching trains. Since tasks can be completed by a single person, it is also easier to plan work under night or single-line closure conditions. This contributes to worker safety and minimizes the impact on train operations.

• Improved data accuracy and reliability: Manual recording errors and misreads are eliminated, and consistently accurate data is accumulated. In inspections, decisions can be made based on reliable data, so inspection accuracy improves. Measurements that previously varied slightly by operator now yield equivalent results regardless of who measures, thanks to digital measurement. Automatic saving and history logging ensures clarity on “who measured what, when, and how much,” which is useful for future audits and trend analysis.

• Skill transfer and human resource development: Smartphone-based measurement is intuitive and easy to learn, making it accessible to newcomers and non-specialists. Reliable measurement without relying on veteran experience supports skill transfer. Reports from the field indicate that “young staff could measure without errors by following the app prompts,” helping build a non-personalized measurement workflow. This is an important consideration for addressing future workforce shortages.

• Real-time decision-making: Previously, measurements were taken in the field and brought back for aggregation and reporting before decisions were made. With smartphone + cloud integration, information sharing and countermeasure planning can be done same-day. For example, a supervisor can check data on the day of measurement and decide “this section has an abnormality, so let’s repair it next week,” accelerating responses. Faster decision-making directly improves the overall maintenance management cycle.


Overall, a digital surveying workflow centered on smartphone + LRTK builds a system that collects and utilizes data faster, safer, and more reliably by automating and reducing the labor of record-keeping. This strongly supports the PDCA cycle (plan-do-check-act) required for railway maintenance management and is highly anticipated as part of on-site digital transformation (DX).


Article conclusion: effectiveness of simple surveying with LRTK and smartphone distance measurement

In the field of rail distance measurement, the fusion of centimeter-level RTK and smartphones is truly a groundbreaking solution. The fact that such important measurement tasks can be performed so easily and with high precision represents a major shift for railway track maintenance and construction. The time, manpower, and accuracy issues inherent in conventional methods are being resolved one after another by a single smartphone + LRTK, and this has been received by on-site staff with surprise and reassurance.


In particular, smartphone positioning devices like LRTK overturn the notion that “surveying is only for specialists,” opening an era in which anyone can perform surveying when needed. If precise distance measurement becomes routine in railway maintenance, more detailed maintenance planning and preventive maintenance will become possible. Early detection of track displacement and correction of slight as-built deviations, for example, rely on accumulation of daily data. The ease of smartphone + RTK fosters such routine data collection and is therefore very effective.


Of course, GNSS surveying requires attention to radio reception environments and other issues, but even taking that into account, the effects of smartphone RTK surveying are enormous. Field feedback includes comments such as “we can’t go back to tape measures” and “sharing measurement results immediately makes reporting to superiors much smoother.” The combination of centimeter-level RTK technology and the familiar smartphone is spreading beyond railways into construction and civil engineering, transforming infrastructure management practices.


Distance measurement underpins safe railway operation and asset management. Now that measurement methods have evolved, we need not accept past inefficiencies. With simple surveying using smartphones and LRTK, anyone can obtain high-accuracy data anywhere. Adopting this latest technology in rail distance measurement is expected to dramatically improve both efficiency and accuracy. The innovation brought by centimeter-level RTK is setting railway maintenance on a path to become smarter and safer. Let’s actively harness technological advances and establish a new standard for rail distance measurement.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.