Solving On-site Labor Shortages with LRTK – Automating and Streamlining Rail Deformation Measurement
By LRTK Team (Lefixea Inc.)
On-site labor shortages and the burden of rail deformation measurement
In Japan’s railway maintenance field, severe labor shortages have become a major issue. Workers responsible for track inspection and repair are aging, and younger generations tend not to settle into these roles. As a result, a limited workforce must maintain vast stretches of track, placing a heavy burden on critical tasks such as rail deformation measurement. In particular, track construction companies often avoid harsh night shifts, and some have reported about a 20% decrease in workforce over the past decade. The burden on each worker has increased, and future skills transfer is a growing concern.
Managing rail deformation (track displacement) is essential for safe train operations. Tracks that carry heavy, high-speed trains every day will gradually deform if left unchecked, causing worse ride comfort and, in the worst case, derailment risks. Therefore, rail deformation measurement must be performed regularly to keep values within specified limits. However, given current labor shortages, continuing precise deformation measurements using conventional methods has become difficult. New technologies that reduce on-site burden while maintaining safety levels are therefore required.
What is rail deformation? (alignment, vertical profile, gauge, lateral shift)
Rail deformation is a general term for the track deviating from its designed position. Concretely, it includes the following types:
• Vertical profile (kōtei): Irregularities in the vertical direction of the rail. When the rail undulates so that there are vertical height differences, it leads to vehicle pitch (fore-aft rocking) and worsened ride comfort.
• Alignment (tōri): Irregularities in the lateral direction of the rail. This deformation causes what should be straight rails to meander left and right, producing yaw (side-to-side rocking) and vibration of rolling stock. Curved sections allow certain curvature, but meandering beyond that is considered abnormal.
• Gauge (kikan): Deviation in the distance between the left and right rails. If the gauge widens or narrows from the standard, wheel-rail conformity worsens, increasing noise and derailment risk. The standard gauge on Japan’s conventional lines is 1067 mm (42.01 in) and on the Shinkansen is 1435 mm (56.50 in), though slight widening on curves is permitted.
• Lateral shift: The phenomenon where the entire track shifts laterally from its design center. Lateral pressure from passing trains or thermal expansion and contraction can gradually displace the track, moving it out of its designed alignment. This can occur due to loosening at track fastenings or in the ballast; if left unchecked, the overall direction of the track can become distorted.
These track displacements must be kept within the management limits set by railway operators. For example, allowable vertical deviation when measuring with a 10 m (32.8 ft) chord (string) and allowable gauge tolerance are precisely specified. Regular rail deformation measurement checks whether these displacements exceed standards; if they do, repairs such as jack-lifting, ballast tamping, or resecuring rail fastenings are carried out. Accurately measuring and understanding rail deformation is a crucial on-site duty to ensure safe and comfortable train operations.
Challenges of traditional methods (spot measurements, night work, inefficient multi-person operations)
Traditional rail deformation measurement has relied heavily on manual labor and analog instruments. Typical issues include:
• Misses due to spot measurements: For vertical profile and alignment, it is common to set a chord every 10 m (32.8 ft) and measure the midpoint deviation—this “spot measurement” approach is typical. Gauge is also measured with a gauge at regular intervals. However, this method does not provide information about points between measured locations, so local deformations occurring between measurement points can be missed. Installing measurement points at every necessary location would require enormous effort, so in practice sampling is used, which limits coverage.
• Burden of night work: Track measurements must be concentrated in the late-night hours after the last train, since tracks cannot be accessed during daytime operations. Preparations, measurement, and cleanup must be completed within a limited number of hours, so work is always a race against time. Working at night on unstable footing forces workers to be constantly on edge and disrupts sleep patterns, imposing significant safety and health burdens. Relying on the same crew night after night as staffing shrinks increases the risk of mistakes and accidents from accumulated fatigue.
• Inefficiency of multi-person operations: Traditional measurements require a team of at least two to three people. For example, alignment measurement might involve one person holding a string while another measures the midpoint; gauge measurement might require one person placing the gauge and another recording. These tasks consume personnel, limiting how much can be done in one night under staff shortages. When heavy measurement jigs or inspection trolleys must be transported, even more hands are needed. Manual multi-person work also requires coordination training, and efficiency and accuracy depend on the skill level of the personnel.
As described above, traditional rail deformation measurement has been labor-intensive and inefficient, making it unrealistic to collect sufficient data during limited nighttime windows. Measurement records have also been mainly paper forms or manual data entry, hindering data sharing and accumulation and making practices person-dependent. Solving these issues requires a shift to more labor-saving, comprehensive, and fast measurement methods.
Achieving labor savings and speed with smartphone RTK and point cloud acquisition
Measurement technology using the recently introduced smartphone RTK contributes significantly to reducing manpower and speeding up rail deformation measurements. RTK (Real Time Kinematic) is a technique in satellite positioning that uses correction information from a reference station to remove errors in real time and achieve positioning accuracy on the order of several centimeters (cm level accuracy (half-inch accuracy)). LRTK is a small RTK-GNSS receiver attachable to a smartphone, turning a phone into a high-precision surveying instrument. As a result, GPS positioning errors that used to be on the order of meters can be improved to the centimeter level, enabling precise position measurement with a smartphone.
Using a smartphone with LRTK, a worker can obtain detailed rail geometry data simply by walking along the track with a smartphone in hand. While scanning the rails and sleeper surroundings with a smartphone’s built-in camera or LiDAR sensor to collect 3D point clouds, LRTK continuously tracks the smartphone’s position with high precision. Each point in the acquired point cloud receives accurate geographic coordinates, allowing continuous recording of track deformation rather than point-by-point measurement. The approach is like measuring the surface rather than isolated points, enabling a complete digital capture of the entire rail.
The advantages of this method are enormous. First, it enables significant manpower reduction. Complex equipment setup and coordinating with assistants are unnecessary; a single operator can capture wide-area data. Night work time is reduced, and with one smartphone RTK per person, multiple team members can measure different sections in parallel rather than having one team work sequentially. For example, if each person takes responsibility for a section and walks it, the distance measurable in one night can increase dramatically.
Speed improvements are also remarkable. Smartphone scanning can record hundreds of thousands of coordinate points per second in real time, so it can obtain a continuous track profile rather than measurements at every 10 m (32.8 ft). Work that used to require returning to the office for calculation and drawing can now be automatically processed and cloud-saved within the smartphone app, allowing same-day verification of results. This greatly shortens the lead time from measurement to analysis, enabling rapid progression from problem detection to countermeasure planning.
There is no need to worry about the accuracy of smartphone RTK measurements. With RTK corrections, smartphone position is always captured with cm precision (cm level accuracy (half-inch accuracy)); for example, it typically falls within an error range of around horizontal 2–3 cm (0.8–1.2 in) and vertical 3–4 cm (1.2–1.6 in). Point clouds acquired by multiple smartphones can be overlaid in the same coordinate system, allowing integration of data measured on different sections or at different times. This enables construction of seamless deformation data over long track sections. Scan errors that might be a concern with a standalone smartphone (positional drift or distortion) are corrected in real time by RTK’s high-precision tracking. Even after walking more than 100 m (328.1 ft), accumulated errors in the point cloud are unlikely, so subtle deformations over long straight sections can be reliably captured.
Additionally, the smartphone + LRTK approach has a low cost barrier. There is no need to buy dedicated laser measurement vehicles or expensive surveying instruments; measurement can start simply by attaching a small receiver to a field smartphone. The small, lightweight equipment is easy to handle, and it’s simple to equip inspection teams with multiple units. Specialized skills are not required: anyone can measure by following the smartphone app’s guidance, so newcomers can be productive immediately. Railway companies that have implemented this approach report that workers can record deformations and settlements simply by “walking along the track,” and work time has been reduced to less than half of the conventional time. Smartphone RTK measurement, which balances manpower savings and speed, can be the key to solving labor shortages.
Improving efficiency via deformation detection, heat maps, and cross-section analysis from point cloud data
3D point cloud data acquired with smartphone RTK not only can be collected but also can bring additional efficiencies through advanced digital analysis. Automated detection and visualization of rail deformation from vast point clouds enable state assessment and decision-making at speeds previously unimaginable.
For deformation detection, rail position coordinates on the point cloud are analyzed to calculate various displacement measures. For example, values of vertical displacement (commonly called “vertical irregularity”) can be extracted as continuous curves from the height data of the left and right rails, and alignment irregularity (“lateral irregularity”) can be calculated from the coordinate series of the rail sides. The gauge can be computed by measuring point-cloud distances between the two rails at each cross section and determining deviations from the standard across the entire section. These automatic calculations provide comprehensive numerical coverage of where and how much deformation exists across the measured area. Small defects that human inspection might have missed are not overlooked by data analytics.
Analysis results can be summarized visually as heat maps, making them intuitively understandable. For example, creating a heat map with track length on the horizontal axis and displacement magnitude represented by color intensity lets you instantly see “where the largest deformations are.” A long graph marking points where vertical or alignment displacements exceed thresholds in red visualizes the distribution and trends of abnormalities, enabling instant narrowing down of priority repair points. Where measurements once required reading tables and interpreting numbers, a heat map lets even non-experts find problem areas by simply viewing colors.
Point cloud data also allows flexible cross-section analysis. Cutting a virtual vertical cross section at any chosen position reveals detailed left-right rail height differences and subgrade cross-sectional shape. It is also possible to quickly generate cross-sectional views from the side or longitudinal gradient profiles along the track direction. Analyzing the distribution of vertical irregularities or the cross-sectional shape at suspected settlement locations helps not only to quantify deformation but also to infer causes and examine countermeasures. For instance, data might show “the track has settled at a certain point, and the cross section reveals ballast voids, suggesting insufficient tamping as the cause.”
Thus, digitized point cloud data enables multifaceted analysis, supporting everything from deformation detection and visualization to cause analysis. Field personnel can view heat maps and graphs in software and check cross-sectional details as needed. This greatly streamlines prioritization of repairs and the drafting of concrete work plans. The speed and coverage of data processing are incomparable to manual methods, enabling fast and sound decision-making in a short time.
Record sharing, reuse, and history management via cloud integration
Point clouds and analysis results acquired with smartphone RTK become powerful for on-site information sharing and accumulation when integrated with cloud services. Measurement data that previously tended to remain at the site or in each department can become an organizational asset if centralized in the cloud.
Rail deformation data uploaded to the cloud can be viewed by stakeholders from anywhere via the internet. For example, if data are synchronized right after on-site measurement, managers and engineers in the office can check results in real time and give immediate instructions. Online information sharing eliminates the need to wait for paper reports and speeds communication. Sharing heat map images and numerical lists of deformation in the cloud with repair contractors and construction managers enables smooth information transfer. When everyone can view the same data, misunderstandings decrease and safety measure discussions become more efficient.
The cloud is also useful for data reuse. Once point cloud data are acquired, they can be used for various analyses in the future. Overlaying new data during the next regular inspection enables comparative analysis of long-term changes. If past deformation measurement history is stored in the cloud, it becomes easy to analyze trends such as “how much settlement has progressed since the last check” or “which locations repeatedly exceed standards.” This helps optimize repair cycles and supports preventive maintenance strategies. Locations of concern that once relied on veteran intuition can be identified quantitatively from data.
History management is another cloud advantage. Storing deformation measurement data by date and line and keeping them retrievable makes tracing past conditions simple when needed. In the event of a trouble, one can quickly look back to see “what the most recent track condition was,” and past data can be presented as evidence during audits and reports. Retaining data also helps reduce knowledge loss when experienced staff retire. Information that would scatter in paper ledgers can be preserved in a cloud database and used across generations.
Moreover, some cloud platforms support integration with AI analytics and other systems. Combining track deformation data with other infrastructure monitoring information (for example, bridge or tunnel inspection results) opens the possibility of building a comprehensive infrastructure asset-management system. Data collection via smartphone RTK is part of on-site DX (digital transformation), and cloud-based data utilization deepens field insight and links to strategic maintenance planning.
Effects of AR display on on-site guidance, measurement accuracy, and young-worker training
Measurement data from smartphone RTK can be directly used in the field by combining them with AR (augmented reality) technology. By overlaying measurement data on live views of the track through a smartphone or tablet screen, intuitive on-site support becomes possible.
Major effects of AR use include:
• On-site guidance: Using stored deformation position data in the cloud, a smartphone held at the site can display AR markers indicating problem points. For example, when you want to confirm “a vertical irregularity at km X,” the smartphone screen can show arrows or markers to accurately guide the worker to that location. Even at night or over long sections, GPS + AR display helps workers reach target points without getting lost, accelerating repair work. If many abnormal points are found across a wide area, workers can follow AR guidance while walking the site and address them sequentially, enabling well-organized repair operations.
• Improved measurement accuracy: AR displays allow visual confirmation of the ideal track position and height on site. For instance, the smartphone screen can show the design rail position and allowable deformation range as green lines, letting workers instantly see how far the actual rail deviates. This enables real-time knowledge of “how many millimeters more must be lifted to meet the specification,” allowing precise corrective work not based on guesswork. Heat maps can be overlaid in AR to show deformation magnitude by color, supporting shared adjustments among workers.
• Training effect for young workers: Track maintenance has traditionally relied on veteran intuition and experience, but AR enables presenting information in forms that newcomers can easily understand. For example, a “5 mm vertical irregularity” that used to be only a number or a feel can be visualized as an explicit gap or tilt through AR, so young workers can correctly recognize the condition. AR can also guide work procedures, highlight points to check, and allow workers to learn while doing. This helps close the gap with experienced staff and smooth skill transfer.
In this way, AR display directly links field and digital information, augmenting human perception. Overlaying track deformation data on reality rather than just viewing it on paper realizes integrated digital support from measurement to repair. For example, displaying an acquired rail point cloud model over the site scene in AR enables on-site comparison with past data or design conditions. Teams can share information while seeing the actual scene, such as “this spot has settled by this much compared to before.” The combination of point cloud + photos + AR introduces a new style of field management that greatly contributes to raising safety awareness and improving worker understanding.
Conclusion: On-site improvements enabled by LRTK
Against the backdrop of worsening labor shortages, the smartphone RTK solution “LRTK” for rail deformation measurement brings innovation to the field in both labor savings and sophistication. It makes track inspection possible by a single person where conventional methods required multiple people, reduces the burden of night work, eliminates measurement omissions, and enables rapid response through data analysis and sharing. As a result, some railway companies have reported work time cut in half, and repair planning has become smoother.
Digital technology is bringing the ideal of “faster, cheaper, more accurate, and safer” closer to reality. By adopting LRTK, a limited workforce can manage wide areas of track efficiently, substantially reducing worker burden while maintaining train safety. Utilizing cutting-edge technology also improves the attractiveness of field work and helps retain younger workers. The national push for *i-Construction* (field DX) by the Ministry of Land, Infrastructure, Transport and Tourism provides additional momentum, accelerating ICT and GNSS adoption in railway maintenance.
Turning the constraint of labor shortages into an opportunity to raise productivity through new technology is essential for future infrastructure maintenance. The use of LRTK in rail deformation measurement is a prime example attracting attention from the field. By embracing digitalization rather than sticking to old methods, it is possible to build a sustainable maintenance management system that keeps safety first. For railway maintenance teams that support rail safety, LRTK will be a reliable partner, and by practicing on-site DX and labor savings it will help shape the next generation of track maintenance.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.