• Reasons why more people are using rented 3D laser scanners combined with RTK GNSS

• Tip 1: First decide which deliverable you want to obtain.

• Tip 2: Organize the required accuracy and on-site conditions in advance

• Tip 3 Consider scan planning and control point planning together

• Tip 4 Simplify on-site role assignments and work procedures

• Tip 5: Consider post-acquisition point cloud processing and the delivery format

• Tip 6 Leave room for verification and re-measurement during the rental period

• Common mistakes and how to prevent them

• Summary


Why More People Are Renting 3D Laser Scanners Paired with RTK GNSS

An increasing number of practitioners considering renting 3D laser scanners and RTK GNSS reflects a need to simultaneously satisfy the speed of measurement required on site and the reliability of positional information. Traditionally, the work of capturing detailed shapes and the work of assigning correct coordinates were often treated separately, with different people responsible for measuring, verifying, and drafting. However, as on-site labor shortages advance and short construction schedules become the norm, there is a growing desire to acquire, with as few people as possible and in as little time as possible, data that is easy to use in downstream processes.


A strong option in such cases is the combination of a 3D laser scanner and RTK GNSS. A 3D laser scanner is well suited to capturing the shapes of objects, terrain, and structures at high density, and RTK GNSS excels at assigning site coordinates to that point cloud. If the data can be used not just to preserve shapes but as spatially aligned, positionally consistent data, its range of uses expands greatly: as-built verification, before-and-after comparisons for renovations, checks against design, quantity verification, maintenance and management records, and more.


On the other hand, many people who search for the keywords "rental 3D laser scanner RTK GNSS" already understand the equipment's effectiveness, yet worry about failing when they take it into the field. Very realistic concerns include whether simply renting the equipment will actually deliver results, whether they can operate it confidently on site, whether they can complete the post-processing, and whether they can finish everything within a short rental period.


The greatest advantage of renting is that it lowers the barrier to initial implementation. You can verify compatibility with your in-house operations before purchasing, more easily adjust equipment configurations on a per-project basis, and use it only during busy periods. However, while renting is easy to start, entering a site underprepared can turn the constraint of having to produce results in a short period into a risk. That is why, more than the performance of the equipment itself, how you plan and the order in which you use it are what matter.


This article provides a detailed explanation of six tips for practitioners introducing 3D laser scanners and RTK GNSS on a rental basis, to help them achieve successful results while avoiding common on-site pitfalls. It is organized to be useful not only for those considering implementation for the first time, but also for practitioners who tried once before and did not obtain the desired results.


Tip 1: First, decide the deliverable you want to obtain

What you should decide first, before renting equipment, is not "what to measure" but "what to create." This is very basic, yet in practice it is a point that tends to be overlooked. If you proceed on the expectation that using a 3D laser scanner and RTK GNSS will let you quickly measure a wide area and obtain point clouds with coordinates, you may find on site that while the amount of acquired data increases, the information required for the final deliverable is lacking.


For example, whether the objective is recording the existing conditions, checking against the design, verifying as-built conditions, or providing baseline data for renovation planning will change the required point cloud density, the necessary coverage, the required coordinate accuracy, and the blind spots that must be checked. If the goal is recording the existing conditions, prioritizing complete coverage of a wide area is important, whereas if design verification is the primary purpose, dimensional reproducibility at critical locations and the reliability of coordinates are given greater weight. Which locations need to be measured also depends on whether the deliverable is for cross-section checking, plan-view use, or reference for a three-dimensional model.


What’s important here is to articulate within the company or on the client side "what level of deliverable is needed this time" before the fieldwork. It’s risky to assume that point cloud data can be used for anything. There may be a possibility of using it for other purposes later, but if you try to make it all-purpose from the outset, only the workload expands, making it inefficient in terms of rental periods and processing time. If you decide the required deliverables in advance, the scan resolution, number of observation positions, how RTK GNSS will be utilized, and estimates of on-site stay time become realistic.


Also, deciding the deliverables in advance makes it easier to consider the combination of equipment to rent. Whether the work is primarily focused on understanding terrain across a wide outdoor area, obtaining detailed data around structures, or even including position checks during construction will change the required peripheral equipment and operational methods. If you enter the site with this unclear, mismatches can occur—for example, you may have conducted sufficient scans but lack the necessary coordinate references and struggle in post-processing, or conversely have managed coordinate control but acquired coarse shape data that is difficult to use.


In other words, the success of a rental is decided not by the day you rent it, but almost entirely by the design done before renting. The first tip is to design 3D laser scanners and RTK GNSS not as mere measuring equipment, but as an integrated series of processes to produce deliverables.


Tip 2: Organize the required accuracy and site conditions in advance

The next important step is to define the required accuracy and site conditions as concrete criteria rather than by intuition. A 3D laser scanner and RTK GNSS are a very well-matched combination, but they will not yield the same results at every site. In particular, RTK GNSS is affected by satellite reception conditions and the availability of correction information, so planning while ignoring the surrounding environment can result in not achieving the expected accuracy and in inconsistent on-site decision-making.


For example, while it is relatively easy to use RTK GNSS on open outdoor civil engineering sites, under tree cover, near slopes, in densely built-up areas, in the shadow of structures, in mountainous regions, or in narrow passages satellite visibility often deteriorates, making it difficult to provide stable coordinates. In such places, you need to plan in advance which points to capture with GNSS and where to connect using other methods or supplementary techniques.


The 3D laser scanner is also influenced by factors such as the target’s reflectivity, movements of pedestrians and vehicles, available space for equipment placement, and maintaining lines of sight. The number of scan positions will vary depending on whether the subject is a complex structure, terrain-focused, or an area with many pipes and installations. Trying to cover a large area with too few positions can create many shadowed spots, resulting in noticeable gaps during post-processing. Conversely, seeking excessive detail can unnecessarily increase the number of observation points, inflating processing load and work time.


The key point here is not to set the required precision stricter than necessary. Quality is of course important, but pursuing excessive precision relative to the business purpose can erode the benefits of renting. What matters is whether the deliverables can withstand business decision-making. The precision required in practice varies by use case—grasping trends in as-built conditions, recording conditions before refurbishment, verifying consistency with the current situation, etc. By clarifying the relationship between the required precision and the business objective, you can see how far to push things on site.


Identifying site conditions in advance will make decision-making on the day more stable. Factors such as the times when measurements can be taken, whether traffic restrictions or access limitations apply, nearby obstructions, travel distances, the need to secure power, the effects of rain and wind, and procedures for backing up data—these non-equipment conditions determine success or failure. When using rented equipment in particular, assume users are unfamiliar with the gear and carefully organize the site conditions; doing so directly prevents troubles.


Tip 3: Consider scan planning and control point planning as a set

One common mistake in the field when combining 3D laser scanners with RTK GNSS is drawing up only the scan plan first and relegating the plan for assigning coordinates to later. On site, the perspective of “where to place the equipment to capture the whole area” tends to take precedence, but to produce a point cloud that is usable in practice you must simultaneously consider “how it will be tied to the coordinate system.”


Even if a point cloud captures shape in fine detail, its usefulness is limited if the basis for its coordinates is unclear. To use it for overlaying with plan drawings or existing drawings, construction management, as‑built verification, or time‑series comparison, the alignment approach must be clear. Therefore, it is important to organize the scan positions and control points, or the arrangement of the objects that will be assigned coordinates, into a single plan.


Specifically, deciding in advance the order in which you will scan the entire site, at which points you will use RTK GNSS to capture coordinates, and which areas you will link to a common reference will stabilize post-processing. Rather than completing the workflow solely by connecting point clouds to each other, intentionally placing connection points tied to site coordinates makes later consistency checks easier. This is increasingly important on larger sites, because the wider the area, the more cumulative positional errors and differences in judgment among operators are likely to have an impact.


Also, when planning control points, the perspective of the post-processing personnel is necessary. What is visible on-site and what is easy to reproduce in the data do not always align. Prominent structure corners or distinctive points on the pavement do not necessarily serve as stable references for post-processing. For that reason, you should decide which points to use as references by comprehensively considering on-site visibility, the ease of GNSS observation, and the ease of identification in the scan data.


Furthermore, by planning control points in advance, the work time on the day becomes easier to estimate. The more observation positions you add for the 3D laser scanner, the greater the effort required for setup and relocation, and the more observation points there are for RTK GNSS, the more time is needed for verification. Rather than treating these separately, assembling them into a single work plan enables manageable operations even within the rental period.


In short, shape acquisition and coordinate assignment are not separate tasks but two wheels supporting the same deliverable. Considering the scan plan and the control point plan together from the start is an important tip for obtaining usable point clouds.


Tip 4 Simplify on-site role allocation and work procedures

Whether introducing rental equipment yields results depends more on how you operate on site than on the performance of the equipment. Especially on first use, it is common to spend more time on site than expected, and many of the causes are not mistakes in operation itself but ambiguous role allocation and complicated procedures. When using a 3D laser scanner in combination with RTK GNSS, the amount of work can appear large, so people tend to assume they must set up a perfect structure in advance, but the opposite is true. What matters is reducing what needs to be done and clarifying who will decide what and when.


A common situation on-site is that everyone only has a vague grasp of the whole, and responsibilities for instrument setup, observation checks, coordinate recording, decisions to move, decisions to re-measure, and data backup are unclear. In this state, each task may seem to be progressing, but when reviewed later gaps and omissions tend to appear. If it is unclear which observation positions are considered complete, which coordinates are final, or which areas remain uncollected, it leads to revisits and reprocessing.


Therefore, on-site it is effective to divide roles into the smallest practical units. For example, simply organizing roles such as a person responsible for equipment operation and installation decisions, a person responsible for coordinate verification and recording, and a person responsible for checking for omissions across the entire site will stabilize the workflow. It is not necessary to have a large number of people. Even with a small team, clarifying each person's decision criteria makes it easier to proceed reliably in a short time.


Also, simplifying procedures is important. Trying to implement complex naming conventions or overly detailed checklist items on site can actually cause confusion during the initial rental. What matters is that the minimum information required for post-processing is reliably retained. By narrowing the rules down to the bare minimum—such as observation order, correspondence of installation positions, targets for coordinate assignment, presence or absence of missing data, and candidates for re-measurement—on-site decision-making becomes faster.


Additionally, it is effective to establish checkpoints at each stage of the work. Rather than reviewing everything only after the entire job is finished, reviewing acquisition status at regular intervals for defined areas lets you detect missed captures sooner. Because the rental period leaves limited room for revisits, it is important to have a verification cycle that can be completed on site. This makes a particularly big difference at sites where 3D laser scanners and RTK GNSS are being combined for the first time.


In other words, in on-site operations you should prioritize reliable operation over aiming for sophisticated operation. Simplifying role assignments and procedures and creating a workflow that is clear to anyone will lead to successful use of rentals.


Tip 5: Consider point cloud processing and delivery formats after acquisition

It can feel like the job is done once data has been collected on site, but in work that utilizes 3D laser scanners and RTK GNSS, that's actually when the real work begins. Among reports of failed rental use, there are many cases where the on-site acquisition itself was fine, but work stalled during point cloud processing or internal sharing, and as a result the data couldn't be fully utilized.


Because point cloud data contain a lot of information, mishandling them can lead to problems such as being too large to open, being unable to extract the required area, ambiguous handling of coordinates that prevents alignment with other datasets, and not being able to quickly access the areas you want to inspect. This is more a matter of deliverable design and processing policy than of the equipment itself. That is why you need to plan, before going to the site, who will do what after the data are acquired.


The first thing to confirm is in what format and to whom the data will ultimately be delivered. The way you need to organize it changes depending on whether there is someone in-house who will handle the point cloud data directly, whether it is primarily for viewing, whether the main purpose is to reflect it in plans and sections, or whether it will be submitted to the client as documentation with coordinates. Even if you collect more high-density data on site than necessary, if it does not match the environment or objectives of those who will handle it, it will just become heavy, unwieldy data.


Also, in point cloud processing, it is important to adopt the approach of ensuring that only the necessary parts are reliably usable. Rather than preserving everything in fine detail, organizing the operationally important areas so they are easy to view, accompanied by coordinates, and easy to reuse can often have greater practical value. This is especially important when using rentals. To achieve the greatest results within a limited period, you should aim to maximize usability rather than the amount of data acquired.


Furthermore, by keeping the delivery format and sharing method in mind, the priorities for on-site data acquisition become clearer. For example, if cross-section verification will be required later, the observation plan should avoid locations that are likely to be missing or damaged in the cross-sectional direction; if the purpose is as-built comparison, you should prioritize assigning coordinates in a way that can be easily reproduced according to the same standard. In other words, by considering processing and delivery first, on-site decisions become more concrete.


When starting with rentals, it's easy to fall into the pattern of 'rent first, try it out, and think about it later.' However, to truly avoid failure, the reverse is true. It's important to decide in advance how you will use it later, and to be sure to collect only the data needed for that purpose. Simply following this order greatly increases the reproducibility of rental usage.


Tip 6 Leave room for verification and re-measurement during the rental period

One thing that's often surprisingly overlooked in rental projects is trying to cram too much site work into a single day. When you have to return equipment on a tight schedule, it's natural to want to make the most of the rental period. However, a tightly packed plan is especially risky for first-time deployments or unfamiliar sites. That's because both 3D laser scanners and RTK GNSS systems have constraints that only become apparent once you're actually on site.


For example, it is not uncommon to find an obstacle at the planned installation location, to have to shift observations because of vehicle traffic, to experience changes in satellite reception depending on the time of day, to encounter more blind spots than expected, or to spend more time moving around the site than anticipated. Any one of these deviations can be absorbed through on-site judgment, but in a plan with no margin they cascade. As a result, the final checks become lax, and missing data or inconsistencies are discovered during the post-processing stage.


Therefore, during the rental period you should always leave room for verification and re-measurement. Ideally, the data capture date and the verification date should be separate, but if you can’t allocate that much time, it’s important to reserve time at the end of the site visit for checks so you can perform additional observations if necessary. Don’t be satisfied just because you’ve finished scanning the entire area; simply setting aside time to check from the standpoint of the deliverables for any deficiencies will greatly reduce the likelihood of failure.


It is also effective to check once midway through the rental period how easy the data is to work with. If you can confirm early whether the point cloud connectivity is as expected, whether the alignment with coordinates is as anticipated, and whether the necessary areas are visible, you can make corrections within the rental period. If you postpone this until just before returning the equipment, the options for action will be limited once you notice a problem.


Furthermore, the idea of leaving room for remeasurement is not merely insurance. During the initial deployment, actually using the system will reveal operational rules that fit your company. Insights such as what density is practical, how far GNSS should be applied to be efficient, and which on-site processes it pairs well with are difficult to gain from a single run. Allowing a little margin increases reproducibility in subsequent deployments.


Rentals are not merely a temporary use but also an opportunity to evaluate whether they suit your company. To maximize that value, it is important to intentionally reserve time for checks and adjustments rather than filling the schedule right up to the last minute.


Common mistakes and how to prevent them

We've explained six tips so far, and finally I'll summarize the mistakes that commonly occur on site. The most frequent is trying to cover too wide an area. If you think, "Since we're renting the equipment anyway, I'll measure all the surroundings as well," the number of survey points increases, post-processing becomes heavier, and verification of the most important area becomes lax. The way to prevent this is clear: decide in advance the area required for the deliverables. You should prioritize usability over size.


Another common misconception is believing that using RTK GNSS will automatically make everything high-precision. In reality, quality is influenced by satellite reception environments and observation conditions. To avoid this, you need to check site conditions in advance and plan alternative connection methods or verification procedures for locations where GNSS performs poorly. Using high-precision equipment is not synonymous with producing high-quality deliverables.


Furthermore, insufficient on-site recordkeeping is another common failure. If it is unclear where and what was measured, post-processing becomes confused and, in the worst case, the data become unusable. To prevent this, rather than creating complicated operating rules, leave the minimum records that allow anyone to trace the observation locations and their correspondences. Even in small-team operations, this must not be omitted.


Also, the load of point cloud processing is sometimes underestimated. When on-site acquisition goes smoothly, it's easy to become complacent, but the more data there is, the longer processing and verification take. To prevent this, decide in advance how you will deliver and share the data, and avoid collecting more information than necessary. It's more valuable for the data to be usable in the required state than to keep everything.


And finally, the most wasteful mistake is expecting perfection on the first try. When leveraging rental services, it is difficult to fully optimize them for your company’s operations on the initial attempt. That is precisely why it is important to achieve results in the first run while bringing back operational insights that can be applied next time. With that perspective, even if you find some areas for improvement, they are not failures but steps forward.


Summary

When using rented 3D laser scanners and RTK GNSS, what matters is not simply borrowing high-performance equipment, but building your operations by working backwards from the deliverables. Clarify the relationship between the geometry you want to capture and the positional information, plan based on site conditions, consider scanning and coordinate assignment as an integrated process, streamline work procedures, look ahead to processing and delivery, and leave room for verification and re-measurement. Simply following this workflow greatly increases the likelihood of success even on the first deployment.


In practical work, creating a system that can be operated smoothly on-site is more important than getting the most out of equipment. Rental is also a way to test such a system with low risk. Implementing it on a per-project basis first and determining which processes in your company's operations will yield the greatest benefit is the most rational approach in the long term.


Furthermore, if what the site needs goes beyond detailed measurements with a 3D laser scanner to include daily position checks, simple coordinate acquisition, control point verification, and more efficient layout/setting-out during construction, considering more accessible high‑precision positioning methods will make operations run more smoothly. For example, LRTK, a high‑precision GNSS positioning device that can be attached to an iPhone, can streamline on‑site coordinate checks and simple surveying and pairs well with the pre‑ and post‑processes of 3D measurement. By performing large‑scale measurements reliably with rented equipment while quickly handling daily on‑site checks and supplementary positioning with LRTK, you can reduce waste across the entire measurement workflow. Those responsible for introducing 3D laser scanners and RTK GNSS are particularly likely to find that incorporating agile solutions like LRTK makes it easier to realize improvements in overall site productivity.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page