The precise GNSS positioning technology RTK has revolutionized surveying at civil engineering and construction sites. But do the deliverables produced by RTK topographic surveys truly meet the needs of the office? This article focuses on the shortcomings of conventional RTK surveying and the candid needs of offices regarding the deliverables they receive from the field, exploring what offices really want. It also explains the value and introduction benefits of LRTK, a solution that fills that gap, with concrete examples and comparisons to other methods.


Table of Contents

• Conventional issues with RTK

• The reality of RTK topo deliverables

• The office’s true needs

• The real value provided by LRTK

• Results and case studies from LRTK adoption

• Use cases and appeal of simplified surveying

• FAQ


Conventional issues with RTK

The advent of RTK surveying dramatically improved tasks that previously required time and manpower with total stations (TS) and the like. However, conventional RTK operations have also been criticized for the following issues.


• Specialist equipment and operational complexity: Conventional RTK surveying requires expensive dedicated GNSS receivers and setup of base stations, and configuring and adjusting equipment requires specialized knowledge. There are many preparatory tasks such as coordinate system setup and communication connection (radio or Ntrip settings) before observation, so it has not been something anyone can use casually.

• Constraints of the positioning environment: Satellite positioning cannot achieve high accuracy unless the sky view is good. In forests, in the shadows of high-rise buildings, or in indoor and underground spaces, RTK positioning is difficult, and in such places one often has to rely on traditional TS and the like.

• Data acquisition and post-processing: While RTK observations can be efficiently performed by one person, producing drawings or analyses from the acquired survey point data still requires specialist skills and time. Inefficiencies also occur when a survey is finished without sufficient on-site confirmation and missing data are noticed only after returning to the office.

• Limitations of deliverables: Deliverables obtained by conventional RTK surveying are mainly coordinate values and the resulting plan drawings, and rarely include spatial information such as site photos or 3D models. Deliverables that consist only of points and lines make it difficult to intuitively grasp site conditions and can be hard for non-technical personnel to understand.


The reality of RTK topo deliverables

So what kinds of deliverables are typically produced by current RTK-based topographic surveys? In practice, the following forms are commonly seen.


Typically, the deliverables from surveying contractors are electronic data and paper drawings. Electronic data are provided as CAD drawings (e.g., DWG/DXF) or lists of coordinates (CSV/Excel), and printed plans or cross-sections are attached as needed. For government projects, prescribed reports and deliverable documents are prepared, but in any case the deliverables are mainly two-dimensional drawings and numerical information, and do not include rich information such as photos or point clouds.


With this type of deliverable, the receiving office often needs to perform further data processing to make use of it. For example, if only a coordinate table is provided, designers must first import it into CAD software and create drawings to understand the site. There are also constraints such as receiving large CAD or point cloud data on a USB memory stick that only a limited number of high-performance PCs in the company can open. As a result, even detailed 3D information acquired in the field may only be viewable by some people internally or may be cumbersome to share. Inefficiencies such as confusion over “which file is the latest?” every time drawing files are emailed, or having to convert to paper or PDF when sharing externally, are common. In short, the current RTK deliverables are digitally high-precision but remain in formats that are not easy to share or utilize as-is.


The office’s true needs

What do office users really want from these surveying deliverables? The main needs that emerge are as follows.


• Accuracy: Needless to say, high reliability of the deliverables is the top priority. Survey data that form the basis for design and quantity calculation must be accurate within an error of a few cm (a few in) to be used with confidence. Offices strongly demand that delivered data conform to known coordinate systems and maintain consistency, and that there are no coordinate conversion or transcription errors.

• Efficiency: There is a need to utilize data acquired on site as quickly as possible without additional effort. Ideally, survey results should be reflected in drawings and quantity calculations on the same day, or at least within a short period. Offices do not want to spend time on cumbersome post-processing or reformatting, so receiving deliverables that are already close to their intended form is desirable.

• Shareability: It is also important that survey results can be smoothly shared internally and externally. When sharing data with multiple designers or subcontractors, requirements for special software or excessively large file sizes can be problematic. The ideal for office users is to receive deliverables in formats that are easily viewable by parties without specialist software, or via cloud-shared links.

• Simplicity: Offices want deliverables that non-specialists can intuitively understand. Instead of just lists of numbers, visual information such as photos and 3D views makes it easier to imagine the site and aids decision-making. Ease of further data use is also important—e.g., being able to analyze by simply loading into software or verify in a browser—so usability is a key point.

• Cost: Finally, cost cannot be ignored. If more comprehensive deliverables can be obtained while reducing surveying and labor costs, that is preferable. Offices ideally want fewer additional surveys or rework and to obtain deliverables efficiently with fewer personnel. “Getting the necessary information with minimal effort and cost” is likely the true desire of site managers and executives.


The real value provided by LRTK

LRTK is an RTK solution using smartphones developed to meet these needs. The true value of LRTK is not only its ability to achieve centimeter-level positioning but its consistent productivity improvements from surveying work through deliverable creation and sharing. Let’s look at its main features and benefits in detail.


• Portability and one-person operation: LRTK is used by attaching a small GNSS receiver to a smartphone, so the equipment is compact enough to fit in a bag. Surveying that previously required tripods and large equipment can now be done lightly, allowing rapid start of surveying anywhere. Since one smartphone can complete positioning and recording, one-person surveying is easy. This mobility is a major advantage on sites with labor shortages, allowing quick measurements whenever needed.

• AR guidance for stakeout: The LRTK app includes augmented reality (AR) features that display design coordinate positions on the camera image to guide work. This makes it possible to intuitively perform stakeout and layout work that traditionally required two people with a TS, by a single person. For example, target points are shown as markers on the smartphone screen, and placing stakes according to those markers achieves high-precision positioning. Visual AR guidance reduces errors and streamlines verification work.

• 3D point cloud scanning and volume calculation: By combining the smartphone’s built-in LiDAR sensor with LRTK’s GNSS, it is possible to scan site structures and terrain as 3D point clouds. Since each point in the acquired point cloud is assigned high-precision coordinates, the entire site can be recorded as precise digital information. From this data, a mesh model can be automatically generated and earthwork volume (volume) calculations can be performed immediately in the software, completing what used to be separate and time-consuming as-built management on-site. The ability to obtain dense point cloud data in a short time greatly reduces the risk of later discovering “missed measurements.”

• Geotagged photos and logging functions: LRTK uses the smartphone camera to record exact coordinates for photographed targets with a geotagged photo function. For example, photographing roadside equipment or buried utilities saves location information with cm-level accuracy (half-inch accuracy), making it very useful for reports and maintenance records. LRTK also supports logging to record trajectories while moving, enabling one-touch tasks such as walking the site boundary or measuring pipe routes. Survey records with photos and trajectories convey site conditions more effectively than plain coordinate tables.

• Cloud sharing and data integration: Data acquired with LRTK can be wirelessly uploaded to a dedicated cloud service. Uploaded survey data can be viewed with 3D point clouds and photos in a web browser, so stakeholders without software can check the results via a URL link. The cloud platform offers simple measurement, cross-section display, and daily report features, enabling collaborative work between site and office while sharing data. It is also flexible in integrating with existing CAD/GIS environments—for example, downloading point lists as CSV or exporting point clouds in common formats for use in other software. Cloud-based workflows make it much easier to share deliverables internally and externally, which was a traditional bottleneck.


Results and case studies from LRTK adoption

Various effects have been reported from sites that have actually adopted LRTK. Here are some of the main outcomes and case studies.


• Faster site work: LRTK is powerful in situations where speed is required, such as initial surveys for disaster recovery. For example, in Fukui City, LRTK Phone was quickly introduced for assessing disaster sites, allowing single-person surveying and immediate cloud sharing, which dramatically sped up site surveys and recovery decision-making that previously required sending survey teams. The ability to share necessary survey data with stakeholders immediately in time-sensitive situations has been highly valued.

• Cost reduction through labor savings: Because one person can complete many tasks with LRTK, it contributes to reduced staffing and outsourcing costs. One construction company switched as-built surveys that used to be done by two-person teams to single-person work with LRTK, cutting working time to less than half. There are also reports that small surveying tasks can now be handled in-house, leading to reduced surveying costs.

• Improved quality of deliverables: Deliverables with 3D point clouds and photos contain far more information than traditional drawings. Designers who used LRTK point cloud data commented that “we could understand the site details three-dimensionally, which made design review smoother.” Subtle terrain changes that are overlooked in drawings can be read from point clouds, helping prevent design errors and additional construction.

• Smoother information sharing: There are cases where using the LRTK cloud strengthened coordination between site and office. On one construction site, an office engineer checked the point cloud on the cloud immediately after surveying and provided instant feedback on additional points to be measured, preventing the need for later re-measurement. The ability to share near-real-time site deliverables reduced internal communication costs and allowed all stakeholders to act on the latest data.

• Easy learning and utilization: There are reports of field workers using LRTK without special training. The smartphone app’s intuitive interface guides procedures, so non-survey specialists can perform basic stakeout and measurement. Comments include “site supervisors can measure without complex equipment operation” and “site staff voluntarily take and share survey data,” contributing to internal DX (digital transformation) efforts.


Use cases and appeal of simplified surveying

LRTK is transforming surveying tasks that previously had to be left to specialists into work that anyone can do easily. The advent of a high-accuracy yet easy-to-use tool is expanding new use cases that can be called “simplified surveying.”


For example, site managers and supervisors who previously had to request surveys can now perform progress management and as-built checks themselves in short time. They can measure excavation or embankment volumes on-site and share them to the cloud the same day, making it easy to reflect results in office schedules. It also enables companies to complete building or equipment stakeout internally without outsourcing to surveying firms, or to record inspection photos with accurate location information during maintenance—providing flexible responses for situations where someone just needs to measure something quickly.


The appeal of this simplified surveying is that high-precision measurement can be performed as needed. Introducing tools like LRTK makes surveying part of routine operations rather than a special event, accelerating decision-making and reducing waste. What offices really wanted—“to obtain high-accuracy data quickly and in a shareable format”—is becoming a reality.


FAQ

Q1. Is surveying accuracy sufficient with LRTK? Is it comparable to total stations? A. By utilizing network RTK and augmentation signals from quasi-zenith satellites, LRTK typically achieves plan position accuracy of ± several cm (± several in) and elevation accuracy of ± several cm (± several in). This level of accuracy is sufficient for common civil engineering and construction surveying, and with proper operation can rival total stations. However, for specialized cases requiring sub-millimeter accuracy such as displacement monitoring, TS still has advantages, so it is important to choose the method according to the application.


Q2. Can employees without specialist knowledge operate it? A. Yes, LRTK is designed to be usable by non-survey personnel on site. The smartphone app guides procedures, so basic point acquisition and stakeout can be done with intuitive operations. While foundational knowledge of coordinate systems and device characteristics is helpful for correctly understanding and using survey results, difficult equipment operation is unnecessary, and many staff can become proficient after a short explanation.


Q3. How can survey data acquired with LRTK be used and shared? A. LRTK features upload of acquired data to the cloud and 3D viewing and sharing via a browser. Office PCs can immediately check site point clouds and survey points and measure dimensions or calculate volumes as needed. Cloud data can be shared with internal and external stakeholders simply by sharing a link. Point lists can be downloaded as CSV and point clouds exported in standard formats for import into CAD software, so creating drawings as before is not an issue.


Q4. What should be done in places where GNSS cannot be received? A. Unfortunately, RTK positioning is fundamentally difficult in locations where satellite signals cannot reach, such as inside forests, indoors, or underground. In such environments, it is realistic to combine other measurement methods such as total stations as before. However, in cases like temporary signal instability around buildings, measuring reference points in a slightly open area and then measuring relative indoor dimensions can be a practical workaround. LRTK itself is continuously evolving, and in the future sensor fusion technologies may allow continued positioning for short periods even when satellite signals drop out.


Q5. How does LRTK differ from conventional RTK equipment from other manufacturers? A. The biggest difference is that LRTK is a smartphone-integrated solution. Traditional RTK receivers were devices that only measured positions, but LRTK combines smartphone apps to provide all-in-one functions such as point cloud scanning, AR stakeout guidance, and photo recording. It is also more portable than fixed installations and offers a data utilization environment that includes cloud services. In short, LRTK is a next-generation RTK system designed not just to “measure and finish” but to “measure and make use of” the data.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.