Introduction

When constructing concrete structures on a construction site, tasks such as placing anchor bolts, assembling formwork, and verifying concrete heights (leveling) are critically important. Errors in these processes can lead to mismatched components in later stages, rework, or potential impacts on the quality and safety of the structure. For this reason, sites pay close attention to layout marking and surveying, but conventional methods inevitably involve human error and considerable labor.


Recently, RTK positioning (Real Time Kinematic) has attracted attention as a technology to solve these issues. RTK is a high-precision positioning technique using satellites that corrects GNSS (GPS etc.) positioning errors in real time, enabling positioning with centimeter-level accuracy. Compared with traditional chalk lines and transits, using RTK allows anchor bolt and formwork layout to be performed quickly and accurately, and is expected to greatly reduce rework caused by surveying mistakes. This article explains, in an easy-to-understand way for beginner to intermediate surveying and construction technicians, how RTK can be used for anchor bolts, formwork, and height verification, and the benefits it brings.


What is RTK (Real Time Kinematic)

RTK (Real Time Kinematic) is a high-precision positioning technology that uses satellite positioning systems. It generally uses two receivers: a fixed receiver called a base station and a mobile receiver (rover) carried by the operator. The error information of satellite signals received at the base station is sent to the rover via radio or the Internet, and the rover applies corrections to its positioning results, reducing GNSS positioning errors that were typically several meters to the order of centimeters. It can achieve about ±1–2 cm (±0.4–0.8 in) in plane position and about ±2–3 cm (±0.8–1.2 in) in height, providing accuracy high enough for layout marking and as-built measurement on construction sites.


A major feature of RTK is that positioning results are available in real time. The rover receiver immediately displays corrected current coordinates, allowing workers to verify on the spot whether “the position they are standing on matches the design.” Since the receiver continues to position continuously while moving, it can measure not only single points but also trace lines and surfaces. For example, when marking a reference height on the ground, RTK can instantly measure multiple points and quickly draw a horizontal reference line.


To perform RTK positioning, a base station with known coordinates is usually installed near the site and communicates with the rover. In Japan, network RTK services that deliver correction information via mobile networks are available, so RTK positioning can be performed with a single receiver using those services. Introducing RTK simplifies the cumbersome surveying preparations that were traditionally required, such as batter boards and water leveling, and reduces the necessary equipment to roughly a receiver and a pole, contributing to labor savings. Now, let’s look specifically at how this RTK technology can be applied to anchor bolt installation and formwork construction.


Using RTK for precise anchor bolt positioning

Anchor bolts are bolts embedded in concrete foundations to secure structural elements such as columns and beams. For example, in steel-frame buildings, anchor bolts are embedded in the foundation concrete and the column bases are fastened to those bolts. If anchor bolt positions deviate from the design, the bolt holes in columns will not align and will lead to construction defects, so it is necessary to place them accurately to millimeter-level precision.


Traditionally, anchor bolt layout used temporary wooden frames called “yarikata” (piles and wales) placed around the site, with string lines stretched to establish building reference lines. Distances from those reference lines are measured with tape measures, and anchor positions are marked one by one according to the drawings.


Although skilled workers can achieve high accuracy with careful layout marking, manual work requires time and effort and carries the risk of cumulative errors from small misreadings or sagging strings.


Total stations (TS) are also used for layout, but TS surveying requires at least two people (an operator and a prism holder) and constant line-of-sight. On large foundation sites, repeatedly repositioning and setting up the instrument is time-consuming and not efficient. There are cases where slight measurement errors in foundation positioning caused anchor positions to be off by several centimeters after concrete pouring, the column base holes did not match, and workers had to cut concrete and re-embed bolts—an unpleasant experience some technicians have faced.


RTK-based anchor bolt layout addresses these challenges. With an RTK-capable GNSS receiver, you can directly display the coordinates of the anchor center specified in the design on the site. If you preload the anchor position data (coordinate values) into the receiver or a smartphone, workers simply walk with the receiver and the difference between their current position and the target anchor position is shown in real time with centimeter-level accuracy. The worker only needs to align the on-screen current position with the target and mark the anchor location, so one person can complete the layout efficiently.


Even without a highly skilled surveyor, RTK enables anchor placement according to drawings and can substantially reduce rework. Sites that have adopted RTK report improvements such as “we can now place anchors at design coordinates and almost never have to cut foundation concrete and re-embed bolts,” reflecting significant satisfaction.


Improving formwork layout efficiency and level checks

Formwork is a temporary structure that shapes concrete to prevent it from flowing out during placement. The shape and dimensions of foundations and walls are determined by the position of the formwork, so accurate placement and leveling (ensuring horizontality) are extremely important. If formwork is misplaced, the finished concrete structure may deviate from design dimensions, or tilting and steps may occur.


In traditional formwork layout, chalk lines are drawn on the ground or slab along the building’s grid lines, and formwork is assembled to match those lines. Straight portions use string lines to establish straight lines, and right angles are set using rules or surveying instruments by measuring offsets from batter boards. While experienced workers can achieve accuracy with these methods, long string lines over wide areas can sag slightly and curve, and complex curves or shapes require repeated measurement and marking, consuming considerable time. If chalk lines or string lines shift or break during work, workers lose reference points and must remeasure, causing additional effort.


Using RTK greatly improves formwork layout efficiency. If you measure reference points such as foundation corners or column locations with RTK, you can instantly check whether each point is located per the drawings. If there is any deviation, it is revealed in real time and the formwork can be corrected on the spot. Also, tasks that used to require two people for horizontal and vertical leveling can be done by one worker carrying a pole with RTK, measuring heights at each point to verify they match the specified elevation. The measured elevation values are automatically corrected by the receiver, enabling uniform top-of-form elevations around the perimeter within a few centimeters of error.


With RTK-based layout, there is no need to manually compute distances or angles between points. The receiver or app displays the “deviation from the design line” numerically in real time, so you can gradually move the formwork to the required position while watching the display. For curved or diagonal formwork, RTK can present complex lines directly as coordinates, enabling accurate line layout without relying on a worker’s intuition. The result is shorter work times, reduced manpower, and improved dimensional accuracy in the finished product.


Using RTK for concrete height verification (leveling)

Height (level) control is also a key quality assurance point in concrete work. Checking whether the top surface elevations of foundations and slabs match the design and whether the surface is uniformly flat is always part of post-construction inspection. Traditionally, optical auto-levels and staffs (grade rods) have been used for leveling. Propagating levels from a benchmark with a known elevation to many measurement points requires two people to travel back and forth and measure dozens of spots, which is labor-intensive, especially over wide placement areas.


There is also the constant risk of human error, such as misreading staff graduations or recording numbers incorrectly.


RTK positioning significantly increases efficiency for height checks. RTK-capable receivers measure the vertical (Z) coordinate in real time, so once you set a reference elevation point, you can measure arbitrary point elevations with the push of a button. For example, after concrete placement, walking across the slab and measuring top-of-slab elevations with RTK lets you immediately see deviations from design elevations. Whereas traditional methods required reading each level and recording it for later comparison, RTK displays the difference from the design elevation on the receiver screen (e.g., “+○○ cm”), enabling instant judgment on whether correction is necessary.


Although vertical accuracy using RTK is somewhat inferior to horizontal accuracy, under good conditions errors typically remain within 2–3 cm (0.8–1.2 in). This is sufficiently practical for general civil and building construction elevation control. It is also possible to combine RTK with conventional precise leveling for rechecking critical parts.


The advantage of RTK height verification is that you can quickly grasp the level conditions over a wide area. You can immediately identify how flat the placement is and where elevation differences occur, which is useful for immediate screeding and surface correction after placement. Measurement results are stored as digital data, making it easy to compile as-built records later or share via the cloud so all stakeholders can review them.


Conclusion: What is simplified surveying with LRTK

As we have seen, using RTK technology makes anchor bolt placement, formwork installation, and level control in concrete work much easier and more accurate. Completing work correctly the first time prevents the cost increases associated with rework and directly contributes to shorter schedules and improved quality. With initiatives like the Ministry of Land, Infrastructure, Transport and Tourism’s *i-Construction* providing momentum, digital surveying technologies including RTK are becoming increasingly widespread on sites.


However, some may hesitate at the mention of “RTK surveying,” thinking “Do I need expensive specialty equipment?” or “Is it unusable without expertise?”


One increasingly popular solution is a simplified RTK surveying system that combines a smartphone with a small GNSS receiver. A representative example is the LRTK series. These systems use pocket-sized RTK-GNSS receivers attached to smartphones and proprietary apps to receive network RTK or augmentation signals from Japan’s quasi-zenith satellite “Michibiki” (CLAS), enabling real-time centimeter-level positioning.


Because the app handles complex equipment settings automatically, operation is very simple. Tap the coordinates of the point you want to measure on the screen and navigation appears; following the guidance lets you reach the exact location. AR (augmented reality) features can overlay design positions and heights on the smartphone screen for visual confirmation. The receivers also support tilt compensation using built-in tilt sensors, allowing correct determination of the pole tip position even if the pole is slightly tilted.


This kind of simplified surveying with LRTK is attracting attention as “RTK anyone can use.” Compared with dedicated surveying instruments, it has a much lower introduction cost and allows intuitive smartphone operation for layout and measurement, so even nonexperts can quickly become proficient. In practice, tasks that used to be outsourced to surveying contractors—such as stakeout and as-built measurement—are increasingly being completed in a short time by in-house staff, leading to dramatic productivity improvements.


It is a good idea to try such easy RTK solutions and experience their effects first, then expand them across the site. Starting with small areas reduces the chance of failure, and building successful experiences will smooth the transition to larger projects.


For those interested in details about the LRTK series, please also visit the [LRTK official site](https://www.lrtk.lefixea.com). The LRTK series lineup includes not only smartphone-mount RTK receivers but also equipment that supports drone photogrammetry and 3D LiDAR scanning, providing comprehensive support for digital surveying on site.


FAQ

Q1. What level of accuracy can be achieved with RTK surveying? A. General RTK-GNSS surveying can achieve approximately ±1–2 cm (±0.4–0.8 in) in plane position and about ±2–3 cm (±0.8–1.2 in) in height. However, achieving high accuracy requires good satellite reception conditions. Open-sky environments tend to provide stable centimeter-level “Fixed” solutions, whereas urban areas surrounded by tall buildings or under tree canopy may not capture enough satellites, causing degraded accuracy or unstable positioning.


Q2. Can RTK be used on sites with many obstructions or indoors? A. RTK positioning is fundamentally a technology that performs best outdoors with clear sky visibility. In areas with many tall buildings or inside forests, satellite signals can be blocked or multipath reflections can cause unstable positioning. In such obstructed environments, you may need to move to a location where positioning is possible or use RTK-derived reference points and then use a total station for detailed measurements. Unfortunately, RTK cannot be used indoors or underground where satellite signals cannot be received directly.


Q3. Can RTK measure height (elevation)? A. Yes, RTK-GNSS receivers can measure vertical coordinates (Z) as well as horizontal positions. However, vertical positioning is generally more susceptible to errors from ionospheric effects and tends to be less accurate than horizontal positioning. With corrections based on high-quality reference points, centimeter-level height accuracy can be expected, but for millimeter-level applications such as precise settlement monitoring of critical structures, it is safer to combine RTK with conventional leveling for confirmation.


Q4. What equipment and preparations are required to introduce RTK? A. The basic setup includes an RTK-capable GNSS receiver (rover) and a base station that provides reference signals. The base station is a fixed station with known coordinates; you can provide one yourself or use network RTK services delivered over the Internet (such as VRS using continuously operating reference stations). The rover requires a communication method (radio modem or mobile data connection) to receive correction information from the base station. It is also recommended to perform localization calibration at known points to match the site coordinate system and improve accuracy. Systems like LRTK can start RTK positioning immediately without preparing a dedicated base station by using nationwide correction data services and Japan’s augmentation signals.


Q5. What is LRTK? A. LRTK is the name of a positioning system that combines a smartphone with an ultra-compact RTK-GNSS receiver. It consists of a small receiver that can be attached to a smartphone and a dedicated app, using network RTK and augmentation signals from Japan’s Michibiki satellite (CLAS) to achieve real-time centimeter-level positioning. Because it can receive augmentation signals directly from Michibiki even in mountainous areas without mobile coverage, high-precision positioning is possible. LRTK is much more user-friendly than traditional stationary GPS surveying equipment and is gaining attention as a new solution that lowers the barrier for on-site layout and as-built surveying.


Q6. How far from the RTK base station can you perform positioning? A. Generally, high-precision RTK positioning is possible within a radius of approximately 10 km (6.2 mi) from the base station. As distance increases, it becomes more difficult to correct errors due to the ionosphere and troposphere, which can increase the time to obtain a Fixed solution and degrade accuracy from centimeter-level to decimeter-level. Network RTK services (VRS) that create virtual base stations nearby can provide some coverage over wider areas, but maintaining stable real-time positioning is typically feasible up to several tens of kilometers. To ensure positioning accuracy, it is preferable to operate as close to the base station as reasonably possible.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.