The Productivity Revolution RTK Accuracy Brings to Construction Sites!
By LRTK Team (Lefixea Inc.)
In recent years, advances in positioning technology have dramatically improved construction-site accuracy and work efficiency. In an industry facing labor shortages and long working hours, a productivity revolution driven by RTK is attracting great expectations. The hallmark of this movement is high-precision positioning using Real Time Kinematic (RTK), commonly called “RTK accuracy.” Today, from major general contractors to small and medium construction firms, surveyors, and infrastructure maintenance sites such as railways and roads, RTK adoption is being highlighted as a trump card for DX (digital transformation).
This article explains the basics of RTK and how it improves accuracy, introduces concrete examples and benefits of the productivity gains RTK accuracy brings to the field, and finally covers the latest device “LRTK” that lets anyone easily perform RTK surveying. If you want to revolutionize productivity on your construction sites, please read on.
Table of Contents
• What is RTK?
• How accurate is RTK?
• Why RTK accuracy is needed on construction sites
• Productivity improvement points RTK accuracy creates
• Simple surveying anyone can do with smartphone RTK “LRTK”
• Frequently Asked Questions (FAQ)
What is RTK?
RTK stands for Real Time Kinematic, a positioning technique that corrects errors in GNSS satellite positioning, including GPS, in real time. With standard GPS (standalone positioning), a single receiver receives satellite signals and various error sources such as the ionosphere and clock errors are not corrected, so positions typically deviate by several meters (several ft). Such meter-level errors are acceptable for smartphone map display, but for surveying and civil engineering work that require precision, meter-level deviations are not tolerable.
RTK uses two GNSS receivers (a reference station and a rover) simultaneously to perform relative positioning, canceling out common error factors observed by both to derive highly accurate positions. The reference station is a fixed station with known accurate coordinates; it calculates error offsets from the satellite data observed there and sends correction information to the rover via radio or the Internet. By applying those corrections, the rover can improve its position to the centimeter level. In short: “measuring simultaneously with two units instead of one allows error correction, so accuracy improves dramatically.”
Recently, networks of electronic reference stations maintained by the Geospatial Information Authority of Japan and private GNSS correction services (such as virtual reference station (VRS) distribution by telecom carriers) have been established, allowing correction data to be obtained via networks without setting up your own reference station. As a result, on-site RTK positioning can be performed with just a single receiver acting as the rover, greatly lowering the barrier to high-precision positioning.
How accurate is RTK?
Using RTK, positioning errors are typically within a few centimeters (a few in) horizontally and also on the order of a few centimeters vertically. Field validations have confirmed that in favorable conditions, positioning errors of about 2–3 cm (0.8–1.2 in) horizontally and 3–4 cm (1.2–1.6 in) vertically can be achieved. This is an order-of-magnitude improvement over conventional standalone positioning (meter-level errors).
However, RTK accuracy is still affected by the surrounding environment and satellite geometry. For example, in urban areas with poor sky visibility (environments with shielding or many signal reflections from high-rise buildings) or inside forests, signals may be interrupted and temporary errors of several tens of centimeters can occur. Therefore, caution is needed in poor positioning environments, but conversely, in open areas centimeter-level (half-inch accuracy) precision can be stably obtained.
Regarding horizontal accuracy, RTK has already reached a level comparable to conventional optical surveying instruments (total stations). For example, there are cases where averaging RTK receiver data for a certain period achieved sub-1 cm (about 10 mm (0.39 in)) accuracy, demonstrating that, for short durations, RTK can achieve total-station-level precision. On the other hand, ensuring strict vertical (elevation) accuracy requires additional measures, and for applications that demand highly accurate ground elevation, combining with other methods such as leveling may be desirable. However, for many tasks like construction management and topographic surveying, ensuring centimeter-level (half-inch accuracy) accuracy in both horizontal and vertical directions is sufficient, and RTK has become an indispensable means to meet those requirements.
Why RTK accuracy is needed on construction sites
There are many situations in construction and surveying that require centimeter-level (half-inch accuracy) precision, such as land surveying and as-built (post-construction shape) verification. Traditionally, it was common to use a total station with two people to set batter boards (layout lines) or to measure as-built dimensions after completion. By introducing RTK-capable surveying equipment, one person can carry a GNSS rover and quickly measure many points, dramatically improving surveying productivity. Because coordinates (planar coordinates and elevation) can be obtained in real time, on-site data verification and additional measurements are also easily performed—another major advantage.
For example, when performing control point surveys for public surveying, using network RTK that receives correction data from electronic reference stations makes it possible to obtain geodetic coordinates immediately on site. The resulting centimeter-accurate control point data directly contributes to creating high-precision plan maps and 3D terrain models. During construction, RTK also enables accurate layout (pile driving and marking). Even without relying on a veteran’s intuition, GNSS rover guidance apps can instruct the operator “move 5 cm east,” allowing structures to be placed at specified coordinates. This enables pile driving and layout to be correct from the first attempt, preventing rework.
Moreover, the spread of high-precision GNSS surveying using RTK has created an environment where not only surveyors but also construction managers and workers themselves can perform surveying. On-site personnel can measure the height of embankments with a tablet and immediately reflect the results in construction—real-time quality control made possible by RTK. All of these represent a new on-site style enabled by centimeter-level (half-inch accuracy) positioning.
Productivity improvement points RTK accuracy creates
Introducing RTK technology on site yields various benefits that directly improve productivity. The main points are summarized below.
• Dramatic improvement in positioning accuracy: Since obtained coordinates can be kept to within a few centimeters, construction that previously had concerns about surveying errors can be executed to design-level accuracy. This eliminates “unmeasurable deviations” that cause quality defects and rework, leading to a dramatic improvement in construction accuracy.
• Major efficiency gains in surveying work: Real-time positioning with RTK greatly simplifies complex surveying procedures and post-processing calculations that were previously necessary. For example, with a total station you had to re-establish the instrument for each line of sight, but with RTK-GNSS you can move and take continuous measurements within visible range. On large development sites, one person can complete surveying simply by walking around, eliminating the effort of moving equipment and aligning prisms. Such time savings directly shorten construction schedules and reduce labor costs, contributing to overall site productivity. In one field case, after introducing RTK, surveying that previously required one round trip each with a total station and a level was completed with a single round trip using RTK plus a level, halving work time in the midday heat.
• Mitigating labor shortages and reducing costs: RTK introduction has a major effect against the worsening labor shortage at construction sites. Even without enough skilled surveyors, a small team can perform high-precision surveying, supplementing manpower with technology. There are increasing cases where a single person carries a receiver and tablet and completes surveying and recording, reducing labor costs and freeing personnel for other tasks. For small-scale construction, handling precision surveying in-house instead of outsourcing can save on subcontracting costs. Additionally, reducing positional errors and rework cuts material waste and corrective labor, producing substantial total cost savings. The recent availability of low-cost RTK services and GNSS terminals has also lowered initial investment barriers, providing a favorable environment for adoption.
• Improved safety and quality control: The ability to perform high-precision surveying in a short time reduces the time workers spend in hazardous locations. For example, batter board work beside busy roads or on steep slopes can be measured from a safe distance with RTK. Equipping drones with RTK enables acquisition of detailed terrain data in areas inaccessible to people. As a result, risks during work are reduced. At the same time, obtaining high-accuracy data in real time allows immediate detection and correction of as-built deviations. Progressing construction while checking for errors prevents inspection comments and rework, suppressing quality defects. If positioning data are shared via the cloud, a history of who measured where and with what accuracy is retained, further improving the reliability of construction management.
• Contribution to ICT construction and DX promotion: RTK is not merely a tool to improve surveying accuracy; it is a foundational technology supporting ICT construction and DX in the construction industry. In *i-Construction*, promoted by the Ministry of Land, Infrastructure, Transport and Tourism, RTK is indispensable as a key means of acquiring high-precision positional information for 3D data utilization. For instance, drone-based 3D surveys can acquire high-precision point cloud data without installing numerous ground control points when aided by RTK, enabling more efficient digitization of existing conditions. Likewise, using RTK positioning in machine guidance/machine control—installing GNSS receivers on bulldozers or excavators—allows real-time automatic control of blade height and position, enabling automated construction with errors of only a few centimeters. This prevents over-excavation and rework while allowing efficient progress. RTK is also essential for future unmanned construction and autonomous movement, playing a central role in the productivity revolution at construction sites.
Simple surveying anyone can do with smartphone RTK “LRTK”
As discussed so far, RTK introduction greatly contributes to improving surveying and construction efficiency, but some may worry “which device should we use?” or “won’t advanced expertise be required?” Fortunately, advances in technology have miniaturized and reduced the cost of RTK equipment. Finally, to address such concerns and introduce a device that allows anyone to easily start RTK surveying, we present “LRTK.”
LRTK is a pocket-sized RTK-GNSS receiver developed by Reflexia Inc., a startup originating from Tokyo Institute of Technology. Its major feature is that the small dedicated receiver can be attached to your iPhone or iPad, instantly turning your smartphone into a high-precision positioning device. Using a simple field app that receives correction information while positioning, professional-grade surveying and layout can be performed without specialized training.
Main benefits of LRTK:
• High-precision positioning: Position information obtained by a smartphone can be corrected to centimeter-level (half-inch accuracy). Demonstrations recorded standalone horizontal accuracy of 8–12 mm (0.31–0.47 in), and by averaging measurement data for about 1 minute achieved an astonishing 8 mm (0.31 in) accuracy, comparable to high-end fixed GNSS surveying equipment.
• Multifunctionality: Beyond simple position measurement, LRTK offers features such as 3D point cloud measurement, navigation for batter board (layout) tasks, automatic geotagging of photos, and AR overlay display of the finished image. Collected positioning data can be shared to the cloud instantly, enabling real-time collaboration between the field and the office.
• Cost performance: Priced far more affordably than conventional RTK equipment, making it realistic for multiple site staff to each carry a unit. Without bulky dedicated equipment or advanced expertise, anyone can achieve centimeter-level (half-inch accuracy) positioning on the spot with just a smartphone and LRTK.
Thus, LRTK is an optimal device for civil and construction engineers who want to introduce RTK. Because it enables ICT construction as part of daily operations, site personnel are beginning to expect that “productivity will improve dramatically if each person has one.” By adopting the LRTK series, on-site surveying accuracy and operational efficiency can leap forward, enabling smart construction that meets the Ministry of Land, Infrastructure, Transport and Tourism’s *i-Construction* initiatives. Detailed case studies and product information are available on the LRTK official site, so please take a look. LRTK can take your site to the next stage.
Frequently Asked Questions (FAQ)
Q: Is RTK accuracy really on the order of a few centimeters? A: Yes. RTK positioning generally yields horizontal errors of about 2–3 cm (0.8–1.2 in) and vertical errors of about 3–5 cm (1.2–2.0 in). In ideal environments (open sky with no obstructions) even sub-centimeter accuracy can be obtained. However, in environments where tall buildings are nearby or inside forests where the sky is not visible, accuracy may temporarily degrade and errors of 10 cm or more can occur. To obtain stable centimeter-level (half-inch accuracy) precision, it is desirable to perform GNSS positioning in as open a visibility environment as possible.
Q: What is needed to perform RTK positioning? A: Basically, you need an RTK-capable GNSS receiver as the rover and a reference station (or correction service) that provides correction information. A standalone GPS receiver alone is insufficient for 1 cm accuracy, so you must either set up a nearby reference station with known coordinates or obtain reference station data (correction information) via a network. In Japan, correction data can be obtained from the Geospatial Information Authority’s electronic reference stations or paid services from telecom carriers. You also need a communication means to connect the receiver and the reference station (radio modem or Internet connection). Recently, Internet services that distribute correction data have become abundant, and receivers that support Ntrip clients can start RTK positioning without preparing a dedicated base station.
Q: Can RTK surveying be done with a smartphone? A: Yes. Built-in smartphone GPS is too coarse (meter-level) for surveying, but attaching an external RTK receiver to the smartphone enables centimeter-level positioning. Using an iPhone-compatible small RTK device like LRTK turns a smartphone into a high-precision GNSS surveying instrument. By receiving correction information through a dedicated app, point measurements and layout can be performed with accuracy comparable to professional surveying equipment. Real-time display of current position and point coordinates on the smartphone screen makes it intuitive even for beginners. Smartphone-based RTK surveying is already practical and is attracting attention as a lower-cost, easier solution compared to conventional equipment.
Q: If we introduce RTK, will total stations become unnecessary? A: RTK can streamline many surveying tasks, but total stations will not become entirely unnecessary. Optical surveying instruments still perform well in environments where RTK struggles (such as among high-rise buildings or indoors), and for installations requiring millimeter-level accuracy, combining total stations or levels with RTK is recommended. Therefore, it is important to use RTK and conventional surveying equipment where each is most suitable. However, by applying RTK to routine as-built surveying and construction measurement, the need for total stations and associated workload can be greatly reduced.
Q: What factors affect RTK positioning accuracy? A: Major factors include the satellite signal reception environment and the quality of correction information. High accuracy is obtained when the sky is open and many satellites can be tracked, while forests or urban areas with tall buildings block satellites or cause signal reflections (multipath), increasing errors. Also, the farther you are from the reference station, the harder it is to correct atmospheric errors such as those in the troposphere; generally, stable high accuracy is said to be obtained when the base station distance is within a few kilometers. Network RTK using virtual reference stations (VRS) can maintain accuracy over wider areas, but satellite geometry and radio interference still have effects. Furthermore, when receiving correction data via mobile communications, delays or disconnections can interrupt corrections and reduce accuracy. Therefore, when operating RTK, it is important to choose locations with as open a sky as possible and to ensure a stable communication environment for receiving correction information.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.


