Why RTK Cross-Sections Now? Overwhelming Benefits Revealed by Comparison with Traditional Surveying

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Table of Contents

• Introduction

• What is RTK Surveying?

• The Role of Cross-Sections in Surveying

• Traditional Cross-Section Surveying Methods and Their Challenges

• Methods for Cross-Section Surveying Using RTK

• The Overwhelming Benefits of RTK Cross-Sections (Compared with Traditional Methods)

• Why RTK Cross-Sections Are Needed Now

• Simple Surveying Realized with LRTK

• Frequently Asked Questions


Why RTK Cross-Sections Now? Overwhelming Benefits Revealed by Comparison with Traditional Surveying

Introduction

In recent years, a satellite positioning technology called RTK (real-time kinematic) has attracted significant attention in surveying and construction management. In particular, the use of RTK for quickly and accurately obtaining terrain cross-sections is spreading. Creating cross-sections with traditional surveying methods required considerable effort and time, but advances in RTK technology have led to dramatic efficiency gains. This article explains why RTK-based cross-section creation is in demand now, and the overwhelming benefits seen through comparison with conventional methods.


What is RTK Surveying?

RTK surveying is a positioning method that uses GNSS (Global Navigation Satellite Systems) to obtain high-precision coordinates in real time. Standard GPS positioning can have errors on the order of several meters, but RTK can reduce errors to the order of a few centimeters (a few inches) by using correction information from a base station. Specifically, RTK computes the difference in satellite signals between a reference station installed at a known position and a roving receiver (rover) that acquires positions while moving, canceling error factors to achieve high-precision positioning. Because correction data are received in real time via communications, it is possible to know high-accuracy latitude, longitude, and elevation on site instantly.


In traditional surveying, achieving high-precision positioning required instruments such as total stations or electronic distance meters, skilled operators, and multiple personnel. In contrast, RTK positioning allows a single person to achieve centimeter-level positioning (cm level accuracy (half-inch accuracy)) with only a compact GNSS receiver and mobile communications (e.g., a mobile network). In recent years, electronic reference stations have been deployed across Japan, and network-based RTK services (for example, the VRS method) that deliver correction information over the Internet have become widespread. As a result, the environment for easily starting RTK surveying without preparing your own base station is becoming established.


The Role of Cross-Sections in Surveying

A cross-section is a drawing that represents the shape of terrain or a structure as if cut vertically. In civil surveying, creating cross-sections is essential for understanding ground profiles of roads, rivers, and development sites, and for comparing design cross-sections with as-built conditions. For example, in road construction, surface cross-sections are measured at regular intervals along an alignment to check for deviations from the design. In embankment or slope construction, cross-sections drawn before and after work are used to verify whether the required slopes have been achieved.


To obtain cross-sections, you must survey the positions and elevations of multiple surface points along survey lines (cross-section lines) and connect them to draw longitudinal profiles. Such cross-section surveys are a critical step directly linked to terrain variation assessment and earthwork volume calculations. However, creating accurate cross-sections requires measuring many points, and for large areas the workload increases accordingly. The next section examines the challenges encountered when creating cross-sections using traditional methods.


Traditional Cross-Section Surveying Methods and Their Challenges

Traditionally, optical surveying instruments have been mainly used to create cross-sections. One typical method uses a level (auto level) and a staff for elevation measurements. A staff is placed at fixed intervals along survey lines, and elevations are read through the auto level. Based on the elevation data obtained, cross-sections are drawn and earthwork volumes (cut and fill) are calculated as needed. This method is relatively simple, but the number of measurable points is limited, so fine terrain variations between points can be missed. When higher accuracy or wider-area surveys are required, methods using a total station (TS) are also employed. Using a TS and a prism, three-dimensional coordinates can be obtained with high accuracy, but this requires two or more people (an operator and an assistant), and on large sites the instrument must be repeatedly repositioned.


A major challenge of traditional methods is the heavy burden in terms of labor and time. Because many points must be measured for each cross-section, surveying work could readily take half a day to more than a day. There is also the effort of bringing field data back to the office for drafting and calculation, which introduces a time lag before results are available. Measurements on steep slopes in mountain areas involve the risk of having workers climb slopes to take readings. New technologies such as drone photogrammetry and terrestrial laser scanners have emerged, but limitations such as flight restrictions, expensive equipment, and the need for specialized data processing skills mean they are not always easily accessible to everyone.


Methods for Cross-Section Surveying Using RTK

The advent of RTK has greatly changed cross-section surveying methods. With an RTK-capable GNSS receiver, a single person can continuously obtain three-dimensional coordinates of points along survey lines. A typical procedure is for the surveyor to touch the rover GNSS receiver at the tip of a pole to the ground along the desired cross-section line and press the measurement button at each point. Latitude, longitude, and elevation are recorded on the spot, eliminating the need to take notes or perform coordinate calculations later. Point spacing can be set as desired, and if necessary you can measure at finer intervals than traditional methods to capture detailed terrain variations.


Even when surveying multiple cross-sections across a wide site, RTK eliminates the need to reposition instruments. Because position is known in real time while moving between survey lines, continuous measurement proceeds smoothly. For example, where leveling instruments were previously set up at cross-section lines every 50 m (164.0 ft), you can now simply walk with RTK equipment and collect data sequentially. Using network-based RTK, correction information can be received from a broad reference-station network, so you can perform high-accuracy surveys without setting up your own base station—an advantage in urban and remote sites alike.


RTK measurement data are stored digitally immediately, allowing real-time display of cross-section shapes on a tablet or PC at the site. You can overlay the obtained cross-section lines on the design drawings to check for discrepancies on the spot and, if necessary, take additional measurement points immediately. Because there is no waiting time to bring data back and process it as with traditional methods, the ability to make immediate decisions on site is another major strength of RTK surveying.


The Overwhelming Benefits of RTK Cross-Sections (Compared with Traditional Methods)

Creating cross-sections using RTK delivers overwhelming benefits compared with traditional methods across various aspects. Below are the main comparison points and their differences.


• Reduced work time: Cross-section surveys that traditionally required half a day to more than a day for surveying and drafting can, with RTK, in some cases be completed on-site in just tens of minutes to a few hours. Positioning through to data storage is automated, so obtained information can be analyzed and cross-sections generated the same day. There are reports of tasks that used to take a full day being completed within the same day, demonstrating substantial time savings.

• Reduced staffing needs: Traditional TS surveys typically required two people working as a team (sometimes three). RTK surveying is essentially one-person operable. There is no need to arrange assisting staff, so surveying can be carried out even at sites with labor shortages. If each person has one unit, individuals can perform surveys without pausing other work to help, improving overall project efficiency.

• Faster data processing: Previously, field measurements had to be taken back to the office, entered into CAD software to draw cross-sections, and then calculated. With RTK, measured data are automatically digitized, and if linked with cloud services, results can be obtained immediately after upload. There are no transcription errors from manual entry, and field data can be shared and reported to stakeholders instantly, dramatically shortening feedback cycles.

• Accuracy and coverage: With levels or TS, sparse point spacing could miss small surface irregularities. RTK makes it easy to collect high-density points, and when combined with 3D scanning technologies described later, it can cover wide areas with high detail. Modern RTK-GNSS equipment achieves centimeter-level accuracy in both horizontal and vertical directions, enabling rapid wide-area surveys with measurement precision comparable to traditional instruments.

• Improved safety: Surveying on steep slopes or in areas with operating heavy machinery was hazardous with traditional methods. RTK surveying allows the surveyor to take measurements while staying in safe locations within reach, minimizing time spent entering dangerous areas. Moreover, combining RTK equipment with small LiDAR sensors makes it possible to remotely scan slopes that cannot be accessed directly and obtain cross-section shapes. This achieves both safety and efficiency.


As described above, RTK cross-section methods offer major advantages over traditional methods in work efficiency, accuracy, and safety. In particular, increased surveying productivity and rapid feedback of results directly contribute to shorter construction periods and reduced costs. It is truly an "overwhelming effect" that transforms on-site workflows.


Why RTK Cross-Sections Are Needed Now

Why is RTK cross-section drawing gaining attention at this particular time? There are several factors behind this trend.


First is the maturation and widespread adoption of the technology. Although RTK-GNSS technology has existed for some time, devices were once large, expensive, and usable only by specialist surveyors. Recently, however, hardware miniaturization, cost reductions, and the development of communication infrastructure have made the technology more accessible to the average construction site. High-precision GNSS receivers are now palm-sized, and products that work with smartphones have appeared. These technological breakthroughs have increased the number of sites willing to try RTK.


Second is the industry-wide push for DX (digital transformation). Initiatives such as the Ministry of Land, Infrastructure, Transport and Tourism’s "i-Construction" promote efficiency and sophistication using ICT in construction. In the context of leveraging 3D survey data and simplifying as-built management, digital cross-section creation using RTK is an approach well suited to the times. Moving away from paper drawings and manual calculations toward real-time, accurate data-based construction management is expected to improve quality and shorten construction schedules.


Third is the trend of labor shortages and workstyle reform. With the aging of surveying professionals and a shortage of personnel, RTK surveying—which can be performed by a small crew—can be a lifesaver on sites. One-person operability reduces labor costs and the burden of personnel adjustments, and shorter working times help address issues of long working hours. Including the increased safety, RTK cross-sections enable a smarter workstyle that does not overburden site staff, making them a solution that should be adopted now.


Simple Surveying Realized with LRTK

As described, RTK cross-section surveying has many advantages, but you may wonder, "What specific equipment should I use?" Here we introduce the LRTK series as an easy solution for RTK surveying. LRTK is a high-precision GNSS positioning system developed by Lefixea, a startup from Tokyo Institute of Technology. Designed to attach a pocket-sized terminal to a smartphone or tablet, it enables anyone to perform centimeter-level positioning (cm level accuracy (half-inch accuracy)) without special skills.


For example, the "LRTK Phone" is an innovative device that converts an iPhone into a high-precision surveying instrument by attaching a dedicated receiver. A roughly 125 g antenna can be attached with one touch; on site, you simply touch the tip to the point to be measured and press a button on the smartphone screen to record the point coordinates. Acquired data can be uploaded immediately to the LRTK Cloud and shared in real time with colleagues in the office. By adding the optional LiDAR unit (LRTK LiDAR), a single person can acquire wide-area terrain point clouds and later extract cross-sections as needed.


Compared with traditional stationary RTK equipment, LRTK pursues convenience in being "anytime, anywhere, anyone." In addition to a compact form factor and easy operation that do not get in the way on site, it supports modern multi-frequency GNSS and Japan’s quasi-zenith satellite system (Michibiki) augmentation signals to ensure stable accuracy. Although its positioning accuracy rivals professional large equipment, the cost of introduction is substantially lower than traditional systems, making it more attainable for small-scale operators. Using LRTK, tasks that previously required specialist surveying crews for cross-sections can be quickly handled by on-site construction management staff themselves.


The LRTK series, incorporating cutting-edge RTK technology, is truly a tool that opens a new era of simple surveying. If you are struggling with the effort or scheduling of cross-section surveys, consider trying this smart surveying with LRTK. Its overwhelming efficiency and accuracy will certainly contribute to improved on-site productivity and operations.


Frequently Asked Questions

Q: What is an RTK cross-section? A: An RTK cross-section is a terrain cross-section created from high-precision position data obtained by RTK positioning. Traditionally, cross-sections were drawn from points measured with levels or total stations, but RTK allows the creation of cross-sections from many points collected in real time. Because high-precision cross-sections can be obtained quickly, they are powerful for comparison with design and for construction management.


Q: What is needed to perform RTK surveying? A: To perform RTK surveying, you need a rover GNSS receiver and a reference station (or a network service) that provides correction information. Specifically, an RTK-capable GNSS antenna set and a communication method to receive correction data from a base station (radio equipment or mobile communications) are the basic components. However, network-based RTK services using electronic reference stations provided by the Geospatial Information Authority of Japan are now common; by using these services you can survey without placing your own base station. For example, smartphone-linked GNSS receivers like LRTK make it easy to start RTK surveying without dedicated special equipment.


Q: How accurate is RTK surveying? A: RTK surveying generally achieves accuracy on the order of a few centimeters (a few inches) horizontally and a few centimeters (a few inches) vertically. This is vastly more precise than standalone GPS positioning and more than adequate for civil surveying requirements. Accuracy, however, depends on satellite reception conditions and distance from reference stations, so it is desirable to use it in open-sky environments and not too far from base stations. Modern RTK equipment that supports multi-GNSS and augmentation satellites provides stable centimeter accuracy, so if used appropriately you can expect results comparable to traditional optical surveying instruments.


Q: Are there weaknesses or cautions for RTK surveying? A: Because RTK uses satellite signals, positioning can become unstable in environments with tall buildings or dense trees that block or reflect signals. Also, real-time correction data require a communication environment, so in areas without mobile coverage you need to take measures (such as setting up a portable temporary base station). Taking precautions like raising the antenna as high as possible in open areas will allow RTK surveying to be used effectively on many sites. Regarding weather, radio signals generally work in rain, but avoid use when there is a risk of lightning for safety reasons.


Q: I’m worried about the cost of introducing RTK. Can small sites use it? A: RTK-capable surveying equipment used to be very expensive and seemed confined to large projects. Recently, however, more affordable products and services have emerged, making RTK accessible to small sites and small-to-medium enterprises. Systems like LRTK that utilize smartphones and tablets can reduce initial investment by leveraging existing devices. Cost benefits from reduced labor and improved efficiency are also significant, and in many cases the investment pays off. It is recommended to try rentals or trials first to experience the effects.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.