5 Reasons RTK Stays in Float|What to Do When It Won't Enter Fix
By LRTK Team (Lefixea Inc.)
In recent years, RTK (Real Time Kinematic) using GNSS has attracted wide attention as a real-time high-precision positioning method. When RTK positioning is functioning properly, a rover (mobile station) receiving correction information from a base station can obtain a Fix solution (fixed solution) that determines its position with an error of a few centimeters (a few inches). However, in the field the problem often occurs that positioning remains in a Float solution (float solution) and does not converge to a Fix. A Float solution is an intermediate stage of RTK in which the integer ambiguities of the satellite signals (ambiguity) remain unresolved. At this stage, position errors can reach tens of centimeters (tens of inches), and the reported positions are unstable and driftingly variable. In other words, while in the Float solution the inherent accuracy of RTK cannot be achieved, causing significant practical problems.
There are several typical factors that can cause an RTK solution to remain at Float and fail to achieve a Fix. In this article, we take up five representative reasons why RTK often does not reach Fix in the field and explain each in detail. We also present concrete countermeasures to take when a Fix cannot be obtained. Since we cover common causes such as positioning environment issues and equipment configuration errors, those involved in RTK surveying should find this useful. At the end of the article, we also introduce a new high-precision positioning solution, LRTK (pronounced "L‑R‑T‑K"), which can resolve these issues all at once.
Table of Contents
• Poor satellite reception environment
• Correction information is not being received
• Errors in reference points or coordinate settings
• Misconfiguration or malfunction of GNSS equipment
• Effects caused by baseline distance and atmospheric errors
• Recommendation to use LRTK for simplified surveying
1. Poor satellite reception environment
RTK positioning requires stable reception of signals from multiple GNSS satellites as a prerequisite for obtaining a Fix solution. However, if the satellite reception environment at the observation site is poor, the number of receivable satellites may be insufficient or the quality of the positioning data may degrade, causing the solution to fail to converge from a Float solution to a Fix solution for a long time. For example, in urban areas surrounded by tall buildings or in forests, the sky can be blocked and the number of usable satellites tends to decrease significantly. Multipath, in which satellite signals are reflected by concrete walls, metal surfaces, or water, is also a serious problem. If errors from reflections contaminate the observed data, the RTK engine may not be able to correctly resolve integer ambiguities, making it difficult to obtain a Fix solution.
Furthermore, caution is required when there are strong sources of radio-frequency noise in the vicinity. Directly beneath high-voltage power lines or near radar facilities, GNSS signals are prone to interference noise, which can cause positioning accuracy to degrade significantly and fail to improve from a float solution. It is also known that during heavy rain or thunderstorms, ionospheric disturbances and radio signal attenuation increase, making RTK unstable. Thus, when the satellite reception environment is in poor condition, there is a heightened risk that RTK will not reach a fixed solution and will remain at a float solution.
Countermeasures: When performing positioning, the primary consideration is to choose a location with as much open sky as possible and to secure a clear view of the sky above. Install the base station antenna at an elevated location with a clear 360° line of sight, and, on the rover side, remove any obstructing obstacles near the measurement point in advance if possible. Also, it is prudent to avoid observations in environments where reflective objects, such as large building façades or vehicles, are nearby. If avoidance is difficult, fitting the antenna with a metal ground plane to reduce ground reflections, or using a high-performance choke ring antenna to mitigate the effects of multipath waves, can also be effective.
Furthermore, recently receivers that support multi-GNSS (multiple satellite systems) and dual-frequency (multiple frequency bands) have become widespread. By using these high-performance GNSS devices, you can increase the number of satellites available even at sites with somewhat poor visibility and more easily cancel out ionospheric errors, so an improved convergence rate from Float to Fix can be expected. If RTK still does not stabilize due to environmental factors, consider not forcing it and conducting surveys during times of favorable satellite geometry (check for times with good DOP values in advance using GNSS visible-satellite prediction services, etc.). If conditions simply cannot be met, it is also important to be flexible and complement RTK with other positioning methods such as total stations rather than clinging to RTK.
2. Correction information cannot be received
In RTK positioning, centimeter-level accuracy is achieved only by continuously receiving error correction data transmitted from a base station (reference point) in real time. Therefore, if communication of the correction information is interrupted, no matter how long you wait you cannot obtain a fixed solution (Fix). While correction data are not being received, RTK will not function, the positioning solution will revert to standalone positioning (single positioning) or code differential (DGPS) level accuracy, and the display will remain a float solution.
Causes for losing reception of correction information can include problems with the communication environment or device settings. In RTK using privately operated radios, if the radio settings on the base station and the rover (transmission frequency or group ID) do not match, or if there is an obstruction between the base station and the mobile station that blocks the signal, the correction data will be interrupted. In cases using low-power radios or UHF radios, the effective radio range is limited to roughly a few kilometers, so on wide-area sites the rover may move out of communication range. Also, in radio-shielded environments such as inside tunnels or in the shadow of buildings, the base station’s signal may not reach, causing communication to be cut and corrections to stop. On the other hand, for network-type RTK that distributes corrections over the Internet (such as the NTRIP method), it is also possible that the survey site is outside mobile-phone coverage and mobile communications are unstable, or that a failure occurs on the base-station service side and data distribution stops.
Countermeasures: First, thoroughly check the communication settings between the base station and the rover in advance. When using radio, inspect that the transmit/receive frequencies and channels match correctly on both stations and that antenna connections have no looseness or breaks. Place the base station antenna as high as possible to secure line-of-sight distance, and install relay antennas as necessary to expand the communication area. When using an internet connection, prepare SIM cards from multiple mobile carriers on site to choose the line with good signal conditions, or improve reception by using an external high-sensitivity antenna or a mobile Wi-Fi router. Also note that during long surveys communication is often interrupted due to battery depletion of both the base station and the rover; fully charge both devices in advance and regularly check battery levels during surveying. Always monitor the reception status of correction data on the rover unit’s screen, and it is reassuring to check indicators such as Age of Differential (latency of differential data) and the number of received messages. If data loss occurs, attempt recovery by reconfiguring the connection destination or by resetting the base station and receiver once and reconnecting.
3. Errors in reference points and coordinate settings
In RTK surveying, the fundamental prerequisites are entering the precise coordinate values of the reference points used into the equipment and correctly specifying the geodetic datum and coordinate system. If these are mistaken, even if the RTK has a Fix, the computed coordinate values will not match the actual ones, resulting in large positional discrepancies. For example, if you mistype a single digit in the known-point coordinates entered into the base station, or select the wrong zone number (system number) in Japan's plane rectangular coordinate system, the positioning results can be off by tens of meters (tens of ft). In fact, on-site you can hear anecdotes of failures such as "I entered the reference-point value with a one-digit error and later turned pale when the results did not match." Mistakes in coordinate settings are by no means a laughing matter.
Also, special care is required at sites that use geodetic or surveying coordinate systems different from Japan's. Japan's current official geodetic datum is the world geodetic system (JGD2011 and JGD2022), but when using control points whose coordinates are given in the older Tokyo datum or when surveying in a proprietary local coordinate system, the resulting coordinates will not match the site’s reference values unless an appropriate coordinate transformation is applied. In the vertical direction as well, if geoid height corrections are overlooked, the obtained elevations can differ significantly from the site’s leveling datum.
Precautions: Before starting surveying, always confirm the coordinate values of the reference points to be used and specify the geodetic datum and coordinate system to be adopted. Refer to the contract drawings and known-point lists, and set the correct reference system (for example, the specific system of JGD2011 or the coordinates for a given prefecture/district) in the equipment. When establishing a base station, it is important to double-check that the entered known-point coordinates are not incorrect. If possible, observe one known point on site before work begins to verify that the coordinates obtained match the device settings. When measuring in a local, custom coordinate system, perform site calibration (on-site adjustment) using multiple known points to align GNSS-derived coordinates with the local reference. Even if you discover a configuration mistake later, it may be possible to restore the data by applying the correct parameters to the recorded data and performing a coordinate transformation. However, such transformation work requires effort and advanced knowledge. Therefore, it is crucial to carefully check and prevent configuration errors from the start.
4. GNSS equipment configuration errors and malfunctions
System or equipment misconfigurations and malfunctions can also cause RTK to fail to achieve a Fix. A basic example is incorrect mode settings for the base station and rover. If a receiver that should be operating as a base station is left in rover mode, or conversely a rover is set to fixed mode (base station mode), correction data will not be generated or applied correctly and positioning will not be established. Also, when using a network-type RTK service, selecting the wrong mount point (virtual reference point data) distributed by the provider can cause the receiver to receive an unsupported data format and fail to obtain a solution. For example, be careful of configuration mistakes such as specifying multi-frequency correction data for a single-frequency receiver.
Equipment-specific troubles also include faults in the GNSS antenna and cables, which should not be overlooked. If the antenna cable connector is loose or a long cable is on the verge of breaking, the receiver may not be able to properly receive satellite signals or correction data, and RTK will not achieve a Fix. Also, when controlling positioning in the field using software on a tablet or laptop, be careful of app misconfigurations or freezes. If settings such as the output coordinate system are incorrect, they can, as mentioned above, cause result offsets, and it can also happen that the app is force-quit and correction reception stops. Especially for GNSS receivers that connect to smartphones or tablets via Bluetooth, there have been cases where the app stopped in the background and the solution quietly reverted to Float.
Countermeasures: To prevent equipment troubles, a thorough pre-check before entering the site is indispensable. Check the GNSS receiver unit, antenna, and radio equipment connections, and perform functional tests including whether the power turns on and whether the battery level is sufficient. When working at a new site or with newly introduced equipment, run a simulation to inspect that the positioning software or app settings (geodetic datum and projected coordinate system, antenna height, communication ports, etc.) are correctly configured. Update receiver firmware and applications provided by the manufacturer to the latest stable versions, and check bug-fix information in advance for reassurance. If you sense any abnormal behavior from the equipment during positioning, calmly pause work and reboot the equipment or verify operation at another known point to isolate the cause early. Also, as basic points, be thorough in preventing human error—confirm the antenna is plumb using the survey pole bubble level and avoid input mistakes for the antenna height.
If you start moving immediately after RTK positioning begins while still in a Float solution, it can be difficult to transition to a Fix solution afterward. To obtain a stable fixed solution, remain stationary for several tens of seconds after powering on or rebooting, and only move or begin observations after you have reliably acquired the first Fix. Once you have a Fix, you can maintain centimeter-level accuracy while moving, provided satellite reception does not deteriorate drastically; however, if you lose the Fix, it is safer to stop again and wait for the solution to reconverge.
5. Effects of Baseline Distance and Atmospheric Errors
As constraints specific to RTK positioning, the distance between the base station and the rover (baseline length) and atmospheric errors such as those from the ionosphere and troposphere must also be taken into account. In general, the greater the baseline distance, the more the error factors in the satellite signals received at the two stations differ, increasing residuals that cannot be canceled out by corrections and making it more difficult to obtain a fixed solution. When a high-precision GNSS receiver's specifications state "horizontal accuracy: 8 mm (0.31 in) ± 1 ppm", this means an error increase of about 1 mm (0.04 in) per 1 km (3280.8 ft). Therefore, if the rover is tens of kilometers (tens of thousands of ft) away from the base station, the observation accuracy required for resolving integer ambiguities cannot be secured, and the solution becomes unstable. Especially with receivers that support only the L1 single frequency, ionospheric errors cannot be sufficiently compensated, so at sites with long baselines it may take a very long time to move from a Float solution to a Fix solution, or in the worst case it may never fix.
In addition, days with ionospheric disturbances caused by solar flares and time periods with poor satellite geometry (geometry) can also be factors that lead to a decrease in RTK fix rates. Even at a flat site with no surrounding obstructions, if the satellites visible overhead happen to be unevenly distributed and the PDOP value is high, RTK initialization may take longer than usual. Conversely, if a multi‑GNSS‑capable receiver can consistently receive 10 or more satellites simultaneously, the likelihood of obtaining a stable Fix solution increases even if some atmospheric errors remain.
Countermeasure: It is a fundamental rule to keep the distance between the base station and the rover as short as possible. If you can set up your own base station, place it near the work area; if that is difficult, take advantage of network reference station services such as the Geospatial Information Authority of Japan’s network of continuously operating reference stations or VRS-based services to effectively shorten the baseline length. Also, before starting surveying, check the operational GNSS satellites and their geometry, and plan to avoid time windows with few satellites and poor geometry. For example, the Geospatial Information Authority of Japan’s “GNSS Satellite Visibility Prediction Service” allows you to check the number of satellites and DOP values for any location and time in advance. Use such tools and perform RTK positioning at the most favorable times possible. Furthermore, on days of high solar activity with large ionospheric disturbances, it may sometimes be necessary to refrain from real-time RTK positioning altogether. Rather than forcing continuation, consider recording only the observation data on site and performing precise processing later using methods such as PPK (Post-Processing Kinematic) or PPP (Precise Point Positioning).
Recommendations for Simple Surveying Using LRTK
So far, we have reviewed the typical causes that leave RTK stuck in a float solution and the countermeasures for them. To achieve stable, high‑precision RTK positioning, there are many on-site points to attend to—from ensuring a good satellite visibility environment to checking detailed equipment settings—which require specialist knowledge and experience. Attracting attention as a solution that resolves these challenges all at once and enables anyone to easily achieve centimeter‑level positioning is our company’s LRTK (エルアールティーケー).
LRTK is a new high-precision positioning system that combines a smartphone with a dedicated compact GNSS device, developed with the concept of "making difficult RTK surveying easy for anyone." Using a receiver that can be attached to smartphones such as the iPhone and leveraging multiple satellite positioning technologies and cloud services, it eliminates the complexities that have long accompanied conventional RTK operations. For example, tasks that used to be required—installing a base station, securing a communications line, and adjusting coordinate systems—are no longer things you need to think about: with LRTK you simply set the device on-site and press a button in the smartphone app, and positioning on the order of millimeters (mm) (≈0.04 in) begins automatically. In actual operation, it also uses sub-meter-class augmentation signals (sub-meter (≈3.3 ft)) provided by Japan's Quasi-Zenith Satellite System (Michibiki: QZSS), enabling stable positioning even in mountainous areas where mobile phone signals do not reach.
High accuracy and stability comparable to conventional specialized equipment are also major features of LRTK. Under favorable conditions, it achieves approximately ±1~2 cm (±0.4~0.8 in) in the horizontal plane and about ±3 cm (±1.2 in) in height, and it can perform highly repeatable positioning even when operated solo using a monopod (monopod). Moreover, with a function that observes the same point multiple times and averages the results, by repeatedly measuring over a short period and calculating the mean the error can be reduced to a few millimeters. Despite such precision, operation is extremely simple—anyone can use it by simply tapping the positioning-start button on the dedicated app’s screen. The acquired positioning data are automatically saved to the cloud, so you can rest assured that results will not be lost even if the on-site device experiences trouble.
By introducing LRTK in this way, you can be freed from common RTK surveying concerns such as "never achieving a Fix" or "settings that are difficult and fail to deliver accuracy." Leveraging cutting-edge technology to lower the barriers to RTK surveying and dramatically improve on-site efficiency and accuracy, LRTK is expected to be applied across a wide range of fields, from construction and civil engineering to surveying and inspection work. If you are interested, please also check LRTK’s official information. We also accept requests for materials and product inquiries, and we would be grateful if you would consider using LRTK as a next-generation, high-precision positioning tool.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.