What is the RTK Fix accuracy in cm? Explaining the difference from Float through numerical comparison
By LRTK Team (Lefixea Inc.)
When using RTK positioning, you will come across the terms "Fix (fixed solution)" and "Float (floating solution)". In particular, how accurate a Fix actually is and how much accuracy degrades with a Float are very important concerns when handling high-precision positioning in the field. In this article, we explain how many centimeters of accuracy an RTK Fix solution can achieve and compare the accuracy difference with a Float solution using concrete numerical values. Furthermore, we explain why such a difference in accuracy arises between the two, the technical mechanisms behind it, and key points for obtaining a stable Fix solution.
On sites that perform GNSS surveying or handle precise location information, correctly understanding whether a solution is Fix or Float is indispensable for judging the reliability of positioning results. Even with the same RTK positioning, the range of coordinate errors differs greatly between a Fix solution and a Float solution, so on-site procedures also change. For example, if a receiver’s display remains Float, there is a high likelihood that high-precision positioning has not been achieved, and some of you may have experienced uncertainty about whether you can use those measured positions as-is. Through this article, let’s correctly grasp the differences between Fix and Float solutions and learn to confidently make use of RTK positioning.
Table of Contents
• Overview of the RTK method and positioning accuracy
• Differences between Fix solution and Float solution
• What is the Fix solution's accuracy in centimeters?
• How accurate is the Float solution?
• Key points for obtaining a Fix solution
• Summary
Overview of the RTK Method and Positioning Accuracy
RTK (Real Time Kinematic) is a method that dramatically improves positioning accuracy by simultaneous observation between a reference point acting as a base station and a mobile station (rover). With standard standalone positioning (a method that uses only GNSS satellite signals for positioning), errors of several meters (several ft) can occur. However, with RTK, by using the correction information sent from the base station in real time, positioning errors can be reduced to a few centimeters (a few in). Note that DGPS (Differential GPS, correction of standard code-based positioning), which is a predecessor to RTK, can reduce errors to tens of centimeters (tens of in; less than 1 m (3.3 ft)), but RTK improves accuracy by another order of magnitude, enabling truly much higher precision. For example, while typical GPS accuracy is said to be about 3-10 m (9.8-32.8 ft), using RTK can reduce errors to about one-hundredth of that, i.e., to the level of a few centimeters (a few in).
The high precision obtained with RTK, described as "centimeter-level" (cm level accuracy (half-inch accuracy)), is indispensable for as‑built management in civil engineering surveying and for tasks that require precise alignment. For that reason, RTK technology is used at many positioning sites. However, to bring out RTK's performance it is important that appropriate conditions are met, and accuracy in particular can vary greatly depending on which mode the solution is obtained in. RTK positioning broadly has two types of solutions: the highly accurate Fix solution (fixed solution) and the somewhat less accurate Float solution (floating solution), and the next chapter will look in detail at the differences between them.
Difference between Fix and Float solutions
In RTK positioning, there are two solution modes for obtaining a solution: "Fix" and "Float". Simply put, a Fix solution (fixed solution) is a state in which the integer ambiguity of the phase difference (the number of carrier-phase cycles) has been successfully resolved in the RTK computation, and this yields the highest accuracy. On the other hand, a Float solution (float solution) is a state in which that integer solution has not yet been fixed; some corrections are applied, but it has not reached a full Fix. Because some uncertainties remain in a Float solution, the resulting accuracy is lower than that of a Fix solution.
The L1 wave (1575.42 MHz) carrier signal emitted by GPS satellites has a wavelength of about 19 cm (7.5 in). In RTK, the phase of this carrier is analyzed to resolve the number of whole wavelengths (also called integer ambiguities) included in the distance from the satellite to the antenna. In a fix solution, because these integer ambiguities are correctly resolved, shifts down to a very small fraction of the carrier wavelength can be detected, and as a result centimeter-level accuracy (half-inch accuracy) is achieved from millimeter-order measurement resolution. In a float solution, because this integer portion remains unresolved, uncertainty remains and the error is correspondingly larger.
In RTK, observations initially start with a Float solution, and when a sufficient number of satellites and stable signal reception are maintained, the algorithm gradually converges the solution to a Fix solution. Conversely, even after achieving Fix, if radio conditions deteriorate or required satellites are no longer visible, it can revert to a Float solution. In this way, Fix and Float switch according to conditions, and on RTK receivers and positioning software screens these states are displayed as statuses such as "RTK-Fix" and "RTK-Float." Basically, for measurements that require centimeter-level accuracy, obtaining a Fix solution is assumed; if only a Float solution is available, you must either improve the positioning environment or wait until it switches to Fix. Securing a Fix solution is the key to realizing the high accuracy that is the true value of RTK.
Note that RTK receivers incorporate internal algorithms that verify the reliability of fixed solutions (e.g., ambiguity resolution consistency checks) and are designed not to declare a Fix when the solution is not sufficiently stable or reliable. This is because deliberately treating an incomplete solution as a Fix could lead to large errors, so the algorithm opts to keep the solution as a Float rather than output an incorrect Fix. Therefore, in unstable environments, a Fix may be hard to obtain, but this can be regarded as the positioning system operating on the safe side.
What is the accuracy of the Fix solution in cm (in)?
So, if a Fix solution (fixed solution) is obtained, what level of accuracy can actually be expected? In conclusion, positioning errors with RTK Fix solutions are generally about 1–2 cm (0.4–0.8 in) horizontally and 2–3 cm (0.8–1.2 in) vertically. Because GNSS satellites are generally not located below the horizon, vertical accuracy is slightly worse than horizontal, but even with a Fix solution vertical errors can be kept to a few cm (a few in). Under favorable conditions, the strength of the Fix solution is that it can determine position to within roughly a few cm (a few in).
Of course, this is a typical accuracy under good conditions, and it can vary somewhat depending on the equipment used and the distance to the reference station. A high-performance GNSS receiver's specifications, for example, may state "Horizontal accuracy: 8 mm (0.31 in) ± 1 ppm, Vertical accuracy: 15 mm (0.59 in) ± 1 ppm." This "ppm" is an error term proportional to the baseline length to the reference station, so, for example, if the distance to the reference station is 10 km (6.2 mi) the horizontal accuracy becomes 8 mm (0.31 in) + (1 ppm × 10 km (6.2 mi)) ≒ 8 mm (0.31 in) + 10 mm (0.39 in) = approximately 18 mm (0.71 in) (1.8 cm (0.7 in)). In general, RTK loses a little accuracy if it is too far from the reference station, but in practical use it can still maintain centimeter-level accuracy (half-inch accuracy) within about 20 km (12.4 mi). In Japan, a nationwide network of reference stations, including the Geospatial Information Authority of Japan's Continuously Operating Reference Stations, has been established, making nearby correction information readily available, so accuracy degradation due to baseline length is not much of a problem.
In short, as long as a Fix solution is obtained, RTK can generally be expected to fall within an error range of roughly 1-2 cm (0.4-0.8 in) based on actual measurements. If such accuracy can be obtained reliably, it can be considered a level that can be safely applied to detailed surveying work and precise positioning in machine-controlled construction.
How accurate is a float solution?
On the other hand, in the case of a Float solution, its positioning accuracy is significantly worse than that of a Fix solution. Unfortunately, a Float solution does not reach "centimeter-level" accuracy; errors are at the decimeter level (on the order of several tens of centimeters). Specifically, in relatively favorable environments where it seems almost possible to obtain a Fix, errors may be within 10 cm (3.9 in) in some cases, but in many cases they are around 20–30 cm (7.9–11.8 in), and under poor conditions they can deviate by more than 50 cm (19.7 in). In addition, for Float solutions the vertical errors tend to be larger than the horizontal ones. For example, if the horizontal error is about 30 cm (11.8 in), the vertical direction can have a deviation of more than 50 cm (19.7 in); the degradation in height-direction accuracy is therefore non-negligible. This is still markedly better than the several-meter errors of standalone positioning, but it is a magnitude of deviation that cannot be tolerated in applications requiring precise positioning.
For example, in urban areas where part of the satellite signals are blocked by building shadows, RTK may not Fix and remain Float, causing the position to deviate by tens of centimeters or more (tens of inches or more). Such errors can cause problems for tasks that require centimeter-level accuracy (half-inch accuracy), such as control point surveys and as-built management at construction sites. Therefore, when only a Float solution is obtained, the positioning results should not be adopted as-is; it is important to improve the environment and obtain a Fix solution.
In short, the accuracy of Float solutions is markedly lower than that of Fix solutions, and you can consider the errors to be at least one order of magnitude (about 10 times) larger. To fully exploit RTK performance, the key is how to transition out of the Float state and obtain a Fix solution.
However, in situations where an accuracy on the order of tens of centimeters (tens of inches) is sufficient, the positioning results from a Float solution can sometimes be used. For example, for applications such as wide-area map making or obtaining approximate locations, an accuracy of 20–30 cm (7.9–11.8 in) may be practically acceptable. However, even in those cases, it should be noted that Float solutions are not as stable as Fix solutions and measurements tend to fluctuate over time or with changes in the environment. Also, when taking measurements with a Float solution, it is desirable, if possible, to observe the same point multiple times and take the average to reduce variability.
Key Points for Obtaining a Fix Solution
To reliably obtain a Fix solution in the field, you need to pay attention to several points. First, it is important to ensure an open sky with good visibility so that satellites can be captured sufficiently. Install the antenna in an open location free of obstructions; the more satellite signals you can receive, the more favorable it is for computing integer solutions. Generally, receiving five or more satellites in common is said to be the minimum condition for a Fix, but in practice it is ideal to be able to capture seven to eight or more satellites simultaneously. Therefore, using a multi-GNSS receiver that supports not only GPS but also GLONASS, Galileo, and Michibiki (QZSS) is effective for increasing the number of satellites and improving satellite geometry.
It is also important to avoid reflections and shielding of radio waves. If satellite signals are reflected by building façades, the ground, or water surfaces, errors from multipath occur and it becomes difficult to obtain a Fix solution. In urban areas and forests, choose locations with as few reflective objects and obstructions around the antenna as possible, and gain height so you can see the sky more broadly. Some high-performance antennas incorporate multipath mitigation, but fundamentally improving environmental conditions is the most reliable countermeasure.
There are also operational considerations regarding receivers and correction information. Using a dual-frequency GNSS receiver improves the accuracy of ionospheric delay correction, allowing a stable Fix solution to be obtained faster than with a single-frequency receiver. In addition, it is essential to continuously receive RTK correction data from the reference station. When receiving corrections over the Internet via a mobile network, radio signals may not reach mountainous areas or underground locations, causing communication interruptions. If communication is lost, the solution can drop from a Fix to a Float within a few seconds to several tens of seconds, so be mindful of coverage and, if necessary, consider installing repeaters or using satellite-communication-based augmentation signals (e.g., receiving CLAS signals from Japan’s QZSS, Michibiki).
Additionally, it is important to remain stationary immediately after starting positioning to stabilize the initialization. RTK typically requires several tens of seconds from start to reach a Fix solution due to its algorithm. Keeping the antenna stationary, rather than moving, allows phase alignment to proceed more quickly and enables obtaining a Fix earlier. Also, if you must work near trees or buildings, it can be effective to first secure a Fix solution in a nearby open area and then move to the work point while taking care not to change the antenna’s position and orientation too much. Some receivers have a hold function that maintains the Fix solution for short periods even if the number of satellites decreases. Furthermore, high-precision GNSS receivers with built-in IMUs (inertial measurement units) can interpolate position using inertial navigation when satellite signals are temporarily blocked, allowing them to maintain high accuracy for short periods. However, the basic principle is that preparing the environmental conditions as much as possible is the quickest route to stable high-precision positioning.
Summary
This explains the difference between Fix and Float solutions in RTK positioning, focusing on their accuracy differences. In summary, if a Fix solution can be established, RTK demonstrates very high horizontal accuracy of about 1-2 cm (0.4-0.8 in), but if it remains a Float solution the errors are large—20-30 cm (7.9-11.8 in) or more—making it unsuitable for precise surveying. In other words, obtaining a Fix solution is essential for RTK to realize its true performance, and a Float solution is only a provisional intermediate result.
Because there is an order-of-magnitude difference in accuracy between Fix and Float, in practice you should always aim to obtain a Fix solution. It is important to secure the satellite reception environment and make equipment adjustments as described in this article so that the Fix state can be maintained as stably as possible. By correctly understanding RTK’s mechanisms and limitations and operating it appropriately, the astonishing centimeter-level positioning accuracy can be utilized in the field.
Meanwhile, as a more accessible way to achieve high-precision RTK positioning, GNSS receiver devices that can be attached to and used with smartphones have appeared in recent years. For example, by using an iPhone-mounted GNSS high-precision positioning device called LRTK, it is possible to perform centimeter-level positioning using only a smartphone. High-precision positioning, which previously required specialized surveying equipment, is becoming more familiar thanks to the emergence of such easy-to-use devices. Going forward, it is expected that the further spread of high-precision positioning technologies will make centimeter-level RTK positioning more commonplace and more widely used across various fields.
Let's maximize the power of the Fix solution and use it to improve on-site efficiency and positioning accuracy.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.


