Easy RTK Offset Setup with LRTK: Correct Antenna Height Entry and Tips to Avoid Errors
By LRTK Team (Lefixea Inc.)
Table of contents
• What is an offset (antenna height) in RTK?
• Errors caused by incorrect antenna height entry
• How to measure and set antenna height correctly
• Tips to avoid offset setting mistakes
• Procedure for setting offset in the LRTK app
• Why use LRTK for simple surveying
• FAQ
For those new to RTK positioning (Real-Time Kinematic), the "offset," i.e., the antenna height setting, is an easy item to overlook. RTK can achieve centimeter-level high-accuracy positioning, but if you do not enter the antenna height correctly, it can cause unexpected errors. For example, if the antenna is mounted on a pole 1.5 m (4.9 ft) above the ground but you perform positioning with the offset set to 0 m (0 ft), you will get a 1.5 m (4.9 ft) error in the vertical direction. Even though you are using high-precision RTK, a simple setting mistake can make your survey results unreliable.
This article explains the meaning and importance of the offset (antenna height) in RTK, gives concrete examples of errors from incorrect entry, describes accurate measurement methods for antenna height, and provides practical tips for correct setup. It also shows the simple steps to set the offset with the LRTK app. The content is organized from a field-oriented perspective so beginners can easily understand and use it to manage RTK surveying accuracy.
What is an offset (antenna height) in RTK?
An offset is the height difference between the installed GNSS receiver (antenna) and the actual ground point you want to measure. Simply put, it refers to the antenna height. In surveying, the antenna is typically mounted on a pole or tripod and positioned away from the ground survey point. Because the antenna is raised above the ground, there is a difference between the measured coordinates and the actual ground point. To correct this, you must enter the antenna height—the offset value—into the app or receiver so the measured position can be adjusted by subtracting that amount.
Antenna height is generally measured as the vertical distance from the ground to the antenna reference point. The antenna reference point is the positioning reference inside the antenna as specified by the manufacturer; it is often marked on the antenna base or side. For smartphone-mounted RTK receivers like LRTK, you can generally consider the device's bottom surface as the antenna reference point (if using an external antenna, refer to the manual for the specified reference point). The important thing is to accurately determine the straight vertical height from the ground survey point to the antenna and set that as the offset value.
Note that the term "offset" has other uses at survey sites—for example, an "offset stake" refers to a stake driven parallel to a design position—but in RTK positioning, remember that offset specifically means correction for antenna height.
Errors caused by incorrect antenna height entry
What kinds of errors occur in RTK surveying if the antenna height is set incorrectly? Here are representative examples.
• Vertical displacement: The most notable is an error in elevation. For example, if the antenna is mounted 1.8 m (5.9 ft) above the ground but you enter the offset as 0 m (0 ft) and perform the survey, the recorded coordinates will be logged as 1.8 m (5.9 ft) higher than the actual position. Conversely, if you enter an antenna height larger than the actual height, the elevation will be incorrectly corrected downward by that amount. This error can be hard to notice until you plot the points on maps or drawings, causing later issues like "the measured point elevations don't match."
• Horizontal displacement: While an incorrect antenna height entry itself does not directly affect horizontal coordinates (XY), indirect horizontal errors can occur due to pole tilt. The antenna should be placed vertically above the survey point, but if you tilt the pole while measuring, the antenna will be horizontally offset from the survey point. Some modern high-performance GNSS receivers include automatic tilt compensation, but with general equipment, the more the pole is tilted, the larger the horizontal offset becomes. For example, if a 2 m (6.6 ft) pole tilts by 10°, the antenna can be located about 35 cm (13.8 in) horizontally away from the ground point. Even if the antenna height is entered correctly, without tilt compensation it is important to keep the pole vertical.
• Errors that are hard to notice: Errors from incorrect offset settings can be troublesome because they are not obvious on site. Coordinates obtained by RTK may appear normal at first glance, but elevations can be off by tens of centimeters. You may finish work without noticing the issue and only discover after overlaying data on drawings that "the elevations are globally incorrect." Since elevation discrepancies are often detectable only by comparing with terrain or design elevations, missing a check on site can lead to rework (re-surveying).
As shown, incorrect antenna height entry can significantly impair RTK survey accuracy. High-precision positioning can be ruined by a single setting mistake. The next section describes concrete methods to prevent such mistakes.
How to measure and set antenna height correctly
The antenna height you enter as the offset should be measured accurately on site. Below are the correct measurement and setting steps.
• Measure the height with a tape or ruler: First, measure the height from the ground to the antenna reference point on the pole or tripod where the antenna is mounted. Use a tape measure and measure vertically from the point on the ground (where the pole contacts the ground) to the antenna reference point. If possible, measure with the pole held vertical to reduce error. Even if the pole has scale markings, it is good practice to confirm with an actual measurement.
• Include adapter height: If you use an L-shaped adapter to attach a smartphone to the side of the pole or an attachment between the antenna and the pole, add that height as well. For example, if the pole itself is 1.5 m (4.9 ft) and the adapter from the pole to the antenna base is 10 cm (3.9 in), the total antenna height is 1.6 m (5.2 ft). It is helpful to know the dimensions of the equipment you use (pole, monopod, adapter, etc.) before going to the field.
• Double-check the measurement: Record the measured antenna height and verify it for errors. If possible, have a colleague cross-check or measure again with another tape. Even millimeter- to centimeter-level errors can affect high-precision surveying, so check carefully.
• Enter the antenna height in the app: Many RTK surveying apps and controllers, including LRTK, have a field to enter antenna height (offset). Enter the measured value using the proper unit (usually meters). After entering, recheck for digit errors or unit mistakes (for example, ensure you entered meters, not centimeters).
• Pay attention when using a base station: If you set up your own base station, measure and set the base station's antenna height as well. For the base, either add the antenna height to the known point elevation or enter the antenna height separately in the base station settings of the app. Correct settings on both the rover and base ensure consistent vertical references and coherent positioning results.
Following these steps from measurement through entry will ensure antenna height correction is accurate. Next, review practical tips to prevent such setting mistakes.
Tips to avoid offset setting mistakes
Measuring and entering antenna height is not difficult, but busy fieldwork can lead to careless errors. Here are field tips to prevent offset setting mistakes.
• Always confirm the setting before starting work: Before beginning surveying on site, check the antenna height value shown in the app. The previous session's value may remain, so confirm it matches the equipment you are using that day. This basic habit prevents mistakes like "I changed the pole length but the app still had the old value."
• Use presets for dedicated poles: The LRTK app has presets for dedicated monopods and standard poles. If you use such equipment, simply select the corresponding length from the menu and the correct offset is entered automatically. Using this feature reduces manual input errors, so use presets when using supported equipment.
• Keep the pole vertical with a bubble level: Many poles or monopods include a bubble level. Keep the bubble centered during measurement so the antenna is directly over the survey point. This minimizes horizontal offset even if there is some error in pole length settings. This is especially important for equipment without tilt compensation.
• Periodic height verification: When possible, measure a known elevation point (e.g., a nearby bench mark) to verify the obtained elevation. If the antenna height is set correctly, the difference from the known elevation should be within a few centimeters. If there is a large discrepancy, reassess the settings.
• Record and share: Share the antenna height values used that day with your team. For example, noting "antenna height XX cm (XX in)" in a daily report or survey log makes it easier to trace causes if data issues arise. If you use cloud syncing, utilize systems that automatically record settings including the offset.
With these small precautions and measures, critical errors from antenna height input can be prevented. Next, see the concrete steps to set the offset in the LRTK app.
Procedure for setting offset in the LRTK app
LRTK is a beginner-friendly RTK positioning system that combines a smartphone (iPhone) and a pocket-sized GNSS receiver with an easy-to-use app. Here are the basic steps to set the antenna height (offset) in the LRTK app.
• Connect the device and smartphone: Turn on the LRTK receiver and connect it to the smartphone via Bluetooth. Launch the LRTK app; once the receiver is recognized, you are ready to position.
• Check the offset before starting: From the app's main screen or settings menu, locate the field that displays the current antenna height (offset). By default it may show 0 m (0 ft) or the value used previously. Before starting measurement, update this value to match the field equipment.
• Enter the antenna height: Tap the "antenna height" or "offset setting" field and enter the measured antenna height. Pay attention to units and enter the value in meters (for example, for 160 cm (63.0 in) enter "1.60"). The LRTK app also allows automatic input by selecting pre-registered pole lengths. If you use a dedicated monopod, choose the corresponding preset length (e.g., 1.8 m (5.9 ft)).
• Confirm the setting took effect: After entering, verify that the antenna height displayed in the app is correct. The offset setting is now complete. For extra assurance, try measuring a point with a known elevation to confirm the correct height is obtained.
• Start surveying: Once the antenna height is set, perform RTK positioning as usual. The LRTK app lets you save points while monitoring position quality (Fix/Float and error indications). With vertical correction applied, the recorded point elevations represent ground values.
These are the steps to set the offset in the LRTK app. The intuitive UI of the dedicated app minimizes complicated operations so antenna height correction is applied properly without much attention. Finally, we discuss how to use LRTK to make surveying easier.
Why use LRTK for simple surveying
LRTK is a solution comprising a smartphone and a compact RTK-GNSS receiver with a user-friendly dedicated app. It allows RTK surveying, which previously required specialist knowledge, to be performed by almost anyone. Regarding antenna height settings, as described earlier, presets and clear displays are provided to minimize mistakes.
For example, the LRTK app can use AR (augmented reality) on the smartphone screen to visually display stake positions or design lines while measuring. This makes tasks like stake-driving or checking as-built shapes intuitive, enabling less-experienced technicians to survey confidently. Collected data is also saved and shared in real time to the cloud, so you can check results at the office immediately after measuring on site.
Using LRTK, tasks such as control point surveying or staking out that were previously outsourced can be completed in-house. You don't need to carry heavy total stations; a smartphone and an LRTK receiver let one person perform high-precision surveying—a major advantage. The ease and accuracy of LRTK make it a valuable tool on future survey sites. Experience efficient simple surveying with modern technology while avoiding elementary mistakes like incorrect antenna height settings.
FAQ
Q: What does "offset" mean in RTK surveying? A: The offset is the correction value for the GNSS antenna height. Specifically, it is the vertical distance from the ground survey point to the antenna (receiver), and it is subtracted from positioning results. If you lift the antenna on a pole, failing to set the correct offset will cause vertical errors.
Q: How should I measure antenna height? A: Measure from the top of the pole or tripod at the ground point to the antenna reference point using a tape measure. Measure vertically with the pole as close to vertical as possible. If there is a mark on the antenna base indicating the reference point, measure to that mark. Then enter the measured value in the RTK app’s antenna height field.
Q: What happens if I forget or enter the offset incorrectly? A: Incorrect antenna height entry causes errors mainly in elevation. For example, if you forget to enter it (left at 0 m (0 ft)), the recorded elevations will be offset by the actual antenna height. If you discover the mistake after surveying, you can partially correct recorded data by adding or subtracting the offset value, but this is not ideal. Because it can lead to rework if unnoticed on site, it is important to set it correctly from the start.
Q: Do I need to measure and enter antenna height every time? A: As a rule, we recommend confirming it each time you survey. If you use the same equipment, the previous setting might still be valid, but pole lengths or adapters may change by site. The LRTK app supports preset selection for dedicated poles, enabling quick correct value recall for supported equipment. Even so, make it a habit to check the displayed antenna height at each session.
Q: Is it okay to measure with the pole slightly tilted? A: If the receiver lacks tilt compensation, a tilted pole shifts the antenna away from the survey point and causes horizontal errors. Keep the pole as vertical as possible during measurement. Receivers that support tilt compensation (such as LRTK Pro2) can correct for moderate tilt with internal sensors, but maintaining vertical is still best for stable accuracy.
Q: Do I also need to set the base station’s antenna height? A: Yes. If you set up your own base station, measure and correctly set the base antenna height. When placing the base on a known point, measure the height from the ground control point to the antenna reference and enter that value in the base station app or controller. Alternatively, set the base station coordinates by adding the antenna height to the known point’s elevation. This prevents height offsets from being included in correction data and ensures accurate elevations at the rover. However, if you use network RTK services such as NTRIP or VRS, the correction data from reference stations already accounts for antenna heights, so users generally do not need to worry about this.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.