RTK Piling Primer: Thorough Explanation of Basic Knowledge and Introduction Steps
By LRTK Team (Lefixea Inc.)
Table of Contents
• Piling work and traditional challenges
• What is RTK piling?
• High-precision construction enabled by RTK piling
• Benefits of introducing RTK piling (improved accuracy, efficiency)
• Equipment required to introduce RTK piling
• Steps to introduce RTK piling (practical guide)
• Use cases of RTK piling and future prospects
• Recommendation for simple surveying with LRTK
• FAQ
Piling work and traditional challenges
On construction sites, stake driving and layout marking are indispensable for placing buildings and structures in the correct positions. By driving piles at the positions indicated on the design drawings or marking the ground, the location and elevation of foundations can be accurately reproduced on site. If a pile position is off, the error propagates through subsequent work and can affect the quality and safety of the structure. Therefore, pile-driving work requires high accuracy.
Traditional pile-driving has mainly been carried out by specialist surveying teams using surveying instruments such as transits and total stations. First, control points are established on site, and distances and angles are measured relative to the coordinates on the drawings to mark and guide the pile positions. This method has been used for many years and is highly reliable, but it also has several challenges.
First is the dependence on manpower and skilled techniques. Experienced technicians who can handle surveying instruments are required, and typically one person operates the instrument while another holds a staff rod or prism, so work is usually done by at least two people. Much depends on the intuition and experience of skilled workers, so work quality can vary depending on the person in charge. In an industry chronically short of labor, such person-dependent methods are difficult to sustain in the long run.
Second is the large burden of time and effort. Setting up surveying instruments and aligning angles takes time, and obtaining the position for a single pile often requires repeated movement and measurement. On large sites, hundreds of points must be measured, and the traditional method takes very long. Even if temporary reference frames called chōhari are set up in advance, if the reference itself is off, rework is required and the overall schedule can be affected.
Third are accuracy and human error issues. Optical surveying instruments are highly accurate, but errors due to operational mistakes or misreading are not zero. For example, if a prism is placed incorrectly or a coordinate value is transcribed incorrectly, the pile position can shift by several centimeters. Even a slight deviation from the design position can require corrective work in subsequent processes, causing significant rework costs. It is difficult for human work alone to detect such errors in real time, leaving uncertainty in quality control.
Furthermore, heavy labor and safety issues cannot be overlooked. Transporting surveying equipment and long periods of standing work place physical strain on workers. Surveying in hot sun, extreme cold, or on poor footing is physically draining and tends to reduce concentration. Surveying piles at height carries the risk of falls, and safety risks are always present. These overlapping issues of personnel, time, accuracy, and safety made traditional methods not necessarily efficient.
What is RTK piling?
An approach that has emerged to solve these challenges is RTK piling. RTK piling refers to a method of guiding and measuring pile-driving positions using GNSS (Global Navigation Satellite System) real-time high-precision positioning (RTK technology). RTK stands for Real Time Kinematic; it is a positioning technology that uses two GNSS receivers (a base station and a rover) to receive satellite signals simultaneously and correct positioning errors in real time to achieve centimeter-level accuracy. Typical smartphone GPS has errors on the order of several meters, but RTK technology can reduce those errors to on the order of a few centimeters.
Applying RTK positioning to pile-driving enables extremely accurate layout on site, with errors of only a few centimeters relative to the coordinates on the design drawings. By installing a receiver that serves as a base station at a known point and attaching a rover to a worker or machine, the rover’s current coordinates are always calculated with high accuracy. Rovers often receive correction information via the internet, but by using the Geospatial Information Authority of Japan’s reference station network or commercial GNSS correction services (VRS, etc.), high-precision positioning is possible without providing your own base station. In Japan, augmentation signals from the Quasi-Zenith Satellite System “Michibiki” are also available, and using compatible receivers can improve accuracy even at sites with poor cellular coverage.
The important point is that the coordinates obtained by RTK are based on public coordinate systems (such as the World Geodetic System or the Plane Rectangular Coordinate System). This allows precise matching between coordinates shown on the design drawings and coordinates measured on site. In other words, design-stage data can be reproduced on site using the same coordinate system. Traditionally, surveying teams transferred dimensions from drawings to the field and then drove piles, but RTK piling reproduces numerical coordinates directly on site, eliminating intermediate steps and dramatically improving accuracy.
High-precision construction enabled by RTK piling
The greatest strength of RTK piling is its ability to dramatically improve construction accuracy. By having workers carry GNSS-equipped devices or mounting them on construction equipment, and checking their real-time position while driving piles, piles can be placed with almost no deviation from the intended design coordinates. Traditionally, machine operators relied on markings or stakes set by surveyors and their own judgment to perform work. With RTK, however, the device’s screen displays direction and distance to the target point, enabling intuitive guidance for positioning. Even less experienced workers can be guided to accurate points simply by moving the receiver as instructed, reducing variability in positioning.
Being able to drive piles with centimeter-level (cm level accuracy (half-inch accuracy)) precision leads to standardization and improvement in construction quality. When piles are consistently installed with high precision, troubles such as mismatched components or overall structural tilt in subsequent processes can be prevented. As a result, the frequency of rework and repairs decreases, contributing to shorter schedules and reduced costs. Securing accuracy also increases the trust of clients and supervisors and improves efficiency in construction management. RTK piling brings significant benefits to sites in terms of quality control and accuracy assurance.
Benefits of introducing RTK piling (improved accuracy, efficiency)
The benefits of introducing RTK piling go beyond improved accuracy. Major advantages also include significant improvements in work efficiency and labor savings. Guidance using GNSS simplifies many of the meticulous surveying and ground-marking tasks that were previously necessary. For example, surveying for stake positions that used to require a two-person team can be completed by a single person using an RTK system, from layout to pile driving. Because the user always knows their position in real time, there is no need to constantly check with or signal a survey assistant. Reducing personnel not only cuts labor costs but also allows fewer people to work around heavy equipment, improving on-site safety.
Work time is also significantly reduced. In one comparative case, introducing a GNSS-based AR piling system reduced surveying and staking time to about one-sixth of that required by the conventional total station method. Rapid position identification and more efficient movement enabled by RTK greatly increase the number of points that can be processed per day, shortening schedules. Labor savings and speed increases improve productivity and reduce overall site costs. Considering in-house surveying that reduces outsourcing fees and savings from reduced errors in materials and labor, investment in RTK piling can pay for itself.
Furthermore, in construction DX initiatives such as the Ministry of Land, Infrastructure, Transport and Tourism’s i-Construction, advancing construction through RTK is an important theme. Many general contractors and surveying companies are introducing RTK technology as a means to digitize sites while balancing productivity improvements and quality assurance. High-precision, efficient construction benefits both clients and contractors and can accelerate infrastructure development, so RTK piling is expected to become increasingly widespread.
Equipment required to introduce RTK piling
The equipment required to start RTK piling has become simpler in recent years. The main equipment preparations are listed below.
• RTK-capable GNSS receivers: GNSS receivers capable of centimeter-level positioning are required. A two-unit configuration—one for the base station installed on site and one rover carried around—is basic, but when using network RTK services, operation with only a rover is possible.
• Data communication environment: If using network RTK (VRS, etc.), a communication method is needed for the rover to receive correction information. Internet access can be secured via a SIM built into the receiver, smartphone or tablet tethering, or mobile Wi‑Fi routers.
• Guidance terminal (controller): A terminal is needed to display positioning data from the RTK receiver and provide navigation guidance. In addition to dedicated handheld controllers, smartphones and tablets can be used with dedicated apps. Choose a rugged device that is easy to handle on site.
• Mounting hardware: Prepare mounting hardware for using the rover receiver on site. For example, it can be mounted on a pole (staff) and carried by a person, or an antenna can be fixed to the arm of an excavator or other machinery. Install it in a manner suitable for the site’s usage.
In addition, prepare the design coordinate data used for guidance (the coordinate list of planned pile positions) in advance. While coordinates were once manually entered from paper drawings, systems that can import electronic data are now mainstream. With cloud-enabled RTK piling systems, uploading coordinate data to the web in advance and synchronizing it with on-site terminals completes position-setting preparation.
Steps to introduce RTK piling (practical guide)
Below is a step-by-step explanation of the general procedure for using an RTK piling system on site.
• Prepare equipment: Bring the equipment mentioned above to the site. Power on the RTK-GNSS receivers and connect them to the terminal (dedicated controller or smartphone) so they can obtain a position. Attach the rover receiver to a pole for a worker to carry or mount it on heavy machinery. If using network corrections, turn on the terminal’s mobile data or Wi‑Fi connection.
• Set reference points: Register known coordinate values that will serve as surveying references in the system. If setting up your own base station, place the GNSS antenna in a stable location with minimal error, input the coordinates of the known point, and set it to base station mode. Even without a local base, connecting to a network RTK service allows reception of correction information from a virtual reference.
• Load coordinate data: Load the design coordinate data for planned pile locations into the guidance terminal. Transfer data via USB, use an SD card, or retrieve it online if cloud synchronization is available. Prepare to manage points by assigning IDs or names to each.
• On-site guidance work: Select the point you want to guide to (pile position) on the terminal. The difference between the current position and the target coordinates (distance, bearing, elevation offset) will be displayed on the screen. Move the receiver toward the target according to those indications. Arrows and distance readouts on the screen provide directional guidance so even non-experts can reach the correct position without getting lost. When you arrive at the target point, mark the ground or drive the pile.
• Record and share: Mark completed points on the terminal and record the coordinates of actual installed piles. With cloud-enabled systems, recorded on-site information is immediately uploaded to the cloud and can be shared with office PCs or other teams. This preserves a history of who installed which point and when, aiding construction management.
As described above, the operation of RTK piling systems is simple, and basic surveying knowledge combined with short training is sufficient to learn. Recently, user-friendly apps that run on smartphones and tablets have appeared, providing intuitive user interfaces that on-site workers can handle. When introducing for the first time, it is advisable to trial it on a small site to get accustomed to the operation before full deployment.
Use cases of RTK piling and future prospects
RTK piling is already being used in various construction fields. In addition to the accuracy and efficiency benefits mentioned above, governmental support for ICT in construction is driving adoption. Below are representative use cases.
• Road construction: RTK guidance is used for staking along roadway centerlines and marking property boundaries and shoulder positions. Based on coordinates in design data, paving extents and drainage installation locations can be accurately set, and there are cases where work was carried out without installing chōhari (temporary construction references). Combining GNSS-equipped construction machines with operator guidance displayed on monitors has enabled operators to perform cutting and filling at specified elevations and slopes.
• Bridge construction: RTK piling guidance has been introduced for positioning foundation piles for piers and abutments. Even in mountainous sites with poor lines of sight, using GNSS-equipped terminals to guide to each pile position enabled high-precision layout. When driving piles with machinery, checking the screen while working helped improve bridge installation accuracy.
• Underground infrastructure works: RTK is also effective in burying water/sewer pipes and communication cables, guiding trench start/end points and corners. For large areas, installing stakes or spray marks at regular intervals based on design positions has become more efficient. Advanced approaches include overlaying virtual pile markers (AR piles) on camera images linked to GNSS antennas to indicate the direction of the next excavation point far away. Workers can identify the target simply by following on-screen guides, reducing excavation mistakes.
From roads and bridges to general infrastructure, RTK piling technology is producing results across a wide range of fields. Due to its dual advantages of accuracy and labor savings, many construction companies are considering adoption, and as part of site digital transformation (DX), its use is expected to grow. In Japan, the capabilities of Michibiki and the development of 5G communications supporting high-precision satellite positioning are expected to further expand RTK construction.
Recommendation for simple surveying with LRTK
Finally, as a recent system that makes RTK piling easy to realize, we introduce LRTK. LRTK is an RTK-GNSS positioning system developed by Refugia (レフィクシア社) that enables high-precision positioning and AR-based piling guidance using commercially available smartphones. By attaching the dedicated small GNSS receiver “LRTK Phone” to an iPhone or iPad, the smartphone itself becomes a centimeter-accuracy surveying instrument. Making pile-guidance possible with a single smartphone—where previously expensive dedicated equipment was required—is revolutionary.
By following the instructions displayed on the smartphone screen, even beginners can reach target points without getting lost. The LRTK app overlays design points and directional instructions on the camera image, so the actual “here is where to drive the pile” position is visually obvious on site. The AR-based coordinate navigation function digitally supports fine positioning adjustments as you approach the target. Without relying on experience or intuition, anyone can perform accurate pile-driving work.
LRTK also supports cloud-linked data management. Collected pile coordinates, photos, and point cloud data can be instantly saved to the cloud and shared among the team. Multiple devices can synchronize data so that everyone on large sites can always check the latest surveying information while working. The receiver, weighing approximately 125 g, has a built-in battery and is easy to carry, enabling a new style in which workers carry it in their pockets. Cost-wise, it is easier to introduce than traditional systems, and it is beginning to spread to small- and medium-sized sites as a tool for simple surveying.
By using LRTK, high-precision construction enabled by RTK piling can be practiced without special equipment or extensive preparation. Combining smartphones with the latest technologies transforms surveying work that once required specialized skills into tasks anyone can perform. If you are considering RTK piling adoption, starting with simple surveying using an accessible, high-performance system like LRTK is recommended.
FAQ
Q: How much accuracy can RTK piling achieve? A: Positioning with RTK-GNSS typically achieves approximately ±1–2 cm horizontally and ±3–4 cm vertically. This is dramatically more accurate than conventional GPS positioning and is sufficient for pile-driving and as-built measurement on construction sites.
Q: Can one person do the work using an RTK piling system? A: Yes. With RTK guidance, a worker can complete everything from layout to pile driving alone without survey assistants or signallers. There are increasing cases where single operators using smartphone RTK perform staking work, achieving both labor reduction and improved accuracy.
Q: Can RTK piling be used in mountainous areas without cell coverage? A: In locations where internet-based correction information cannot be received, you can set up your own base station and transmit correction data by radio. Also, using augmentation signals from Japan’s Quasi-Zenith Satellite System “Michibiki” can help maintain a certain level of accuracy even without cellular coverage. However, in environments where satellite signal reception itself is difficult—such as inside dense forests or under cliffs—RTK positioning can become unstable, so caution is needed.
Q: I’m worried about introduction costs. Are there benefits even for small sites? A: Recently, low-cost products such as smartphone-compatible RTK receivers have appeared, lowering the barrier to adoption. Even at small sites, the advantage of being able to perform layout in-house without arranging external survey teams is significant. Although initial investment is required, many cases see sufficient returns through labor cost reductions and schedule shortening.
Q: Do I need special qualifications or training to master RTK piling? A: No special qualifications are required to operate RTK equipment itself (however, compliance with radio laws is necessary if using radio equipment). With basic surveying knowledge, operation can be learned in a few days. Attending manufacturer or vendor training provides additional confidence for on-site introduction. With repeated on-site trials, you can become accustomed to operation in a short period.