Solo RTK Stakeout: The Latest Surveying Method That Eliminates the Need for Total Stations

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Table of Contents

• Conventional stakeout work and manpower challenges

• Solo stakeout made possible by RTK

• How RTK positioning works and its accuracy

• Benefits of RTK-only surveying

• Caveats and limitations of RTK surveying

• Are total stations no longer necessary?

• Simple surveying with LRTK

• FAQ


Conventionally, stakeout (setting out positions) has typically been performed by multiple people using a total station (TS). An experienced surveyor operates the instrument while another worker holds a prism at the target point—work is normally done in pairs. This approach requires personnel and effort, and on large sites it is not uncommon for stakeout to take an entire day. Manual work also carries the risk of human error, such as recording mistakes or misreads that can lead to rework.


In recent years, solo stakeout using RTK-GNSS (Real Time Kinematic GPS) has attracted attention as a way to improve surveying efficiency. By combining RTK’s high-precision positioning with smartphone apps, it has become possible to achieve centimeter-level positioning on site without a total station. This article explains methods and key points for RTK-based solo stakeout, comparing them with conventional methods and covering benefits and cautions. At the end of the article, we also introduce simple surveying using the new solution LRTK.


Conventional stakeout work and manpower challenges

Stakeout is an indispensable task on civil engineering and construction sites, but conventional methods have faced major issues with manpower shortages. Especially for surveys using a total station, at least two people—and sometimes a recorder making three—are required. One person operates the surveying instrument while another holds a staff or prism at a distant point, so staffing is essential. If a skilled surveyor is assigned to another site, work can halt while waiting for surveying, and this dependence on specific individuals impedes on-site efficiency.


Total station surveying also requires time for setup and preparation. The instrument must be mounted on a tripod, leveled, and repeatedly back-sighted and sighted to known points for each stakeout point. When measurement points are numerous over a wide area, much time is consumed installing and moving equipment, sometimes taking a full day. Survey results often remain as coordinate records on site and require drawing and quantity calculation back at the office, creating inefficiency because survey data cannot be used in real time.


Manual surveying work also carries unavoidable human error risks. Parallax-induced reading mistakes or handwriting errors can lead to position discrepancies or construction mistakes in later stages. These conventional challenges have increased industry demand for labor-saving and efficiency improvements.


Solo stakeout made possible by RTK

The advent of RTK-GNSS positioning has brought dramatic changes to stakeout work. RTK is a technique that corrects satellite positioning errors in real time, reducing typical GPS errors of several meters down to a few centimeters. Recently, the spread of the Geospatial Information Authority of Japan’s reference station network and private correction services (network RTK) has made RTK positioning more accessible.


By carrying an RTK receiver (rover) on site and moving to the coordinates specified in the design drawings, a single person can perform stakeout. When the target coordinate is selected in a dedicated surveying app, the smartphone displays a directional arrow and distance to the target. Following that guidance and approaching the target, the display switches to an AR (augmented reality) guide. When viewing the site through the smartphone, a virtual stake marker appears; by moving the device you find the point where the marker aligns with the ground location. This allows positioning to be refined to within a few centimeters (a few inches), so stakes that used to be located by feel or guesswork can now be pinpointed with digital navigation. Even less experienced workers can accurately find points, enabling a single person to complete stakeout work without veteran assistance.


RTK positioning accuracy for stakeout, in open-sky favorable environments, typically falls within approximately 2–3 cm (0.8–1.2 in) horizontally. This meets the accuracy required for many stakeout tasks such as roadwork and land development. For example, placing boundary stakes in a large development area or marking a road centerline can be done efficiently under RTK guidance. Unlike optical instruments, RTK does not require line of sight, so even where obstacles or terrain make it difficult to secure a total station’s sight line, GNSS can directly measure stake coordinates as long as the sky above is visible.


How RTK positioning works and its accuracy

RTK (Real Time Kinematic) is a GNSS technique that improves positioning accuracy via simultaneous observations by a base station and a rover. Simply put, the base station’s known position is compared with the rover’s observations to calculate errors, and those error corrections are sent to the rover in real time, reducing standalone GPS errors of several meters to a few centimeters. In Japan, network RTK using the Geospatial Information Authority of Japan’s reference stations is common; via mobile communications the rover receives correction data in real time (VRS and similar methods). This enables high-precision positioning without having to set up your own base station. In areas without mobile coverage, centimeter-level augmentation services provided by the QZSS satellite (CLAS) can realize RTK without relying on communication lines.


RTK positioning can sometimes take time to obtain a fixed solution (Fix) depending on satellite geometry and signal reception. However, once a Fix is obtained, centimeter-level accuracy can be maintained while moving. Modern equipment can establish a Fix in several tens of seconds to about a minute after power-on, letting you start surveying immediately. While a regular smartphone GPS can be off by 5–10 m (16.4–32.8 ft), RTK reduces that to just a few centimeters, making it suitable even for elevation checks and as-built measurement in many cases. Note, however, that vertical accuracy tends to be slightly worse than horizontal; vertical errors of around 3–5 cm (1.2–2.0 in) can occur. Therefore, for strict elevation checks it is advisable to complement RTK with optical leveling or compare and correct against known elevation benchmarks.


Benefits of RTK-only surveying

Solo surveying using RTK offers various advantages not found in traditional methods. The main benefits are summarized below.


• Minimum personnel required: Surveys that previously needed 2–3 people can be completed by one person with RTK. Because roles like operating the instrument and holding the target simultaneously are unnecessary, sites facing manpower shortages can respond quickly.

• Fast measurement over wide areas: GNSS surveying directly acquires absolute coordinates, eliminating the need to sight from known points for each measurement. You can walk through large sites or along long alignments and acquire measurement points continuously, greatly reducing work time.

• Immediate verification and sharing of results: RTK provides coordinates in real time on site, so measurements can be checked immediately. Additional measurements or re-measurements can be performed on the spot, and data can be shared with the office via the cloud for as-built checks or comparison with design values.

• Less equipment setup work: With a total station you must re-establish setups and back-sight for each point, but with RTK you carry the rover and continuously measure. The hassle of repeatedly setting up and taking down a heavy tripod is eliminated, simplifying preparation.

• Less reliance on advanced skills: Tasks like setting out batter boards with tape measures or precise sighting with a TS required experience, but RTK displays numeric results digitally, so once basic operations are learned even inexperienced personnel can achieve a certain level of accuracy. Especially when combined with intuitive smartphone app navigation (AR displays), beginners can find points without hesitation, reducing dependence on veterans.


As described above, RTK-only surveying is a revolutionary method that greatly reduces manpower, time, and effort while delivering high-precision results. With the Ministry of Land, Infrastructure, Transport and Tourism promoting *i-Construction* (ICT-enabled construction), labor-saving surveying using GNSS will become increasingly important, and RTK is a key enabling technology.


Caveats and limitations of RTK surveying

There are points to note even with convenient RTK surveying. Because it is not万能, understanding its weaknesses and planning countermeasures is important.


• Dependence on satellite reception conditions: RTK accuracy is strongly affected by satellite signal reception. In open-sky locations where many satellites are visible accuracy is high, but in urban canyons or forests multipath and signal blockage can increase errors. In environments with poor sky visibility, errors on the order of several tens of centimeters can occur or positioning can remain unstable as a “float” solution. In such cases, it is preferable not to rely solely on RTK but to supplement and verify with total stations or traditional stakeout methods.

• Vertical accuracy: As mentioned, vertical measurement accuracy tends to be worse than horizontal. For tasks requiring millimeter-level elevation accuracy, such as checking fill heights or concrete thicknesses, it is safer to verify height benchmarks with leveling or to correct RTK results against known elevation points.

• Initialization and number of satellites: RTK reaches full precision only after obtaining a “Fix” solution, and depending on satellite geometry (GDOP) and signal conditions it may take time to establish Fix or revert from Fix to float. Before work, check satellite visibility and geometry, choose time windows suitable for positioning where possible, and avoid measuring at times with few visible satellites.

• Dependence on communications: Using network RTK requires the rover to continuously receive correction data via mobile communications. In mountains or underground where communication is unavailable, network RTK cannot be used; in such sites you must either set up your own base station and broadcast corrections or switch to post-processing (PPK). On site, prepare spare batteries and have alternative surveying methods ready in case communications are unstable.

• Treatment as official survey results: Some surveying tasks require submission of deliverables or inspection by authorities. In such cases you may be required to provide observation records and accuracy assurance documentation for RTK-derived results. For boundary determination surveys, GNSS observation data must be explainable to inspectors (comparisons with reference points and error verification results). Coordinates obtained by RTK are officially treated as “survey observation records” under surveying law, so save measurement timestamps and correction data logs so results can be verified later.


By paying attention to these points, RTK-only surveying can yield highly reliable results. The important principle is “do not leave everything to RTK.” It’s a useful tool, but combining conventional surveying knowledge and double-check habits allows you to harness RTK’s advantages while appropriately controlling risks.


Are total stations no longer necessary?

With practical high-precision RTK surveying, some may wonder, “Are total stations no longer needed?” The conclusion is that RTK does not make TS or levels entirely unnecessary. Each surveying instrument has strengths, and using them according to the situation is important.


RTK is strong for single-person coverage of wide areas and for surveying where line of sight is difficult, but for fine-detail measurements requiring millimeter precision, optical total stations and levels remain more reliable. For example, positioning critical structural reference points or conducting precise displacement measurements are situations where final verification with conventional surveying provides extra assurance. Also, where RTK positioning is unstable (urban canyons, dense forests), total stations may be the only option. Ideally, use RTK to streamline what it can handle and supplement final checks and parts requiring high precision with TS or levels. That said, many stakeout and as-built check tasks traditionally done with TS are increasingly being replaced by RTK. From the standpoint of saving labor and time, prioritizing RTK while using TS as needed will likely become mainstream.


Simple surveying with LRTK

To fully leverage RTK technology, easy-to-use equipment and systems are also important. The recently introduced “LRTK” is a solution that attaches a small high-performance GNSS antenna to a smartphone or tablet and receives correction information via a network to achieve centimeter-level positioning. Simply attaching a small receiver weighing about one hundred-some grams to your everyday smartphone transforms it into a high-precision surveying device. No complicated configuration is required; dedicated apps guide the user so beginners can start surveying easily.


With LRTK, even inexperienced users can handle tasks from simple surveys to advanced stakeout. For example, a stakeout that used to require two people can be reliably guided by a single person using LRTK plus smartphone AR navigation. On-screen arrows and AR stake markers guide the user to the exact coordinates without relying on intuition. Even when you cannot approach the point directly on a slope or at height, you can indicate a virtual position from a safe location and place a marker, enabling reductions in manpower and procedures while maintaining accuracy and greatly improving construction workflow.


In short, simple surveying with LRTK is “a new surveying approach that provides RTK-level accuracy with easier equipment and operation.” Centimeter-accuracy surveying, which previously required expensive specialized instruments, has become suddenly more accessible thanks to LRTK. It is easy for small-to-medium contractors and municipalities to adopt and is a powerful tool to promote on-site DX (digital transformation). If you are interested in surveying that can be done by one person, consider leveraging such new technologies to improve efficiency.


For more information, please also see the [LRTK official site](https://lrtk.lefixea.com).


FAQ

Q: RTK surveying accuracy—how good is it? Can it really position to within a few centimeters? A: Under good conditions (open-sky sites), RTK-GNSS surveying can achieve approximately 2–3 cm (0.8–1.2 in) horizontally and about 3–4 cm (1.2–1.6 in) vertically. This level of accuracy is adequate for many civil surveying and construction management tasks. However, in areas surrounded by buildings or forests, temporary errors of several tens of centimeters may occur. Depending on environmental conditions, complementing RTK with conventional surveying methods may be advisable. For critical points, double-checking RTK positions with a TS or level provides security.


Q: If I have RTK, do I no longer need total stations or levels? A: RTK is very convenient, but it does not completely replace total stations (TS) or optical levels. Each instrument has different strengths. RTK allows one person to survey wide areas and enables labor savings, but for precision measurements requiring millimeter accuracy or for locations where satellites cannot be received, TS or levels are appropriate. Ideally, use RTK for tasks it can handle efficiently and supplement final detailed checks with TS or levels to combine the strengths of both approaches.


Q: What equipment or preparation is needed to use network RTK? A: To use network RTK (VRS and similar), you need a GNSS receiver (rover) and an environment that can receive correction data via the Internet. Specifically, a mobile-communication-capable device (a receiver with a SIM card or a smartphone-connected type) and subscription to a correction-data service are required. In Japan, various private GNSS correction services and correction data provided via the Geospatial Information Authority’s reference station network are available. With these correction data you can perform RTK positioning without setting up your own base station. If you are outside communication range, network RTK cannot be used; you then need to set up a temporary local base station to broadcast corrections or switch to post-processing (PPK).


Q: I’m nervous about introducing RTK to my site for the first time. Can anyone handle it? A: Modern RTK equipment and software are designed to be user-friendly, and basic operations are not overly difficult. Systems like LRTK allow surveying by following on-screen instructions in a smartphone app, making them usable even by those with limited expertise. Still, to maximize accuracy you should learn satellite reception tips (keep the antenna unobstructed and high, remain still for a short time while observing, etc.) and become familiar with the equipment. Start practicing in open areas to check result variability and accumulate experience. If questions arise, consult the manufacturer or provider support. With appropriate learning, even first-time users can make RTK surveying an effective on-site resource in a relatively short period.


Q: What is “simple surveying with LRTK”? A: LRTK is a solution name for a small RTK-GNSS receiver that works with smart devices plus a dedicated app. It aims to let anyone perform centimeter-level surveying (simple surveying) without heavy specialized equipment or complex setup. For example, simply attaching an LRTK receiver to a smartphone and walking the site will automatically acquire high-precision position data that can be saved and shared in the cloud. Tasks that conventionally required an experienced surveyor, such as stakeout or as-built management, can be accurately performed by newcomers using LRTK’s intuitive AR navigation. In other words, simple surveying with LRTK is “a new method that makes RTK-level accuracy accessible to everyone,” and its effectiveness is already being proven on many sites.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.