top of page

AR-compatible RTK Surveying Opens a New Era: Achieving Centimeter-level Accuracy with a Smartphone

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Table of Contents

• Background: Challenges in the Surveying Industry and the Wave of Technological Innovation

• What Is RTK Surveying?

• Application of AR Technology on Construction Sites

• How Smartphones Achieve Centimeter-level Accuracy

• Main Benefits of AR-enabled RTK Surveying

• Key Use Cases (Examples of AR × RTK Surveying)

• Comparison with Traditional Methods

• Promoting Simple Surveying with LRTK

• FAQ


Background: Challenges in the Surveying Industry and the Wave of Technological Innovation

In recent years, surveying sites have been undergoing major changes. Facing issues such as a shortage of surveyors and the aging of skilled personnel, the construction industry is seeing a push toward ICT adoption and DX (digital transformation) to boost productivity. Traditionally, surveying work was labor-intensive—teams of two operating total stations or setting up GPS survey equipment. However, demand for surveying that can be completed by a single person has been rising, and various new technologies have emerged. Among them, RTK surveying that leverages GNSS satellite positioning is attracting particular attention.


The advantage of RTK surveying lies in its ability to use correction information from a base station to achieve high-precision positioning in real time. As a result, surveying that once required multiple personnel and large equipment can now achieve centimeter-class accuracy with much simpler gear. In Japan, the Ministry of Land, Infrastructure, Transport and Tourism’s *i-Construction* initiative has promoted ICT adoption at construction sites. The use of 3D survey data and automated construction is encouraged, and as efficiency and labor reduction are demanded, there is growing expectation for high-precision surveying tools that anyone can use. One solution born from this context is surveying using compact RTK positioning devices that work with smartphones.


What Is RTK Surveying?

First, let’s briefly review what RTK (Real Time Kinematic) surveying is. RTK surveying utilizes signals from GNSS (Global Navigation Satellite Systems) such as GPS and is based on simultaneous satellite positioning by a base station (a receiver installed at a known location) and a rover (the receiver used at the point to be surveyed). The base station sends positioning error information to the rover via radio or the Internet, and the rover applies corrections to dramatically improve positioning accuracy in real time. Standalone GPS positioning typically has errors on the order of 5–10 m (16.4–32.8 ft), but with RTK methods, errors can be reduced to within a few centimeters. For example, in public surveying or as-built management for infrastructure works, positioning within a few centimeters enables accurate stakeout and measurement.


To achieve this high precision, rover receivers are equipped with high-performance GNSS antennas and receiver chips that support multiple frequencies. In recent years, network RTK (VRS and similar methods) that obtain correction data via networks without the need to set up a private base station has become widespread. Additionally, Japan’s quasi-zenith satellite system “*Michibiki*” provides CLAS (centimeter-class augmentation service), and it is becoming possible to continue centimeter-class positioning by directly receiving augmentation signals from satellites even where mobile signals do not reach. With these advances in the technological foundation, RTK surveying has become an indispensable high-precision positioning method for civil engineering and construction sites.


Application of AR Technology on Construction Sites

Meanwhile, AR (augmented reality) technology is rapidly gaining presence in construction and surveying fields. AR overlays digital information (3D models, text, etc.) on a smartphone or tablet screen that shows the real scene. By blending virtual objects into the actual view, a variety of useful visualizations for the field become possible.


For example, you can display a planned building model in AR on the site before construction to simulate the finished appearance, or project piping routes from drawings onto real structures to check for clashes. A major construction company has demonstrated overlaying BIM equipment and piping models onto site video to visualize pipes hidden inside walls before finishing. The advantage of AR is that it enables intuitive understanding of information that is hard to grasp from drawings or numbers alone. Just by looking at a smartphone screen on site, necessary information appears in context, smoothing information sharing among stakeholders and helping prevent construction errors and improve inspection efficiency.


How Smartphones Achieve Centimeter-level Accuracy

So what system is required to achieve RTK-level centimeter accuracy with a smartphone? The key is the use of compact RTK-GNSS receivers that can be attached to a smartphone. The smartphone’s built-in GPS alone has large errors and is unsuitable for precision positioning, but by pairing an external high-precision GNSS receiver with the phone via Bluetooth or similar and performing RTK-corrected positioning, latitude, longitude, and elevation can be obtained accurately in real time on a smartphone.


Specifically, a small receiver is attached to the smartphone to receive signals from multiple satellites such as GPS and GLONASS while obtaining correction data from a base station over the network (or CLAS signals from *Michibiki*). These are integrated and processed by a smartphone app, making it possible to determine the current position with horizontal accuracy of a few cm (a few in) and vertical accuracy on the order of a few cm (a few in). That a precision once achievable only with stationary, expensive surveying instruments can now be reached with a smartphone plus a palm-sized device is revolutionary.


Moreover, the smartphone itself is packed with high-performance sensors: a camera, accelerometer, gyroscope, electronic compass, and on the latest models even a LiDAR scanner. By combining these, the smartphone functions as a platform to capture and display spatial information. With high-precision positional data, virtual stakes or 3D models can be overlaid on the camera view to make them appear as if they exist in the real world. LiDAR can scan nearby terrain or structures, and it is easy to tag that point-cloud data with positional coordinates for recording. In short, giving the smartphone the “eyes” of high-precision GNSS effectively transforms it into a surveying instrument.


Main Benefits of AR-enabled RTK Surveying

The fusion of smartphones, RTK-GNSS, and AR technology creates various benefits in field surveying. Below are representative advantages gained by adopting AR-enabled RTK surveying.


• One-person surveying: Traditionally, surveying required multiple personnel, but with a smartphone and a small GNSS receiver, one person can complete the survey. There is no need to transport heavy equipment or coordinate with an assistant, allowing efficient work while compensating for on-site staffing shortages.

• Improved mobility and safety: Because surveying can be done with a palm-sized device and a smartphone, crews can move nimbly even in tight spaces, on heights, or on slopes that were problematic for traditional equipment. The risk of carrying heavy tripods into unstable areas is reduced, lowering worker burden and improving safety.

• Rapid measurement and real-time sharing: Since positioning, recording, and calculations can all be handled in an app on the smartphone, results can be obtained on the spot for immediate decision-making. Measured data can be shared instantly via the cloud, allowing office staff and clients to confirm in real time. This reduces the effort of preparing reports and the risk of re-surveys, speeding up decision-making.

• Intuitive operations reduce errors: AR visualizes “which point to measure” and “where to place stakes” on the screen, reducing reliance on intuition or experience. For example, simply marking the location shown by a virtual stake in AR allows precise stakeout, preventing misreadings or placement errors common with traditional methods.

• Multifunctional all-in-one: Smartphone apps integrate map display, photo capture (with automatic geotagging), notes, calculations, and more. There is no need to bring data back to a PC for processing—distance, area, and volume calculations can be completed on site. Because it can handle not only surveying but also construction management and record-keeping, substantial efficiency gains are possible.


Key Use Cases (Examples of AR × RTK Surveying)

AR-enabled RTK surveying is expected to be useful across a wide range of field scenarios. Here are some typical use cases.


• On-site projection of design data: Import design models from drawings or BIM into a smartphone and display them in AR to verify positions and elevations against plans on site. In earthworks, overlaying a designed ground elevation model makes it immediately clear where to cut or fill and by how much. For structural layout checks, projecting column and foundation models on site enables pre-checks for interference with surroundings. Performing reviews on site intuitively rather than on drawings helps prevent rework due to misinterpretation.

• As-built management and quality inspection: Scan completed structures or terrain with a smartphone LiDAR, then overlay the acquired point cloud with the design data in AR for comparison. Point clouds annotated with high-precision RTK position data automatically align to world coordinates, allowing immediate assessment of deviations between measured and design values. For example, measuring road surface shape after repair and comparing it with the design profile on the spot allows instant checks for flatness or drainage slope compliance. This greatly speeds up inspections and reduces errors.

• Stakeout and marking work: Workers follow guides shown on the smartphone screen to perform stakeout or marking. When approaching pre-set reference or installation points, the screen displays prompts like “Place stake here,” so workers can operate precisely by following the instructions. Even on slopes or in areas with poor lines of sight, AR guidance can eliminate the need for temporary sighting frames and benchmarks, shortening work time and reducing human error.

• Visualization and maintenance of buried utilities: It is possible to “see through” and confirm the positions of underground water/sewer pipes and cables in AR. If pipe locations were measured as point clouds with a smartphone + RTK during installation, then after backfilling those utilities can be visualized simply by holding up the smartphone. Municipal staff inspecting buried utilities under roads can compare drawings and actual positions in AR on the spot, reducing the risk of accidental pipe damage. This is an innovative example that contributes to DX in maintenance management.

• Rapid surveying at disaster sites: Lightweight smartphone surveying is powerful in disaster aftermaths such as earthquakes or heavy rains. Even when large equipment cannot be deployed to landslide or flooded areas, damage can be quickly measured with just a smartphone and GNSS receiver. If the system supports offline operation, surveying can continue even in mountainous areas without mobile coverage or without temporary base stations. Acquired data can be shared via the cloud immediately to support initial disaster response.


Comparison with Traditional Methods

Although AR-enabled RTK surveying is innovative, some may wonder, “Can it truly perform on par with traditional surveying?” Here are the main differences compared with conventional methods.


• Equipment used: Traditionally, total stations, large GNSS receivers, tripods, prisms, paper field books, and cameras were among the many tools taken to sites. With AR-enabled RTK surveying, most tasks can be completed with a smartphone and a palm-sized receiver. The amount of gear is greatly reduced, lowering transport and setup burdens.

• Required personnel: Surveys that used to require 2–3 people can generally be performed by one person with a smartphone survey system. Eliminating the need for support personnel simplifies staffing plans and can reduce labor costs.

• Survey accuracy: Precision instruments like total stations can achieve millimeter-level angular and distance measurements, but RTK-GNSS provides centimeter-level horizontal accuracy that is sufficient for typical civil engineering surveys. Modern GNSS receivers can track multiple satellites with fewer losses from obstructions, providing stable positioning with errors on the order of a few cm (a few in).

• Workflow: Traditionally, field measurements were recorded and later converted to CAD drawings and reports in the office. With the new method, data are automatically saved and shared to the cloud as they are collected, enabling seamless data linkage between the field and the office. Additional measurements or retakes can be done immediately as needed, preventing rework.

• Cost aspects: Compared to assembling expensive surveying equipment and dispatching multiple personnel, using small devices and smartphones can reduce initial and operating costs. Of course, the best choice depends on site scale and required precision, but for small projects and routine surveying tasks, it can be a cost-effective option.


Promoting Simple Surveying with LRTK

As we have seen, the combination of smartphones, RTK positioning, and AR technology is key to opening a new era in surveying. To make this innovative surveying experience easy to realize, our company offers “LRTK.” LRTK consists of an ultra-compact RTK-GNSS receiver that can be attached to a smartphone and a dedicated app, enabling centimeter-level surveying with intuitive operation that anyone can use.


Attach LRTK to your phone and high-precision positioning starts in just a few tens of seconds, after which you simply follow on-screen prompts to measure points or display virtual models. No complex setup or specialized knowledge is required. Acquired data are automatically saved to the cloud and can be checked immediately from a remote office. Also, CLAS-capable models that receive *Michibiki* augmentation can continue positioning even in areas without mobile coverage, maintaining stable accuracy nationwide.


With the arrival of LRTK overturning conventional wisdom, the notion that “surveying is only for specialists” or “high-precision surveying requires expensive gear” is becoming a thing of the past. If you have a smartphone, you can now measure and verify on site immediately—this reality has been enabled by AR-enabled RTK surveying. If you are considering labor-saving or accuracy improvements in your workplace’s surveying operations, please try simple surveying with LRTK. It will surely dramatically expand your onsite productivity and the scope of information utilization.


FAQ

Q1. Can a smartphone alone really perform high-precision surveying? A1. By combining a smartphone with a dedicated RTK-GNSS receiver (for example, LRTK), high-precision positioning comparable to conventional surveying instruments is possible. With a phone’s built-in GPS alone, errors of several meters (several ft) are typical, but with RTK corrections the error can be improved to a few cm (a few in). In practice, smartphone + LRTK has been used for control point surveys and as-built measurements with results comparable to total stations.


Q2. What is needed to start RTK surveying? A2. Fundamentally, a high-precision GNSS receiver and an application to control it are required. For example, a receiver like LRTK and a smartphone app allow immediate RTK surveying. To obtain correction information, an Internet connection to government or municipal reference data services is useful, or in areas with poor communication the CLAS signals from the quasi-zenith satellite *Michibiki* can be used. Be sure to confirm the survey datum settings (such as WGS) as needed.


Q3. Can it be used in mountainous areas or tunnels without mobile coverage? A3. If satellite signals can be received, RTK positioning can continue even without mobile coverage. For example, LRTK models with CLAS support can receive augmentation signals directly from *Michibiki* to maintain centimeter-class positioning in areas without cellular service. However, in deep tunnels or fully indoor environments where satellites cannot be received at all, GNSS positioning becomes difficult and alternative surveying methods are required.


Q4. Can people without specialist knowledge use it? A4. Yes—the operations are designed to be intuitive in the smartphone app. Simple procedures such as pressing a button to record a point or selecting a design model to display let users perform measurements and checks on site without special knowledge. There are real-world cases where field workers have used LRTK successfully without prior specialist training. If you are comfortable with smartphones, you should be able to operate it without problems.


Q5. Can it completely replace conventional surveying equipment? A5. It depends on the type of survey and required precision. For general civil engineering surveys and construction management, smartphone + RTK can handle many tasks and often has advantages in mobility and efficiency. However, for millimeter-level precision measurements (such as specialized displacement monitoring or micro-strain measurement of structures), optical instruments may still be more suitable. Also, in indoor environments or locations without satellite reception, laser scanning or traditional terrestrial surveying methods are necessary. The recommendation is to use the right tool for the purpose, but for the majority of field tasks, smartphone RTK surveying is becoming the mainstay.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page