Differences between RTK Positioning Environments in Japan and Overseas and Key Points for Implementation
By LRTK Team (Lefixea Inc.)
RTK (Real-Time Kinematic) positioning is a technology that provides centimeter-level (cm-level accuracy, half-inch accuracy) high-precision location information and has been widely adopted in the construction and surveying sectors in Japan. When attempting to introduce RTK overseas, what environmental differences should be expected compared to Japan? When utilizing RTK abroad, it is important to understand the local positioning environment and regulations.
This article compares the differences between Japan and overseas RTK positioning environments from three perspectives: "correction service provision structure," "difficulty of establishing and maintaining reference stations (base stations)," and "legal and regulatory frameworks related to RTK operation," and explains how each affects practical operations. In addition, as points to note when introducing RTK overseas, we discuss cooperation with local partners, obtaining radio licenses and surveying licenses, accommodating local geodetic datums, and selecting appropriate correction methods, and introduce an example of simplified surveying using LRTK (smartphone RTK)—a combination of a smartphone and a compact GNSS device—as a concrete measure to lower the barriers to RTK implementation.
Differences in RTK Correction Service Provision Structures (Japan vs. Overseas)
In Japan, infrastructure for providing high-precision GNSS correction information is well developed. The Geospatial Information Authority of Japan (GSI) operates the Continuously Operating Reference Station network "GEONET," which places reference stations (CORS) at approximately 1,300 locations nationwide and distributes GNSS data in real time. This provides a foundation that enables RTK positioning anywhere in the country. In the private sector, telecommunications carriers have also built their own reference station networks and provide high-precision positioning services. For example, a certain telecommunications operator has established several thousand reference stations nationwide and distributes centimeter-level (cm-level accuracy, half-inch accuracy) correction information, with the advantage that users can receive stable corrections even while moving. Thus, in Japan both the public and private sectors have built a dense correction service provision system, allowing users to easily obtain RTK correction information from contracted services as needed.
On the other hand, overseas RTK correction service provision structures vary by region. In advanced countries in Europe and North America, national GNSS reference station networks (CORS networks) have been established by country, and correction services are provided by government agencies and surveying equipment manufacturers. For example, Germany has SAPOS and France has RGP—nationwide, government-led RTK networks—and private-sector wide-area services that can be used across borders are also being offered (in Europe, it is not uncommon for surveying equipment manufacturer–linked services to cover multiple countries). In the United States, state CORS and private network RTK services are also available. However, the providers differ from Japan: surveying equipment manufacturers and government-related organizations are more central than telecommunications carriers. Also, the sort of competitive situation among mobile carriers seen in Japan is not common; users often contract with equipment manufacturer–related services or public services to obtain correction information. There are also services that allow unified contracts across multiple countries, so the scale differs from a system that is contained within a single country like Japan.
Another difference in correction methods is the use of regional augmentation satellites for positioning enhancement. In Japan, the Quasi-Zenith Satellite System (QZSS, "Michibiki") provides the "Centimeter-Level Augmentation Service (CLAS)," allowing compatible receivers to receive correction information directly from satellites. In Europe, the Galileo GNSS is operational, and the High Accuracy Service (HAS) began trial provision in 2023. Both distribute high-precision correction data from satellite orbits and are attracting attention as a means to maintain RTK-level accuracy in areas outside of communication coverage. While the providers and network structures of correction services differ between Japan and overseas, the trend toward multi-GNSS utilization and satellite augmentation is common.
Differences in Difficulty of Establishing and Maintaining RTK Reference Stations
RTK positioning can be achieved by installing reference stations (fixed stations) or by using existing network reference stations. As mentioned above, Japan’s nationwide reference station network is well developed, so users rarely need to set up a reference station at each site. Using network-type RTK (VRS-type, etc.) allows positioning with only the GNSS receiver on the rover, eliminating the need to carry or install heavy base station equipment at the site. Additionally, Japan’s favorable mobile communications environment enables stable reception of correction data via the Internet, making it easier to maintain positioning accuracy.
Overseas, the state of reference station deployment and infrastructure varies greatly by country and region. In urban areas in Europe and North America, network-type RTK services are available as in Japan, so in many cases there is no need to prepare reference stations on one’s own.
However, in emerging countries or areas without developed infrastructure, high-precision networks may not exist. In such environments, users must install and operate reference stations at project sites themselves. For example, at long-term construction sites, it may be necessary to mount receiver antennas outdoors, secure a stable power supply and communication line, and keep them running continuously. Maintaining a reference station locally requires measures such as dust- and water-proofing equipment, theft prevention, and periodic calibration. Furthermore, if the distance to the rover becomes too great, accuracy degrades, so multiple reference stations may be required to cover a wide area. Thus, in some overseas locations the burden of operating reference stations can be greater than in Japan, and additional planning and costs may be required to achieve high-precision positioning.
Differences in Legal and Regulatory Frameworks Related to RTK Operation
When operating an RTK system, attention must be paid to differences in laws and regulations concerning radio use and surveying activities. In Japan, when transmitting correction signals from a reference station to a rover by radio, a radio station license under the Radio Law is required. Except for cases using very low-power radios such as specified low-power radio equipment, typical RTK radios that communicate with UHF transmitters in the 1 W class require prior license application to the Ministry of Internal Affairs and Communications. However, if correction information is received via the Internet using methods like Ntrip, no radio transmission is involved and no license is required. From the perspective of the Survey Act, conducting public surveys or map-making requires qualifications as a surveyor or registration as a surveying business. When producing official survey results in Japan using RTK, the work must be carried out under the supervision of a qualified person.
Looking overseas, regulations concerning radio and surveying differ by country. In many countries, a license or permit is required to transmit radio signals in certain frequency bands. When bringing RTK radio modems into another country and using them, you must check in advance whether the frequency band is legal there and whether licensing procedures are necessary. Some countries may have frequency bands where no license is required below a certain output (for example, the 433 MHz band in parts of Europe or the 902–928 MHz band in North America). It is important to either obtain the necessary licenses in advance according to local regulations or choose a license-free communication method (such as Internet-based or satellite communications).
Surveying work is also regulated by qualification systems in many countries. For example, in the United States, a Professional Land Surveyor license is required by state, and only licensed professionals can perform high-public-interest tasks such as boundary surveys. In many European and Asian countries, official survey results cannot be submitted unless supervised by nationally certified surveyors or surveying technicians. When Japanese companies conduct surveying and measurement abroad, collaborating with local licensed personnel or following local certification procedures for official use of results is essential. In addition, geodetic datums (reference coordinate systems) differ by country, so it is necessary to convert positioning results to the local coordinate system. Applying WGS84 or JGD2011 coordinates obtained in Japan directly to overseas drawings will produce errors, so perform transformations or corrections aligned to local control points to ensure coordinates are both legally and technically consistent.
Points to Note and Countermeasures When Introducing RTK Overseas
• Coordination with local partners: When introducing RTK technology overseas, it is important to collaborate with partner companies or technicians who are familiar with local conditions. Working with local companies helps overcome language and cultural barriers and makes it easier to obtain local correction services and support for various application procedures. In the surveying field in particular, participation by technicians holding local surveying qualifications increases confidence in the reliability and official acceptance of survey results.
• Confirm required licenses and permits: Before bringing and using RTK equipment, confirm the radio station licenses and work permits required locally. As noted above, some countries require licenses for RTK radios, or have different output limits. Investigate regulations of the relevant authorities in advance and apply for licenses if necessary. Also, if surveying work itself requires permits or registration (especially for public surveys or map-making), arrange to obtain them during the contracting phase.
• Handling geodetic datums and coordinate systems: To utilize positioning data locally, conversion to the local geodetic datum and coordinate system is essential. Research the target country’s official geodetic standards and map projection methods in advance, and obtain conversion parameters as needed. Performing calibration surveys at known points (local control points) at project start to correct RTK results so they match local coordinates is also effective. For vertical positioning, apply the country-specific geoid model to align elevations with local standards.
• Selecting correction services and positioning methods: Identify available local correction information and positioning methods to choose the optimal approach. If an existing network RTK service is available, contracting and using it is efficient. In areas with unstable network connectivity, consider traditional methods of installing a local reference station and sending corrections by radio, or using PPP (precise point positioning) services via satellite communications. As the types of satellite augmentation available (SBAS, QZSS CLAS, etc.) vary by country, pre-testing the most stable and accurate method locally is advisable.
• Utilizing simplified RTK solutions: Consider solutions that achieve high-precision positioning without bringing large surveying equipment. For example, RTK systems that combine a smartphone and a compact GNSS receiver (such as smartphone-type LRTK) can achieve centimeter-level (cm-level accuracy, half-inch accuracy) positioning via the Internet or satellite augmentation even where local reference station infrastructure is absent. Compared to dedicated equipment, these solutions are easier to deploy and have lower operational costs, making them suitable for trial introductions overseas and training local staff.
Example of Introducing LRTK Simplified Surveying by Combining a Smartphone and a Compact GNSS Device
Finally, we present an example of a simplified survey using LRTK (smartphone RTK) that leverages a smartphone and a compact GNSS receiver. LRTK was developed with the concept of a "palm-sized RTK surveying instrument": an ultra-compact GNSS device that mounts on a smartphone and a dedicated app together realize centimeter-level (cm-level accuracy, half-inch accuracy) positioning. High-precision surveying that previously required a tripod-mounted base station or bulky dedicated equipment can now be completed with a single smartphone and a pocket-sized receiver. There is no need for complex equipment setup upon arrival at the site; start the app and high-precision positioning begins in several tens of seconds. The guided operation makes it easy for technicians with limited surveying experience to use.
In actual deployments, reported uses include mounting an LRTK device on a surveying pole (monopod) with a dedicated holder and having a single person measure stake-out positions or perform as-built checks. Tasks that once required multiple people with a total station can be done by one person who follows guidance on the smartphone screen to quickly reach target coordinates and record positions on the spot. Acquired point data and survey results can be shared immediately via the cloud, facilitating smooth data coordination between the site and the office. This enables high-precision location-based construction management and surveying on overseas sites while minimizing the transport and setup of complex equipment.
By utilizing simplified high-precision positioning tools like LRTK, you can lower initial investment and personnel requirements while fully enjoying the benefits of RTK in overseas projects. By adopting new technologies beyond traditional frameworks, productivity and accuracy can be improved at construction and surveying sites across borders.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.