Revolutionizing Construction Site Safety Management! Protecting Workers with High-Precision Location Information
By LRTK Team (Lefixea Inc.)
Table of Contents
• Current status and challenges of safety management at construction sites
• What is high-precision location information technology?
• Applications of high-precision location information at construction sites
• Benefits of using high-precision location information
• Points to consider when implementing
• Simple surveying with LRTK
• FAQ
Current status and challenges of safety management at construction sites
Construction sites are environments where danger is always present. Various occupational accidents occur, such as falls from heights and collisions with heavy machinery, and their numbers have not decreased. According to statistics from the Ministry of Health, Labour and Welfare, the number of fatalities in the construction industry exceeds 200 per year, accounting for about 30% of all industries and ranking the highest. Even when incidents do not lead to serious accidents, injuries and near-misses (hirari-hatto: startling experiences or near-misses) occur routinely. Ensuring the safety of people working on site remains a major challenge.
Until now, the construction industry has centered safety management on human-driven awareness and rule compliance under the slogan "safety first," enforcing helmets and safety harnesses, conducting KY (hazard prediction) activities before work, and performing safety patrols. However, due to labor shortages and increasing work complexity, it has become difficult for managers alone to grasp all risks. With many tasks proceeding simultaneously across large sites, it can be impossible to know what is happening in blind spots. Against this backdrop, there is growing attention on strengthening site safety management by leveraging technology.
What is high-precision location information technology?
A new trump card expected for safety management is high-precision location information technology. High-precision location information refers to technologies that use satellite positioning systems (GNSS such as GPS and GLONASS) and ground sensors to obtain extremely precise position coordinates on the order of a few centimeters (a few in). While a typical smartphone GPS has errors on the order of several meters (several ft), by using real-time positioning technologies called RTK (Real Time Kinematic), these errors can be reduced to a few centimeters (a few in). The RTK method uses correction information from a base station antenna to correct satellite signal errors in real time. As a result, in open outdoor areas with a wide view of the sky, horizontal positions with an accuracy of about 1–2 cm (0.4–0.8 in) can be achieved, providing precision far beyond conventional GPS positioning.
In addition, to obtain high-precision positions in environments where satellite signals cannot reach, such as indoors or underground, ground-based positioning technologies like BLE beacons (Bluetooth Low Energy) and UWB (ultra-wideband) are also used. Although their range is limited, these are effective for determining the locations of people and objects where GNSS cannot be used. In short, high-precision location information technology is a group of technologies centered on GNSS RTK positioning that acquire far more accurate location information than before by various means.
Applications of high-precision location information at construction sites
How can such high-precision location information be concretely applied to safety management at construction sites? First is real-time tracking of workers' positions. By having each worker carry a high-precision positioning device (such as a high-precision GNSS receiver or positioning tag), site supervisors can see everyone's current positions at a glance on a digital map. For example, if a worker approaches a prohibited or hazardous area, the system can automatically trigger an alarm or display a warning on the worker's or supervisor's device. This can prevent situations where a worker unknowingly enters a dangerous area.
Also, by installing position sensors on heavy machinery and vehicles and continuously monitoring their relative distance to workers, systems to prevent collisions between machinery and people can be implemented. Operators of excavators, cranes, and the like can be alerted by the system if a person enters a blind spot outside their line of sight. In some cases, it is conceivable to link triggers for emergency stops or alarms on the machinery side. This is expected to significantly reduce near-misses between vehicles and pedestrians on site.
High-precision location data also has great power for rapid response in emergencies. If an accident or disaster occurs, being able to instantly know who is where enables rescue and evacuation guidance to proceed much more smoothly. For example, in the event of a collapse, the system can quickly identify "workers who have not yet evacuated" and allow precise instructions to be issued. By accumulating movement data for each worker, locations with frequent near-misses can be identified and visualized on maps as danger zones, informing subsequent safety measures. By using high-precision location information in this way, real-time and proactive safety management against site risks can be realized.
In practice, domestic construction companies have already begun introducing such technologies. One major general contractor has trialed a system that visualizes hazardous areas and the positions of workers and machinery on a map and automatically detects proximity. The expected outcomes include not only improved site safety and work efficiency but also cost reductions in safety management through optimization such as concentrating personnel where and when they are needed. Such advanced cases are increasing, and the use of high-precision location information is poised to bring a revolution to construction site safety management.
Benefits of using high-precision location information
Incorporating high-precision location information into safety management brings numerous benefits to sites. The main benefits are summarized below.
• Prevention of occupational accidents: By monitoring the relative positions of people and machinery in real time, dangerous approaches or entries can be detected and warned against in advance. As a result, the occurrence of accidents and near-misses can be expected to decrease.
• Rapid response in emergencies: Even if an accident occurs, if location information is available on the system, site supervisors and rescue teams can quickly rush to the scene and take appropriate action. Being able to identify the injured without hesitation or delay minimizes damage.
• Efficiency of safety monitoring: Even on vast worksites, workers' locations can be monitored digitally without relying on manpower. A limited number of safety officers can cover many workers, leading to labor savings and improved monitoring efficiency.
• Data-driven improvements: By analyzing accumulated location data, danger points and wasteful movement patterns become clear. Based on that data, layouts can be changed or additional safety measures implemented, enabling continuous, evidence-based safety improvements.
• Increased sense of security on site: Workers also gain peace of mind knowing their safety is being watched over. However, it is important to communicate clearly that the purpose is safety assurance so that it does not become a pressure of being monitored. If managed appropriately, it can foster trust that "the company is protecting us with the latest technology," which may also raise safety awareness.
Points to consider when implementing
When introducing a safety management system that uses high-precision location information, there are several points to keep in mind. Here are things to consider and prepare in advance.
• Preparation of equipment and infrastructure: First, you need to prepare the positioning devices and communication infrastructure to be used on site. This includes high-precision GNSS terminals or positioning tags carried by workers, receiving antennas and base stations that aggregate that location information, and computers or tablets to display and manage the data. Recently, small GNSS receivers that pair with smartphones have appeared, allowing the use of existing smartphones in some cases. For RTK positioning, there are methods to obtain correction information via the Internet and methods to directly receive the domestic QZSS (Michibiki) *CLAS* signal. It is important to choose the optimal method according to the site's communication conditions.
• Understanding the site environment: Before implementation, thoroughly assess your site environment. High-precision GNSS is basically usable outdoors where the sky is open. In urban areas surrounded by high-rise buildings or in mountainous areas, satellites may be difficult to capture and accuracy may temporarily drop. In tunnels or underground spaces inside buildings where GNSS signals do not reach, using other systems such as BLE beacons in combination should be considered. Plan in advance which technologies to use in which areas according to your site's conditions.
• Operational rules and structure: Simply introducing the system will not improve safety. To make it effective, operational rules and organizational structures must be established. For example, decide who will set hazardous areas and who will monitor them, the response flow and contact procedures when an alarm sounds, and how to deal with someone who forgets their device, and communicate these in advance. It is also important to define the retention period and usage scope of collected location data and create privacy-conscious rules. Indicating guidelines such as "do not use for purposes other than safety assurance" helps avoid undermining trust on site.
• Education and training: To embed a new system on site, training for workers is indispensable. Workers need basic training on device use (how to wear the device, charge management, etc.), how to respond to alarms, and emergency communication methods. Fortunately, many modern systems are intuitive, and if workers are familiar with smartphone apps, they are usually easy to use. Provide short training sessions or demos to support site staff so they can use the system without anxiety. Also, conduct regular drills and reviews to identify and improve operational issues.
• Cost-effectiveness assessment: Cost considerations cannot be avoided when introducing the system. Estimate costs such as high-precision GNSS receivers and system implementation and operational communication fees, and compare them with benefits such as prevention of losses from reduced occupational accidents, insurance premium reductions, and labor cost savings from more efficient monitoring. Recently, inexpensive, high-performance equipment and subscription-based services have appeared, lowering the barrier to introduction. Rather than rolling out across all sites at once, it can be effective to trial the system at small sites or limited areas and gradually expand while verifying effectiveness. Plan the optimal schedule and scope for your company to ensure the investment yields appropriate returns.
Simple surveying with LRTK
To leverage high-precision location information for safety management, it is important first to accurately grasp site map information and the coordinates of hazardous areas. However, traditional surveying requires expertise and manpower, and busy sites often lack the time. This is where the new smartphone-based surveying solution "LRTK" shines. LRTK is an innovative system that allows anyone to perform centimeter-level positioning (half-inch accuracy) by attaching an ultra-compact high-precision GNSS receiver to a smartphone. Combining a dedicated smartphone app and a cloud service enables site personnel to obtain accurate position information for each point without complex settings or complicated equipment operation.
For example, with LRTK, attaching a receiver to an iPhone or iPad and taking a single photo automatically records the photo's capture position (latitude, longitude, altitude) with an accuracy of a few centimeters (a few in). By photographing points of interest, the photos themselves become precise survey data. This greatly streamlines recording hazardous locations and understanding conditions before and after construction. Tasks that used to require forming a survey team and considerable time can be completed by one person in a short time using LRTK. No cable connection is needed; turn on the power and go to a place with a view of the sky, and initial positioning completes in just a few dozen seconds. Walking around a large site and measuring and recording necessary points one after another is also easy.
By using simple surveying with LRTK in this way, the barriers to handling high-precision location information on site are greatly reduced. Your own staff can easily perform coordinate surveying for required benchmarks and area divisions needed by the safety management system. It is a solution that overturns the conventional wisdom of "if you want high-precision location information, you must rely on large-scale surveying by specialists." Why not leverage cutting-edge positioning technology to revolutionize construction site safety management? LRTK can be a powerful partner to help you take that first step.
FAQ
Q: Why is accuracy insufficient with ordinary GPS? A: Positioning with ordinary GPS generally has errors on the order of several meters (several ft). While a few meters of offset may not be a major problem in wide outdoor areas, this error can be critical for safety management at construction sites. For example, when monitoring a danger zone with a radius of several meters (several ft), ordinary GPS can cause situations where it appears a person is outside when they are actually inside. High-precision location technologies like RTK reduce errors to a few centimeters (a few in), preventing such misses.
Q: What equipment is required to introduce a high-precision location information system? A: Basically, you need a GNSS receiver capable of centimeter-level positioning, a method to receive correction information, and software to manage and display them. Specifically, the configuration includes small high-precision positioning devices worn by workers (or a smartphone + high-precision GNSS module), base stations installed on site or correction data services provided via the Internet, and management screens on PCs or tablets that display each worker's position. Recently, aftermarket high-precision GNSS receivers for smartphones (like LRTK products) have appeared, allowing operation without purchasing dedicated equipment from scratch. It is best to start with the minimal configuration that fits your company’s scale and needs.
Q: Are there real-world cases of such positioning systems being used at construction sites? A: Yes, there are several advanced cases. Some major construction companies have trialed systems that attach position sensors to workers and machinery, visualize them in real time, and sound alarms when dangerous proximity occurs. There are also efforts to monitor the locations of workers in tunnel construction from the surface to ensure safety in unseen workspaces. These cases report not only reductions in accidents but also improved work efficiency due to increased peace of mind on site. Going forward, safety management using high-precision location information is expected to spread further across the industry.
Q: Can high-precision positioning be used in areas with poor signal or indoors? A: In environments where satellite signals cannot be received, general RTK-GNSS positioning unfortunately does not function. For example, in underground areas, inside buildings, or tunnels where GNSS does not reach, indoor positioning using other technologies such as BLE beacons or UWB is necessary. On the other hand, even in mountainous areas without cellular coverage, if there is a mechanism to receive correction information directly from satellites, such as Michibiki's *CLAS*, high-precision positioning can be maintained. There are actual cases of using LRTK to position and safely manage work areas in remote mountain regions outside communication zones. However, this technology generally achieves the highest accuracy in open outdoor environments, so combining ground-based surveying or adjusting equipment placement according to site conditions is required.
Q: Can it be introduced even if there are older workers who are not good with machines or IT? A: Yes, in most cases there is no problem. Modern systems are designed to be intuitive, and they can often be operated without special IT skills. To reduce burden on workers, devices often transmit location information automatically when worn, and alarms or notifications are delivered when necessary. For those unfamiliar with smartphone operations, simple pre-training or support from a site leader is usually sufficient. Including veteran workers' opinions during implementation and rolling out the system in a way they find "easy to use" and "helpful" is a key to success.
Q: Are there concerns about workers' privacy or being monitored? A: The purpose of high-precision location-based safety management is to protect employees, not to monitor work performance or prevent slacking. It is important to explain this clearly at introduction and to formalize rules within the company that collected data will be used only for safety. For example, promising not to scrutinize behavior during breaks or use location data for personnel evaluations will help workers cooperate. Since location data is personal information, it should be strictly managed and deleted appropriately when no longer needed, with attention to privacy protection. If such efforts make it clear that the system is "a mechanism to protect everyone's safety," it is likely to increase workers' sense of security.
Q: What are the characteristics of LRTK? A: LRTK is a next-generation high-precision positioning system designed to be used with smartphones. By attaching a palm-sized device to a smartphone, you can measure your current position with an accuracy of 1–2 cm (0.4–0.8 in). No complicated operations are required; with a press of a button on the app you can record survey points and take photos. Its ease of use for non-specialist surveyors is its greatest feature, enabling one person to survey wide areas and helping alleviate labor shortages. It stands apart from traditional expensive, large surveying equipment and aims to be a tool that "anyone can survey anywhere." In the context of safety management, LRTK enables on-site staff to measure fine points themselves and implement highly accurate safety measures.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.


