In recent years, the construction industry has rapidly advanced its DX (digital transformation) through the use of three-dimensional models. One keyword attracting particular attention is CIM. This article explains from the basics what CIM is, how it differs from BIM, the benefits of introducing it, concrete use cases, and the steps for implementation. As of 2025, the Ministry of Land, Infrastructure, Transport and Tourism is promoting the spread of CIM as part of *i-Construction*, making it an unavoidable presence in the industry. Through this article, let’s firmly grasp the basic knowledge of CIM and key points for implementation.
CIMとは?
CIM (Construction Information Modeling / Management) is a method that links and utilizes a three-dimensional digital model with related information in construction and civil engineering works. A 3D model built on a computer is linked with various attribute information such as design data, costs, materials, schedules, and maintenance data, and this information is shared and utilized across all stages from survey and design to construction and maintenance to improve overall project efficiency and quality.
In other words, CIM is an approach that centers operations around a “3D model that contains information.” Traditionally, construction and design were conducted using two-dimensional drawings, but accurately imagining the finished form from plan views alone required experience and made information sharing cumbersome. By introducing CIM, stakeholders can intuitively share the completed image on a 3D model and centrally manage related information, making communication of design changes and quantity calculations smoother. As a result, misunderstandings among stakeholders are reduced, leading to less rework and improved productivity.
CIM誕生の背景
The emergence of CIM was driven by successful digitalization in other fields. For example, manufacturing and the automotive industry have improved productivity by utilizing 3D data. In architecture, a 3D model utilization method called BIM has spread widely, especially overseas. BIM stands for *Building Information Modeling* and is mainly used in the design and construction of buildings (offices, houses, etc.).
In response to this trend, Japan’s Ministry of Land, Infrastructure, Transport and Tourism proposed the introduction of CIM for civil engineering in 2012. Initially defined as *Construction Information Modeling*, CIM later evolved into a concept that includes management. Overseas, the term “BIM” is often used comprehensively even in civil engineering, so the term “CIM” is not always common. However, in Japan, to distinguish it from architectural BIM, the 3D utilization in civil infrastructure is called CIM, and the combined notation BIM/CIM has been promoted. In fact, the ministry has used the unified expression “BIM/CIM” in official documents since around 2020 to promote 3D model utilization across architecture and civil engineering.
BIMとCIMの違い
So what specifically differs between BIM and CIM? The basic idea is similar, but differences in the target domains lead to distinct characteristics.
• Difference in targets: BIM mainly targets buildings (offices, houses, commercial facilities, etc.), whereas CIM mainly targets civil engineering structures (roads, bridges, dams, tunnels, etc.). Architecture focuses on interior building design, while civil engineering involves wide-area outdoor work closely related to terrain and geology.
• Difference in project characteristics: In architecture, members like columns, beams, and walls are relatively standardized, making standardization easier. In civil engineering, however, site-specific terrain conditions vary greatly, and structures are often one-off with varying scales. Therefore, CIM requires flexible responses tailored to each site and adaptability to differing conditions. Also, because work is mainly outdoors, projects are strongly affected by weather and terrain.
• Nomenclature and adoption: As noted above, overseas the term “BIM” is commonly used even for civil engineering, and “CIM” is a uniquely Japanese designation. Recently, because of many technical and methodological overlaps, “BIM/CIM” is increasingly used domestically. Both aim to improve efficiency through 3D model utilization, and there is a growing trend to actively adopt digital technologies across both architecture and civil engineering.
CIMモデルの基本構成
The core CIM model is broadly composed of two elements.
• Three-dimensional model (geometric data): A digital model that reproduces the structure or terrain in three dimensions. It is created from design drawings and survey data and accurately represents actual terrain shapes and structural dimensions and forms.
• Attribute information (various data): Information linked to each component or part of the 3D model. You can attach any data necessary for project management, such as part names, dimensions, quantities, material, strength, manufacturer, cost, construction schedule, and inspection history.
By combining this 3D geometry and attribute data, you create an information-rich 3D model, not just a solid model. For example, a bridge CIM model would include not only the bridge’s shape but also specifications and quantities of used members, construction costs, and post-completion maintenance plans. CIM models are used across the project lifecycle, allowing stakeholders to obtain needed information while viewing a common model. This centralizes data management, reduces communication losses between departments, and enables rapid information sharing when design changes occur.
CIM導入のメリット
Introducing CIM can have a significant impact on productivity in infrastructure development and construction projects. Especially by adopting methods known as front-loading and concurrent engineering, dramatic efficiency gains compared to traditional methods are possible.
フロントローディングによるメリット
Front-loading refers to concentrating work and review in the early project stages (planning and design) to reduce rework and inefficiencies in later stages. Utilizing CIM, front-loading can yield the following effects.
• Prevention of design errors: With a 3D model, the finished image can be visually confirmed, making it easier to detect clashes and inconsistencies during the design stage. Errors that are easy to overlook on drawings can be identified in advance, minimizing rework during construction.
• Optimization of temporary works planning: Temporary structures and construction methods required during works can be simulated on the 3D model. For example, scaffold and crane placements can be verified on the model to develop safe and efficient construction plans.
• Pre-verification of construction procedures: Construction processes can be simulated in advance on the 3D model to identify procedural and scheduling issues. Careful consideration of construction steps during the design phase reduces on-site setup errors and adjustment work.
• Reduction of rework: These measures reduce rework or changes on site due to design deficiencies. Thorough early-stage review ultimately shortens overall schedules and reduces costs.
コンカレントエンジニアリングによるメリット
Concurrent engineering is a method of progressing different stages as concurrently as possible. With CIM as a platform, designers, contractors, and clients can more easily participate in the project concurrently, producing benefits such as:
• Incorporation of contractor feedback: It becomes easier to incorporate feedback from constructors and on-site staff from the design stage. Sharing the CIM model while exchanging opinions allows adjustments from the actual construction perspective rather than purely desk-based design, resulting in plans that are easier to construct and that improve quality.
• Improved quality and safety: Early incorporation of field knowledge helps ensure quality during construction. Safety concerns can also be detected in advance and addressed, improving occupational safety.
• Faster information sharing: With cloud-hosted CIM models, all stakeholders can access the latest information, enabling speedy sharing of drawing revisions and design changes. Communication losses between stages decrease, and coordination becomes smoother.
• Faster decision-making: Faster information sharing and considerations grounded in on-site realities accelerate decision-making by management and clients. Faster responses to issues and quicker judgments on additional measures can lead to schedule shortening and cost containment.
CIMの活用シーン
CIM can be used in all phases of a project. Let’s look at how CIM can be specifically helpful in design, construction, and maintenance phases.
設計段階での活用
Using CIM in the design phase offers the following benefits.
• Faster consensus building:Presenting planned structures with a 3D model makes it easier to align understanding with clients and stakeholders. Spatial images that are hard to convey with drawings alone can be shared, speeding up explanations and discussions.
• Automated quantity calculation:By modeling the terrain as well, quantities such as cut-and-fill volumes in roadworks can be automatically calculated. This reduces manual calculations and quantity takeoffs from drawings, improving estimating efficiency.
• Accurate material cost estimation:Because CIM models include quantities and specifications of used parts, the required quantities of materials can be identified early. This enables higher-accuracy cost estimates from the conceptual phase and aids budget management.
• Efficient resident briefings:A 3D representation of the completed image makes project explanations to local residents without technical knowledge more effective. Showing the finished appearance in three dimensions helps gain understanding and supports consensus building.
施工段階での活用
Introducing CIM in the construction phase produces effects such as:
• Visualization of construction procedures:The 3D model created during design can be used for construction planning to visualize the entire schedule. On-site staff can intuitively grasp work steps and progress, enabling smooth execution.
• Immediate sharing of change information:If design or condition changes occur during construction, changes can be shared immediately on the CIM model. Compared with swapping paper drawings, everyone can quickly access the latest information, preventing delays in response.
• Optimization of material and equipment procurement:Changes in schedules or design can be anticipated on the model and reflected early in procurement planning for materials and heavy equipment. This prevents wasteful inventory and missed rental arrangements, aiding cost control.
• Enhanced safety management:By reviewing construction procedures in 3D, hazardous areas and risk factors can be identified in advance. Simulating locations of dangerous tasks and heavy equipment movements helps prepare safety notifications and safety equipment on site.
• Efficient as-built management:CIM is also useful when checking the as-built condition. By comparing point cloud data obtained via 3D scanners or drone surveys after construction with the CIM model, differences in the as-built condition can be efficiently verified.
• Integration with ICT construction machinery:If CIM model data can be loaded into control systems of compatible construction machines (excavators, bulldozers, etc.), automated construction via machine control becomes possible. This compensates for a shortage of skilled operators and achieves uniform, high-precision construction quality.
維持管理段階での活用
Even after completion, CIM can be used in various ways during maintenance.
• Centralized data management:The CIM model developed during construction can be used as a ledger for maintenance management. Inspection histories, repair records, and various sensor measurement data can be aggregated in the model and shared among stakeholders. Information won’t scatter, and consistent asset management is possible even if personnel change.
• Intuitive information retrieval:Information about structures can be visually searched via the 3D model. Rather than flipping through drawings and documents, you can click on the part you want on the model to call up related data, making on-site confirmation tasks more efficient.
• Efficient inspection records:For structures requiring regular inspection, such as bridges and tunnels, inspection results can be linked to the CIM model. Crack locations and repair histories can be mapped and accumulated on the model, making it easier to track changes over time and useful for planning the next inspection or repair.
• Rapid disaster response:In disasters such as earthquakes or heavy rain, quick identification of damaged areas and formulation of recovery plans are required. If a well-maintained CIM model exists in normal times, current information of damaged structures can be understood immediately. Reflecting the post-disaster situation in the model quickly allows rapid assessment of damage extent and calculation of required materials, contributing to early recovery.
CIMがもたらす未来
As CIM spreads, the construction industry can expect major changes such as:
• Dramatic productivity improvement:Efficiency gains from 3D models will shorten schedules and reduce working hours, significantly improving on-site productivity. This could positively impact workstyle reforms such as correcting long working hours and increasing wages.
• Transformation of construction processes:Paper-based procedures will be reconsidered, and processes like procurement, contracting, construction, and inspection will be linked via digital data. Visualization of information will reduce wasteful processes and greatly change methods of quality and cost management.
• Acceleration of new technology adoption:With a 3D data utilization platform established by CIM, it becomes easier to introduce the latest technologies on site, such as robotic construction, AI-based automatic analysis, and new materials. The speed of technological innovation across the industry will increase, and production processes will be further advanced.
• Creation of new industries:Peripheral service industries supporting digitalized construction sites will develop. For example, drone inspection services, XR (AR/VR) remote construction support, and predictive maintenance services based on data analysis will create new businesses and employment opportunities. CIM has the potential to transform the construction industry’s business models themselves.
CIM導入のステップ
The Ministry of Land, Infrastructure, Transport and Tourism has formulated guidelines for CIM introduction and recommends a phased approach. Even if you are tackling CIM for the first time, implementing the following steps in order will enable smooth introduction.
• Current state analysis and goal setting:Identify your company’s operational challenges and clearly define the goals you want to achieve with CIM.
• Human resource development:Develop digital personnel within your company who can handle CIM (operation of 3D CAD and CIM software, point cloud data processing, etc.).
• Environment setup:Prepare the necessary hardware and software for CIM, such as high-performance PCs, 3D modeling software, and cloud services, to establish the work environment.
• Pilot on small projects:If your company lacks sufficient know-how, try introducing CIM on small-scale projects to gain experience.
• Effect verification and improvement:Verify the results of pilot projects, horizontally deploy successful practices, and address and improve any issues.
• Full-scale companywide implementation:Incorporate CIM into company rules and workflows and implement it throughout the organization.
まとめ
CIM is a key technology for driving DX in the construction and civil engineering industries. By enriching three-dimensional models with abundant information and utilizing them, productivity and quality improvements can be expected at every stage of design, construction, and maintenance. In particular, business reforms that incorporate front-loading and concurrent engineering can greatly streamline traditional processes and reduce unnecessary rework. Concrete effects such as rapid consensus building in the design phase, visualization of progress during construction, and centralized data management during maintenance have also been confirmed.
The government is strongly supporting CIM adoption, and as its spread continues, it should contribute to industry-wide workstyle reform and productivity improvements. For construction companies, CIM is becoming an increasingly important factor in competitiveness. Delaying introduction risks falling behind the digitalization wave, so early consideration is crucial.
When starting CIM, preparing accurate on-site survey data is indispensable. However, conventional surveying requires specialized equipment and personnel, which raises the hurdle. A useful solution is simplified surveying using LRTK. LRTK is a modern surveying solution that links with smartphones and achieves centimeter-level accuracy (half-inch accuracy) positioning. Using this, one person can efficiently perform on-site three-dimensional surveys without special equipment or advanced operations. Because point measurement and data sharing can be done intuitively on a familiar smartphone, it greatly simplifies the acquisition of the current-condition data essential for CIM. Consider actively using such latest tools as you efficiently prepare for CIM implementation.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.