top of page

Guide to Using Setting-Out Navigation Apps: Tips for On-Site Efficiency and Accuracy Improvement

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Table of Contents

• What is a setting-out navigation app?

• Benefits of setting-out navigation apps for on-site efficiency

• Benefits of setting-out navigation apps for accuracy improvement

• Main features and cutting-edge technologies of setting-out navigation apps

• Points to consider when introducing a setting-out navigation app

• Simple surveying with LRTK

• FAQ


What is a setting-out navigation app?

In construction, "setting-out" refers to the task of accurately transferring design points from drawings to the actual site. Traditionally, this positioning work was typically carried out by experienced surveyors using tape measures, transits, total stations, and other instruments, often requiring several people. For example, one would measure distance and direction from a reference point on the drawing and place stakes or markers on the ground accordingly. However, these largely manual methods are time-consuming and labor-intensive and are prone to human error.


To address these issues, surveying equipment manufacturers have long developed various specialized devices to improve efficiency. For example, the advent of the automatic-tracking total station (robotic total station), which allows a single person to place stakes, has made it possible to perform setting-out without veteran surveyors. While specialized equipment can reduce labor, the devices themselves are often expensive and require time to master, raising barriers to adoption for small- to medium-sized sites and beginners.


Recently, a new class of tools called "setting-out navigation apps" has emerged, leveraging digital technologies to assist setting-out tasks. These are applications that run on smartphones or tablets and combine positioning technologies such as GPS and GNSS (Global Navigation Satellite Systems) with digital drawing data to navigate on-site workers to specified positions. Think of them as a "car navigation system for construction sites": they guide workers to specified coordinates and support marking exact points.


With a setting-out navigation app, positioning tasks that once relied on the intuition and experience of veteran staff can be performed intuitively by anyone. The screen displays the relative positions of your current location and the target, and users simply follow instructions to reach the target point. As digital transformation (DX) in construction advances, driven by initiatives such as the Ministry of Land, Infrastructure, Transport and Tourism’s *i-Construction*, these setting-out navigation apps are attracting attention as a new technology that contributes to improved on-site productivity.


Benefits of setting-out navigation apps for on-site efficiency

Using a setting-out navigation app can dramatically improve on-site work efficiency. Here are some main benefits.


• Reduced manpower by enabling one-person operation: Positioning tasks such as stake driving and batterboard installation—which traditionally required multiple people in a survey crew—can be handled by a single person using the app’s navigation. Because you no longer need an assistant to operate surveying equipment or a partner to measure distances, you can optimize staffing and reduce labor costs.

• Significant reduction in work time: Since the app provides real-time, accurate position guidance, the need to walk back and forth for re-measurement is reduced. Instead of repeatedly measuring distances while referring to drawings, you only need to follow the on-screen directions, making the positioning confirmation process much faster. As a result, tasks that used to take half a day can sometimes be completed in a matter of tens of minutes.

• Immediate data verification and sharing: Many setting-out navigation apps can save measured point data on-site and share it with the office via the cloud along with photos and notes. This simplifies paperwork and reporting after returning to the office and smooths information flow between the field and the office. Because you can verify on the spot whether a measured point is correct, you can immediately detect omissions or misplacements.

• Rapid upskilling of inexperienced staff: Thanks to intuitive displays and navigation, staff with limited surveying knowledge can perform effectively on site. With simple apps, new site staff can learn to use them after short training and achieve positioning speeds comparable to experienced personnel. This shortens training time and helps eliminate dependence on particular veterans.

• Reduced mistakes even in complex sites: In sites with complex structures or many points, planning and avoiding missed points has been challenging. With an app, a large number of pre-registered points can be managed in a list, preventing omissions or marking oversights. Because the app tells workers the next point to measure, omissions and duplication are less likely, reducing rework and improving efficiency.


Benefits of setting-out navigation apps for accuracy improvement

Using setting-out navigation apps contributes greatly not only to efficiency but also to improved accuracy. Here are the main accuracy-related benefits.


• Reduced human error through digital guidance: App guidance displays position based on coordinate data from drawings. This reduces human errors such as reading tape measures incorrectly or misunderstanding verbal instructions. Because workers follow objective numerical and on-screen instructions, errors tend to be smaller than when relying on intuition or experience.

• Improved accuracy through high-precision positioning technologies: Modern setting-out navigation apps increasingly support high-precision GNSS (such as RTK positioning), not just smartphone GPS. RTK (Real Time Kinematic) corrects satellite positioning errors in real time and can improve position accuracy to within a few centimeters (a few inches). This makes it possible to handle highly precise positioning down to millimeter-level for tasks that were difficult with traditional simple methods, preventing positional shifts or tilting of structures.

• Real-time visualization of offset: Apps continuously display the offset between your current position and the target coordinate in numbers or graphs. For example, it may show "East +0.05 m (0.16 ft), North -0.10 m (0.33 ft)," so you can see at a glance in which direction and by how much to move. This real-time feedback lets workers perform fine adjustments repeatedly to minimize errors, resulting in a dramatic improvement in the final stake or marking accuracy.

• Intuitive verification with AR overlays: The latest apps can overlay virtual markers or arrows on the camera view using AR (augmented reality), visualizing target positions in the real world. This makes it easier to visually confirm setting-out locations and prevents misplacement. Because anyone can place a stake where the on-screen arrow points, it’s easier to ensure consistent accuracy regardless of the operator.

• Improved quality control and traceability: Since measured points are recorded digitally, there is a record of who placed which point and when. If you later need to verify whether a stake was placed correctly, you can trace and check the records. Compared with relying on paper notebooks or field notes, digital records improve traceability of survey results and make it easier to assess the impact if mistakes are discovered.


Main features and cutting-edge technologies of setting-out navigation apps

Current setting-out navigation apps come with many useful features. Below are representative functions and the latest technologies used.


• Importing and using design data: By importing prepared design drawing data (digitized drawings or coordinate lists), you can manage all points to be set out digitally. Many apps natively support reading CAD data and CSV-formatted coordinate data and displaying target points on in-app maps or drawings. This lets you confirm required positions on your smartphone screen without carrying paper drawings.

• Point navigation guidance: The core feature of setting-out navigation apps is navigation that tells you the distance and direction to a target point. The difference between current position and target coordinates is constantly calculated, with instructions such as "north 〇.cm" or "east 〇.cm" and compass displays indicating bearing. Some apps provide voice guidance or vibration alerts so even inexperienced users can move in the correct direction. You can reach the correct point simply by following the device instructions without mentally interpreting maps.

• Support for high-precision GNSS (RTK): GNSS positioning is key to ensuring accuracy. Because typical smartphone GPS has large errors, many setting-out apps support high-precision positioning via external RTK-GNSS receivers or augmentation services such as Japan’s quasi-zenith satellite "Michibiki" correction services (CLAS). Using these technologies, centimeter-level positioning can be achieved without preparing a dedicated base station. By connecting a high-precision GNSS terminal to the smartphone via Bluetooth or cable and configuring the app to receive correction information, you can obtain a high-precision current location.

• Visual guidance with AR: AR features that overlay guidance information onto the camera view are a major characteristic of the latest apps. For example, virtual flags or markers indicating "place here" can be displayed within the camera view, or arrows pointing toward the target direction can be shown. Because marking positions are indicated directly on the real-world scene, users can intuitively and visually understand where to place marks. This is particularly useful in complex terrain or large sites with few landmarks.

• Saving measured point data and cloud sharing: Apps can store each measured point’s coordinate values, elevation, timestamp, and responsible person in a database. Cloud-connected apps automatically upload recorded data so the office can check it immediately from a PC. This simplifies preparation of as-built documentation and quality certification materials and improves reporting efficiency. With cloud storage, teams can share the latest information, making early detection and correction of setting-out errors easier.

• Other convenient features: Depending on the app, additional features may include electronic bubble level tilt correction for device inclination, batch surveying modes for multiple points, geo-stamped photos, and on-drawing note and marking functions. By choosing an app that fits your site needs, you can use it not only for setting-out guidance but also as a comprehensive site management tool.


Points to consider when introducing a setting-out navigation app

When actually introducing and using a setting-out navigation app on site, there are several points to watch. Below are tips to ensure successful adoption and maximize benefits.


• Consider the positioning method according to site conditions: Choose the optimal positioning technology for your site environment. GNSS (satellite positioning) is effective for outdoor sites with a clear view of the sky, but in urban canyons or mountainous areas where satellite signals may be blocked, consider using existing control points or apps that can interface with total stations. Selecting a method suited to the environment is crucial.

• Trial and comparison before introduction: Before deploying on a live project, if possible test drive a trial version or demo equipment on a small site. Comparing ease of use, guidance accuracy, and the richness of features helps select an app that meets your needs. Collect feedback from site staff and check whether the app is intuitive and whether Japanese-language support is available.

• Pre-check control points and perform calibration: Even when using GNSS, aligning to the site’s coordinate system by performing corrections at known points and coordinate transformations is key to ensuring accuracy. Beforehand, verify the app’s positioning accuracy at known control points on site and set offset corrections if necessary. Skipping such calibration can lead to systematic offsets even if the device itself is accurate.

• Prepare equipment and power: Basic preparations such as using waterproof/dustproof cases for smartphones and tablets, preparing spare batteries, and ensuring high-precision GNSS receivers are charged are essential. Prevent scenarios like "survey can’t be done due to dead batteries" or "device failure from rain." Thoroughly check equipment condition and secure sufficient power. Also update apps to the latest version in advance and, if available, pre-download offline maps for areas with limited connectivity.

• Pay attention to safety management: While convenient, these apps can cause users to focus too much on the screen and neglect surrounding safety checks. When working near operating heavy equipment, always stay aware of surroundings. Use voice guidance or vibration so you don't need to stare at the screen continuously. Also, avoid operating devices at heights or on unstable scaffolding without securing the device with a strap to prevent drop accidents—don’t forget safety precautions.


Simple surveying with LRTK

As described above, setting-out navigation apps are powerful tools that dramatically improve on-site efficiency and accuracy. Among these, LRTK stands out as a solution that balances ease of use and high precision.


LRTK consists of a very small RTK-GNSS receiver that attaches to a smartphone and a dedicated app. With just a smartphone, anyone can perform full-scale surveying with centimeter-level positioning. LRTK provides RTK positioning—which previously required specialized equipment and expertise—in an all-in-one package that even beginners can operate intuitively. The app displays design coordinates on the smartphone screen and navigates the difference from the current position down to centimeter units, making stake driving and control point installation surprisingly simple. AR features are also included to overlay target positions on the site view, making it easier to grasp the target location.


Moreover, LRTK can save acquired point coordinate data to the cloud for team sharing and later verification. Although it is specialized equipment, it is compact and easy to handle and uses the familiar smartphone interface, lowering the barrier to adoption. It truly embodies the convenience of "all you need is a smartphone" to complete on-site surveying and setting-out.


For those considering introducing a setting-out navigation app, LRTK is a compelling option for achieving simple surveying. Leverage this high-precision, immediately useful solution to improve the efficiency and quality of your construction sites.


FAQ

Q: What is a setting-out navigation app? A: A setting-out navigation app is a smartphone/tablet application that digitally guides workers to the correct locations when placing stakes or marking control points on construction sites. It uses GPS or high-precision GNSS positioning and digitized drawing data to show distance and direction from the current location to target coordinates in real time. This enables beginners to perform positioning work that previously required surveying expertise intuitively and accurately.


Q: Can accurate setting-out be done with just a smartphone’s GPS? A: General smartphone GPS alone has errors on the order of several meters (several feet), so it is unsuitable for tasks requiring high accuracy like construction surveying. Therefore, many setting-out navigation apps support higher-accuracy positioning methods such as RTK GNSS or augmentation services like Japan’s Michibiki CLAS that provide centimeter-level corrections. By connecting a dedicated small GNSS receiver via Bluetooth or using augmentation services, positioning accuracy can be improved to the centimeter range.


Q: Can people with no surveying experience use a setting-out navigation app effectively? A: Yes. Setting-out navigation apps are designed with user-friendly interfaces, and most people with limited surveying experience can learn to use them after short practice. Users simply follow on-screen guidance or AR markers, so there is no need to interpret maps or perform difficult calculations. However, it is advisable to learn basic precautions for accurate surveying, such as device calibration and checking satellite reception.


Q: Can a single person perform surveying tasks with a setting-out navigation app? A: Yes. Combining a setting-out navigation app with a high-precision positioning device enables one person to perform tasks that used to require multiple people, such as stake driving and batterboard installation. Traditionally, one person would look through the surveying instrument while another held the stake and followed instructions, but the app can navigate an operator to the target so one person can both measure and drive the stake. For safety, however, it may still be preferable to have an assistant nearby when working near heavy machinery.


Q: Can setting-out navigation apps be used at any site? A: They can be used at many outdoor sites where satellite positioning is available, but conditions matter. In urban areas with tall buildings or in forests, satellite signals may be blocked and GNSS accuracy can degrade. GNSS cannot be used underground or indoors, so in such cases you need an app that can interface with total stations or other instruments. In short, these apps are very effective in open outdoor environments but may require auxiliary surveying methods in some locations.


Q: I’m worried about introduction costs. Are there cost benefits? A: Setting-out navigation apps themselves are often inexpensive to introduce. By utilizing existing smartphones or tablets and adding high-precision GNSS receivers as needed, initial investment is generally lower than purchasing a full set of specialized surveying equipment. Because they can also greatly reduce labor and time spent on surveying-related tasks, they often lead to overall cost savings. Specific costs vary depending on devices and services (e.g., monthly correction service fees), but products at price points accessible to small sites are increasingly available.


Q: What is LRTK? A: LRTK is a solution for performing full-scale RTK positioning using a smartphone. By attaching a very small RTK-capable GNSS receiver to a smartphone and using the dedicated LRTK app, anyone can achieve centimeter-precision positioning and setting-out guidance. It includes AR displays and cloud connectivity and is notable for combining ease of use with high precision. Compared to traditional expensive surveying instruments, LRTK has a lower adoption barrier and is easy for beginners to handle, making it a good entry point for site DX.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page