LRTK-Supported SfM Processing Revolution: Achieving Centimeter-Level Accuracy (half-inch accuracy) with GNSS Integration

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

SfM processing (Structure from Motion) is a photogrammetric technique that reconstructs the three-dimensional shape of a subject from multiple photographic images. It finds common feature points across images taken from different viewpoints and, based on those correspondences, simultaneously computes camera positions and orientations and the 3D coordinates of the feature points (bundle adjustment). This computation automatically generates dense point cloud data (a collection of many 3D measurement points) from photos. Advances in SfM processing algorithms have made 3D modeling—which previously required specialized software and manual work—easily attainable, so SfM-based point cloud generation is now widely used in civil surveying and construction site as-built management.


Point clouds obtained by photogrammetry can record surface terrain and structure shapes in detail, with accuracy reaching millimeter to centimeter levels. Applications of SfM processing continue to expand yearly, from creating terrain models from drone aerial images to measuring dimensions of structures from ground photography. It also offers the advantage of flexible 3D measurement at a lower cost compared to specialized LiDAR equipment. However, point cloud models generated by SfM initially remain in an arbitrary-scale relative coordinate system, so georeferencing is required to use them as actual survey deliverables. The next section explains this accuracy issue and the conventional method of installing GCPs (ground control points).


Accuracy challenges of SfM processing and the burden of GCP installation

To use an SfM-derived point cloud model as a surveyed product aligned with map coordinates (e.g., terrain maps with elevation or as-built drawings), the model must be assigned the correct scale and absolute coordinates. Traditionally, this has been done by placing multiple known-coordinate points on site, called GCPs (Ground Control Points), and adjusting the model’s position and scale based on those points. For example, when conducting drone photogrammetry over a large reclamation area, targets (GCP markers) are placed every tens of meters to a hundred meters (roughly 32.8-328 ft) apart, and accurate coordinates for those targets are obtained in advance via GNSS surveying or total station. In the SfM processing software, the operator marks the GCP positions that appear in photos, and by aligning the model to those reference points during analysis, a terrain model can be reproduced with centimeter-level accuracy.


However, this GCP installation work requires substantial effort. Deploying control points over a wide area demands manpower and time, and installing and surveying targets is difficult in highly uneven or hazardous locations. As construction progresses and terrain changes, installed GCPs may move or disappear, requiring re-surveying. The task of locating and marking targets in photos is also tedious and subject to operator skill and human error, which can affect accuracy. Against this backdrop, the field’s challenge has been how to achieve high-accuracy SfM point clouds with as few GCPs as possible.


Complementarity of GNSS positioning (RTK/PPK) and SfM: the importance of coordinate correction and scale assignment

A promising approach to solve the above issues is the combination of GNSS positioning and SfM for direct georeferencing. High-precision GNSS techniques such as RTK (Real-Time Kinematic) and PPK (Post Processed Kinematic) measure camera positions at the time of photography with centimeter-level accuracy (half-inch accuracy) and record those coordinates (geotags) for each photo. In SfM analysis, camera positions and orientations (external parameters) are normally unknowns computed simultaneously, but providing high-precision initial coordinates reduces the degrees of freedom in the calculation and resolves the model’s scale ambiguity. In other words, by supplying the photo data with accurate answers for scale and position in advance, high accuracy can be achieved with fewer GCPs, and in some cases GCP-less (no GCPs) practical 3D surveying results can be obtained.


RTK-GNSS–equipped drones (UAVs) are already available, enabling real-time high-precision coordinates to be embedded in photos captured during flight. For ground photography, experiments are being conducted to record shooting positions with GNSS receivers integrated into cameras. In this way, GNSS and SfM complement each other’s weaknesses. SfM alone can produce detailed point clouds but requires effort to determine absolute coordinates and scale. GNSS alone can provide high-precision positions in open-sky environments but is unstable under tree cover or indoors. Combining the two enables flexible photogrammetry with reliable positioning accuracy, dramatically expanding the applicability and trustworthiness of photogrammetric surveying.


How LRTK provides high-precision geotagging and simplifies GCPs

A practical solution that makes this GNSS×SfM fusion easy to implement on site is LRTK. LRTK (the name of the positioning device/service provided by Refixia) consists of a small RTK-GNSS receiver that can be attached to a smartphone and a dedicated app; it performs centimeter-level positioning in real time during photography and records high-precision coordinates (geotags) for each photo. For example, the product marketed as LRTK Phone lets you attach a thin RTK receiver to an iPhone/iPad with a single touch, and by simply pointing the phone camera and pressing a button, you can instantly obtain latitude, longitude, and height for the shooting location. It is a pocket-size device weighing approximately 125 g, attracting attention as a convenient, portable means to measure on site whenever needed.


Because LRTK can assign precise coordinates to each photo, it can substantially simplify GCP deployment for photogrammetry. Instead of the dozen or so reference points that used to be required, a few verification-point surveys may suffice, and in some cases no GCPs at all are necessary. Geotag information provided by LRTK is used as fixed or initial positions for photos in the bundle adjustment during SfM processing, and the point cloud model is automatically reconstructed in the correct geodetic coordinate system. In aerial photogrammetry in particular, even if the drone itself is not RTK-enabled, measuring reference points in advance with LRTK or post-processing some of the in-flight photos to add precise coordinates can yield accuracy improvements close to those of RTK-equipped platforms. Having high-precision geotags also streamlines SfM analysis itself; with accurate initial values, stable solutions can be obtained in less time as a beneficial side effect.


One advantage of operating LRTK receivers in Japan is their compatibility with the centimeter-class augmentation service (CLAS) provided by the Quasi-Zenith Satellite "Michibiki." This allows real-time reception of correction signals without placing a dedicated base station on site, provided there is network coverage. Eliminating the need for expensive dedicated equipment has made centimeter-level positioning far more accessible. With just a palm-sized LRTK device and a smartphone, high-precision positioning data can be obtained anytime, anywhere—this ease of use is revolutionizing on-site photogrammetry workflows.


Practical workflow for aerial photogrammetry + LRTK × SfM: preparation → shooting → analysis → deliverable generation

Let’s check the procedure for creating SfM point clouds by combining LRTK with drone-based aerial photogrammetry. Broadly, it can be divided into four steps: "Preparation," "Shooting," "Analysis," and "Deliverable Generation."


• Preparation: Plan the flight area and prepare equipment. First determine the area, resolution, and altitude for drone photography and set up the automated flight plan. At the same time, attach the LRTK receiver to the smartphone, launch the app, and confirm connection status to GNSS base stations or network RTK services (or CLAS signals). If the drone lacks RTK support, it is advisable to measure a few reference points on site that will be used later for model alignment (LRTK can instantly provide known-point coordinates with centimeter-level accuracy (half-inch accuracy)).

• Shooting: Execute the aerial survey with the drone. Following the automated flight plan, capture photos over the entire site while ensuring appropriate overlap. If the drone supports RTK, high-precision coordinates will be recorded for each photo. In addition, on the ground use the LRTK Phone to scan and photograph details that are difficult to capture by drone (such as areas shaded by structures or blind spots on slopes) while walking the site. As described later, blind spots that are hard to acquire by drone can be complemented by smartphone measurements, resulting in a more complete dataset. If all aerial and ground photos obtained in this way are tagged with high-precision geotags, downstream analysis becomes significantly easier.

• Analysis: Import the captured photos into SfM analysis software (or a cloud-based point cloud processing service) to generate 3D point clouds. The software computes camera positions and point clouds via feature matching between images, but by combining LRTK-derived high-precision geotags, the model is output already aligned to real-world coordinates. If necessary, use the reference points (GCPs) obtained during preparation for accuracy verification or fine adjustments. In recent years, cloud services that automatically generate point clouds by simply uploading photos—without requiring a high-spec PC—have become available. For example, LRTK Cloud can process large numbers of aerial images on the server side and generate high-precision point clouds and orthophotos in about an hour after upload, allowing analysis results to be checked on the same day as shooting.

• Deliverable generation: From the analysis results, you can obtain dense 3D point cloud data, wide-area orthomosaic images (aerial photogrammetry maps), and other survey deliverables such as digital elevation models (DEMs) and contour maps. As needed, cross-sections and longitudinal sections can be produced from the point cloud, or the data can be compared with design drawings to create as-built documents; various analyses based on the obtained data can be carried out in a short time. In the LRTK+SfM workflow, the photos and point cloud data already contain accurate coordinate information from the outset, so the conventional work of coordinate transformation and manual alignment is largely unnecessary. This enables the rapid creation of up-to-date 3D models and various drawings, facilitating smooth integration into construction management tasks described below.


Heat-map difference display, volume calculation, and construction quality control using point clouds

High-precision 3D point clouds and orthophotos obtained in this way can be used in a variety of ways for as-built and quality control on construction sites. Major use cases include the following features.


• As-built heat-map display: Overlay the design data (design surface or planned 3D model) with the current SfM point cloud and visualize elevation differences as a color distribution (heat map). By color-coding how far each point in the point cloud deviates from the design surface, you can immediately identify excess or deficiency in fill/cut and the quality of finishing. For example, LRTK Cloud can overlay design drawings and point clouds and automatically color-code areas that match the design in green, overfilled high areas in red, and over-excavated low areas in blue. This allows site supervisors to intuitively grasp as-built conditions over wide areas and helps early detection of construction errors and reduction of rework.

• Volume calculation (quantity estimation): You can quickly calculate soil volumes and work quantities from the acquired point cloud data. Traditionally, calculating fill and excavation volumes required creating cross-sections from survey data and performing volume computations, but with dense point clouds you can automatically compute volumes within any area in software. By calculating volumes from differences between point clouds, you can precisely track daily construction progress and quantities. LRTK Cloud can instantly measure soil volumes on the order of thousands of cubic meters, allowing personnel on-site to use a tablet to immediately check information such as “how many cubic meters more need to be placed to reach the design elevation.” This dramatically improves the efficiency of quantity management.

• Digital quality control using point clouds: SfM point clouds record current conditions in detail, so by comparing them with design drawings and reference values you can digitally verify construction quality. For example, in road construction you can measure whether pavement gradients, widths, and elevations match the design; for concrete structures you can comprehensively check as-built dimensions. Because point clouds contain surface-wide information, areas previously assessed by interpolation between measured points can now be evaluated accurately. Keeping high-precision point clouds as inspection records also helps with quality certification and future traceability. By leveraging point cloud data in this way, the PDCA cycle of construction management can be driven by data, improving the accuracy and reliability of quality control.


Operational efficiency and safety improvements through cloud sharing and real-time confirmation

Survey data generated by LRTK and SfM also contribute to operational efficiency and safety improvements through cloud sharing and real-time confirmation.


First, sharing data in the cloud speeds up information transfer. Uploading point clouds and orthophotos captured on site to the cloud allows office staff and clients to view the latest status immediately. Because high-resolution 3D data are hosted server-side, recipients can easily inspect and measure them from a web browser without special software. This enables meetings and reporting that used to require on-site gatherings to be conducted efficiently remotely. It also eliminates the need to equip each office with expensive workstations or point cloud viewers, contributing to cost reduction.


Second, the ability to confirm and use data in real time offers major safety management benefits. Using drone aerial photography, you can safely monitor high places, steep slopes, and heavy machinery operation areas from the air—areas that are difficult for workers to access. Survey tasks that previously involved risk can be replaced with remote sensing, reducing worker exposure to hazards. Furthermore, because LRTK enables immediate on-site positioning and as-built checks, mistakes can be detected and corrected on the same day. For example, if the locations of buried utilities are recorded in point clouds beforehand and projected on site via AR, the risk of accidentally damaging underground pipes or cables during excavation can be prevented. With accurate information shared in real time and everyone able to intuitively understand site conditions, safety management and work efficiency improve dramatically.


Conclusion: The SfM surveying revolution driven by LRTK and the benefits of adoption

The use of LRTK combined with RTK-GNSS technology represents a true revolution in surveying workflows, improving the accuracy and efficiency of photogrammetry (SfM). It dramatically reduces the burden of laborious GCP deployment while enabling rapid acquisition of centimeter-level 3D models comparable to those from laser scanners. As a result, surveying and as-built management tasks that previously required specialists and many personnel can now be performed routinely by small teams in short timeframes.


The primary benefit of adopting LRTK is the promotion of on-site DX (digital transformation). Using digital data consistently from surveying through construction management advances process visualization and automation, reducing dependence on individual expertise and standardizing operations. Another major advantage is increased productivity and cost savings through labor reduction. If one smartphone per person is used for surveying, a limited workforce can cover large sites, providing a solution to worsening labor shortages. Moreover, sharing accurate current-state data in real time helps prevent rework and achieve consistent quality (reduced variance). In short, adopting LRTK raises on-site operations to the next level by balancing safety and efficiency.


Fortunately, these advanced technologies can be introduced on site without special large-scale equipment. For example, with just a smartphone and a drone, you can start simple photogrammetry using LRTK. Whereas expensive equipment like RTK-equipped drones and laser scanners were once necessary, today anyone can achieve centimeter-accuracy 3D surveying by equipping a consumer drone and a palm-sized RTK receiver attached to a smartphone. Products such as “LRTK Phone,” which turns an iPhone into an all-purpose surveying instrument, are appearing, and the era in which each person can survey on site whenever they want is becoming a reality. With lower initial investment and a reduced need for specialized skills, now is the ideal time to consider starting high-precision photogrammetry with a smartphone + drone as the first step in on-site DX. You will likely be surprised by the convenience and the quality of the deliverables.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.