What Is the Mechanism of SfM Processing? A Beginner-Friendly Explanation of the Technology That Generates 3D Models from Photos

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Use of 3D models is spreading in the construction industry and municipal operations. One technology attracting attention for generating 3D models from photos is SfM (Structure from Motion). This article explains the mechanism of SfM processing, the basic steps, required equipment, differences from other surveying technologies, benefits of adoption, and points of caution in an easy-to-understand way for beginners. Finally, it also introduces how to combine SfM with smartphone simple surveying using LRTK.


1. What is SfM processing?

SfM (Structure from Motion) is a technique for reconstructing three-dimensional models from multiple photographic images. As a type of photogrammetry, it can restore the 3D shape of objects or terrain from multiple photos taken with ordinary cameras or drones without using specialized surveying instruments. Originally developed in the field of computer vision, advances in software in recent years have broadened its use in construction and civil engineering.


Advantages of SfM include that it can be started at low cost without expensive instruments like laser scanners, it pairs well with drones to measure large areas quickly, and it can produce detailed color 3D models from high-resolution photos. Analysis can automatically generate deliverables such as point clouds, 3D meshes, and orthophotos (top-down photo maps). On the other hand, results are heavily influenced by the quality of the photos taken, and processing large numbers of photos can require long computation times. Nevertheless, because it balances ease of use and improving accuracy, SfM is expected to support on-site DX (digital transformation).


2. The process from photos to a 3D model

In SfM processing, there are several steps from photographing to obtaining a 3D model. Let’s look at the basic flow step by step.


• Shooting: First, photograph the object or area from various angles. A key point is to ensure adjacent photos overlap by more than 80% (in the flight direction) and more than 70% (side-to-side). When using a drone, plan the shots with automated flight, and for three-dimensional objects such as buildings, also take oblique images to capture side information. Take photos as brightly and sharply as possible, taking care to avoid blur and uneven exposure.

• Feature point extraction: When the photos are loaded into dedicated software, the software first automatically detects markers called feature points from each image. It extracts many distinctive points such as high-contrast patterns, edges, and corners that can be recognized even when the viewpoint changes.

• Feature point matching: The extracted feature points are compared between photos and corresponding points that appear to show the same location are matched. By finding sets of feature points that appear in multiple photos, the software identifies which photos overlap. Since incorrect matches can be mixed in, processes such as the RANSAC algorithm are used to remove mismatches.

• 3D reconstruction (structure estimation): Based on matched points between photos, the camera positions and orientations (external parameters) and the 3D coordinates of the feature points are calculated simultaneously. This is achieved by triangulation (distance measurement using angle differences from multiple viewpoints), where the spatial coordinates of a point are derived from its positions in multiple images. At this stage, the arrangement of cameras for each photo and a sparse point cloud representing the object are obtained. Then, using the obtained camera positions and the coarse point cloud, a method called Multi-View Stereo is used to densify the point cloud. Depth is estimated for each pixel of the images and gaps are filled to generate a dense point cloud and a 3D mesh model. Finally, integrated point cloud data and 3D models are output.


3. Required equipment and software

This section explains the shooting equipment and software needed for SfM processing. You can use familiar cameras or drones without special surveying instruments.


• Camera: A high-resolution digital camera is preferable. Standard DSLRs and mirrorless cameras are of course suitable, and compact digital cameras can also be used. Fixing focal length (zoom) and focus during shooting so that the field of view does not change will improve accuracy in post-processing.

• Drone: Aerial drones are ideal for wide-area photogrammetry. By automatically acquiring many photos from above, you can efficiently create 3D models of terrain and large structures. Recently, drones equipped with RTK-GNSS that can add high-precision geotags to captured images have become widespread.

• Smartphone: Modern smartphones have high-quality cameras and can be used to create 3D models of small objects. While a smartphone alone can capture photos for SfM, adding dedicated apps or accessories that provide position information allows application to surveying use cases.

• RTK positioning equipment: To give an SfM-generated model an absolute coordinate system (real surveying coordinates), ground control points (GCPs) or high-precision GNSS positioning are required. RTK-capable GNSS receivers are available for this purpose. RTK (Real Time Kinematic) is a technique for enhancing satellite positioning, allowing centimeter-level positioning accuracy (half-inch accuracy). For example, using an RTK system for smartphones such as LRTK allows you to attach high-precision position information to the captured photos, making it easier to generate 3D models in an accurate coordinate system without installing control points.


Software: Dedicated software is required for SfM processing. A variety of tools are available from commercial to free. Open-source software such as Meshroom and COLMAP can be used. However, settings can be difficult for beginners, so it may be better to start with user-friendly commercial software or cloud services. Recently, cloud services that automatically process images simply by uploading them to the web have appeared, enabling large-scale SfM analysis even without a high-performance PC on hand.


4. Differences between SfM and other technologies

SfM is a convenient technology, but it’s important to understand its characteristics compared with other surveying and 3D measurement methods. Here we explain differences when compared with laser scanning, BIM, and drone LiDAR.


• Difference from laser surveying: Laser measurement (3D scanning) is an active method that uses LiDAR to emit laser pulses at objects and measures distance directly from the reflections. SfM, on the other hand, is a passive method that estimates shape from photos taken by a camera. Laser scanning can be used in dark conditions and can obtain shape even for textureless objects (for example, a uniformly white wall), whereas SfM cannot generate a point cloud if features are not visible in the photos. In contrast, SfM has the advantage of low equipment cost and easy operation, and can measure anywhere a camera can reach. Laser scanners are expensive and require expertise, but SfM can often substitute using familiar cameras.

• Difference from BIM: BIM (Building Information Modeling) refers to digital design documentation and 3D models used in construction and civil engineering. Unlike measurement techniques based on real photos such as SfM, BIM is an information model created by humans from the design stage. BIM models contain attributes and dimensions of components, while point clouds or meshes from SfM are data of shape only. However, point clouds created by SfM can be combined with BIM as a current-condition 3D model of existing structures. For example, an SfM point cloud can be used to create a BIM model that reflects current conditions during renovation, or point clouds obtained during construction can be overlaid with the design BIM to verify as-built conditions.

• Difference from drone LiDAR: Drone LiDAR mounts a lightweight laser scanner on a drone to measure terrain and structures from the air. Though its purpose is similar to drone photogrammetry using SfM, the data acquisition mechanism differs. LiDAR directly measures distance with lasers, so it can capture ground points through gaps in tree foliage and obtain point clouds even for terrain with few features. Some systems can generate point clouds in real time during flight. However, LiDAR equipment is very expensive and difficult to handle, and the acquired point cloud is single-color data containing intensity information only. Therefore, when a high-resolution color 3D model is required, SfM is more suitable. For wide-area terrain surveying, SfM is cost-effective, whereas LiDAR is preferred when surveying under vegetation or when special objects such as power lines are involved.


5. Benefits of adoption in construction, civil engineering, and municipal operations

What kinds of benefits can SfM provide in actual construction sites, civil engineering works, and municipal operations? The main advantages are summarized below.


• Low cost: You can greatly reduce initial investment because you do not need to purchase dedicated surveying equipment or laser scanners. Existing digital cameras and drones can be used, and software options range from free to commercial. 3D surveying, which formerly required expensive equipment, has become much more accessible with the advent of SfM.

• Ease of use: Even without specialized surveying knowledge, you can start 3D surveying simply by taking photos with a camera and processing them with dedicated software. A single person can operate it, so fewer personnel are required. Many GUI-centered software tools are intuitive, making it easy for young technicians and beginners to adopt.

• Accuracy: There is a misconception that photogrammetry is low in accuracy, but with proper measures it can be kept to errors on the order of several centimeters (several in). In particular, if ground control points (GCPs) are placed and the model is aligned to known coordinates, accuracy comparable to conventional ground surveying can be achieved. Stable results are obtained even with repeated measurements, so it can be applied to as-built management and displacement measurement.

• Time savings: Large areas can be photographed in a short time, leading to significant time savings. For example, tasks that used to require measuring each point by hand have been reported to be completed in about half a day using drone aerial photography. Although post-processing requires time, the ability to greatly reduce on-site working days is a major benefit. Also, a single flight can capture data reaching several million points, reducing the need for re-measurement and streamlining the overall workflow.

• Safety: Data can be collected remotely from hazardous sites, improving worker safety. Drone or remote photography can handle slopes at risk of collapse, disaster sites, and aging infrastructure where it is dangerous for people to approach. Reducing tasks such as erecting scaffolding or climbing to heights lowers accident risk while still enabling measurements.

• Digital utilization (DX promotion): Point clouds and 3D models obtained by SfM are digital assets that can be imported into CAD software or GIS for analysis and sharing. Information that was hard to see in traditional 2D drawings or photos can be intuitively understood on a 3D model. This improves on-site information sharing and decision-making accuracy, and helps advance construction and maintenance management. SfM thus contributes to DX (digital transformation) in these operations.


6. Common misunderstandings and points of caution

When performing SfM processing, beginners tend to fall into certain misunderstandings and there are points to be careful about. The representative points are explained below.


• Importance of GCPs (control points): GCPs (Ground Control Points) are indispensable for aligning an SfM-created model to a real-world coordinate system. Photos alone yield relative 3D shapes, but the model’s scale and position remain arbitrary. By measuring points on site with known coordinates and specifying those points during processing, you can give the model an accurate scale and absolute position (coordinates). Without GCPs, the model’s absolute accuracy is not guaranteed, and errors can accumulate especially in wide-area surveys. For work requiring high accuracy, always place a sufficient number of GCPs or supplement with RTK-capable drones.

• Coordinate system settings: To overlay the point cloud or model obtained by SfM with maps or design data, you need to unify the coordinate system. A model from drone photos is by default in the camera coordinate system at the time of measurement (an arbitrary axis) and will not match maps as-is. It is important to convert the model to public coordinate systems (such as Japan’s plane rectangular coordinates or the World Geodetic System) using GCPs or RTK positioning. Neglecting coordinate transformation can make the completed 3D model incompatible with maps or drawings and unusable.

• Processing time and PC specs: SfM processing requires substantial image analysis by a computer and thus demands time and computational resources. For example, processing several hundred photos can take high-performance PCs several hours to half a day or more. The load increases with photo resolution and number. Obtaining immediate results on site is difficult, so plan with ample time from surveying to deliverable creation. When needed, delegate processing to cloud services or run batch processing overnight to make effective use of time.

• Shooting conditions (weather and reflections): Pay attention to environmental conditions during photography. Slightly overcast weather, which may seem dim, is actually suitable because it reduces shadows and provides even lighting (rainy weather is not suitable). Conversely, bright midday sun can create strong direct light and large brightness differences between photos, negatively affecting matching. Avoid extreme shadows by adjusting shooting time and exposure. Highly reflective surfaces such as water or glass can disrupt feature detection and matching due to reflections. For such areas, change shooting angles or use a polarizing filter if possible to reduce reflections. If reconstruction remains difficult, understand that point cloud gaps may occur in those areas.


7. Summary

SfM processing is a revolutionary technology that enables easy generation of 3D models from photos. If beginners understand the key points and follow the correct steps, they can obtain 3D data with practical accuracy on site. Applying this technology in construction sites, civil engineering, and municipal operations not only improves efficiency and safety but also greatly contributes to digitalization (DX) of operations.


The combination with smartphone simple surveying using LRTK is particularly well suited. By combining high-precision RTK positioning with a smartphone for photogrammetric capture, anyone on site can easily acquire 3D models with absolute coordinates. Smartphones plus LRTK can complement drone limitations by capturing fine details and blind spots that are hard to photograph by drone. By adopting these new approaches, surveying tasks that were once left to specialists can be performed by on-site personnel themselves, lowering the barrier to technology adoption. Make use of the combination of SfM and smartphone surveying to promote DX on your site.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.