top of page

Overview: Photogrammetry using SfM (Structure from Motion) is becoming commonplace on construction and surveying sites. SfM processing, which can quickly build 3D models from photos taken by UAVs (drones) or cameras, contributes to improved on-site efficiency and cost reduction. However, achieving high-accuracy surveying results with SfM requires attention to several factors. Here, we explain five secrets to significantly improve surveying accuracy with SfM processing. Those involved in development or surveying who operate drone photogrammetry or photo-based measurement should use these tips in daily operations.


Tip 1: High-quality image acquisition is the key to SfM processing accuracy

In SfM, the “quality of the photos” directly determines the accuracy of the results. Accurate tie points (corresponding points) cannot be extracted from blurred or out-of-focus images. No matter how advanced the software or how skilled the operator, low-quality input photos greatly increase the likelihood of unstable SfM results. To avoid this, thorough preparation and settings at the shooting stage are essential to acquire high-quality image data.


To obtain high-accuracy SfM models, pay attention to the following when shooting:


• Focus and blur countermeasures: Fix focus with manual focus set to infinity or equivalent so it does not change during shooting. Also set a fast shutter speed, and for drone flights, fly the aircraft slowly to prevent motion blur (for example: for a ground sampling distance of 5 cm (2.0 in)/px and a flight speed of about 10 m/s, a shutter speed of at least 1/1000 second or faster is desirable).

• Noise reduction with low ISO: Set ISO sensitivity as low as possible to obtain clear, low-noise images. Excessive noise destabilizes feature detection and reduces matching accuracy. On sunny daytime shoots aim for around ISO 100, and in somewhat darker environments use a tripod or lighting to avoid raising ISO too much.

• Turn off image stabilization: In-camera optical image stabilization moves lens elements during shooting and can destabilize SfM internal parameter estimation. If possible, turn off stabilization and stabilize the camera physically (use the drone gimbal, a tripod, or a remote shutter) instead.

• Exposure and RAW shooting: Set exposure (aperture and shutter speed) manually and keep it constant during shooting. Avoid extremely high f-numbers that cause diffraction blur; keeping the aperture around F8–F11 allows the lens to perform well. If possible, shoot in RAW so you can adjust brightness and contrast in post-processing while preserving detail.


By ensuring image quality carefully at the shooting stage, point-cloud matching in SfM becomes stable, leading to improved accuracy. Choose conditions with little wind and sufficient light where possible, and aim for “high-quality photos that do not blur and will not be blurred.”


Tip 2: Build a robust model with sufficient overlap and multi-angle shooting

SfM accuracy is greatly affected by the degree of overlap between photos and the diversity of shooting angles. The more features that appear in multiple images, the more stable the alignment between images, and the stronger and more precise the 3D model. Therefore, plan shots to ensure sufficient overlap in the forward/backward and lateral directions, and capture the target from as many angles as possible.


For typical drone aerial surveys, we recommend image overlap of 80% or more in the forward direction and 60% or more sideways. High overlap improves the surveying accuracy of each point and produces point clouds with fewer gaps and distortions. Also, photographing a planar subject only from directly overhead can cause a “doming” distortion where the whole model bulges. To prevent this, mix oblique shots with nadir (vertical) photos. For example, in drone surveying, adding oblique images with the camera tilted about 20° helps correct model distortion and stabilizes accuracy.


Checklist for flight planning:


• High-overlap flight plan: Set flight routes so adjacent photos share a large overlap area. Narrow the spacing between strips (flight lines) and shoot around the perimeter of the target area with margin to improve edge reproducibility.

• Shoot from multiple directions: Photograph the subject from various angles so the SfM algorithm can more accurately estimate camera positions and lens distortion. For terrain surveys include oblique images; for structures photograph all around the object (360°) from various directions. This reduces distortions that occur when vertical information is lacking.

• Texture and environmental conditions: If the subject lacks texture or distinctive features, SfM may not find enough tie points and accuracy will drop. On uniform surfaces such as grass, snowfields, or water, place artificial targets or take additional photos to supplement feature points. Also, moving vegetation or people/cars in the scene can cause mismatches. If possible, shoot when the wind is calm and avoid including moving objects—prepare the environment accordingly.


In short, “shoot lots of overlapping images from many angles” is fundamental to improving SfM accuracy. Optimize your shooting plan for both overlap and angles so the algorithm can confidently find matching points.


Tip 3: Optimize camera calibration and equipment settings

SfM estimates camera internal parameters (focal length, principal point, lens distortion coefficients, etc.) simultaneously. If camera calibration is inaccurate, scale errors or curvature distortions may appear across the 3D model. Therefore, improve accuracy by calibrating cameras in advance and standardizing equipment settings.


First, calibrate the cameras and lenses you will use as much as possible beforehand. Capture a checkerboard calibration chart to derive distortion correction parameters, or create lens profiles using your SfM software’s calibration features to understand lens distortion. Feeding pre-determined internal parameters as fixed values or initial estimates into SfM processing increases computational stability and accuracy. This is particularly effective for commercial drone cameras and wide-angle lenses, which tend to exhibit significant distortion.


Also, keep the camera internal state constant during shooting. Pay attention to the following:


• Fix focal length/zoom: If using a zoom lens, fix the focal length for the whole shoot. Changes in zoom or focal length alter internal parameters and make it difficult for SfM to find consistent values. Many drone cameras have fixed focal length, but be careful with handheld cameras.

• Uniform focus and aperture: As mentioned, fix manual focus and keep aperture constant during shooting. If autofocus or aperture changes mid-shoot, each image has different projection characteristics and accuracy will suffer.

• Disable in-camera corrections: Some cameras automatically apply lens distortion or chromatic aberration correction to JPEGs. SfM benefits from having raw distortion data for parameter estimation, so disable these automatic corrections if possible (RAW shooting avoids these corrections).

• Calibrate multiple pieces of equipment: When shooting across multiple cameras or multiple flights, internal parameters may differ per device. For batch processing, either allow separate internal parameter estimation per device or prepare calibration data for each camera/gimbal configuration.


These steps help bundle adjustment estimate lens distortion and focal length more accurately, improving overall model accuracy. If you observe doming or scale errors in results, internal parameter estimation may be biased; use additional oblique images or ground control points (described below) to correct this. In any case, keep the camera in a consistent state and apply calibration data as needed.


Tip 4: Use ground control points (GCPs) and reinforce with high-accuracy positioning

No matter how good the SfM algorithm is, relying on photos alone leaves uncertainty in scale and position. The trump card to resolve this is using ground control points (GCPs). GCPs are marked points with precisely surveyed coordinates on site; incorporating them into SfM processing ties the model to a real-world coordinate system and fixes the scale.


For high-accuracy SfM surveying, always set a sufficient number of GCPs. As a guideline, use at least 3 points (for planar alignment) and ideally 5–10 points or more, placed evenly around the area (corners and near the center). For large or highly variable terrain, add more GCPs to cover the whole area. Place each GCP so it appears in as many photos as possible, and use markers that are clearly visible from air to improve post-processing marking accuracy. For example, placing clear markers about 30-50 cm (11.8-19.7 in) in diameter (black-and-white checkerboards or cross marks) makes them identifiable even in aerial images from about 100 m (328.1 ft) altitude.


Use precise positioning methods to measure GCP coordinates. Standalone GPS or smartphone location data can have 5–10 m errors and are not sufficient. Instead, use the following high-accuracy positioning methods:


• RTK-GNSS surveying: Using RTK (real-time kinematic) corrections with GNSS enables point positioning on the order of ±1–2 cm (±0.4–0.8 in) horizontally. With a base station and rover you can obtain high-accuracy coordinates for each GCP in a short time.

• Network RTK or VRS: Network RTK (VRS, etc.) retrieves reference station data via the internet and allows RTK positioning without setting up a local base station. This enables cm-level positioning (half-inch accuracy) easily in the field.

• Total station surveying: The highest accuracy comes from total stations, measuring angles and distances from known points to determine coordinates at the 1–2 mm (0.04–0.08 in) level. However, this requires equipment and personnel, so RTK is more efficient for wide areas.


Input these reliable coordinates into your SfM software and recompute the project to georeference the model and obtain dimensionally accurate 3D deliverables. When setting GCPs, be meticulous about marking them in images. Aim to keep marking error on the image to within ±0.1 pixels by zooming in and marking precisely. Larger, clearer targets make marking easier and improve accuracy.


Finally, use check points for validation. Like GCPs, measure several points on site but do not use them in SfM computation. After the model is produced, measure these check points in the model and compare them to surveyed true values to objectively evaluate SfM errors. This check reveals accuracy distribution (for example, “within 2 cm in one area but around 5 cm elsewhere”) and helps improve future shooting and GCP placement.


Tip 5: Advanced SfM software settings and accuracy verification

Even with perfect shooting and surveying practices, don’t slack off in processing. Advanced settings in SfM software and post-processing accuracy checks can further raise result quality.


Software setting tips: Common SfM/photogrammetry tools have trade-off settings between accuracy and speed and offer various filtering options. For maximum accuracy, push settings toward high accuracy where possible. For example, set feature extraction precision to “high,” increase per-image feature counts and matching limits, and reduce image downscaling (scale factor) so matching and bundle adjustment are performed as close to full resolution as feasible (this increases computation time but improves accuracy). Multi-pass processing (coarse alignment followed by progressively finer recalculation) can also combine stable initial alignment with high final accuracy.


Tie-point filtering: After the initial SfM run (sparse point cloud generation), review detected tie points. There may be obviously mismatched sparse points or points with large reprojection errors. Removing these outlier points improves accuracy. Refer to per-point reprojection error or uncertainty indicators provided by the software and remove a portion of the worst points (for example, the top 5%), then rerun bundle adjustment. If necessary, repeat this iteratively; gradually the point cloud and camera parameter estimates will improve. Do not remove too many points—keeping removals to a few percent of total points is prudent.


Precise GCP marking: When using GCPs, the marking precision in software directly affects final accuracy. Even if automatic detection is available, always verify visually and adjust manually as needed. As noted earlier, a one-pixel marking error can translate to several centimeters on the ground. Carefully mark all GCPs, then perform the final bundle adjustment to apply constraints. Check the software’s GCP residual report to ensure residuals are very small.


Deliverable accuracy verification: After processing, always validate results. If you have check points, extract their coordinates from the 3D model and compute differences from surveyed values. Confirm horizontal and vertical errors are within target tolerances. For example, if the required accuracy is ±5 cm (±2.0 in), then a maximum check point error of about 3 cm (1.2 in) may be acceptable. If larger errors occur, analyze causes; if check points are far from GCPs near the area edge, add GCPs near that region next time; if a low-texture area (e.g., windbreak) caused the issue, add artificial targets.


Comparing known dimensions within the model is also useful. Measure a length directly surveyed on site (e.g., a building dimension) and compare it to the distance measured in the SfM model to check scale accuracy. Overlay point clouds or orthophotos with other survey results (existing point clouds or topographic maps) to inspect discrepancies.


In summary, a single software setting or one extra verification step can dramatically improve trustworthiness of SfM deliverables. Always “compute with high-accuracy settings and question the results” as a quality-control step.


Summary: Improving SfM accuracy and using simple surveying with LRTK

By applying the five points described above, you can extract surprisingly high surveying accuracy from SfM photogrammetry that was previously considered difficult. High-quality photos, thorough flight planning, proper calibration, the introduction of ground control points, and final software adjustments—combined—can, in some cases, model terrain and structures with accuracy on the order of a few centimeters. This can rival traditional surveying instruments and greatly expand SfM applicability.


Recently, new positioning technologies that support SfM accuracy improvement have also emerged. One is LRTK for simplified surveying. LRTK attaches a small RTK-GNSS receiver to a smartphone, enabling centimeter-level positioning (half-inch accuracy) for anyone. For example, attaching a dedicated small receiver (weighing about 125g) to an iPhone or iPad turns it into a pocket-size high-precision surveying device, allowing a single operator to obtain coordinates in the field instantly. While regular GPS has errors of several meters, LRTK can achieve horizontal accuracy of 1–2 cm and vertical accuracy of about 3 cm (horizontal 1–2 cm (0.4–0.8 in); vertical 3 cm (1.2 in)).


Combining LRTK simplified surveying with SfM can further improve accuracy and efficiency. Specifically, quickly measuring important on-site points with LRTK and using them as GCPs or check points in SfM models enables high-accuracy model correction. Work that traditionally required total stations and multiple personnel can be completed by one person in a short time with an LRTK device and a smartphone, saving time and labor. Especially in disaster sites or urgent surveys where carrying bulky equipment is difficult, LRTK is useful for quickly obtaining reference points for SfM.


The hybrid use of photogrammetry (SfM) and ground surveying (LRTK, etc.) is making it realistic to combine speed and accuracy. By practicing the tips introduced here and actively adopting new technologies, your field surveying should become both more accurate and more efficient. Use high-accuracy SfM models as a tool to expand the possibilities of surveying work. If you are interested, please also refer to this article for details about LRTK: https://ken-it.world/success/2024/09/lrtk-phone-boom.html


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page