Innovating Stake Layout Work with Smartphone AR! A New Method That Even Veteran Surveyors Approve

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Reverse staking work—such as placing stakes and markings on site based on design coordinates—is indispensable on construction sites, yet it remains a labor- and mind-intensive task even for experienced surveyors. Recently, a new method combining smartphone AR (augmented reality) and RTK positioning technology has emerged, bringing innovation to this work. What exactly is this new method that made veteran surveyors say, "Now this makes sense"? In this article, we explain its innovativeness and practical benefits from a surveyor's on-site perspective, and conclude by introducing the LRTK system that enables simple surveying.


Challenges surveyors face with reverse staking work

Even veteran surveyors have faced a variety of challenges with reverse staking tasks such as driving stakes and marking lines. First is the difficulty of achieving accurate positioning. Stake locations are indicated by coordinates on drawings, but identifying those exact points on site without the slightest deviation requires advanced experience and intuition. Traditionally, survey teams used total stations (optical surveying instruments) and tape measures to measure distances and angles from control points and set up stake marks or batter boards on the ground. However, this manual work takes time and manpower, and surveying itself can become difficult depending on weather and terrain conditions. For example, surveying under strong sunlight or placing stake markers on steep, unstable slopes are extremely arduous tasks.


Next is the risk of surveying errors and mistakes. As long as humans are involved, small measurement mistakes or marking offsets are unavoidable. Even a stake position offset by just a few centimeters can cause distortion in structures or unnecessary corrective work later in construction. In situations that demand high accuracy—such as bridge piles or high-rise building foundations—rework due to such errors leads to significant costs and time losses.


Safety issues also cannot be ignored. Marking stake positions is often done in areas where heavy machinery operates, and if a worker accidentally approaches that machinery there is a risk of accidents. When installing stakes on narrow shoulders or slopes, poor footing increases the risk of falls. It was not uncommon for surveyors to descend with safety lines to indicate anchor positions on steep slopes. There is also the physical constraint of not being able to drive stakes into hard concrete. Against these conventional challenges, there has been growing demand on site for a way to determine stake positions more efficiently and safely.


Background of AR adoption and on-site usefulness

In this context, the idea of applying smartphone and tablet AR (augmented reality) technology to reverse staking work has attracted attention. AR overlays digital information onto the real-world scene viewed through a camera. Familiar examples include smartphone games that place characters in real space or map apps that overlay directional arrows on camera images. On construction sites, this can be applied to overlay instruction signs or design lines onto the real view to show "drive a stake here."


The background for adopting AR includes improvements in smartphone performance and advances in positioning technologies. Recent smartphones are equipped with high-performance CPUs and sensors (gyros and accelerometers, and in some models even LiDAR), greatly improving spatial awareness accuracy in AR. In Japan, the satellite positioning field has also developed the Michibiki (quasi-zenith satellite) centimeter-class positioning augmentation service (CLAS), making high-precision positioning—previously requiring specialized equipment—more readily available. Built on this technological foundation and driven by the trend of construction DX (digital transformation), AR use on job sites has become a realistic option.


The biggest advantage of using AR on site is efficiency through intuitive information display. Where teams formerly compared drawings and the site and relied on experience to judge “this should be the design position,” overlaying digital information with AR makes the answer immediately obvious. AR visual guidance is especially powerful when locating an exact point on bare land with no visible markers, such as stake positions. By displaying coordinate data from drawings in AR, even non-experts can identify the exact point without hesitation. With labor shortages and more young workers being assigned to sites, this offers high expectations as a way for anyone to work with near-expert accuracy.


What is the new reverse staking method using smartphones × RTK × AR?

So what exactly is the new reverse staking method that combines a smartphone, RTK, and AR? In this method, a compact RTK-GNSS receiver antenna attached to a smartphone and a dedicated app enable centimeter-level high-precision positioning and AR display simultaneously. It is literally a "surveying instrument that fits in your pocket," eliminating the need for traditional optical instruments.


The specific workflow is as follows:


• Importing design data: First, register the design coordinate data for the stakes to be placed in the smartphone app’s cloud system. Create a coordinate list from construction drawings and upload it to the cloud so you can call up the information on site.

• Equipment setup: On site, attach the RTK-GNSS receiver (e.g., an LRTK device) to the smartphone with one touch and launch the app. When the receiver acquires satellite signals and obtains correction information so high-precision positioning is possible, preparation is complete (takes several tens of seconds).

• Guidance to stake position: When you select the stake number or point you want to mark in the app, navigation to that point begins. The smartphone screen displays a real-time arrow indicating the direction and the distance from your current location. For example, guidance such as "5.3 m (17.4 ft) to the northeast" may appear, and you follow that instruction. It works like a navigation system for construction sites, guiding the worker to the target coordinate.

• Final position confirmation: As you approach the destination, the display switches to finer guidance. Remaining distance is shown in centimeters—e.g., "10 cm (3.9 in) left"—and when you reach the exact design position markers overlap and indicate "Here it is!" At the same time, the smartphone’s camera view renders a virtual stake (AR stake) standing upright at that point. Although there is nothing on the ground, you can see a pink or otherwise conspicuous stake through the screen. This AR stake lets you intuitively confirm that you are standing exactly at the design position.

• Marking and staking work: Once the exact location is confirmed, mark the spot with spray paint or drive an actual wooden stake or pin. If you need to tell a heavy equipment operator the position, showing the smartphone screen makes it immediately clear. If driving a physical stake is difficult—for example on concrete or in inaccessible locations—you can substitute by photographing the AR stake display and keeping it as a record. In places where physical stakes cannot be installed, you can leave a digital stake position record without forcing physical placement.

• Recording and sharing: After the work is complete, save photos with location data in the app and upload them to the cloud. This immediately shares records of which stakes were placed at which coordinates within the company or with the client. It eliminates the later office work of reassembling results and can be used directly as construction management documentation.


Through this process, stake positioning work that once relied on expert skill can be completed with just a smartphone and a small device. The procedures are simple enough that first-time users can follow the on-screen instructions, enabling even non-specialist workers to perform high-accuracy staking.


Main functions and features of smartphone AR reverse staking

Here are the main functions and features that underpin the smartphone × RTK × AR reverse staking method.


• AR stake display: The smartphone screen can display a virtual stake corresponding to the design position. This visualizes stake positions over the real view so targets are not lost even in dark areas or wide open lots. Workers can intuitively grasp where to drive stakes simply by looking through the camera.

• Coordinate navigation: The app provides real-time guidance of direction and distance to pre-registered coordinates. You follow the on-screen arrow and the remaining distance is shown down to the centimeter, eventually guiding you to a pinpoint. This prevents hesitation and misunderstandings so anyone can reliably reach the destination.

• High-precision positioning and accuracy management: RTK-GNSS provides centimeter-level positioning accuracy (cm level accuracy (half-inch accuracy)) on a smartphone. The app allows you to check positioning status (satellite tracking and correction reception), so work can always be carried out with awareness of accuracy. Conventional GPS errors of several meters can be reduced to within a few centimeters, minimizing deviation from design coordinates.

• Construction support features: Beyond simple position finding, the system includes various features to assist construction. For example, you can display AR stakes from a safe, remote location so you can determine stake positions on dangerous slopes without physically approaching. Acquired coordinates and point cloud data can be shared in the cloud for later as-built verification, or 3D models can be overlaid on the current site in AR to confirm construction plans with stakeholders. In short, it supports on-site "see, measure, and record" tasks in an all-in-one manner.


Benefits of introduction: from labor reduction to improved safety

Implementing this smartphone AR reverse staking method brings numerous benefits to sites. Here are the main advantages from a field perspective.


• Labor reduction and efficiency: Because one person can complete stake marking work, you can reduce personnel such as the traditional surveyor-plus-assistant team. For example, tasks that used to take two people half a day to complete have been done by one person in a few hours. Substantially shortened work times compress schedules and allow parallelization with other tasks.

• Intuitive operation: Users only need to follow visual guides like arrows and AR stakes on the screen, so specialist surveying knowledge is not required. Young workers can achieve accurate positioning by following the device rather than relying on a veteran’s intuition, aiding skill transfer and personnel development. Simple, intuitive operation reduces confusion on site and helps prevent mistakes.

• Error reduction and quality improvement: Centimeter-class guidance reduces stake position offsets and surveying mistakes to nearly zero. As a result, construction can be carried out as designed, preventing rework and errors caused by misplacement. Because data is stored in the cloud, all stake positions can be digitally verified later, simplifying quality control. You also gain reliability to assure clients that "everything falls within the design tolerance" based on objective data.

• Improved safety: There is no need to have people forcibly survey dangerous areas. AR allows remote confirmation of points, reducing accident risks in high places, steep slopes, and heavy-equipment zones. Workers can operate from safe positions, reducing physical strain and enabling a more focused and secure working environment.

• Cost reduction: Reductions in personnel and work time lower overall construction costs. Because a smartphone combined with a small device can replace expensive specialized surveying equipment, initial investment costs can be relatively low. For projects that previously outsourced surveying, being able to perform surveying and stake layout in-house can reduce outsourcing expenses.


Use cases: from bridge piles to residential development and disaster recovery

In what scenarios does this technology shine? Here are some expected use cases.


Case 1: Pile driving for bridge piers – In large bridge construction, multiple piles forming the pier foundations must be positioned precisely. Traditionally, a surveying team marked positions with batter boards and layout lines, and heavy equipment operators relied on those marks to drive piles. With smartphone AR, site supervisors can mark stake positions one after another with a smartphone and direct operators, dramatically shortening the time required per stake and accelerating overall foundation progress. In actual projects, stake layout that once took half a day has been completed in a few hours, reducing personnel costs. Digital records proving that all piles were within design tolerances also streamline inspections and client explanations.


Case 2: Residential land development – This technology is also powerful for housing site development and small-scale projects. Normally you hire surveyors to stake boundaries and development extents, but on small sites repeatedly calling a survey team is costly and time-consuming. If site staff use smartphone AR surveying, they can perform stake layout and marking themselves as needed. For example, they can immediately confirm and AR-display lot boundaries and elevation benchmarks and mark them on the spot, allowing grading and surveying tasks to proceed in parallel. Even inexperienced staff can locate survey points using the app’s guidance, enabling stable process management that doesn’t depend on specific personnel and resulting in shortened schedules and reduced costs.


Case 3: Disaster recovery sites – After earthquakes or landslides, benchmarks may be lost and topography may change, making layout work especially difficult. Conducting surveys amid heavy equipment is hazardous and bringing in large equipment may be impractical. In such situations, a pocket-sized smartphone AR surveying system proved invaluable. For example, after the Noto Peninsula earthquake, a system using an iPhone and a small RTK receiver was employed to survey damage and determine pile locations for recovery work. Even in areas where mobile communications were disrupted, this system—compatible with Michibiki and other satellite augmentation signals—enabled high-precision positioning and real-time recording and sharing. For steep-slope recovery work, AR stakes allowed anchor locations to be shown from a safe spot so workers could mark without entering hazardous areas. As a result, limited personnel promptly and safely advanced surveying and construction preparation, contributing to faster recovery and cost savings.


In this way, smartphone AR reverse staking is effective across a wide range of scenarios—from large infrastructure to small developments and emergency disaster responses. Its ability to adapt to previously difficult conditions has earned high praise from field teams.


Differences from conventional methods

Let’s summarize how the smartphone AR reverse staking method differs from conventional approaches. The biggest difference is the significant simplification of the "people and equipment" requirements. Previously, expensive, bulky surveying equipment and a team including experienced surveyors were necessary. The new method uses lightweight gear—a smartphone and a small device—and allows one person to complete the work. This dramatically reduces the burden on site.


There is no compromise in positioning accuracy either. The portable smartphone set can achieve accuracy comparable to optical total stations and traditional GNSS surveying instruments. Errors on the order of a few centimeters are acceptable for many staking and marking tasks. In addition, because data is digitally managed, recordability and reproducibility have greatly improved. Where stake positions were once managed with handwritten batter-board diagrams and photo logs, those positions can now be stored and shared in the cloud with linked coordinates and photos, making later verification and information sharing easy.


The workflow has changed as well. Previously, you had to schedule stake layout work to align with the surveying team’s availability. With smartphone AR surveying, you can perform surveying and layout in-house whenever needed. This increases site autonomy and flexibility in construction planning. Overall, the smartphone AR reverse staking method stands apart from conventional methods by enabling high-precision surveying "by anyone, anytime, anywhere."


Future outlook

With on-site DX advancing, this smartphone AR surveying and staking method is expected to become even more widespread. *i-Construction* promoted by the Ministry of Land, Infrastructure, Transport and Tourism encourages the use of ICT in construction, including AR and 3D data utilization. With concerns about an aging surveying workforce and labor shortages, this method is attracting attention as a potential solution and may become a site standard.


Technology will continue to evolve. Improvements in smartphone GNSS chip performance and enhancements in real-time data sharing via 5G and satellite communications will enable more seamless and stable positioning and AR displays. In the future, AR-capable smart glasses may allow workers to display stake guidance in their field of view while using both hands. The role of surveyors and construction managers on site may shift from providing traditional craft skills to focusing on quality control and data utilization using such digital tools.


Moreover, accurate construction data accumulated by smartphone AR surveying becomes an asset for maintenance and future renovation work. If digital data is available from the construction phase, it eliminates the effort of locating position information during post-construction infrastructure management. In this way, the ability to use data consistently from construction through maintenance is another potential of AR surveying. Going forward, AR technologies that link real site conditions with design data will spread to various scenarios beyond stake driving, contributing to overall improvements in productivity and safety in the construction industry.


Recommendation: Simple surveying with LRTK

Finally, as a concrete solution to realize the smartphone AR reverse staking technology described in this article, we introduce LRTK. LRTK is a system developed by Refixia, a startup originating from Tokyo Institute of Technology, that transforms smartphones into universal surveying instruments. By attaching a dedicated ultra-compact RTK-GNSS antenna to an iPhone or iPad and using the LRTK app, you can achieve pocket-sized centimeter-level positioning accuracy (cm level accuracy (half-inch accuracy)) and intuitive AR-based position guidance. Simply attaching a receiver weighing only about 125g turns a handheld smartphone into a high-precision surveying device.


LRTK includes the coordinate navigation and AR stake display functions described in this article, as well as tools useful on site such as photo recording of position and orientation, 3D scanning, and cloud sharing—an all-in-one suite. It has already been adopted at construction sites and local governments nationwide, and its accuracy and usability have been highly rated even by veteran surveyors. In fact, a seasoned surveyor blog reported that "LRTK achieved high-precision positioning even in dense mountain forest," and there are now voices saying they want to "continue using it as a primary surveying instrument."


Thus, LRTK is a key tool that lowers the barriers to surveying and stake-driving work and enables simple surveying that anyone can carry and use. With LRTK, tasks that once relied on "craftsmanship" can be transformed into smart, data-driven operations. Surveyors and construction managers struggling with reverse staking work can experience innovation and efficiency by adopting these new methods and tools.


The future of construction sites is being shaped not only by experience and intuition but also by collaboration with digital technologies. Don’t miss the wave of innovation in reverse staking with smartphone AR—try out LRTK and other modern simple surveying technologies. The new method that convinces both veterans and young workers is sure to become a strong ally on site.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.