4 Steps to Verify the Mounting Structure Height of a Solar Power Plant Using Drone Surveying
By LRTK Team (Lefixea Inc.)
At solar power plants, the height of the racks supporting the panels affects drainage, maintenance circulation paths, mowing, inspection work, and how the system interfaces with the surrounding terrain. To confirm whether the construction matches the design and whether the necessary clearance relative to ground undulation is being maintained, drone surveying—which enables an areal grasp of the site—can be useful.
This article explains, for practitioners responsible for solar power plants, the approach and four steps to verify rack height using drone surveying, presented in a form that is easy to use for construction management and maintenance.
Table of Contents
• Why verifying the mounting structure height is important at solar power plants
• Step 1: Clarify the height you want to check and the target range
• Step 2 Set reference points and surveying conditions to align height references
• Step 3: Use drone surveying to obtain terrain and data around the mounting racks
• Step 4: Verify the mounting frame height from the acquired data and record it.
• Precautions to avoid reducing accuracy when verifying mounting frame height
• Summary: Streamline verification of support-frame height using drone surveying
Why Verification of Racking Height Is Important at Solar Power Plants
The mounting height of a solar power plant is not merely a factor that determines the appearance or layout of the panels. It also affects site ground elevation, drainage paths, ease of operation and maintenance, the practicality of work during mowing and inspections, interference with cables and ancillary equipment, and the way the plant interfaces with surrounding facilities, all of which influence the quality of management after commissioning. Especially at large sites where many mounting structures are arranged, simply walking the entire site and checking heights individually tends to cause missed checks and variability in records.
When checking the mounting structure height, it is important to clarify what baseline is being used for the measurement. Depending on whether it is the height from the ground surface to the bottom edge of the panels, the height to the top of the mounting posts, the deviation from the design planned elevation, or the minimum clearance you want to secure for drainage and maintenance, the required surveying method and the data that should be checked will vary. Even when verifying on site that the height is correct, if the parties involved do not share the same understanding, the interpretation of the survey results can be inconsistent.
Drone surveying is well suited to sites where a wide area needs to be inspected in a planar manner, such as solar power plants. Data captured from above makes it easier to check changes in slope, the continuity of height across racking rows, undulations of the prepared surface, and the relationship with slopes and drainage channels—items that are easy to overlook from ground-level inspections. Furthermore, if surveys are conducted regularly under the same conditions, it becomes easier to compare conditions before construction, during construction, at completion, and during operation and maintenance.
However, conducting drone surveying does not automatically mean the rack height will be determined accurately. In typical photogrammetry, three-dimensional data are created based on the shapes of surfaces shown in images, so areas beneath panels, thin members of the rack, strongly shadowed parts, and highly reflective areas can be difficult to capture. If the ground surface is covered with grass, there is also a risk that the tops of the grass will be treated as the ground. Therefore, when verifying rack height with drone surveying, it is important to first define the verification purpose, establish reference points, perform photography and point-cloud generation suited to the site conditions, and combine these with supplementary ground measurements as necessary.
In construction management for solar power plants, deviations in mounting structure height can become a problem in subsequent processes. For example, if height variations are discovered after panel installation, the scope of adjustment work can expand and the impact on the schedule can become significant. If unevenness of the prepared surface or the effects of drainage slopes are overlooked, some mounting structures may lack sufficient clearance from the ground, which can hinder maintenance work and grass cutting. If doubts about heights arise during post-completion inspections and records from the construction phase are insufficient, it can take time to isolate the cause.
To reduce such issues, it is important to treat rack height not as an item checked only on the spot at the site, but as survey data to be retained and managed so it can be reviewed later. By using drone surveying, you can get an overview of the entire site while focusing inspections on necessary locations. In particular, at sites where the same structures are repeatedly arranged, such as solar power plants, the advantage is that it becomes easier to identify trends by row and candidates for local anomalies.
Step 1 Clarify the height you want to check and the target area
The first step, before flying the drone, is to clarify which height you will be checking. Even when referring to the mounting height of a solar power plant, there is not just one measurement to verify. Depending on the purpose, the positions to check differ: the height from the ground to the bottom of the mounting frame, the height from the ground to the bottom of the panel, the height to the top of the support post, the height of rails and beams, the difference from the design planned elevation, and the relative height to adjacent rows of mounting frames. If you survey with this left ambiguous, you may be unable to decide which point to adopt as the height after data acquisition, requiring a recheck.
In practice, it is advisable to define in words the heights you want to verify while cross-referencing the design drawings, construction drawings, as-built management standards, and on-site inspection instructions. For example, if you want to check the working space under the mounting frame, the minimum height from the ground surface to the underside of the panel or to the lower edge of the mounting frame is important. If you want to check the installation condition of the support posts, the top of the posts or the height of the supporting members is important. If you want to check the relationship with drainage or the graded surface, you need to look not only at the height of the mounting frame itself but also at the elevation and slope of the surrounding ground.
Organizing the scope of coverage is also indispensable. The surveying plan will change depending on whether you check the entire solar power plant at once, only a specific block, or proceed in order from areas where construction has advanced. On a large site, trying to inspect every mounting rack at the same density can result in an excessive amount of data and long processing times. Therefore, it is practical to first separate, according to the inspection objectives, the areas that require an overall grasp from those that should be checked with priority.
When checking the mounting structure height, ground conditions must also be considered within the scope. Even if the structures are at the design height, if the finished surface is higher or lower than expected, the clearance to the ground and the appearance of drainage will change. In particular, when the site has gentle undulations, looking only at the height of the rows of mounting structures may not reveal problems. It is important to assume that terrain data and data around the mounting structures are acquired together so the ground and the structures can be checked in the same coordinate system.
Before on-site inspections, organizing identification numbers and the naming of sections will make later processes easier. At solar power plants, terms such as rack rows, sections, blocks, aisles, and equipment layouts can vary among stakeholders. Even if you find an area of concern in survey data, if you cannot convey which rack on site it refers to, repairs and verifications will take time. By mapping the section names and row numbers on drawings to how they are displayed in the survey data in advance, reports and corrective instructions become clearer.
Also, the timing of inspection is important. Depending on whether it is immediately after the mounting structure has been installed, after the panels have been attached, or after site preparation and drainage facilities have been completed, the areas that are easy to check will vary. If the panels are not yet in place, the condition of the posts and rails is easier to see, while the under-panel clearance in the finished state may be difficult to judge. If the panels have been attached, you can inspect in a state closer to completion, but shadows and reflections can make survey data difficult to read. Choosing the optimal survey timing according to the purpose affects the accuracy and efficiency of verifying the mounting structure height.
The thing you most want to avoid in this procedure is proceeding with a “let’s just fly the drone and figure it out later” approach. Drone surveying of photovoltaic power plants can collect large-area data in a short time, but if the purpose is unclear, unnecessary data will increase and the necessary parts may be lacking. If you are going to check racking height, aligning in advance which heights, over what area, to what level of accuracy, and who will make the judgment is the first important task.
Step 2: Align the Height Reference by Setting Reference Points and Survey Conditions
The next step is to align the vertical reference. When checking the support structure height, you often need not only to see whether it is relatively higher or lower, but also to check how much it deviates from the design values or management standards. Therefore, it is important that the data obtained from drone surveying is consistent with the site reference points and design coordinates. If data are produced with a shifted reference, apparent height differences can arise, leading to locations that are actually fine being judged as abnormal, or conversely causing real deviations that should be checked to be overlooked.
If there are existing control points on site, verify their positions and elevations. It is important to confirm whether the control points are those used for construction management, whether they are based on the same coordinate system as the design drawings, and whether they have been moved or damaged in the field. If control points are insufficient, establish reference points and check points at appropriate locations within the survey area. Reference points are used to align data to the correct position, while check points are used to verify the accuracy of the finished data. They should not be confused; it is desirable to keep their roles distinct and manage them separately.
At solar power plants, the site is large and movement can be restricted by mounting structures, fences, drainage facilities, and slopes. When placing control and reference points, choose positions that are easily visible from a drone, do not interfere with on-site work, and are easy to recheck later. Avoid locations that fall in the shadows of panels or mounting structures, places that can be easily concealed by grass, or spots that may be covered by vehicles or materials, as these become difficult to recognize during surveying. If points cannot be confirmed after surveying, it can affect the overall reliability of the data.
Care must also be taken in how elevations are handled when checking heights. On some sites, the heights shown on design drawings, provisional heights used for construction management, and reference heights used on site may differ. Stakeholders need to decide which height will be taken as the authoritative one for comparison. If the purpose is to compare against design values, consistency with the design coordinates and planned elevations is important. If you only need to check relative variations within the site, you may be able to make a judgment as long as the reference is consistent within that site. However, if there is a possibility of comparing with other survey data at a later date, it is safer to use a reference that is as reproducible as possible.
Organizing surveying conditions is also essential. In drone surveying, flight altitude, capture interval, image overlap, flight direction, weather, sunlight conditions, and wind effects all affect the quality of the acquired data. When checking the height of mounting structures, there are many cases where you need to interpret the ground surface and the shape around the mounts, so simply photographing a wide area can be insufficient. Set a flight altitude that ensures the required resolution, and plan with the row direction of the mounts and the way shadows fall in mind so that hard-to-see areas are minimized.
In photovoltaic power plants, reflections on the panel surface and shadows can affect data processing. During periods of strong sunlight and high reflectance, feature points around the panels may be less stable. Also, when the solar altitude is low and long shadows appear, it can become difficult to capture readings beneath the mounting racks and of the ground surface. If the shooting time can be adjusted, choose conditions in which shadows and reflections are less extreme. Overcast skies have the advantage of weaker shadows, but if brightness is insufficient image quality may deteriorate, so decisions should be made according to local site conditions.
Safety preparations are also carried out at this stage. At a solar power plant there are items to be taken into account in the flight plan, such as overhead lines, meteorological observation equipment, monitoring equipment, fences, surrounding roads, and worker movement routes. On sites under construction, because heavy machinery and vehicles are in motion, flight times and access control are adjusted. Also, depending on the flight location and method, confirmations, permits, approvals, and notifications to stakeholders may be required under aviation law and site rules. While drone surveying helps improve efficiency, it cannot be separated from on-site safety management.
The purpose of this procedure is to put surveying data into a state where it can be trusted and used later. Checking the mounting structure height often leads to numerical comparisons and corrective decisions, so proceeding with unclear criteria will make explanations difficult at the time of reporting. Arranging reference points, calibration points, validation points, flight conditions, and imaging conditions, and ensuring the basis for the survey results can be explained, is a prerequisite for putting drone surveys of solar power plants to practical use.
Step 3 Acquire terrain and data around the mounting structure using drone surveying
The third step is to actually conduct drone surveying and acquire data on the terrain and the areas surrounding the mounting structures. When checking the mounting height, it is important to capture not only the position and height of the structures themselves but also the elevation of the surrounding ground at the same time. When confirming the clearance from the ground surface, obtaining only the height on the structure side is insufficient if you cannot identify ground undulations or local high spots. Therefore, include not only the rows of mounting structures in the survey area but also access paths, drainage channels, slopes, graded surfaces, and the areas around equipment, as this makes subsequent root-cause analysis easier.
Data obtained by drone surveying mainly include three-dimensional data and elevation data created from images. Depending on the purpose on site, point clouds, surface models, orthophotos, and other products are combined and reviewed. Orthophotos are useful for grasping the positional relationships of rack rows and plots. Point clouds and elevation data are convenient for checking heights and cross-sections. When checking rack heights, it is difficult to judge from planar images alone, so planning assumes acquiring data that can be verified three-dimensionally.
During flight, it is important to ensure sufficient image overlap. Because solar power plants have repeating panels and mounting racks, capturing enough feature points is essential to stabilize positional relationships in image processing. In areas with many monotonous surfaces, including ground textures, pathways, drainage structures, and surrounding features in the imagery tends to improve data stability. Rather than narrowly photographing only the rack rows, including surrounding terrain and fixed objects can sometimes make overall alignment easier.
To check the height of the mounting structure, also consider the shooting direction. Shooting directly overhead makes it easy to grasp the overall layout, but the sides of the mounting structure and the area beneath the panels can become difficult to see. Combining oblique-angle shots as needed can make it easier to understand the shape around the mounting structure. However, when performing oblique shots, data volume increases and processing time tends to be longer, so it is practical to limit the scope according to the objective. One approach is to capture the whole area from directly overhead and add oblique angles only for the key parts.
When verifying the ground surface, attention should be paid to the effects of grass and materials. At solar power plants, after site development weeds may grow over time and the ground surface can become difficult to see directly. If the top surface of the grass is treated as the ground, it can be assessed as higher than the actual ground. If the purpose of checking the mounting height is to verify clearance from the ground, the condition of the grass greatly affects the results. Measures appropriate to site conditions are required, such as surveying as much as possible after mowing or during periods when the ground surface is easier to see, and performing supplemental ground-level measurements where necessary.
Pay attention to reflections from panels and mounting frames. Panel surfaces easily reflect light, and depending on shooting conditions, highlights can blow out or shadow details can be lost. Metal members of the mounting frames also appear differently depending on the angle. Because parts of the frame may be missing after data processing or the point cloud may become coarse, it is safer not to rely solely on drone surveying to determine the detailed dimensions of frame components. Drone surveying is strong for grasping overall trends and identifying key areas, and combining it with ground measurements for final verification increases reliability.
At sites under construction, it is also important to record the conditions at the time of surveying. Recording which areas of the mounting racks have been installed, whether panels have been installed, whether earthworks and drainage facilities have been completed, and whether temporary stored materials or vehicles are present will make it easier to interpret the data later. Drone survey data may appear objective, but without knowing the site conditions at the time of capture, you may not be able to tell whether something is an anomaly or just a temporary condition.
After surveying, it's reassuring to perform a quick on-site check. Verify whether any shots were missed, whether control points and survey markers are captured, whether shadows or reflections are obscuring important areas, and whether the acquisition coverage is sufficient. If you notice deficiencies after leaving the site, a revisit or reflight may be necessary, which will affect the schedule. When checking the platform height, pay particular attention to the edges of the target blocks, areas near slopes, around drainage channels, locations with large elevation differences, and near construction boundaries.
This procedure is not aimed at merely obtaining attractive aerial images, but at acquiring survey data that can be used for height verification. Being easy to view as a photograph and being easy to use as survey data are not the same. To verify the racking heights of a solar power plant, it is important to acquire data from which the terrain, racks, reference points, and surrounding equipment can be read together, and to ensure quality that can be used in subsequent processes for numerical checks and cross-section verification.
Step 4 Confirm the mounting structure height from the acquired data and record it
The fourth step is to process the acquired data, verify the mounting structure heights, and record them. Images and point clouds obtained from drone surveys can be difficult to use as-is for decision-making. By aligning survey data to coordinate and elevation references, organizing the necessary area, and preparing it so that rows of mounting structures and the ground surface can be confirmed, the data becomes easier to use for construction management and maintenance.
First, confirm that the processed data does not deviate significantly from the control points and check points. What is important here is not only visual consistency but also verifying vertical differences using check points and the like. When dealing with support-structure heights, merely having the horizontal positions align is insufficient. If there is a vertical offset, you cannot correctly assess ground clearance or the difference from the design values. If the verification results are worse than expected, you need to review the readings of the control points, the placement of calibration points, the imaging conditions, and the processing settings.
Next, decide how you will take the height measurements you want to verify. If you are checking the height from the ground to the bottom edge of the panel, compare the ground surface elevation with the elevation of the panel bottom or the bottom of the mounting frame at the same or nearby locations. If you are checking the height of posts or rails, identify the target members in the point cloud and read the height using representative points or cross-sections. When the ground surface is sloped, it is important not to judge from a single point but to examine multiple points around the mounting frame and identify the location where the clearance becomes smallest.
When rack rows are continuous, checking cross-sections is effective. Creating sections in the longitudinal direction along the rack rows and in the transverse direction across them makes it easier to understand the relationship between ground undulations and rack heights. Variations in height that are hard to see from plan views or ortho images are easier to grasp in sections. In particular, at locations where the graded surface changes significantly, near drainage channels, and close to the shoulder or toe of slopes, sectional checks make it easier to determine whether there are any problems.
When comparing with the design values, reconfirm that the reference frames of the design data and the survey data are aligned. Being able to review the comparison results with color coding or difference displays makes it easier to grasp overall trends. However, while difference displays are convenient, if the input data or reference frames are incorrect, they can propagate incorrect judgments widely. When you find locations with large differences, first check the control points, ground conditions, the appearance of the supports or mounting structures, and the influence of vegetation or shadows, and, if necessary, perform supplementary on-site verification.
When recording, organize the information in a way that makes decisions easy, not just the numerical values. Because the site supervisor, contractor, client, and maintenance personnel may not all look at the same data, records that clearly show the location and content to anyone who looks at them are desirable. Organizing the rack row number, section name, inspection date, surveyed area, reference used, definition of the height that was checked, how to interpret differences, and areas that require attention will be helpful when reviewing later. Showing the inspection points on an orthophoto and attaching cross-sections and height values also makes it easier to translate into on-site verification instructions.
When checking mounting structure heights at a solar power plant, it is more efficient to manage by separating overall trends from priority areas rather than inspecting every location with the same level of detail. Use drone surveys to capture the overall terrain and the trends of the rows of mounting structures, and identify locations with large deviations, small clearances, or those likely to affect drainage or maintenance access. Then, by conducting ground measurements and visual inspections only where necessary, you can improve the accuracy of your decisions while reducing the burden of on-site work.
When keeping records at project completion, it is also important to do so in a way that allows comparison during future maintenance. At solar power plants, site conditions can change after operations begin due to ground subsidence, scouring, overgrowth of vegetation, poor drainage, repair work, and other factors. If you record the mounting structure height and ground condition at the time of construction, it becomes easier to determine later whether a problem was present from the start or developed during operation. Drone survey data can also be used as evidence of the completed condition.
What matters in this procedure is not to stop at simply acquiring survey data. Verification of racking height only becomes meaningful when used for construction decisions, corrective instructions, completion records, and maintenance management. By treating data processing, difference checks, cross-section verification, compilation into reports, and on-site supplementary confirmation as a continuous workflow, drone surveying of solar power plants becomes a management tool directly linked to practical operations.
Precautions to preserve accuracy when checking mounting structure height
When confirming the height of mounting structures with drone surveying, there are several points to be aware of. First, do not overtrust the fine details of the mounting structures or panels. Drone surveying is a strong method for capturing large-scale shapes, but it cannot always obtain the heights of thin members, reflective members, or members hidden in shadow with high precision. Rather than reading a single point on a mounting structure and deciding pass/fail, you should combine information from the surrounding ground conditions, the trend of the entire row, cross-sectional shapes, and on-site verification when making a judgment.
Next, pay attention to the conditions for reading the ground surface. When checking the mounting structure height, the ground surface is often used as the reference, so the presence of grass, crushed stone, mud, puddles, temporarily placed materials, and the like can make it difficult to read the correct ground elevation. In particular, data acquired when grass is overgrown can make the top of the grass appear to be the ground surface. When surveying a solar power plant under maintenance, the appearance can change significantly before and after mowing, so it is important to record the timing of the survey and the on-site conditions.
The effects of shadows should not be overlooked. Areas beneath panels and under the mounting structure are prone to shadowing, and their appearance changes depending on the time of capture. When shadows are deep, there are fewer features in the image, and shape reconstruction during data processing can become unstable. Conversely, when sunlight is too strong, reflections from panel surfaces and metal components increase, making details harder to see. If the purpose is to confirm the mounting-structure height, consider the site orientation, panel angle, and the sun’s position, and choose conditions that make key areas as visible as possible.
Care must also be taken in the placement of reference points. In large solar power plants, if reference points are concentrated in one area, accuracy can become unstable at the edges of the survey area. When verifying racking heights, vertical reliability is important, so arrange reference and verification points to surround the entire target area, and add points within the area as needed. It is particularly important to use verification points to confirm results at site edges, near slopes, and in locations with large elevation differences from grading.
When comparing with design data, pay attention to when the data was created. If design changes were made during construction, comparing against old drawings or outdated planned elevations may cause areas that were correctly constructed to be wrongly judged as abnormal. Confirm that the design data used for comparison is the latest version and that site‑approved changes have been reflected. Also, if mounting frame specifications or finished ground elevations differ by area, avoid judging the whole site by a single uniform standard.
When reporting the results of drone surveys, recording the limits of accuracy and the conditions under which verification was performed can prevent misunderstandings. Separating and indicating areas where vegetation remains, areas with strong shadows, areas where support-frame members are indistinct in the point cloud, and areas supplemented by ground measurements makes it easier for recipients to assess. In practice, it is important not to treat all locations with the same level of confidence, but to clearly distinguish between areas that have been verified and those that require caution.
Also, checking the mounting structure height contributes not only to as-built control but also to maintenance management. Even if there appears to be no problem during construction, after operations begin the ground may be scoured or some areas may settle due to poor drainage. By regularly surveying the same area with a drone and comparing it with past data, it becomes easier to detect changes in terrain and clearance. Organizing the data from the initial survey with future comparisons in mind allows it to be used for long-term management.
Finally, it is important to clearly define the division of responsibilities with on-site verification. Drone surveying excels at capturing wide areas, identifying potential anomalies, and streamlining record-keeping. On the other hand, final corrective judgments and checks of detailed dimensions may require ground measurements. Rather than trying to complete everything with drone surveying alone, deciding how far to rely on drone surveying and at what point to supplement it with on-site measurements will allow you to establish a practical management system.
Summary: Streamlining mounting-frame height verification with drone surveying
To verify the racking heights at a solar power plant, it is necessary to efficiently grasp the entire large site while accurately checking the required locations. By using drone surveying, you can capture racking rows, the ground surface, access paths, drainage channels, slopes, and areas around equipment as surface data, making it easier to identify height trends and relationships with the terrain that are difficult to notice by walking the site alone. In particular, a major advantage is that if you retain data from during construction through completion and maintenance, you can compare conditions later.
The basics of mounting structure height verification start with clearly defining the purpose of the check. Depending on whether you want to examine clearance from the ground, the difference from the design planned elevation, or the heights of posts and rails, the required data and the method of judgment will vary. Next, establish reference points and surveying conditions to align the height datum. Then acquire the terrain and the area around the mounting structure as a single dataset, and use the processed data to check cross-sections and differences. Finally, it is important to organize the verification results into records that are easy to use on site.
When using drone surveying, attention is required to vegetation, shadows, reflections, the placement of reference points, and the update status of design data. Rather than judging solely by the appearance of the acquired data, checking it in light of surveying conditions and on-site circumstances can reduce misjudgments. Also, locations that require final detailed verification can have their reliability increased by combining drone data with ground measurements. Drone surveying is not foolproof, but it can be an effective means of quickly understanding conditions over a wide area and narrowing down the locations that need further checking.
The racking height at a solar power plant affects not only construction quality but also post-operation maintainability, drainage, grass cutting, and inspection routes. For that reason, it's important to put a system in place that allows checks not only at completion but also during construction and the operation and maintenance stages. By using drone surveying, confirmation of racking height can be shifted away from reliance on subjective visual checks toward data-driven, easy-to-explain management.
To streamline verification of rack heights and make construction management and maintenance of solar power plants more reliable, it is essential to clarify objectives before surveying, confirm on-site reference points, record acquisition conditions, and allocate roles between drone and ground measurements. By organizing the entire workflow—from capturing current conditions with drone surveys to checking, recording, and sharing rack heights—you can increase the speed of on-site decision-making and the clarity of explanations.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.


