At solar power plants, heavy rain, typhoons, rising rivers, and poor drainage can leave traces of inundation on site. Even if the flooding itself recedes quickly, surface mud marks, stranded debris, residues on fences, scouring of slopes, sediment around drainage channels, and the wet extent beneath mounting racks can provide important clues for later determining the extent of damage and its causes. If you try to record this information using only ground-level photos, it can be difficult to explain where the flooding reached and where problems are concentrated within the plant. One useful method for this is drone surveying, which can record the entire site from above.


Table of Contents

• Align the purpose of recording flood marks across the entire site.

• Use drone surveying to capture and preserve an aerial overview of the inundation extent.

• Verify height information together with terrain changes.

• Reinforce evidence by combining ground-based photographs and point clouds

• Use before-and-after comparisons of recovery to prevent recurrence.

• Summary


Align the purpose of recording flood marks across the entire site

When documenting traces of flooding at a solar power plant using a drone survey, the first thing to clarify is the purpose of the documentation. Simply photographing where the water reached will produce material that is difficult to use later. Depending on whether the aim is maintenance inspection, reporting to the client or managers, determining the scope of restoration work, or considering measures to prevent recurrence, the required shooting coverage and the items that should be recorded will differ.


At flood sites there is a lot of information that is easily lost over time, such as mud deposits, the way grass has been flattened, and the locations of washed-up debris. If clear weather continues, wet traces on the ground fade, and once cleaning or restoration work begins the original conditions become even harder to discern. Therefore, before conducting drone surveying it is important to set priorities for what to record. The outer perimeter of the flooded area, inundation marks near facilities, drainage paths, locations where sediment entered, and traces around fences and gates are all items you should capture as early as possible.


In solar power plants, management targets such as panels, racking, junction boxes, wiring, access paths, developed land, slopes, detention ponds, drainage ditches, and fences are spread over a wide area. When documenting flood marks, it is important to be able to explain their relationship to these facilities and the terrain. For example, even if you take a single photo of muddy marks, if it is not clear which section of the plant the photo relates to, how far it is from the panel rows, or whether the location is lower than the surroundings, it becomes difficult to use for planning countermeasures. Drone surveying records the entire site from above and can, when necessary, be linked with coordinate and elevation information, making it easier to organize flood marks within the whole site.


When aligning recording objectives, it is important to note that different stakeholders want different information. Maintenance personnel may want to confirm whether they can patrol safely and whether there are signs of flooding near equipment. Construction personnel may want to understand the condition of drainage and slopes, locations where sediment has entered, and the scope of restoration work. Owners and managers may want to know the extent of damage, the priorities for restoration, and future countermeasure policies. To make the results of drone surveying easier to use later, these perspectives should be compiled in advance and reflected in the imaging plan.


Also, when recording flood marks, it is important not to be too quick to definitively determine the full extent of inundation. Mud traces and color differences visible in aerial photos are useful clues, but their appearance varies on grass, gravel-covered areas, paved surfaces, and shaded sections. If you judge only by the condition of the ground surface after the water has receded, you may overlook the actual maximum water level or areas that were inundated for a short time. Therefore, while using the overhead information obtained from drone surveys as a foundation, it is necessary to take an approach that combines ground checks, interviews with those involved, and inspections of equipment conditions.


Clearly defining what will be recorded also contributes to safety during filming. On properties after flooding, hazards that are not normally present can lurk, such as mud, collapsed road shoulders, unstable slopes, driftwood and sediment, and areas around exposed wiring. If you can grasp the overall condition from above with a drone before people walk around and check everything, it becomes easier to identify places where entry should be avoided. Drone surveying can also serve as an effective initial inspection before entering the site. However, before flight you must check the weather, wind, surrounding obstacles, power lines, transmission facilities, third-party access, and takeoff and landing areas, and conduct operations within reasonable limits in accordance with laws and site rules.


Capturing and Preserving Flood Extents from Above with Drone Surveying

The basic approach to recording flood traces is to retain images that provide an overview of the entire solar power plant. Solar power plants cover large sites, and photos taken from the ground alone can make it difficult to grasp the overall picture. In particular, when the flooded area spans multiple sections, spreads in bands along drainage channels, or concentrates in low-lying areas, having aerial records makes it easier to explain.


In drone surveying, the entire power plant is photographed with consistent overlap and later organized into orthophotos, point clouds, and three-dimensional data. An orthophoto is an image in which the distortions of aerial photographs are corrected so it can be viewed like a map. This makes it easier to confirm, in plan view, the extent of flood marks, the distribution of mud and sediment, the locations of debris, and the relationships with access routes and equipment. Regular oblique photos are also useful for explaining conditions, but data captured under as consistent conditions as possible is helpful when measuring areas or overlaying with drawings.


When documenting the extent of flooding, it is helpful for later causal analysis to photograph not only the perimeter of the power plant but also the surrounding terrain and the routes by which water entered. Roads outside the site, adjacent waterways, rivers, farmland, slopes, and areas near drainage outlets are important for understanding the background of the flooding. If you only photograph the site itself, it can be difficult to tell where the water came from and where it drained. Of course, when photographing outside the site, you should check local safety, privacy, and flight rules and limit recording to what is necessary.


When shooting, it's also important to choose a time of day when signs of flooding are easy to see. If the sun's angle is too low, shadows lengthen and shadows from panels and mounting structures can make it difficult to see ground conditions. Conversely, at times when reflections are prominent, puddles and wet ground can appear white, making it hard to discern subtle differences. If your purpose is to record signs of flooding, it's desirable to choose conditions with minimal shadows and reflections, where the ground's color and texture can be easily confirmed. However, after a disaster the weather and site conditions may be unstable, so prioritize safety and be prepared to refrain from flying.


To enable later comparison of inundation extent, it is important to record the imaging coverage and capture conditions. If you organize the flight date, time, weather, flight altitude, shooting direction, the coordinate reference system used, and whether ground verification was performed, it will be easier to compare changes when re‑acquiring images at a later date. In particular, if you want to compare the same location after recovery or after the next heavy rainfall, large differences in capture conditions make it difficult to determine whether observed changes are due to actual surface changes or to differences in capture conditions.


When recording the boundary of flood marks, it is safer not only to simply trace the visible area on the image but also to separate out ambiguous parts. Areas where bands of mud remain clearly can be classified as areas with a high likelihood of inundation, but boundaries can be unclear in grassy or gravel areas. Organizing such locations as "estimated area" or "areas requiring ground verification" helps avoid making overly definitive assertions in reports. Drone survey results provide materials that make it easy to share the situation, but it is important to distinguish between what can be interpreted from images and what was confirmed on site.


When recording evidence of flooding, the proximity to equipment is important. Whether water reached beneath the panel rows, whether mud remained only in the walkways, or whether there are traces near junction boxes and electrical equipment will change inspection priorities. Overlaying the equipment layout on an orthophoto, or aligning it with block names and row numbers, makes it easier for stakeholders to identify the same location. Even when verbal descriptions on site—such as "the low area on the north side," "near a certain row," or "the end of the maintenance aisle"—are hard to convey, having aerial imagery makes sharing easier.


Check elevation information along with terrain changes

The planar extent alone is sometimes insufficient when recording flood marks. Flooding at solar power plants can be related to elevation differences within the site, drainage gradients, settlement of developed land, inflow from slopes, clogged side ditches, and the concentration of water in low-lying areas. Therefore, organizing elevation information from images acquired by drone surveying and confirming the relationship between flood marks and terrain is effective.


Checking elevation information makes it easier to identify where water is likely to collect. For example, situations such as a walkway inside the power plant being low only in one section, a weak gradient toward the drainage channel, depressions in the graded surface, or bands where water tends to remain between rows of panels can be difficult to notice from plan-view photos alone. If the data are organized as point clouds or elevation models, it becomes easier to determine whether flood traces remain along low-lying areas or whether there are obstructions in the drainage paths.


Height information obtained from drone surveying can be affected by imaging conditions and the state of the ground surface. In areas with tall grass, beneath panels and their racks, on wet ground, in puddles, or in locations with heavy shadowing, it can be difficult to accurately capture the ground surface. At solar power plants, panels are arranged in regular patterns, so there are areas where the ground is not visible from above. Therefore, height information is not infallible and should be considered together with on-the-ground verification, existing drawings, and drainage planning information.


After flooding, particular attention should be paid to scouring and sediment deposition. At the lower parts of slopes, the outlets of drains, around catch basins, the edges of walkways, and along fences, the flow of water can erode the ground or, conversely, cause sediment to accumulate. These changes are easy to overlook if you only look at the extent of inundation. Recording terrain irregularities with drone surveys and supplementing the details with ground-level photos makes it easier to determine whether restoration work is necessary.


When using height information, it is important to use a consistent reference. A single survey conducted after a disaster can capture the current topography, but it may be difficult to determine what has changed compared with the past. If past survey data, as-built topographic data from project completion, or records from regular inspections are available, comparing them with post-flood data makes it easier to identify trends such as subsidence, scour, and sediment deposition. Even if no past data exist, keeping this drone survey as baseline data will make it useful for comparisons in future surveys.


When explaining topographic changes, it is important not only to present numbers but also to express them in ways that are easy to understand on site. For example, organizing on drawings the locations of remaining flood marks and the elevation differences with surrounding areas, the relationship to drainage outlets, the positions of depressions where water tends to stagnate, and the directions from which sediment flowed makes it easier for stakeholders to consider countermeasures. Simply handing over point cloud data alone can be hard to understand for anyone other than technical specialists. To make drone surveying results useful in practice, you need the perspective of processing survey data into report-ready information.


Combining signs of inundation with elevation information makes it easier to prioritize recovery efforts. Low-lying areas near equipment, locations suspected of poor drainage, spots where inflow from slopes is likely to recur, and places that could affect the safety of maintenance walkways tend to be targeted for early inspection. Conversely, even if signs of inundation remain, if they are located away from equipment and stabilize after drainage, the response may be limited to continued monitoring. The important point is not to keep inundation marks as mere damage photos but to link them with topography and equipment layout as decision-making material.


Strengthening evidence by combining ground photographs and point clouds

Drone surveying can efficiently record an entire solar power plant, but it cannot capture every detailed trace. The height of mud buildup, grass or debris caught on fences, scouring around racking foundations, clogged drains, soil around wiring, and cracks or steps on pathway surfaces are sometimes easier to interpret when photographed up close from the ground. To make flood traces usable as practical documentation, it is important to combine aerial point clouds and orthophotos with ground-level photographs.


When taking ground photos, it is important not only to take close-up shots of areas of concern but also to record their locations so they can be identified. Close-ups alone can make it impossible to tell later which section or which piece of equipment is shown. First take a wide shot that shows the surrounding conditions, then take close-up photos of the problem areas, and, if necessary, indicate the same positions on aerial imagery so that the reporting materials are more reliable. If you correlate the ground photo locations with orthophotos from drone surveys, you can explain both the overall picture of flood marks and the detailed evidence together.


Useful indicators of flood traces include mud on the ground, flattened grass, debris, residues on fences and equipment, waterline marks, sediment accumulation, scouring, and blockages in drainage channels. These are a mix of features that are visible from the air and those that are not easily seen. For example, a wide band of mud is easy to confirm from the air, whereas the height of grass attached to a fence is clearer in ground-level photos. Blockages in drainage ditches can also be difficult to assess for depth or internal condition from aerial imagery alone. Separating the roles of aerial records and ground verification can reduce omissions.


When using point cloud data, it is useful to ensure that the positions of ground photographs can be matched to features on the point cloud. Using easily identifiable reference points—rows of racks, intersections of walkways, corners of fences, drainage inlets, edges of slopes—makes it easier to verify locations later. If you show the boundaries of flood marks and scour areas on the point cloud and supplement the details with ground photos, the explanatory materials will be more consistent. The resulting documentation will make it clear to both field staff and managers that they are referring to the same locations.


To strengthen the evidence, it is also essential to record the condition at the time of photographing. The meaning of a photo changes depending on how many days after the flooding the record was made, whether it was taken before or after cleaning or restoration work, whether rain was still ongoing, or whether the area had already dried. For example, faint mud marks do not necessarily mean the inundation was minor. Water may have flowed before the photo was taken, cleaning may have been carried out, or the scene may have dried over time. Including a brief note of the shooting conditions and work status with the records helps prevent misunderstandings.


Also, when recording flood marks near electrical equipment, confirming safety must take priority. After flooding there may be hazards around equipment that cannot be judged by appearance alone, so follow specialized inspection procedures and avoid approaching until the necessary checks are complete. Aerial inspection by drone is useful for assessing surrounding conditions before people approach, but it does not determine electrical safety itself. It is important not to confuse the roles of survey records and equipment inspections.


Combining ground-level photos with point clouds makes explanations clearer for clients and managers. By showing the flood extent on an overall map, attaching ground-level photos for each problem location, and indicating height information and distances as needed, stakeholders who have not visited the site can easily understand the situation. Materials that link locations with photographs are especially helpful when discussing the scope of restoration work or when you want to verify the same spots during the next inspection. A major advantage is that you can preserve the on-site rationale for decisions—which tends not to be retained through oral explanation alone—in a form that can be reviewed later.


Use before-and-after comparisons of recovery to prevent recurrence

Recording flood marks should not stop at merely documenting the damage; it is important to use them for post-recovery verification and preventing recurrence. At solar power plants, after flooding there may be sediment removal, drainage channel cleaning, slope repairs, pathway maintenance, tidying around fences, and equipment inspections. If drone surveys are conducted before and after these operations under similar conditions, the extent of restoration becomes easier to understand and the effectiveness of measures easier to verify.


In pre-restoration data, record the extent of inundation, sediment deposition, scour/erosion, puddles, debris, and locations obstructing passage. In post-restoration data, confirm to what extent those issues have been resolved, whether drainage routes have been secured, and whether any new unstable spots remain on slopes or pathways. Comparing orthorectified images from before and after makes it easier to visually explain the areas where sediment was removed, the places that were leveled, and whether any residual materials remain. When elevation information can be compared, it is also easier to understand the repair status of scoured areas and the removal status of accumulated sediment.


When considering prevention of recurrence, it is necessary to maintain records that track the flow of water. If you can identify where water entered, where it accumulated, and where it drained, it becomes easier to determine whether cleaning the drainage channels is sufficient, whether gradients or flow paths need to be reviewed, or whether measures to prevent inflow from slopes are required. By supplementing the overall picture obtained from drone surveys with ground checks, you can develop measures that address water movement across the entire site rather than merely local responses.


For before-and-after comparisons, it is important to keep shooting conditions as consistent as possible. If flight altitude and coverage, image overlap, flight route, weather, or time differ significantly, interpreting the comparison results can become difficult. Even if you cannot capture images under exactly the same conditions, it is advisable to consciously record the main sections and problem areas from the same angle and covering the same area. In particular, at power plants that experience periodic flooding, accumulating records taken during normal conditions, after heavy rain, and after recovery makes it easier to grasp trends in the changes.


When verifying after restoration, you need to check not only whether the appearance has been cleaned up but also whether any conditions remain that would allow water to pool again. Even if mud is removed, if low terrain or poor drainage remain, the same spot may show flooding again after the next heavy rain. Simply smoothing the surface of a slope can alter flow paths and concentrate water in different areas. It is important to use the results of drone surveys to get an overview of the entire site after restoration and confirm how localized measures affect the surrounding area.


As part of reporting materials, it is important not only to place before-and-after images side by side but also to document in writing the judgments you made. For example, separating and recording the areas where signs of flooding were observed, the areas where sediment removal was carried out, the areas where drainage routes were checked, the areas that require additional inspection, and the areas designated for follow-up observation makes it easier to plan subsequent actions. While drone survey outputs are visually intuitive, interpretations can vary among viewers. Keeping images together with the written judgments reduces misunderstandings among stakeholders.


Over the long term, accumulating records of flood marks as power plant maintenance data is effective. If the same format of data is recorded for every post-disaster inspection, locations prone to flooding, places where sediment tends to accumulate, drainage weaknesses, and areas that take a long time to restore will become apparent. Trends that could not be identified from single records become easier to understand by layering multiple sets of data. This makes it easier to decide which locations to prioritize for inspection before the next heavy rain and to plan preventive drainage cleaning and slope inspections.


Summary

The aim of recording flood traces at a solar power plant through drone surveying is not merely to take photos of the damage. It is valuable to capture an overview of the inundation extent, clarify its relationship with equipment and terrain, and leave behind materials to inform decisions on the scope of restoration and measures to prevent recurrence. At the site after flooding, much information is lost over time, such as mud marks, drifted debris, scouring, sediment accumulation, puddles, and deposits on fences. By recording the whole site from the air at an early stage and supplementing necessary areas with ground-level photographs, you can create materials that are easier to explain later.


An effective approach is to first clarify the purpose of the records and gather the information stakeholders need. Next, use drone surveying to obtain an overview of the entire power plant and surrounding inflow routes, and map the inundation extent using orthophotos and similar imagery. Then verify elevation data and terrain changes, and examine factors such as low-lying areas, poor drainage, scouring, and sediment deposition. Further, combine ground photographs with point clouds to reinforce evidence for fine details. Finally, by comparing pre- and post-restoration conditions and summarizing the effectiveness of measures and remaining issues, you can help reduce the risk of future inundation.


One thing to keep in mind is not to conclusively determine the cause of flooding or the safety of equipment based solely on drone surveying. Aerial images and point clouds are useful recording tools, but they are affected by ground surface conditions, vegetation and shadows, puddles, shadows cast by equipment, and imaging conditions. For safety verification of electrical equipment and detailed determination of causes, on-site confirmation and specialized inspections are also necessary. Positioning drone surveying as a means to grasp the entire site and to organize materials for decision-making will make it more practical for use in the field.


By continuing to record flood traces, the weaknesses of each solar power plant become apparent. If you can identify which drainage channels are prone to clogging, which walkways tend to collect water, which slopes are likely to shed sediment, and which sections require more time for restoration, that knowledge can be applied not only to post-disaster response but also to routine maintenance. Drone surveying of solar power plants is a practical method that bridges post-flood documentation, restoration verification, and recurrence prevention. If you want to preserve on-site conditions clearly and share the same information among stakeholders, standardize the method for recording flood traces and consider using drone surveys adapted to the site conditions.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.