5 Points for Documenting Typhoon Damage to Solar Power Plants with Drone Surveys
By LRTK Team (Lefixea Inc.)
In solar power plants, it is necessary after a typhoon to quickly inspect a wide area, including panels, mounting structures, graded surfaces, drainage facilities, maintenance access routes, and fences. Visual inspections from the ground alone make it difficult to assess conditions on upper slopes, the back of the site, muddy areas, or places that are hard to approach due to fallen trees or debris, and it can take time to grasp the full extent of the damage. This is where records from drone surveying are useful.
Drone surveying is not only a way to inspect damaged areas from above, but also an approach that makes it easy to objectively document what happened using photos, orthophotos, point clouds, and elevation data. It can be used to prioritize restoration work, report to stakeholders, coordinate with insurers and contractors, and plan measures for future disasters. However, post-typhoon sites differ from normal conditions and are prone to increased flight risks, gaps in records, and variability in positional accuracy. Simply flying and taking photos may not produce survey results that are usable later.
In this article, for practitioners seeking information on drone surveying of solar power plants, we explain five key points to keep in mind when documenting typhoon damage. We outline an approach for recording damage in a way that is safe, accurate, and easy to use in downstream workflows.
Table of Contents
• Conduct safety checks after a typhoon before determining the flight area.
• Record the overall extent of damage and the localized damage separately.
• Ensure positional accuracy so that before-and-after recovery comparisons can be made.
• Preserve not only photographs but also point clouds and elevation changes.
• Record with reporting and data management in mind.
• Summary
Perform post-typhoon safety checks first and determine the flight area
When recording typhoon damage at a solar power plant with drone surveying, the first thing to consider is not which area to fly but which area can be inspected safely. Immediately after a typhoon, the site may have components blown away by strong winds, fallen fences, flooded walkways, loosened slopes, eroded drainage channels, and tilted mounting racks. The usual inspection routes may not be usable, and there may be locations where bringing in vehicles or personnel could cause secondary damage.
A major advantage of drone surveying is that it allows inspection of areas that are difficult to approach from the ground from the air. However, care is also required for the flight itself. After a typhoon has passed, even if the wind appears to have died down, turbulent winds can remain in mountainous areas, along the coast, in valleys, and between rows of panels. In addition, if there are power lines, communication lines, transmission towers, trees, temporary structures, or damaged structures around the site, there may be more obstacles than usual. Before flight, it is important to check wind speed, wind direction, takeoff and landing locations, line of sight, no-entry zones, and possible emergency landing spots, and to plan so as not to approach too closely at low altitude.
Especially at solar power plants, because the panel surfaces are wide and continuous, areas that look safe from the air may still have mud or standing water on the ground. If drainage channels are clogged with sediment or the shoulders of maintenance access paths have collapsed, movement by personnel can be hazardous. It is practical to begin with broad overview photography from the site entrance or a safe high vantage point to identify hazardous areas, and then determine the detailed survey area. Rather than approaching damaged locations from the start, following the sequence of wide-area inspection, extraction of hazardous spots, and detailed imaging makes on-site decision-making easier.
When deciding the flight coverage, be clear whether you will survey the entire power plant at once or prioritize areas suspected of damage. In typhoon damage, there are multiple types of damage—not only panel damage but also inadequate drainage, sediment inflow, slope failure, scour around foundations, anomalies around cable racks, fence collapse, and so on. Because photographing everything at the same level of detail can take too much time, it is efficient to first capture from an altitude that gives an overview of the entire plant, and then add detailed or low-altitude shots only for locations where abnormalities are observed.
Recording immediately after a typhoon is also a race against time. Once recovery work begins, removal of debris, temporary protective measures, movement of components, and preparation of access routes will change the condition as it was right after the damage. To be able to explain the causes and extent of the damage later, it is important to preserve the pre-recovery state as early as possible. However, rushing to fly without adequate safety checks can lead to aircraft crashes or worker accidents. It is necessary to balance the speed of recording with ensuring safety, and to adopt a phased surveying approach that starts with areas where it is safe to fly.
When multiple stakeholders—site managers, chief electrical engineers, maintenance companies, contractors, and so on—are involved, it is essential to share the objectives before the flight. If you fly without clarifying who needs to confirm what, you may find after shooting that there are gaps, such as missing photos from a needed angle, the upstream side of a drainage channel not being captured, or the location of damage being unclear. When recording typhoon damage, the goal is not merely aerial photography but producing materials that can be used for later assessment. Therefore, at the pre-flight stage decide how far this survey will go among overall situational awareness, identifying damage locations, quantity verification, restoration planning, and preparation of reporting materials, so the intended use of the results is clear.
Please translate the following input into English.
Record the overall damage and the localized damage separately
When recording typhoon damage, it is important to separately preserve the overall condition of the power plant and the details of each individual damaged location. With only an overall view, it is difficult to determine the type and extent of damage, and with only localized photos, it is hard to tell where within the plant the damage occurred. In drone surveying, combining records that provide a wide-area overview with records that allow detailed inspection of damaged locations produces materials that are practical and easy to use in actual operations.
First, when recording the overall situation, photograph so that the relationship between the power plant site boundary, panel rows, maintenance access paths, drainage system, slopes, retention ponds, and surrounding roads is clear. Typhoon damage often does not occur in isolation: upstream drainage failures can lead to downstream sediment buildup, and sediment washed from slopes can spread beneath panels or onto access paths. Recording the entire plant from above makes it easier to understand how damages are connected and how water flows.
On the other hand, when documenting localized damage, a resolution capable of identifying specific defects—such as cracked panels, tilted mounting racks, excavation around foundations, fallen fences, clogged drains, the thickness of sediment inflow, collapsed walkways, and cracks in slope faces—is required. Shooting at the same altitude as overall photography may miss fine abnormalities. Once a damage site is confirmed, photograph it from multiple directions while changing the angle so that the positional relationships and the condition of the defects are clear. Combining frontal, oblique, and directly overhead records makes it easier for stakeholders who later review the materials to understand the situation.
In solar power plants, because similar rows of panels are repeated, it can be difficult to pinpoint a location from photos alone. In post-typhoon reports, expressions such as “around which row number,” “along the drainage channel on the north side of the site,” or “at the lower part of the southwest slope” can lead to mismatched understandings among stakeholders. Using orthoimages produced by drone surveys and geotagged photos makes it easier to indicate damaged areas on a map. Numbering each damage location and linking the overall map to detailed photos also makes it easier to issue restoration instructions and to verify estimates.
The things you should record are not limited to obvious damage. After a typhoon, it is important to document not only damage that immediately causes power outages but also small changes that could lead to future malfunctions. For example, spots where soil under panels has shifted slightly, branches and leaves accumulated in parts of drainage channels, shallow erosion on slope surfaces, or small settlements beside access paths may seem minor during an initial inspection. However, since they can expand during the next heavy rain, it is worth recording their locations and conditions. Drone surveying can record large areas under the same conditions, making it an effective way to preserve the initial state of such changes.
When organizing the overall picture of damage, it is effective to view it by damage type. Classifying damage into structural damage, damage to the ground or site-formation surfaces, damage to drainage facilities, damage to perimeter facilities, and inflow damage from surrounding areas makes it easier to assign recovery personnel and determine priorities. For example, anomalies related to power generation equipment are linked to electrical safety checks, while slope and drainage anomalies are linked to civil engineering recovery assessments. By organizing drone survey results by damage category instead of treating them as a simple photo album, it becomes easier to proceed with subsequent actions.
Also, when documenting typhoon damage, it is meaningful to record locations that were not damaged. If you can distinguish which parts of the power plant appear sound and which require detailed inspection, priorities for inspection work become clear. If you only photograph damaged areas, questions may remain later about whether other areas were checked. Including overall orthophotos or aerial overview photos that indicate the areas that have been checked will strengthen the credibility of the report.
Ensure positional accuracy so that comparisons can be made before and after restoration.
The purpose of recording typhoon damage with drone surveying is not just to preserve site photographs. It is important to utilize the data as survey information—measuring the extent of damage, estimating the volume of sediment, comparing conditions before and after restoration, and considering measures to prevent recurrence. To do this, you must ensure positional accuracy and keep the data in a state that allows the same locations to be compared later.
At solar power plants, because panel rows and mounting racks are arranged in a regular pattern, it is easy to confuse locations based on appearance alone. Especially at large plants, where similar scenery continues, even a slight shift in the photo’s shooting position can make identifying the damaged area take a long time. By georeferencing the images and point clouds obtained from drone surveys so they can be overlaid on site plans and management maps, it becomes easier to align understanding among stakeholders.
Methods to ensure positional accuracy include establishing reference points on-site, utilizing existing survey points or clearly defined structures, and using positional corrections for surveying. Whatever method is chosen, the important thing is to determine the required accuracy based on what the current record will be used for. If the main purpose is to describe the damage situation, accuracy sufficient to understand positional relationships within the power plant may be enough. On the other hand, when the data will be used for earthwork volume calculations, design of restoration work, or fine difference comparisons with previous data, more stringent accuracy control is required.
At a site after a typhoon, reference points and markers can be buried by debris, washed away, or become inaccessible. Because the calibration points normally used may not be available, it is reassuring to identify multiple candidate points in advance. Rather than scrambling to find control points after damage occurs, organize the reference locations within the power plant during normal times and decide on a method to manage positional information that can be used in disasters; this will lead to more rapid drone surveying.
When comparing before and after restoration, it is also important to keep the imaging conditions as consistent as possible. If flight altitude, shooting direction, overlap, imaging range, reference points, or processing methods change significantly, it becomes difficult to determine whether differences are due to damage or restoration or to differences in surveying conditions. If you may conduct an initial survey immediately after a typhoon, a survey after emergency repairs, and a survey after full restoration, retaining a flight plan that makes re-surveying easy from the outset will make comparisons easier.
Positional accuracy relates not only to the planar (horizontal) dimension but also to the vertical (height) direction. Slope failures, sediment accumulation, scouring, subsidence, and deformation of pathways can involve changes in elevation. To understand not only the area of damage but also how deep erosion has occurred and how thick sediment has been deposited, data that include height information are useful. However, survey data can show variability under panels, beneath vegetation, on highly reflective surfaces, or in areas with strong shadows. When using the results, it is necessary to make judgments based on an understanding of the data’s accuracy and the conditions under which they were acquired.
To increase the reliability of damage records, the conditions at the time of surveying should also be preserved. Recording the capture date, capture time, weather, wind conditions, flight range, control points used, processing methods, and constraints confirmed on site makes it easier to judge the results when reviewing them later. In responding to typhoon damage, multiple stakeholders often review materials at different times, so not only the survey data but also records of the acquisition conditions become important explanatory material.
Preserve not only photos but also point clouds and elevation changes
When it comes to recording typhoon damage, many people in charge may first think of taking photographs. Of course, photos are effective for intuitively conveying the extent of damage. However, photos alone may be insufficient for using damage information from solar power plants in restoration planning and recurrence prevention. The strength of drone surveying lies in its ability to create, in addition to photographs, orthophotos, point clouds, three-dimensional models, elevation data, and so on.
An orthoimage is an image in which the tilt and distortion of aerial photographs have been corrected, making it as easy to use as a map. It is effective for showing damage distribution across an entire power plant, making it easier to grasp the positional relationships of panel rows, walkways, drainage channels, slopes, fences, and so on. In post-typhoon reports, indicating damaged areas on an orthoimage makes it easier for stakeholders to confirm the same locations. Even when it is difficult to identify locations from ordinary oblique photos alone, an orthoimage clarifies their positioning within the whole.
Point clouds and 3D data are useful for checking three-dimensional changes in terrain and structures. For example, where a slope has collapsed, you can confirm the extent of the collapse and changes in height in three dimensions. If sediment has flowed into pathways or under panels, they can be used to estimate the extent and thickness of the deposits. Around drainage channels, they provide clues to locations where sediment or branches are obstructing water flow. This information helps prioritize restoration, plan access for heavy machinery, and consider sediment removal.
Recording changes in elevation is also important when considering the causes of typhoon damage. To determine where water flowed in, where it pooled, and where it concentrated, it is necessary to understand the elevation differences within the power plant. At solar power plants installed on developed land, drainage flow is influenced by the terrain, pathway gradients, and slope geometry. By utilizing elevation data from drone surveys, it becomes easier to correlate locations where damage occurred with the topographic conditions.
However, when handling point clouds and elevation data, it is necessary to understand the limitations of the data. Surfaces under solar panels, ground covered by weeds, puddles, surfaces with strong reflections, and areas with deep shadows can be difficult to capture accurately from aerial surveying alone. In particular, small anomalies such as erosion beneath panels and around cables should be checked on the ground in combination. Drone surveys are excellent for understanding large areas, but they do not replace every detail. A realistic approach is to use aerial data to narrow down locations that may have anomalies and then perform ground checks where necessary.
Combining photographs, orthophotos, point clouds, and elevation data increases the persuasive power of damage records. Photographs serve as materials to show the situation, orthophotos serve as materials to indicate location, point clouds serve as materials to understand shape, and elevation data serve as materials to consider changes and water flow; dividing these roles makes them easier to understand. By not confusing these and using them according to their purpose, the results of drone surveys become easier to apply in practice.
Also, when documenting typhoon damage, it is important to preserve not only the condition immediately after the damage but also the condition after restoration. By comparing pre-restoration point clouds and orthophotos with post-restoration data, it becomes easier to confirm which areas were restored, how much sediment was removed, and whether drainage routes were improved. If the same location suffers damage again in the future, having past records allows you to assess whether the damage has expanded or whether the same causes are recurring.
Record with reporting and data management in mind
The results of drone surveying are not complete at the moment of capture. In responding to typhoon damage, you will often need to explain the situation to multiple stakeholders, such as power generation operators, operations and maintenance companies, contractors, designers, insurance representatives, landowners, and government officials. Therefore, it is important to record information while considering what kind of reports or data will ultimately be provided.
To make records easy to use in reports, it is necessary to organize not only photo clarity but also the location, date and time, details of damage, and the status of responses. For example, assembling for each damaged spot the position on an overall map, an overhead photo, detailed photos, a description of the damage, and the items that need to be checked will make it easier for stakeholders to make decisions. Even if there are a large number of photos, it takes time to review them if they are not organized. Conversely, even with a small number of photos, if the location and content are clear, the value as report material is high.
File names and folder structures are also important in data management. Organizing them so that the typhoon name, date of occurrence, survey date, power plant name, photographic coverage area, and type of deliverable are identifiable makes later searches easier. On site, because urgent responses are ongoing, image data can remain in temporary storage locations or it can become unclear who holds the latest data. Especially when surveys are conducted multiple times—before restoration, after emergency restoration, and after full restoration—it is necessary to be conscious of data version control.
When recording typhoon damage, it is advisable to keep both processed outputs and the original data, not just image data. Processed orthophotos and point clouds are convenient for reporting and verification, but if you need to reprocess for a different purpose later, the original photos and flight logs may be necessary. For example, something that was initially intended only to check damaged locations may later require rough estimates of sediment volumes or comparisons of restoration extents. Properly storing the original data makes it easier to accommodate additional analyses.
When preparing reports, care must be taken to avoid overly definitive expressions. What can be confirmed by drone surveying is the appearance and shape information based on data acquired from above. Internal abnormalities of electrical equipment, internal damage to foundations, subsurface scouring, and fine details beneath panels may not be determinable by drone surveying alone. Therefore, in reports, use expressions such as "within the range visible from above" or "in the images, a detailed ground inspection is required," and clearly separate what can be determined from the survey results and what requires additional confirmation.
Records of typhoon damage may also be used for insurance or contractual verification. In such cases, the capture date and the timeline after the damage occurred can be important. It is necessary to make clear what point in time the condition documents—whether it was before or after restoration work, and whether emergency measures were taken. If the timeline is ambiguous, it can become difficult to explain the extent of the damage or its cause. To use drone survey results as objective records, it is essential to preserve not only the data itself but also the circumstances at the time of acquisition.
In power plant maintenance, post-disaster reviews are also important. If records of typhoon damage are preserved, they can be used for future inspection schedules and reinforcement plans. By accumulating information about which drainage channels are likely to become clogged, which slopes are prone to erosion, and which pathways are likely to flood, it becomes easier to identify vulnerabilities specific to each plant. Rather than using drone surveying only as an emergency response during disasters, integrating it with routine maintenance data makes it easier to establish a management system that is prepared for typhoons.
Summary
When recording typhoon damage at a solar power plant with drone surveys, it is important not only to quickly capture wide areas but also to document them in a way that can be used later for assessment. After a typhoon, the site may have fallen trees, sediment, flooding, structural damage, or collapsed access ways, and conducting inspections or flights with the same mindset as during normal conditions can be dangerous. First perform safety checks and determine the areas where flight is possible, then proceed in stages with overall assessment and detailed recording.
In damage records, it is necessary to record the overall condition of the power plant separately from localized deformations. Having overall orthophotos or overview photographs makes it easier to explain the positional relationships of damaged areas. By combining detailed photos with low‑altitude photography, it becomes easier to identify specific anomalies in panels, mounting structures, slopes, drainage channels, walkways, fences, and similar elements. Furthermore, if positional accuracy is ensured, comparisons before and after restoration and re‑surveying can be handled more easily.
By using not only photographs but also point clouds and elevation data, it becomes easier to grasp three-dimensional changes such as sediment deposition, scour, slope failures, and poor drainage. However, because there may be areas that are not visible with drone surveying alone, it is important to combine it with ground verification and specialized inspections. Drone surveying is an effective method for efficiently capturing the overall picture of a site and narrowing down locations that need to be checked.
Also, by recording with an eye toward reporting and data management, the value of surveying results is greatly increased. If you organize the date of capture, survey area, locations of damage, acquisition conditions, raw data, and processed data, they can be more easily used for restoration work, stakeholder briefings, insurance verification, and consideration of measures to prevent recurrence. In responding to typhoon damage, speed is important, but recording in a form that can be used later is just as important.
Maintaining solar power plants involves a heavy burden of on-site inspections after every typhoon or heavy rain. By utilizing drone surveying, you can assess the entire site before approaching hazardous areas, making it easier to determine whether there is damage and to set priorities. Considering disaster-time records, post-restoration comparisons, and the accumulation of management data during normal operations as a single integrated process can improve the quality of plant management. When reviewing the typhoon damage recording system, it is important to consider practical drone surveying operations that are easy to use in practice, covering on-site safety checks, flight planning, positional accuracy, results organization, and data storage.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.