When calculating solar power generation, if you only look at system capacity and solar irradiance, it's easy to overlook differences caused by orientation. Especially for rooftop installations or designs on limited plots, you can't always orient all panels due south. You need to decide how many panels to install on each orientation — east-facing, west-facing, southeast-facing, southwest-facing, and in some cases north-leaning surfaces. This article explains, for practitioners responsible for solar power generation calculations, four decision criteria for estimating generation by orientation.


Table of Contents

• Fundamentals to Grasp First in Directional Calculations

• Criterion 1: Examine not only annual power generation but also generation trends by time of day

• Evaluation criterion 2: Verify azimuth and tilt angle together

• Criterion 3: Examine shadows, surrounding obstacles, and reflection conditions separately for each direction

• Evaluation criterion 4: Assess compatibility with self-consumption, electricity sales, and storage batteries.

• Common Oversights in Calculating Power Generation by Orientation

• Summary: Orientation-specific calculations should be determined by considering both power generation and usage.


Basic Principles to Master First for Direction-Based Calculations

The basics for calculating solar power generation are to estimate the generation over a given period by combining the photovoltaic capacity to be installed, the solar irradiance conditions at the installation site, the panels' azimuth and tilt angle, and various losses. In general, when panels of the same capacity are installed in the same region, the closer they face south the greater the annual generation tends to be, while orientation to the east or west tends to reduce generation somewhat. However, making a judgment based on this explanation alone is insufficient in practice, because the value of generation is not determined solely by the annual total; it also depends on when the power is generated, which electricity demand it can serve, the available installation area, and how shading occurs.


In regions located in the Northern Hemisphere, like Japan, the sun passes through the southern sky, so south-facing surfaces are more likely to receive solar radiation. Therefore, for the roofs of houses and commercial buildings and for ground-mounted power generation equipment, planning often focuses on a south-facing orientation when possible. On the other hand, sites have constraints such as building shape, roof orientation, site boundaries, adjacent buildings, mountains and trees, the layout of electrical equipment, and constructability. There are many cases where, rather than aligning everything to the ideal orientation, it is more important to consider how to combine the surfaces that can actually be used.


When calculating orientation-specific solar power generation, it is important not to treat the installation surface as a single unit but to consider separate orientations such as south-, southeast-, southwest-, east-, and west-facing surfaces. If a roof is divided into multiple planes or, for ground-mounted systems, rows face different directions, the insolation conditions will differ for each surface. Entering only the total capacity and calculating everything at once can easily overlook generation trends and impacts by orientation. In practice, it is safer to organize each surface's capacity, azimuth, tilt, shading conditions, and wiring system, and then sum them to verify the overall generation.


One point to watch is not to overly simplify differences in orientation. For example, rather than assuming east-facing is disadvantageous or west-facing is disadvantageous, east-facing generation can be useful for facilities with high morning demand. For facilities with heavier power use toward the evening, west-facing generation may better match self-consumption. Even south-facing systems will see a reduced annual generation outlook if they suffer significant afternoon shading. Conversely, combining east- and west-facing surfaces can broaden the hours of generation and smooth the peak. The purpose of orientation-specific calculations is not merely to compare differences against a south-facing system, but to create a generation plan that fits actual operations.


In estimating power generation, local solar irradiance, panel capacity, and loss coefficients are used to estimate annual or monthly generation. Adding corrections for orientation and tilt angle makes the calculation closer to reality. Losses include output reduction due to temperature rise, conversion losses from equipment such as power conditioners, wiring losses, soiling, degradation over time, shading, and site-specific conditions such as snow accumulation and salt damage. Even if you only correct for orientation, if you greatly overlook other loss factors the calculated results will diverge from actual performance. When making orientation-based judgments, both the aim of increasing generation and the need to avoid excessive expectations must be considered.


Evaluation Criterion 1: Consider not only annual power generation but also time-of-day generation trends

When calculating solar power generation by orientation, the primary criterion is to look not only at annual output but also at generation trends by time of day. South-facing panels tend to produce more during the central daytime hours and are often advantageous in terms of total annual output. Conversely, east-facing panels ramp up generation in the morning, while west-facing panels tend to continue generating into the afternoon and toward the evening. Southeast- and southwest-facing panels have intermediate characteristics. Therefore, even if south-facing looks better based solely on annual output differences, another orientation may be more effective when matched to actual electricity usage times.


A common oversight in practice is assuming that the proposal with the largest total annual generation is automatically the optimal one. If the system is designed mainly for selling electricity, the size of the annual generation is an important metric. However, when prioritizing self-consumption, it is important whether the generated power can be used on-site. For example, a facility that runs machinery or air conditioning from the morning may find east-facing generation better matched to its consumption. Conversely, a facility with long afternoon operating hours may find west-facing generation helpful in reducing surplus. In orientation-based generation calculations, it is necessary to separate the total value from the time-of-day value.


In designs that split panels east–west, instantaneous generation peaks may be suppressed compared with south-facing installations. This can appear disadvantageous when looking only at annual generation, but it can also be beneficial from an operational perspective. When generation peaks are flattened, a certain level of output tends to continue over a wide part of the daytime. For self-consumption systems, it can be more convenient to generate closer to the load for a longer period than to produce a large amount for a short time and create surplus. Of course, this depends on demand patterns, system capacity, and contract terms, so it is not advantageous at every site. The important thing is to check time-of-day generation by orientation and overlay it with the site’s power usage.


When checking by time of day, monthly differences must not be overlooked. Because solar altitude changes with the seasons, even the same east- or west-facing orientations will show different power output patterns in summer and winter. In summer, days are longer and conditions make it easier to receive sunlight in the mornings and evenings, but you also need to consider output reductions due to temperature increases. In winter, the sun is lower in the sky and shadows tend to have a greater impact, so shading from buildings, mountains, and nearby equipment is more likely to affect generation; even if the annual total seems only minimally affected, at sites where shadows extend long in winter mornings and evenings, orientation-specific power output can be lower than expected.


When using solar power generation calculations in practice, it's desirable to look not only at daily or monthly generation but, if possible, estimated generation by time of day. Especially for self-consumption systems and systems with battery storage, it's important to know whether generation is concentrated in the morning, midday, or evening. When checking calculation results in quotes or proposal documents, if only the annual generation is prominently displayed, it's safer to verify the breakdown. By understanding how capacity is allocated to south-facing, east-facing, and west-facing arrays and when each is expected to generate, it's easier to judge what the calculation results mean.


Criterion 2: Check azimuth and tilt angle together

The second criterion is to always check orientation and tilt angle together. Orientation shows which direction the panel faces, and the tilt angle indicates how steeply the panel is inclined. Because power generation varies with the combination of these two, looking only at orientation and judging “about this much because it’s east-facing” or “about this much because it’s south-facing” will not accurately reflect actual conditions. Even if panels face the same south, installations that are nearly horizontal and those set at the roof’s slope receive sunlight differently by season. Even for the same east-facing orientation, whether the tilt is shallow or steep changes how morning generation ramps up and how winter affects output.


For roof-mounted systems, panels are often placed to match the roof pitch, so the tilt angle may not be freely chosen. For ground-mounted systems, the tilt can sometimes be adjusted by the racking design, but factors such as wind loads, snow, constructability, land use, and row spacing also come into play. You should not choose the angle solely to maximize energy yield. Increasing the tilt can improve winter irradiation but may lengthen inter-row shadows and increase wind exposure. Lowering the tilt can help reduce shading effects in some cases, but it is necessary to check for poorer dirt runoff (soiling) and increased seasonal generation bias.


What requires particular attention in the combination of azimuth and tilt angle is east-west oriented roofs. On a gable roof split east-west, generation is distributed between the morning and the afternoon. In this case, although you are unlikely to see a high peak like that of a single south-facing surface, it can be easier to secure usable installation area. In generation calculations, it is important to treat the east and west surfaces separately and enter each surface’s capacity and tilt angle. If you treat both surfaces together as a single azimuth, you will not correctly capture the morning/evening generation trends and impacts. If estimates or design documents sum the east and west surfaces, you should check the calculation conditions for each surface.


On installations with a shallow tilt or on near-flat roofs, the effect of azimuth can sometimes appear relatively small. This is because on surfaces close to horizontal, panels tend to be less strongly dependent on a single orientation. However, this does not mean orientation can be ignored. Decisions must take into account conditions specific to low-tilt installations, such as surrounding parapets or upstands, guardrails, equipment, adjacent buildings, and shading between panels. In addition, a shallow tilt can make it easier for dirt to remain, which may become a factor in long-term reductions in energy generation. Simple irradiance calculations alone cannot fully reflect these operational differences, so it is important to verify ease of inspection and cleaning as well.


When comparing solar power generation by orientation in calculations, it is fundamental to record the azimuth and tilt for each installation surface and compare them under the same assumptions. If one option takes tilt into account while another is calculated using only a simplified azimuth correction, the fairness of the comparison is compromised. When comparing multiple options, you need to align and verify the solar irradiance data used in the calculations, loss rates, azimuths, tilt angles, installed capacity, and how shading is treated. Rather than looking only at the numerical results of the calculations, examining the conditions from which those numbers were derived improves the accuracy of your assessment.


Evaluation Criterion 3: Evaluate shadows, surrounding obstacles, and reflective conditions separately for each direction

The third criterion is to assess the effects of shadows and nearby obstructions separately for each orientation. In calculating photovoltaic power generation, not only the differences in solar radiation by orientation but also whether the panels actually receive sunlight have a major impact. Even a south-facing surface cannot be treated as ideally south-facing if conditions such as a neighboring house casting a shadow in the morning, trees casting longer shadows in the afternoon, or mountain shadows in winter occur. Conversely, east- or west-facing surfaces can be expected to deliver practical power output if there are few surrounding obstructions and they receive sunlight consistently.


An important point in shadow assessment is to consider the times of day and seasons when shadows occur separately. Whether shadows occur only in the morning, during the hours around midday when power generation is high, or in the evening when the low sun casts long shadows will change the impact on generation. Especially in winter, when solar altitude is lower, obstacles that were not a problem in summer can cast shadows. In calculations of annual generation, the proportion of winter generation in the total varies by region and installation conditions, but for systems that place importance on winter generation, shadows at low solar altitudes cannot be ignored. For orientation-specific calculations, it is practically useful to organize the times when shadows occur for the south-, east-, and west-facing surfaces.


On rooftop installations, roof ridges, chimneys, ventilation components, antennas, rooftop equipment, handrails, and adjacent upper-floor walls can cause shading. For ground-mounted systems, fences, utility poles, trees, slopes, adjacent equipment, and shadows cast between rows of panels are involved. These shadows do not merely darken part of a panel surface; they can affect the power output of the entire generation circuit. Because how shadows fall — and therefore the magnitude of their impact — varies with panel layout, wiring grouping, and equipment configuration, energy-yield calculations must not be satisfied with a vague statement like "there is some shading"; it is necessary to confirm on which surface, at what times of day, and over what extent the shading occurs.


Reflection conditions and the surrounding environment also affect orientation-specific assessments. In typical power generation calculations, it is common to approximate by considering direct and diffuse solar radiation, but in actual sites reflections from surrounding ground, roofing materials, walls, water surfaces, and snow can have an impact. However, care must be taken not to include an overly optimistic uplift from reflections in the calculations. Reflections are prone to change with weather, season, and local conditions, so they carry uncertainty if expected as stable generation. Especially for figures used in estimates and business planning, it is safer to create a realistic projection under normal conditions rather than heavily incorporating optimistic reflection effects.


When checking shading by direction, it is important to align the on-site survey records with the calculation conditions. Organizing photos, orientation, time of capture, locations of surrounding obstructions, roof surface dimensions, and the planned installation area makes it easier to verify the basis for power generation calculations. If you judge “there is little shading” based only on impressions observed on site, unexpected shading may occur when the seasons change. Conversely, overemphasizing short-duration shading can lead to excessively excluding areas that could be used for installation. When evaluating shading, it is important to distinguish whether it occurs during times that have a large impact on power generation, whether it repeats throughout the year, or whether it affects the entire circuit.


Criterion 4: Evaluate based on compatibility with self-consumption, electricity sales, and storage batteries

The fourth criterion is to evaluate orientation-specific generation in terms of compatibility with self-consumption, power sales, and battery storage. In solar power generation calculations, people tend to assume that the more electricity generated the better, but the optimal orientation allocation depends on the system’s purpose. For systems focused on power sales, maximizing annual generation becomes a major deciding factor. On the other hand, for systems focused on self-consumption, it is important whether the generation matches the consumption profile. When a storage battery is installed, you need to consider the generation peaks and how surpluses occur, the times when charging is possible, and the times when discharging takes place.


For facilities that prioritize self-consumption, it is essential to check when peaks in electricity usage occur. Facilities with high power usage around the lunch break may pair well with south-facing generation. Factories, retail stores, and offices that operate from the morning may be able to make effective use of east-facing generation. Facilities that still have power demand from the afternoon into the evening may find west-facing generation helpful in suppressing surplus. Of course, the shape of demand changes depending on building use, operating days, holidays, and seasonal variations. When evaluating generation by orientation, it is practical to look at the overlap with the demand curve rather than simply ranking orientations by total generation.


In systems that include power sales, total generation tends to have a strong impact on profitability, but time-of-day differences by orientation cannot be ignored. When there are power handling conditions or grid interconnection constraints, instantaneous output peaks can become problematic. Concentrating capacity facing south tends to produce daytime peaks, while splitting capacity east–west tends to disperse those peaks. Whether dispersing output is beneficial for the overall operation of the installation depends on contract terms, equipment capacities, control methods, and whether there is any load. Therefore, in orientation-specific calculations, it is desirable to check not only annual generation but also how the maximum output manifests and the timing of surplus occurrence.


When a storage battery is installed, the perspective of when to charge the generated electricity and when to use it is added. If a system faces south and generates a large amount during daytime, surplus tends to occur during the day and it can be easier to charge the battery. Combining east- and west-facing generation can change the times when charging starts and when charging continues. If the battery capacity is insufficient, a generation peak that is too large may not be fully chargable and surplus can occur. Conversely, when generation is dispersed, charging into the battery becomes smoother and it can be easier to use together with the load. Even here, rather than one option always being advantageous, it is important to decide based on the purpose of the equipment.


At business sites and factories, electricity consumption can vary significantly between weekdays and holidays. Even if the amount of generation available for self-consumption is large on weekdays, surpluses may increase on holidays. Even if you distribute generation time periods by orientation, it can be difficult to avoid surpluses when demand is low on holidays. Conversely, at facilities that operate year-round, distributing generation time periods can lead to improvements in the self-consumption rate. If you use solar power generation calculations for proposals and design, it is important to check the relationships among annual generation, monthly generation, generation by time of day, and electricity consumption, and to consider an orientation allocation that matches the purpose of the installation.


Common Oversights in Calculating Power Generation by Orientation

One common oversight in calculating solar generation by orientation is not accurately reflecting how the installed capacity is distributed. For example, a proposal that places more panels on the south-facing side and a proposal that spreads them across the east and west sides will yield different generation profiles even with the same total capacity. Nevertheless, if you compare them as if they were identical by looking only at total capacity, it’s easy to misinterpret the calculation results. You need to clarify how many panels of what capacity will be installed on each roof surface, what the total capacity per surface is, and how the wiring and circuits will be divided.


Another easily overlooked factor is monthly variation. Even if annual generation doesn’t show a large difference, certain seasons—such as winter, the rainy season, or summer—can exhibit noticeable differences. For self-consumption systems, seasonal electricity demand—high air-conditioning loads in summer and increased heating and lighting loads in winter—affects the value of generated power. When performing orientation-based calculations, checking monthly generation as well as the annual total makes it easier to understand mismatches with demand. In particular, because the sun’s altitude is low on winter mornings and evenings and shadow effects tend to be greater, it is necessary to check orientation differences together with the impact of shadows.


One point of caution is treating loss rates too uniformly. Temperature loss, conversion loss, wiring loss, soiling, shading, aging, and so on include components that are common to the entire installation and components that differ for each mounting surface. For example, if ventilation or temperature conditions differ between roof planes, the rate at which panel temperature rises can vary. Shading conditions can change significantly by surface. Some surfaces are more likely to retain dirt or fallen leaves. Applying the same loss rate to all orientations is convenient for quick calculations but may not adequately reflect site-specific differences. For projects that require detailed assessment, it is safer to separate the loss factors by surface.


Also, when comparing power generation by orientation, people sometimes confuse historical actual values with design values. When examining the performance of an existing installation, the generation figures include weather, failures, outages, soiling, inspections, curtailment, and measurement errors. The calculated values at the design stage are projections based on certain assumptions. If you compare these two directly without correcting for differences in conditions, you cannot make an accurate judgment. You need to separate whether the lower output is due to an east-facing orientation, shading, equipment downtime, or weather effects.


When reviewing estimates or proposal documents, confirm that orientation-specific assumptions are clearly stated. If only the total power generation is listed and it is unclear how many kilowatts are assumed to be installed on which faces, how the azimuth and tilt angles are set, or how much shading is anticipated, it becomes difficult to judge the validity of the calculation results. Even if the generation figures are written in detail, if the assumptions are ambiguous their practical reliability does not increase. In orientation-specific calculations, whether the assumptions match the site conditions is more important than numerical precision.


Summary: Determine orientation-specific calculations by considering both power generation and usage

When calculating solar power generation by orientation, it is important not to judge solely by whether a south-facing orientation is advantageous, but to consider the generation time of day, tilt angle, shading conditions, and how the system will be used together. South-facing is the basic orientation that tends to be advantageous for annual generation, but east- and west-facing orientations also have practical roles. For facilities with high morning demand, facilities with high afternoon power use, systems that aim to spread generation peaks, and systems that prioritize self-consumption or integration with batteries, closely examining orientation-specific generation patterns leads to more realistic planning.


As evaluation criteria, it is important to check not only the annual generation but also generation trends by time of day. Next, look at orientation and tilt angle together to correctly reflect the conditions of each installation surface. Furthermore, check shadows, surrounding obstacles, and reflection conditions separately for each orientation to capture site-specific differences that simple orientation correction alone cannot reveal. Finally, consider self-consumption, feed-in sales, and compatibility with batteries, and evaluate how the generated power will be used. By addressing these four points, you can turn the results of solar power generation calculations into actionable information for practical use.


In calculations for solar power generation, producing detailed numerical values for their own sake is not the goal. What matters is calculating based on assumptions that match the site conditions and applying those results to design, estimation, operation, and inspection. If you can correctly organize generation amounts by orientation, it helps determine which mounting surfaces to prioritize, how to allocate capacity, how to address shading, how to use batteries, and how to assess future declines in generation. For practitioners in particular, putting orientation-based calculation results into an explainable form makes it easier to improve the accuracy of internal reviews, client explanations, and maintenance management.


If you want to check generation by orientation in a way that more closely reflects on-site conditions, it is important to organize the conditions for each installation surface and link the projected generation to actual operational data. Don’t stop at the design calculations: establish a system to continuously monitor actual generation performance and signs of anomalies after commissioning, which makes it easier to detect decreases in generation or discrepancies with the calculations early. Checking the relationships between orientation, tilt, shading, and power consumption one by one and managing solar PV systems more practically is the basic approach to making generation calculations useful on site.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page