5 Checkpoints for Calculating Solar Power Generation by Time of Day
By LRTK Team (Lefixea Inc.)
Calculating solar power generation is straightforward if you look only at daily or monthly totals, but in practice you can make incorrect judgments if you do not check when the generation occurs. In particular, when managing self-consumption, battery storage, equipment inspection, investigating causes of generation decline, or matching generation to demand, it is important to check generation by time of day. Even if the total daytime generation is the same, the measures to be taken on site will differ depending on whether production is skewed toward the morning, concentrated around noon, or remains stable through the evening.
This article explains, for practitioners searching for "solar power generation calculation", five points to check when calculating solar power generation by time of day. It organizes not only simple formulas but also considerations of solar irradiance, system capacity, losses, demand data, and comparison with measured values, making it easy to use as material for pre-publication review or internal presentations.
Table of Contents
• Decide beforehand the purpose of calculating by time of day.
• Reflect changes in solar radiation and solar altitude for each time period
• Organize equipment capacity and loss conditions on an hourly basis
• Confirm overlap with power consumption
• Identify points for review based on the differences between measured and calculated values.
• Summary
Decide the purpose of calculating by time period first
When calculating solar power generation by time of day, the first thing to confirm is why you need time-of-day figures. When thinking about generation calculations, it's easy to imagine tasks like determining annual or monthly output, but the purpose of time-of-day calculations is slightly different. The aim of looking at generation by time of day is not only to grasp the total amount generated, but also to check the relationship between when power is generated and when electricity is used.
For example, when a building or factory consumes a lot of electricity during the daytime, the effectiveness of solar power cannot be judged by simple annual generation alone. Even with the same annual generation, if generation is concentrated in periods when demand is low, the amount of electricity that cannot be used on site may increase. Conversely, if generation overlaps with the operating hours of air conditioning, ventilation, refrigeration and freezing, pumps, and manufacturing equipment, it becomes easier to use solar power effectively. Thus, in time-of-day calculations, it is important not only to look at generation itself but also at the overlap between generation and demand.
If the objective is to create a power generation plan, assume representative clear days, cloudy days, and standard days for each season, and estimate hourly power generation. In this case, emphasis is placed on clearly organizing the trends of increase and decrease by time of day rather than on precise year‑round reproducibility. After capturing the basic pattern—generation ramps up in the morning, rises around midday, and falls in the evening—reflect differences due to season and installation conditions.
If the objective is to evaluate self-consumption, you need to consider not only the generation but also the electricity consumption during the same time periods. Even in hours with high solar power generation, surplus electricity is likely if on-site consumption is low. Conversely, even if generation is moderate, generated power can be more readily used on-site if there is stable demand during that period. Therefore, for time-of-day calculations aimed at self-consumption, it is essential to overlay and compare the generation curve and the demand curve.
If the objective is to determine the cause of decreased power generation, time-of-day calculations are useful for isolating anomalies. If generation is low only in the morning, factors such as east-side shading, fog, condensation, shifts in the measurement start time, or start-up conditions may be involved. If it is low only around midday, you need to check output control, equipment temperature rise, converter limitations, or the influence of set values. If it is low only in the evening, consider west-side shading, equipment layout, or the impact of surrounding structures. Differences that are easy to overlook when looking only at daily totals become easier to recognize when viewed by time of day.
Also, when considering pairing with a storage battery, generation calculations by time of day are important. A storage battery is a system that considers during which time periods generated electricity is stored and during which time periods it is used. Therefore, total daily generation alone makes it difficult to determine how much can be charged into the battery and how much can be used in the evening and later. By checking how much excess power there is during the daytime and whether there are periods in the morning and evening when shortages are likely, it becomes easier to concretely consider how to use the storage battery.
If you proceed with work while the purpose of time-of-day calculations is unclear, you may collect more detailed data than necessary or, conversely, lack information needed for decision-making. First, decide which of the following is the primary objective: estimating power generation, checking self-consumption, anomaly analysis, equipment planning, battery storage evaluation, or internal reporting. Then, by clarifying whether hourly resolution is sufficient, whether 30-minute intervals are needed, whether to separate by season, whether to look at representative days, or whether to compare with measured data, the calculation framework will be more consistent.
In practice, it is more important to decide on a granularity that suits the purpose than to aim for precise calculations from the start. For example, in an initial study a rough estimate at 1 hour intervals may be sufficient. On the other hand, when examining overlaps with demand or the impact on contracted power, it is easier to make judgments if you check using a time resolution that matches the electricity consumption data, such as 30 minute intervals. If the time resolution does not match, you may not be able to correctly assess the relationship between generation and demand, so before calculating generation you should confirm the time units of the data to be compared.
Calculating solar power generation by time of day is not just a simple subdivision. By breaking the total into time-based segments, you visualize generation peaks, troughs, temporal shifts, times when generation cannot be fully used, and times of generation shortfall. Therefore, the first point to confirm is to clarify the purpose of the calculation and decide on the time interval and the reference for comparison that suit that purpose. If this is organized, subsequent checks of irradiation conditions, equipment conditions, loss conditions, and demand data will also lead to consistent judgments.
Reflect changes in solar radiation and solar altitude by time of day
When calculating solar power generation by time of day, the fundamental factor is the variation in solar irradiance. Solar power generation is strongly affected by the amount of light received from the sun. Solar irradiance is not constant throughout the day: it is low in the morning, increases and peaks around midday, and decreases again in the evening. For that reason, simply dividing the daily generation by the number of hours can deviate from the actual generation pattern. When calculating by time period, it is necessary to reflect which time period the peak in irradiance occurs.
On clear days, the power generation curve generally takes on a roughly mountain-shaped (bell-shaped) profile. In the morning, generation starts low because the sun’s elevation is low. As the sun rises, generation increases and becomes largest around noon. In the afternoon, as the sun’s elevation falls, generation gradually decreases. However, in practice it is often not perfectly symmetrical due to installation orientation, panel tilt, surrounding shading, temperature, cloud movement, and other factors. Installations oriented toward the east tend to have generation skewed to the morning, while those oriented toward the west tend to produce more in the afternoon.
Roofs and mounts that face close to south tend to show a peak in power generation around midday. However, because the solar elevation changes with the seasons, the hourly power output for the same system varies between summer and winter. In summer, sunrise is earlier and sunset is later, so the generation period tends to be longer, but there are also time periods when output is likely to drop due to rising temperatures. In winter, daylight hours are shorter and the solar elevation is lower, so the window for power generation tends to be narrower. In snowy or cold regions, the effects of snow and reflected light also need to be considered, but for general calculations it is fundamental to first account for seasonal differences in solar irradiance and solar elevation.
When estimating power generation by time of day, consider generation as the combination of "installed capacity", "solar irradiance conditions for that time period", and "loss coefficients". Even with the same installed capacity, generation will not be the same in the morning and at midday because irradiance differs. For example, even if the total daily generation is known, you should not distribute it evenly; instead, allocate smaller shares to morning and evening and larger shares to late morning and early afternoon. More practically, use data that closely matches regional, seasonal, and hourly irradiance to stack up generation for each hour.
However, when using solar irradiance data, it is important to confirm which surface the irradiance refers to. The irradiance on a horizontal plane is not the same as the irradiance actually incident on the panel surface. Solar panels are often installed at an incline, and the amount of light they receive varies with azimuth and tilt. Using horizontal-plane irradiance as-is can fail to adequately reflect the expected power generation on the installation surface. While preliminary studies may use horizontal-plane irradiance for rough estimates, for practical decision-making it is necessary to apply corrections to approximate the conditions of the installation surface.
Variations caused by clouds cannot be ignored in time-of-day calculations. Calculations that assume clear skies produce a smooth power generation curve, but actual power output can rise and fall rapidly as clouds pass. When viewed on a 1-hour basis, those fluctuations may average out, but when viewed in 30-minute intervals or shorter, the ups and downs in generation can become noticeable. Therefore, when comparing time-of-day calculation results with measured values, it is necessary to confirm whether the day was clear, slightly overcast, or intermittently cloudy.
Shading effects are also important in time-of-day calculations. Shadows do not fall in the same place throughout the day. In the morning, obstacles on the east side cast shadows; in the evening, obstacles on the west side do; and depending on the season, buildings or trees to the south or inter-row shading from the equipment itself can have an impact. If you only look at the daily total energy generation, the effect of shading can appear diluted across the whole. However, when viewed by time of day, it appears as a drop in generation at specific times, making it easier to determine whether shading is present. In particular, if generation in the morning and evening is lower than expected, it is necessary to distinguish whether this is due to simply less solar irradiance or a decrease caused by shading.
When the solar altitude is low, the baseline power generation is small, so even a small shadow or dirt can appear as a large percentage drop. Therefore, it is premature to judge all morning and evening declines as abnormal. Morning and evening are times when the solar incidence angle is shallow and the light reaching the panel surface tends to be weak.
Conversely, if power generation drops significantly around midday, it may be difficult to explain by irradiation conditions alone, and you need to check clouds, output curtailment, equipment condition, wiring, temperature, and unusual shading patterns.
In time-of-day power generation calculations, it is important not to treat solar irradiance conditions as mere average values but to view them as changes at each time. Combining the morning ramp-up, the peak around noon, the afternoon decline, seasonal changes in the time window, morning/afternoon bias due to orientation, and reductions in certain periods caused by shading brings calculation results closer to the on-site reality. If changes in solar irradiance and solar altitude can be reflected, time-of-day generation becomes information that is useful for operational decision-making rather than a mere rough estimate.
Organize equipment capacity and loss conditions by time unit
When calculating solar power generation by time of day, you need to consider not only the solar irradiance conditions but also equipment-side conditions. Generation is not determined solely by the capacity of the solar panels. Many factors are involved: the panels' rated capacity, the capacity of conversion equipment, the condition of the wiring, temperature, dirt, shading, tilt angle, performance degradation over time, downtime, and so on. When calculating on a time-of-day basis, it is important to check whether these losses are constant throughout the day or biased toward specific time periods.
As a basic concept, time-of-day generation is calculated by multiplying the installed capacity by a factor corresponding to the solar irradiance intensity for that time period and then subtracting losses. What should be noted here is that treating losses as a uniform percentage may not fully explain the behavior. In preliminary assessments, soiling, wiring, conversion, temperature, and other factors are sometimes lumped together into a single loss coefficient. While this method is simple and easy to understand, it can be insufficient for analyzing the characteristics of generation decline for each time period.
Output loss due to temperature is a factor to be especially aware of in time-of-day calculations. Solar panels tend to generate more power when irradiance is strong, but their output tends to drop as panel temperature rises. For that reason, around midday on sunny days, generation may not increase as much as expected despite high irradiance because of temperature effects. If the midday peak is overestimated in generation calculations, the difference compared with measured values can appear large. Especially around midday in summer, irradiance increases and temperature-induced decreases occur simultaneously, so it is necessary to consider temperature conditions in addition to simple irradiance proportionality.
The capacity and limits of the conversion device also affect generation by time of day. In configurations where the converter’s capacity is smaller than the panel capacity, output can hit a ceiling during periods of strong solar irradiance. If this is overlooked, a discrepancy can occur where calculations predict additional generation around midday, but measured values do not rise above a certain level. Such capping can be hard to detect from daily totals, but when viewed in time-of-day graphs or figures it may appear as a flat shape around midday. When calculating by time of day, it is important to confirm the relationship between the panel-side capacity and the converter-side capacity of the system.
Performance degradation due to soiling or aging might at first glance be treated as a constant loss regardless of the time of day, but in reality the appearance can change when combined with the solar incidence angle and the way shadows fall. Soiling on the panel surface affects all times of day, but during periods when light enters at an oblique angle in the morning and evening, the effects of shadows and soiling can appear relatively larger. Also, if soiling or anomalies are present only on some circuits or strings, they do not necessarily manifest as a uniform reduction in overall power generation. When comparing measured and calculated values by time of day, check for biases that cannot be explained by a simple uniform loss.
Downtime and curtailment time are also major items to check in time-of-day calculations. If there were periods when part of the equipment was offline, periods when it was stopped for inspections, periods when measurement values were missing due to communication failures, or periods when output was reduced by protection actions, generation during those periods will be lower than the calculated value. Looking only at the daily total leaves the impression that “today was low,” but when viewed by time period you can see at what times the drop occurred. When comparing calculated and measured values, first check for data gaps and downtime history, and evaluate only the periods when the system was actually able to generate power.
Also, when calculating by time period, attention must be paid to how the aggregation unit is handled. Whether the value is a 1-hour value, a 30-minute value, or an instantaneous value changes the meaning of the observed generated energy. Instantaneous output indicates the output at that moment, whereas generated energy is the amount of electricity produced over a given period of time. For example, even if the output at a certain moment is high, if that condition lasts only briefly the energy generated in that time period will not be large. In practice, it is important to organize not only peak output but also energy expressed over a duration.
When calculating by time periods, be careful not to confuse units. Installed capacity is generally expressed in kW, and generated energy is expressed in kWh. If the average output over one hour is 1 kW, the energy produced in that hour is 1 kWh. However, when looking at 30-minute intervals, even if the average output is 1 kW, the energy produced in those 30 minutes is 0.5 kWh. If you perform calculations without checking these basic unit differences, you may make errors that cause the calculated generation to be twice or half the actual amount. In time-period calculations, it is essential to clearly distinguish between output (power) and energy.
Furthermore, when calculating multiple installations together, you need to consider the orientation and tilt of each installation separately. Even within the same site, if south-facing, east-facing, and west-facing surfaces coexist, the timing of the peaks in power generation will differ. If these are simply calculated as a single installation, the time-of-day power output may not match the actual situation. Especially for buildings with multiple roof planes or systems that have been expanded in stages, separating generation patterns by installation section and then summing them makes it easier to explain the calculation results.
Organizing equipment capacity and loss conditions on an hourly basis is important not only for improving calculation accuracy but also for explaining differences from measured values. Even when solar irradiance is the same, power generation varies depending on equipment-side conditions. Clarifying which losses are treated uniformly, which losses are considered by time of day, and whether equipment should be separated into categories makes generation calculations more practical and easier to use in actual operations.
Check for overlap with power consumption
One of the main purposes of calculating solar power generation by time of day is to check how it overlaps with electricity consumption. Even if generation is high, if electricity is not being used on-site at that time, you need to consider alternative ways to utilize the generated power. Conversely, even if generation is not very large, if it coincides with a period of stable usage, it becomes easier to use on-site. Therefore, in time-of-day calculations, it is important not to look at generation alone but to check it together with demand data.
When comparing electricity consumption, first align the time units. If generation is measured in 1-hour intervals and consumption in 30-minute intervals, comparing them as-is will produce discrepancies. In practice, consumption data is often managed in 30-minute intervals, so matching generation to the same intervals makes it easier to view. Aligning the time periods lets you organize times when generation exceeds demand, times when demand exceeds generation, and times when generation and demand are close.
Facilities with high daytime electricity consumption can be well suited to solar power generation. For example, in buildings where air conditioning and mechanical equipment operate during the day, periods of increased generation and increased electricity usage tend to overlap. However, this is not true for all facilities. In facilities where equipment stops during lunch breaks, does not operate on holidays, or whose electricity usage varies significantly by season, the overlap between generation and demand changes. Therefore, it is important to separate and check typical patterns such as weekdays, holidays, peak periods, off-peak periods, summer, and winter.
When viewed by time of day, there may be periods when solar power generation exceeds demand. During these periods it may be impossible to use all the generated electricity on site, so it is necessary to clarify how it will be used. Responses vary depending on site policy, such as charging batteries, diverting power to equipment whose operating hours can be adjusted, increasing loads that run during the daytime, or checking conditions to curtail generation. However, what is important here is to assess the potential surplus not as a daily total but by how much occurs in each time period.
On the other hand, mornings and evenings tend to be periods when electricity consumption is high but generation is low. Solar power generation cannot produce electricity at night, and sunlight is weak in the morning and evening, so it can be difficult for it to cover all demand. When calculated by time of day, the periods when solar power performs well and when it performs poorly become clear. This allows the range in which solar power can be relied upon to be separated from the range where other measures are needed.
When assessing the overlap between power generation and electricity consumption, it is important not to judge by the maximum value alone. Even if generation is high at a single moment during the day, if it does not coincide with demand immediately before and after that moment, its utilization efficiency may not be as high as expected. Conversely, even if the generation peak is not very large, if it overlaps with demand steadily over a wide time period, it can be easier to manage in practice. In time-of-day calculations, it is important to look not only at the size of the peak but also at how many hours it overlaps with demand.
Demand data may include temporary fluctuations. If you base calculations on a day with an equipment outage, special work, operation on a holiday, or an unusually high temperature—conditions that differ from normal—your judgment of the calculation results can be biased. When comparing time-of-day calculations of solar power generation with demand, it is preferable to choose representative days or check averages over multiple days or typical patterns. Especially when making annual forecasts, you should look at seasonal trends rather than a single day.
When evaluating on-site self-consumption, separate the portion of generated power that can be used on-site from the portion that may not be fully consumed. During periods when generation is less than or equal to electricity consumption, the generated portion is generally considered easy to use on-site. During periods when generation exceeds consumption, consider how to handle the excess portion. However, in practice the treatment can vary depending on equipment control, load fluctuations, the location of measurement points, contract terms, and operating rules; therefore, rather than making a final decision based solely on a simple comparison, it is necessary to verify this in conjunction with the site’s electrical system and operational conditions.
Be careful about differences in measurement points. If the locations where generation and consumption are measured are not aligned, comparisons between generation and demand may be incorrect. Confirm whether the measured consumption is for the entire building, for specific equipment, at the service entrance, or on the distribution board. Overlaying data with different measurement scopes as-is can lead to overestimation or underestimation of the effect of generation.
Time-of-day power generation calculations are not merely an exercise in plotting generation peaks. By examining the relationship with electricity consumption, they provide the basis for judging how much of the generated power can be utilized, which time periods will experience shortages or surpluses, and where there is room for operational improvement. To make calculations of solar power generation useful in practice, it is essential to compare the generation side and the demand side on the same time axis.
Identifying points for revision from discrepancies between measured and calculated values
When you calculate solar power generation by time of day, compare it with the measured values if possible. Calculated values are estimates based on assumed conditions, while measured values are the actual results of the equipment, weather, and operation. Comparing the two lets you confirm whether the calculation assumptions are reasonable, whether there are any equipment abnormalities, and whether the impacts of solar irradiance and shading are being appropriately accounted for. In particular, comparing by time of day reveals patterns of discrepancy that are hard to see from the daily total.
When comparing calculated values and measured values, first check the weather conditions. If the calculations assume clear skies but the measurement day was cloudy, it is natural for the measured values to be lower. Conversely, if the calculations assume average conditions but the measurement day had very strong sunlight, the measured values may be higher. Therefore, do not immediately conclude an equipment malfunction just because there is a discrepancy; you should confirm whether the underlying assumptions are aligned.
Next, examine which time periods the discrepancy appears. If measured values are low only in the morning, consider eastern shadows, fog, condensation, start-up conditions, or an offset in the start of measurement. If they are low only around midday, check for temperature rise, output saturation, limitations of power conversion equipment, protection operations, sudden changes in solar irradiance, or partial shutdowns of equipment. If they are low only in the evening, check for western shadows, nearby structures, mountains or trees, or incorrect assumptions about orientation. If they are low all day, review more broadly for soiling, age-related performance changes, incorrect equipment capacity inputs, differences in measurement range, shutdown history, wiring or circuit problems, etc.
In comparing calculated values and measured values, it is important to look not only at simple differences but also at differences in shape. If the calculated and measured values have similar peak shapes but the measured values are consistently lower by a fixed proportion overall, the loss coefficient or equipment capacity settings may be incorrect. If the peak of the measured values is shifted toward the morning side, the orientation conditions may differ from assumptions or there may be shading or restrictions on the afternoon side. If the measured peak is flat-topped, check the capacity or restrictions on the conversion equipment side. If there are sudden drops in places, check for temporary factors such as clouds, shading, stoppages, or measurement gaps.
Checking data quality is also essential. When dealing with generation by time period, if the measured data contain missing values, duplicates, time shifts, or unit mismatches, comparisons with calculated values cannot be performed correctly. For example, whether the measurement timestamp indicates the start or the end of each time period affects how you align it with demand data and solar irradiance data. Also, mistakenly treating output values as energy generation can cause large discrepancies in the comparison results. Before using measured values, verify the data’s units, aggregation interval, time notation, and whether there are any missing values.
Input errors in calculation parameters are also a common point to check. If there are errors in the order of magnitude of equipment capacity, the azimuth of the generation surface, tilt angle, loss coefficients, the target period, time of day, regional conditions, etc., the calculated values will not match reality. In particular, when aggregating multiple installations or dealing with equipment after expansion, verify whether calculations are still using old capacity figures, whether some equipment has been included twice, or conversely, whether some have been excluded. For time-of-day calculations, because azimuth and tilt inputs affect the shape of the generation curve, it is important to cross-check against site drawings, photographs, and the asset register.
When checking the difference from measured values, it is important not to draw conclusions based on a single day. Even if a difference appears on a given day, it can be difficult to determine whether it is a temporary effect due to weather or a persistent issue caused by equipment conditions unless you examine multiple days. If you compare several clear-sky days and the same kind of difference repeatedly occurs at the same times of day, you are more likely to suspect persistent factors such as shading, equipment conditions, settings, soiling, or performance changes due to aging. On the other hand, if the way the difference appears varies greatly from day to day, highly variable factors such as clouds or operational conditions may have a large influence.
Also, combining this with on-site inspections makes time-of-day differences more useful. For example, if there is a tendency for generation to be low only around 9 a.m., check where shadows fall on site at that time. If output plateaus at midday, check the inverter output status, settings, and their relation to system capacity. If there is a sudden drop in the evening, check for western obstructions, mountain shadows, or building shadows. Rather than determining the cause from numbers alone, it is practical to use time-of-day differences as clues to prioritize on-site checks.
To make calculation results easier to use for operational decision-making, organize the peaks and troughs of generation by time period, seasonal differences, periods when generation exceeds demand, and periods when generation falls short of demand. When using this for internal briefings, clearly state the capacity of the equipment in question, installation orientation, installation tilt angle, target season, time resolution, assumptions about losses, and the scope of the demand data used so that stakeholders can discuss matters under the same premises. If you present only the generation figures while the conditions remain ambiguous, it will prompt questions later such as "Which season do these numbers refer to?", "Are they based on clear-sky assumptions or averages?", and "Which building's demand data was used?", making it difficult to advance decision-making.
Time-of-day calculation results can also be used for inspection planning. By comparing measured values with calculated values, if you can detect patterns—such as being low only in the morning, only in the afternoon, plateauing only around noon, or dropping sharply on specific days—you can narrow down the time windows for on-site checks. For checking shadows, it is important to inspect the site during the time period when the problem occurs. If an anomaly appears at noon, checking only in the morning may not reveal the cause. Time-of-day calculations therefore provide clues to carry out inspections more efficiently.
Considering operations that update calculation results improves the accuracy of power generation management. Use general conditions for the initial calculations, and after operations begin, reflect measured values and revise the conditions so it becomes easier to establish baseline values suited to the site. For example, by using the actual generation curve on a clear day as a reference and creating standard generation patterns for each season, it becomes easier to detect future generation declines or anomalies. Rather than creating calculation values once and finishing, the approach of comparing them with actual performance and making adjustments is effective in practice.
When using time-of-day calculations, it is also important not to demand excessively fine accuracy. Solar power generation is affected by the weather, so it is not common for calculated values and measured values to match exactly. What matters is not reducing error to zero but grasping trends well enough to inform decisions. If you can identify and organize the morning and evening dips, the daytime peak, seasonal differences, overlaps with demand, times when surplus is likely, and periods when anomalies may be suspected, you can use them as practical inputs for operational decision-making.
Comparing measured and calculated values is not just a check on whether the calculations are correct, but a process for finding points to improve. It involves sorting out whether loss coefficients should be revised, shading conditions added, equipment capacity inputs corrected, the way demand data is overlaid changed, or inspections are needed. Viewing the data by time of day makes it easier to narrow down candidate causes and clarifies what to check next.
Summary
Calculating solar power generation by time of day helps organize practical issues that are hard to see from annual or monthly generation figures alone. Even if the total generation is the same, whether it is higher in the morning, concentrated at midday, or extends into the evening changes how equipment is used and how well it matches demand. Viewing generation by time of day makes it easier to check overlaps between generation and electricity consumption, times when surpluses are likely, times when shortages are likely, and periods when generation is declining.
The first checkpoint is to clarify the purpose of the calculation. When estimating power generation, evaluating self-consumption, assessing battery storage, conducting anomaly analysis, or preparing internal reports, the required time window and comparison targets differ. If you start calculating without a clear purpose, you may lack necessary data or, conversely, end up organizing things too finely. First, decide what you are trying to assess with the time-of-day calculations.
The second is to reflect changes in solar irradiance and solar altitude. Solar power generation typically increases from morning to midday, peaks around noon, and falls in the evening. However, that pattern changes depending on the season, orientation, tilt, clouds, and shading. Rather than simply distributing a day's generation evenly, taking into account the solar irradiance conditions for each time period yields a calculation closer to the actual on-site generation.
The third is to organize equipment capacity and loss conditions. Equipment capacity, the capacity of power conversion equipment, temperature, soiling, shading, wiring, downtime, measurement range, and so on affect power generation by time of day. In particular, a midday plateau, reductions in the morning and evening, and drops at specific times can be related to equipment-side conditions. To compare calculated and measured values, it is necessary to clearly state which losses were accounted for and how.
Fourth, verify the overlap with electricity consumption. Time-of-day generation only becomes practically meaningful when combined with demand data. If demand is low during periods of high generation, surpluses are likely, whereas even moderate generation can be readily used if it coincides with demand. It is important to align the time units and assess how much of the generation can be utilized while examining demand patterns on weekdays, holidays, and by season.
The fifth point is to look for items to review from the difference between measured values and calculated values. If a discrepancy exists, sequentially check weather, solar radiation, shading, temperature, equipment capacity, output capping, shutdown history, missing measurement data, and errors in input conditions. Comparing by time of day makes patterns easier to see—low only in the morning, low only at midday, low only in the afternoon, or low throughout the day—and helps narrow down candidate causes.
Time-of-day calculations of solar PV generation are not intended to produce precise numbers for their own sake. The purpose is to organize the times when power is generated, times when it is used, times when there is a surplus, times when there is a shortfall, and times when anomalies are suspected, and to inform on-site decision-making. Rough estimates are acceptable for initial studies, but when used in practice it is important to progressively cross-check solar irradiance, system conditions, losses, demand data, and measured values, and to adjust the assessment to suit the site.
If you can understand power generation by time of day, it becomes easier to consider introducing solar power generation, improve the operation of existing equipment, identify causes of generation decline, and evaluate batteries and self-consumption. By visualizing not only total generation but also changes over time, it becomes easier to explain to stakeholders and to set priorities for countermeasures. Taking site-specific conditions into account, it is important to link the calculation results to the cycle of planning, operation, inspection, and improvement.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.