top of page

How to Choose Surveying Instruments: 7 Key Points | Application-specific Decision Criteria to Avoid Mistakes

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Table of Contents

• Why Failures Occur When Choosing Surveying Equipment

• Point 1: Make clear at the outset what you are measuring

• Point 2: Determine the required accuracy by working backward from the task objective

• Point 3 Choose a method suitable for the on-site environment

• Point 4 Decide based on the number of personnel and the operational structure

• Point 5 Choose based on the flow of recorded data and deliverables

• Point 6 Check the ease of ongoing operation

• Point 7 Choose with future business expansion in mind

• Considerations for Surveying Instruments by Application

• Summary


Reasons Why Failures Occur When Choosing Surveying Equipment

When selecting surveying equipment, many practitioners initially worry about which device is high-performance, which system is the latest, or whether their company can actually make full use of it on site. However, causes of regret after implementation often stem less from the merits of the equipment itself than from insufficient clarification of assumptions during the selection process.


The term "surveying equipment" covers a very wide range of devices, including instruments for determining position, instruments for checking elevation, instruments for measuring distance and angles, and instruments for capturing terrain and structures in three dimensions. Therefore, even when the consultation is the same—"we want to introduce surveying equipment"—the actual role required can be completely different. On sites where boundary verification is the main objective versus sites where setting out for construction is the main objective, the necessary functions and operational methods change significantly. Whether you want to streamline as-built management, quickly obtain current-condition information over a wide area, or perform precise position checks in confined spaces will also change the appropriate selection criteria.


A typical example of failure is choosing equipment based on its classification rather than its intended use. For example, if you proceed with only a rough understanding—outdoor use means location-based equipment is better, measuring distance means optical equipment is better—you will not obtain the desired results in the actual field. This is because surveying is not simply the task of collecting numbers; it is an operation that depends on surrounding environmental conditions, working hours, the required accuracy, how the results will be used, and the proficiency of the field personnel.


On-site dissatisfaction tends to arise more from increased hassle than from an inability to take measurements. Even if measurements themselves are possible, if preparation takes time, installation flexibility is limited, there is a lot of rework in data organization, or results vary depending on the person in charge, the effectiveness of adoption quickly diminishes. In other words, when choosing surveying equipment, it is important not only to look at the numbers on the specification sheet but also to determine whether it is truly easy to use within the workflow on site.


The seven points explained below are not merely superficial criteria for comparing equipment. They are the criteria for judging whether the equipment can be used continuously without undue difficulty in actual operations and whether its introduction will lead to operational improvements. If you want to avoid failure with surveying equipment, the starting point is to organize your company's operations and site conditions before looking at the equipment itself.


Point 1: Clarify what you are measuring first

The first step in choosing surveying equipment is to clearly define what you will be measuring. It may seem obvious, but if you begin selecting equipment while this is still unclear, you may end up choosing devices that are more advanced than necessary or, conversely, equipment that proves insufficient on site.


For example, whether you want a rough understanding of ground and terrain conditions, to verify the positions and elevations of structures with high reproducibility, or to carry out staking out and positioning efficiently during construction, the measurement targets you need differ. It is easy to overlook this when you lump everything together under the single word "surveying", but in practice the work of accurately locking down points and the work of capturing surfaces or overall shapes are clearly separated. If you bring only instruments that excel at acquiring wide-area shapes to a site where you need to determine point positions quickly, everyday operations will remain inconvenient. Conversely, at sites where surface records and as-built preservation are important, deploying only instruments specialized in point-by-point observations will make it take longer to grasp the whole picture.


Furthermore, even when measuring the same target, the required conditions change depending on the purpose. For example, on roadworks or land development sites, position management in accordance with construction standards can be important. On the other hand, for equipment replacement or maintenance management, recording the locations of existing objects and comparing before-and-after renovation conditions may be emphasized. For records of cultural properties or conservation subjects, prioritizing documentation that does not compromise the current state may be necessary. In this way, even if the task is "measuring position," the functions to be emphasized differ according to the business purpose.


The important point here is not to choose based on the name of the surveying equipment. What you should consider first is which targets you will handle, at what level of granularity, and with what frequency. The optimal choice changes depending on whether you have many one-off checks, will use it repeatedly for daily construction management, will use it while moving around a large site, or will operate it in a near-fixed setup within a narrow work area.


As a practical way to organize measurements for field work, it is effective to first consider the object to be measured as a "point," "line," "surface," or "shape." Then, by clarifying whether the final deliverable you want is coordinate values, cross-section checks, as-built records, or three-dimensional data, the required functions will become clear. If this is sorted out, you will be less likely to waver when narrowing down candidate instruments.


Surveying equipment is not universal. That’s why clearly defining what you will measure at the outset is the foundation for a choice that won’t fail. The clearer the intended use, the simpler the selection process and the higher the on-site suitability after deployment.


Point 2 Work backwards from the task objective to determine the required accuracy

One common misconception when choosing surveying equipment is the belief that the higher the accuracy, the better. Of course, accuracy is important, but demanding more precision than necessary can complicate equipment operation and increase the time spent on setup and checks, making the overall fieldwork inefficient. What matters is not how high the accuracy is, but whether it meets the accuracy required for the task.


For example, when positioning for construction work, there are situations where the allowable tolerance for error is relatively strict. Conversely, during field surveys or preliminary inspections, being able to quickly grasp the relative positions of objects on site can be more important. When capturing the current conditions over a wide area, being able to produce consistent records in a short time is sometimes prioritized over fine-detail accuracy. In this way, even on the same site, the required level of accuracy varies depending on the task.


What you should be careful about here is not to judge solely by the accuracy listed in the catalog. Practical accuracy is influenced by various factors such as the observation environment, installation conditions, ensuring a clear line of sight, whether corrections are applied, and the operator’s adherence to procedures. Even equipment that appears highly accurate based on the numbers alone may fail to produce stable results if the field conditions are not suitable. Conversely, choosing a method that fits the site conditions makes it easier to consistently secure the required quality.


Moreover, accuracy should be considered not only in terms of absolute values but also in terms of whether the same results can be produced repeatedly. For operational staff, what matters is not obtaining a good value once, but getting reproducible results regardless of who uses the equipment. Instruments with large operator-dependent variability increase the burden of verification and remeasurement and, as a result, put pressure on the process.


To work backwards to determine the required accuracy, it is important to first clarify the intended use of the deliverable. Whether the data will be used to cross-check against designs, to guide construction, or for reporting and record-keeping will change how allowable errors are considered. Next, assess whether that level of accuracy can be realistically maintained under field conditions. Equipment that can perform only under ideal conditions may become difficult to use in day-to-day operations.


When choosing surveying equipment, it is important not to overestimate the required accuracy. Excessive performance may seem reassuring, but on site it can manifest as longer preparation times, more checks, and a higher training burden. Can the required quality be ensured through practical, manageable operations? Viewing it from this perspective makes it easier to find surveying equipment that fits actual work.


Point 3 Choose a method that suits the on-site environment

No matter how high-performing a surveying instrument is, if it is not suited to the site conditions its usability will be greatly reduced. Therefore, when selecting one, it is essential to concretely consider not only the object you want to measure but also the specific type of location where it will be used.


The most suitable approach differs between open outdoor sites and areas around buildings or places with large elevation differences. In locations where the sky is largely visible, it is easier to make use of positioning information, whereas in places where the sky is obstructed it can become unstable. Conversely, approaches that assume a clear line of sight can be difficult to use in places with many obstacles or at sites with heavy pedestrian and vehicle traffic. In other words, every approach has environments in which it excels and environments in which it struggles.


In the field environment, the aspects you should pay particular attention to are the openness of the sky, the ease of obtaining line of sight, the stability of the ground and working platforms, the space available to set up equipment, the safety of the surroundings, and the distance to be traveled. For example, at sites with a wide range of movement such as large development sites or farmland, approaches that allow you to progress while quickly acquiring positions are suitable. On the other hand, at sites where structures are densely clustered or site boundaries are complex, operations suited to precise position verification are required. In mountainous areas or locations near forests, obstructions and communication conditions cannot be ignored.


Usability also varies with the season and time of day. In scorching sunlight, shortening work time becomes critical, while after rain, ease of setup and the portability of equipment matter in muddy conditions. On jobs where multiple locations must be visited in a short time, not only measurement accuracy but also quick startup and easy pack-up are major factors in decision-making.


If you misjudge the on-site environment, equipment that should be suitable in theory can become inconvenient to use in practice each time. The accumulation of issues—each installation taking time, needing to find a stable position, and having many checks before measuring—places a heavy burden on on-site personnel. As a result, equipment that is usable can end up being equipment people do not want to use.


When selecting equipment, it is important to prioritize the operational image on site over the device’s standalone capabilities. If you can envision where you will stand, in what order you will take measurements, how long it will take to move between points, and under what conditions rechecks will be necessary, the suitability of different methods will become clear. Choosing a method that fits the site not only improves measurement quality but also reduces the burden on operators and helps stabilize daily operations.


Point 4: Make decisions based on workforce size and operational structure

When selecting surveying equipment, people tend to focus on the instrument's performance and measurement method, but what determines practical adoption is who will operate it, how many people will be involved, and how they will operate it. Equipment chosen on the assumption that the site has sufficient personnel often proves ill-suited to small-team operation in practice, and as a result its utilization rate frequently declines.


For example, equipment designed to be used by multiple people with divided roles can deliver high efficiency when operated by a team. However, in small on-site crews or organizations with many staff holding multiple responsibilities, the preparation and coordination themselves can become a burden. Conversely, equipment that a single person can easily handle has the advantage of being more nimble on site and makes checks and re-measurements easier to carry out on the spot.


The important thing here is to consider your company’s standard operating structure as the baseline. Rather than an ideal arrangement, you should make decisions based on how many personnel you can typically secure on site, whether there is a dedicated surveyor, whether construction staff will handle the work concurrently, and whether you can allow sufficient time for training. If equipment operators rotate between sites, equipment that is less prone to operator dependence is more suitable. Equipment that only a few experienced personnel can operate may be fine in the short term, but it carries the risk that operations will stop when those personnel are absent.


Moreover, ease of operation is not simply about whether the screen is easy to read. Whether the initial setup is difficult, whether the measurement procedures are intuitive, whether the items to be checked are clear, and whether there is any ambiguity in interpreting measurement results are all factors that affect usability in the field. In particular, in busy workplaces, a device can fall out of use if its operation is even slightly complicated. No matter how high its performance, if you have to consult the manual every time, it will not become established in daily work.


Furthermore, when evaluating the operational setup, it is important to consider not only the period immediately after deployment but also the situation several months later. Even if a tool is used with initial interest, if there are issues such as difficult configuration, numerous procedures, or time-consuming result organization, its usage will gradually decline. When selecting equipment, you should prioritize whether it will be used continuously over its initial impact.


Surveying equipment only creates value when it is used on-site. For that reason, it is important to choose based on operational aspects such as the number of personnel, division of roles, training burden, and the degree to which operations are susceptible to dependence on specific individuals. If you select equipment that fits your company's realistic setup, the benefits of implementation are more likely to be stable and it will lead to improvements on-site.


Point 5: Choose Based on the Flow of Recorded Data and Deliverables

When choosing surveying equipment, if you decide based only on whether it can take measurements, you may encounter unexpected hassles after implementation. In practice, obtaining values and positions on site, organizing that data, and how it is used as deliverables are all part of a single workflow. Therefore, it is extremely important to select equipment with an awareness of the flow from recorded data to final deliverables.


For example, there are tasks for which being able to check measurement results on the spot is sufficient, and others that require creating drawings and organizing reports after returning to the office. In construction management, the speed of on-site decision-making is emphasized, whereas in maintenance and asset recording it is necessary to retain information in a form that is easy to reference later. When three-dimensional use is anticipated, not only point data but also the ease of handling surface information and shape data becomes important.


A common problem in such cases is that something that worked on site becomes difficult to organize afterward. For example, if the acquired data format does not fit in-house operations, if there is a lot of conversion work, if only the person in charge knows how to handle it, or if it is hard to hand it over to another process, then even if measurements are made more efficient, it will not lead to overall optimization. The effectiveness of introducing surveying equipment should be judged not only by observation time but by the total time from recording through sharing.


Also, the level of the deliverables is important. If on-site position verification is the primary objective, priority should be placed on being able to check values instantly. If as-built records and history management are required, it is desirable to retain them in a format that is easy to accumulate and compare. Furthermore, if there is a possibility that the data will be used by other departments in the future, it is important not to depend on a format that only certain personnel can understand.


From the perspective of practitioners, there are many situations where leaving data in a usable form is more important than simply measuring. In particular, when working on multiple sites simultaneously, equipment that imposes a heavy burden on data organization will reduce overall efficiency even if it speeds up immediate on-site work. By considering on-site acquisition, office verification, incorporation into reports, and future reuse, you can identify the equipment that truly fits.


When selecting surveying equipment, it's essential to consider the entire data workflow, not just the momentary ease of use on site. Choosing equipment that matches how your deliverables are produced reduces rework after implementation and makes it easier to balance overall quality and speed of operations.


Point 6: Confirm the Ease of Ongoing Operation

The moment surveying equipment is introduced is not the end goal. Rather, what truly matters is whether it can be used continuously in the field. Even if it attracts attention immediately after introduction, if it doesn't become part of daily operations, it will eventually become equipment that is no longer used. Therefore, when selecting equipment, you must always confirm how easy it will be to keep it in continuous use.


There are many factors involved in ongoing operation, but particularly important are ease of setup, portability, the burden of daily inspections, reproducible procedures, and the ability to handle personnel changes. Equipment that takes a long time to set up each time or whose operation varies greatly depending on site conditions tends to be avoided, especially in busier workplaces. Conversely, equipment that can be put into use quickly and whose workflow from measurement to verification is stable is easier to integrate into routine operations.


Furthermore, in ongoing operation, the ease of isolating issues during incidents should not be overlooked. Equipment that makes it easy to determine whether on-site unstable readings are caused by the environment, the settings, or the procedures can reduce the time required for retesting and verification. Equipment whose causes are difficult to identify can, as a result, increase operators' anxiety and lead to reduced frequency of use.


Training is also important. When a new staff member joins, whether they can learn the operations in a short period and whether the procedures can be reduced to a level that can be taught internally are major considerations when thinking about long-term operation. Operations that rely too heavily on experienced personnel can become unstable at once due to staff transfers or resignations. In practice, it is more valuable for multiple staff members to be able to operate at a consistent quality than for only a few special individuals to be able to handle the work.


Furthermore, when considering continued operation, it is also important whether the role of the equipment is clearly defined on-site. If equipment is introduced simply because it seems convenient, the timing of its use within actual processes will not become established. Equipment for which it is clearly determined which process it will be used in, what labor it will save, and which verification tasks it will reduce is more likely to be used continuously.


Surveying equipment will not automatically produce results simply because it has been introduced. It is important that it is designed for continued use and that the job site can adopt it without undue burden. Don’t overlook the ease of ongoing operation; choosing with attention to whether it can be integrated into everyday work will help you make a decision that avoids failure.


Point 7: Choose with future business expansion in mind

When choosing surveying equipment, it's important to consider not only the immediate site but also potential future business expansion. It may seem sufficient to solve only the current problems, but in practice the range of applications often expands after implementation. If equipment introduced initially for existing-condition surveys can also be used for construction management and maintenance, the return on investment becomes much greater.


For example, even if simple position checks are the primary focus now, integration with photo records and three-dimensional data may be required in the future. On construction sites, there is a growing push for not only conventional verification tasks but also the standardization of records and faster sharing. In the maintenance management field as well, operations that assume comparison with past data and history management are increasing. Considering these changes, choosing based solely on current uses may leave you feeling short of requirements in a few years.


Of course, there’s no need to build an excessively complex system that focuses solely on future potential. What’s important is that it can be used in current operations without strain while leaving room to support future business expansion. For example, considering not only the acquisition of location information but also whether it can easily integrate with on-site records, whether data can be easily organized and shared, and whether it can be easily connected to other workflows will increase its potential for future use.


Also, when considering business expansion, you should pay attention to changes in the field. If labor shortages deepen, the value of equipment that can be operated easily by a single person will increase. If stricter reporting and recordkeeping become necessary, data consistency and traceability will become important. By considering not only short-term ease of use but also how easily equipment can adapt to changing conditions, you can more easily choose options that will remain useful over the long term.


Selecting equipment with an eye to future operational expansion is not simply about choosing devices with the most features. What matters is that they appropriately match current field needs without excess or shortfall and can transition to the next stage of use without strain. Seen from that perspective, surveying instruments reveal their value not merely as tools but as a foundation for business improvement.


Considerations for Surveying Instruments by Application

We've covered seven points so far, but in practice it's easier to make decisions by considering each application. When choosing surveying instruments, organizing around which tasks you'll use them for and how you'll use them, rather than starting from the instrument name, helps prevent mistakes.


First, for tasks that require handling point positions accurately—such as boundary verification, identifying control points, and confirming construction locations—repeatability and stability are important. More than simply being able to measure, it is crucial that you can obtain the same results under the same conditions and that on-site verification can be carried out easily. For these applications, you should prioritize aligning the required accuracy with the site conditions.


Next, in tasks where you need to efficiently cover wide areas such as site development, roads, and around facilities, whether you can quickly take measurements while moving becomes important. Equipment that requires heavy preparation for each measurement tends to be a burden in large-area work, so choosing with an emphasis on mobility and work tempo is effective. Here, using not only accuracy but also the contribution to reducing work time as a criterion makes failure less likely.


Also, for uses intended to be reviewed later—such as as-built management, maintenance management, and comparisons before and after renovation—recordability is important. It is required not only to confirm numbers on site, but also to preserve them in a form that is easy to explain later and easy to share among multiple people. For such uses, the smoothness of the workflow leading to the deliverable is of greater value than measurement capability.


Furthermore, for applications that emphasize three-dimensional recording and preservation of current conditions, point information alone may not be sufficient. At sites where it is necessary to retain the overall shape of the subject, spatial relationships, and the pre-modification state, methods that make surfaces and shapes easier to handle should be considered. However, what matters in this case is not merely the ability to acquire the data, but whether that data can be handled in practice. If the burden of post-acquisition organization is too great, on-site use will be limited.


And for small crews, or for applications where construction personnel must use the equipment in addition to their other duties, ease of use is paramount. Equipment that requires time-consuming setup or checks will not take root on busy sites. The quicker it can be brought up and running, the easier the results are to read, and the clearer the process for re-checking, the more readily it will become part of daily operations.


In this way, when you think in terms of use cases, the criteria you should prioritize change considerably. Rather than comparing surveying instruments as a single group, it is important to break down your company’s main operations into several scenarios and clarify what to prioritize in each. That accumulation reduces regret after implementation and leads to choices that truly fit the field.


Summary

When selecting surveying equipment, the most important thing to avoid mistakes is not to judge solely by high performance or newness. First, clarify what you will measure, determine the accuracy required for that task, and consider the site environment, the number of workers, the flow of data, ease of ongoing operation, and potential future business expansion. The seven points introduced here are not intended to decide which device is superior, but to serve as criteria for finding the equipment that truly fits your company’s field operations.


In practical work, outcomes are determined more by whether surveying equipment can be used easily on site than by the equipment itself. Considering whether preparation takes too much effort, whether it can be operated when personnel change, and whether the acquired data can be readily used in the next process will greatly affect satisfaction after implementation. When you are unsure about surveying equipment, it is especially important to organize your choices by working backward from the site’s challenges rather than by starting from equipment types.


If you want to streamline position checks across large sites, introduce a system that's easy for a small crew to operate, or bring position data acquisition closer to everyday work, it is useful to consider LRTK as a candidate when selecting equipment. As an iPhone-mounted GNSS high-precision positioning device, LRTK is an option worth considering when you want to balance on-site ease of use with high-precision positioning. Those responsible for selecting surveying equipment, in particular, should clarify which tasks they want to streamline in light of their company's use cases and compare options including LRTK; doing so will make it easier to choose what best fits their field.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page