Five differences and precautions CAD staff should know to avoid confusion between SXF and SFC
By LRTK Team (Lefixea Inc.)
Table of contents
• First, organize the differences between SXF and SFC
• Point 1: SXF is the name of the standard and SFC is one of its file types
• Point 2: The format you choose differs for final delivery and interim exchange
• Point 3: Don’t choose SFC just because it’s lightweight
• Point 4: Don’t confuse file format with the drawing representation level
• Point 5: Check extensions and related files before handing over
• Practical workflow to avoid confusion between SXF and SFC
• Summary
First, organize the differences between SXF and SFC
The problem of “I don’t really understand the difference between SXF and SFC” doesn’t arise simply from not knowing the terms. At the root of the confusion is that the hierarchical level of the terms being compared isn’t aligned. SXF is the name for the overall specification for CAD data exchange, while SFC is one of the physical file formats exchanged under that specification. Moreover, SXF includes the concept of levels as an approach to drawing representation, so mixing up discussions about file formats and drawing representation leads to conversations that often fail to align in practice. Starting with this clarification is the shortest path to reducing handover troubles. OCF OCF For example, if you’re told at a site or in a design meeting to “send it in SXF,” that single phrase doesn’t specify what’s actually required. The format to choose and the way to check it differ depending on whether it’s assumed to be for formal delivery, a lightweight exchange for interim review, a handover intended for re-editing, or simply sufficient for visual confirmation. In reality, however, the generic name SXF often circulates on its own: the sender outputs an SFC, while the receiver evaluates it assuming it’s a formal deliverable, and such mismatches commonly occur. Accurately pinning down the definitions of the terms isn’t just an academic issue; it’s a practical measure to prevent rework. What practical CAD staff searching “sxf sfc difference” really want isn’t only a dictionary-like explanation. They need the decision axes: what each is, in which situations to use which, and how to differentiate them. If you keep handing over data with that ambiguity, you may well open the drawings but later discover other problems: the delivery conditions aren’t met, the expected layer structure isn’t present, images are missing, or verification methods differ and require resubmission. This article organizes the SXF–SFC relationship into five practical points to help avoid such operational stumbles.
Point 1: SXF is the name of the standard and SFC is one of its file types
The first point is not to treat SXF as if it were a single file extension. Published specification documents define SXF as the name of the overall CAD data exchange specification, and as physical files output under that specification, there are formats with the .p21 extension and the .sfc extension. In other words, SXF and SFC are not parallel terms to compare; SFC is contained within the larger framework called SXF. If you don’t know this structure, a request like “I want SXF” can lead to the sender thinking they’ve provided enough while the receiver finds it different from their expectations. OCF Another frequently overlooked practical point is that the extension .sfc itself has a history that causes confusion. Specification documents explain that in early versions the extension was .sxf, but because this was easily confused with the name SXF for the overall specification, it was later changed to .sfc. Thus the current confusion stems not only from insufficient understanding by field staff but also from the origin of the specification itself. Knowing this background helps you stay calm and sort things out when you see older documents with different notation. OCF What’s important here is not to accept the word “SXF” at face value when someone uses it. What you should confirm is whether they need exchange data conforming to the standard, deliverable data that can be treated as a formal deliverable, or just a lightweight file for interim review. Judging by the terminology alone can lead to situations where the data you send “opens, so it should be fine,” but actually the format is for a different stage. CAD staff differentiate themselves not by focusing on the format name but by verbalizing the purpose behind the format. The same applies to request messages and internal instructions. If a directive merely states “SXF submission” or “SXF receipt,” it’s safer to confirm the extension and the intended use before starting work. If you align early on whether it’s P21 or SFC, whether it’s compressed, and whether it’s for drawing review or for re-editing, you can significantly reduce downstream rejections. Accurate understanding of terminology may seem mundane, but in practice those who don’t slacken this area can better stabilize overall progress. OCF
Point 2: The format you choose differs for final delivery and interim exchange
The second point is that the format you choose differs between final delivery and interim exchange. Published materials state that formal electronic deliverables following CAD drafting standards are, in principle, targeted as the P21 form of SXF, or the compressed P2Z form. Meanwhile, in stages prior to formal delivery, SFC or the compressed SFZ form can be used. In other words, the P21 family and the SFC family are not ranked by superiority; they are divided by role depending on the situation. Without this understanding, an SFC sent for interim exchange may be treated as a final deliverable, or conversely, interim reviews may be handled under heavy delivery-oriented procedures every time. OCF The reason P21-family formats are emphasized for formal delivery is that they are organized as formats compliant with international standards and as forms suitable for long-term preservation. SFC, by contrast, is described as a domestic format developed for internal exchanges among stakeholders: convenient for everyday data exchange, but not equivalent to a formal deliverable. Understanding this distinction determines whether you can properly separate internal review data from external submission data. Being able to open a file and being officially accepted are different matters. In practice, SFC’s lightness and ease of handling are helpful in many interim situations. When you just want to quickly check how a drawing looks, iterate correction instructions, or share in-progress work among stakeholders, it’s more reasonable to use an exchange-oriented format than to operate every time under final-delivery assumptions. However, if you continue that convenient practice into the final stage, you may need format changes and re-verification right before delivery, which ultimately increases workload. Treat interim convenience and final submission requirements separately. OCF To make this separation stick, it’s effective to change file naming and the wording in messages. For example, labeling files as “for meeting review,” “for pre-delivery final check,” or “for formal delivery” clarifies interpretation for the recipient. Passing along not only the format name SXF or SFC but also what stage the data is in prevents operational mismatches before the file itself. CAD staff responsibilities include not only converting and handing over files but also aligning handover conditions so recipients aren’t confused.
Point 3: Don’t choose SFC just because it’s lightweight
The third point is that SFC’s lightness doesn’t make it the optimal choice in every case. Published resources describe SFC as a domestic, simplified file format that produces smaller file sizes than P21 and is therefore easier to handle. This property is certainly useful in practice. Especially for interim checks and short-cycle exchanges, SFC can reduce conversion time and the burden of transfer, making sharing among stakeholders easier. But it’s risky to immediately conclude “SFC is the only option because it’s light.” Choosing a file format should be judged not only by size but also by how the drawing was constructed and how downstream processes will use the data. In fact, published documents explain that file size and ease of handling depend on how graphics are represented. For example, if a drawing is saved using a large number of line segments, the file size—particularly in P21—can grow and loading can become slow. Also, if adjacent vertex intervals are too short, using multiple short line segments can make line types hard to distinguish, and extremely short geometry may disappear during exchange. In other words, causes of heavy or hard-to-handle files are influenced not only by the format difference but also greatly by how the original drawing was created. OCF With this perspective, you see that thinking “SFC is lighter so it’s safe” isn’t sufficient. For example, drawings that include raster-to-vector converted graphics, many fine polylines, or a lot of special expressions may encounter display or reuse problems after exchange. Choosing a format solely on the basis of lightness may make sending or storing easier at the moment, but later you might discover missing geometry or differences in appearance, forcing re-output. Lightness is one selection criterion, but it must not be the sole deciding factor. OCF A practical way of thinking is to decide the intended use first and then inspect the drawing contents. If you only need a quick check, SFC may be appropriate; but if you expect to move to formal delivery soon after, it’s safer to check early whether P21-family output will be acceptable. Also, if the source drawing contains extremely small geometry or many fragmented line segments, it’s better to tidy the original data before considering formats. Don’t assume changing the file format alone will solve everything; organizing the way the drawing is created leads to more stable operations and less confusion. OCF
Point 4: Don’t confuse file format with the drawing representation level
The fourth point is not to conflate the difference between P21 and SFC with the difference between Level 1 and Level 2 representation. Published documents state that SXF encompasses the concept of levels from Level 1 to Level 4, and what is widely published now is mainly Level 1 and Level 2. Level 1 emphasizes accurate visual reproduction on screen or paper. Level 2, by contrast, is described as fulfilling the requirements of two-dimensional CAD data and ensuring usability for reuse. The important thing is that the choice of P21 or SFC as a file format and the question of how reusable the information should be (i.e., the level) are separate axes. OCF A common practical source of confusion is judging reuse quality solely by file format, such as “SFC means simple” or “P21 means complete.” In reality, even with the correct file format, the drawing’s representation method and conversion rules change the downstream usability. Visual correctness and editability are not the same. Even if a drawing opens on screen, you can’t judge whether it’s reusable without checking layer management, geometry structure, and how elements are treated after conversion. Relying on a format name alone causes this oversight. OCF A prime example is layers. Published materials explain that SXF’s layer feature for exchange handles only the layer name and visibility. Even if your CAD manages line types and colors per layer, SXF exchanges line types and colors as attributes attached to individual geometry. Therefore, the order of layers may change after conversion, and empty layers may not be preserved. In other words, the layer management you see in the original CAD environment may not transfer with the same feel to a different environment. OCF Another point to watch is how elements unsupported by SXF are handled. Published documents indicate that if the original CAD has elements for which SXF has no corresponding feature, the CAD’s conversion rules may convert them into other forms or, if conversion is impossible, they may not be output. Also, if data converted to SXF is read back into the original CAD, those proprietary elements may not automatically restore to their original form; their specific functions may no longer be available. Thus, “I reopened it with the same CAD so it’s back to normal” does not necessarily hold true. This is a point easily misunderstood in practice. OCF Therefore, CAD staff should not only check the first impression after conversion. It’s of course important to see whether the drawing layout has been preserved, but you also need to verify whether empty layers have disappeared, whether changes in layer order affect operations, and whether proprietary drawing elements have been replaced by different forms. Those who avoid confusing format and level don’t simply check “whether it opens”; they check “whether the next person can use it.” That difference in perspective greatly reduces downstream confusion. OCF
Point 5: Check extensions and related files before handing over
The fifth point is not to be complacent with just the main file before handing it over. In SXF-related exchanges, in addition to P21 and SFC, there are compressed formats like P2Z and SFZ. Even if the sender says “I output SXF,” if you don’t confirm which extension is actually being sent, whether decompression is required, or whether the recipient’s environment supports that format, the recipient may not be able to check it as expected. Don’t end the discussion with the generic term SXF—always close the conversation by confirming the extension. OCF Also, don’t overlook relationships with attribute files and image reference files. Published materials explain that attribute files are managed with the same names as the CAD data except for the extension, but inside they reference the corresponding CAD data’s file name, so changing file names individually can prevent correct loading. In other words, even if names appear aligned externally, internal inconsistencies among related files can cause failures on the recipient’s side. Manually changing file names carelessly right before handing over is risky. OCF Drawings that include images require extra caution. Published materials state that image reference file names correspond to CAD data, and if you change the CAD file name at the electronic delivery stage, you must also change the image file names or the links will break and images will disappear. Moreover, the CAD data itself contains the image file names, so simply renaming the outer files is insufficient. A drawing that appears complete when only the main file is sent can be practically incomplete on the recipient’s side if images vanish. Consider the pre-handover check not as reviewing a single file but as inspecting the entire set of components. OCF Also, differences in supported versions cannot be ignored. Published documents warn that using insufficiently supported helper tools can cause image data to disappear or even corrupt CAD data files. In other words, tools that make conversion and renaming convenient can in some cases introduce other risks. Especially in environments used continuously over a long period, the assumption “it worked before so it’ll be fine this time” is easy to make; therefore, don’t skip read-in checks that include related files. OCF Practical checks are not difficult. Before sending, verify the main file’s extension, whether it’s compressed, the existence of related files managed under the same name, whether image references are intact, and whether the recipient’s environment can read the files. Even a few minutes of checking these basics immediately prior to sending can prevent typical rejections such as “it won’t open,” “images are missing,” or “attributes can’t be read.” As important as understanding the formats, final handover verification is a modest but highly effective task. OCF
Practical workflow to avoid confusion between SXF and SFC
To avoid being uncertain about SXF and SFC, translate the request into operational terms before exporting files. Confirm whether it’s “final delivery or interim exchange,” whether “the recipient intends to edit or only visually check,” which extension they assume, and whether a compressed format is acceptable. If you proceed to conversion with these points ambiguous, format selection and verification methods will waver. Conversely, once these four points are settled, whether to use the P21 family or SFC family and how to package related files becomes much clearer. Early confirmation is the lowest-cost and highest-impact measure to prevent rework. Next, it’s important to draw with exchange in mind. As published materials indicate, layers without geometry are not saved and layer order may change. Extremely short line segments and fine polylines can affect appearance and persistence during exchange. Elements not defined in SXF may be converted to other forms or not output at all. In other words, whether you encounter trouble at handover starts before you press the export button—at the creation stage. Prepare drawings intended for exchange with the awareness of not increasing elements that are likely to cause trouble during exchange. OCF After exporting, it’s safer not to finish verification only in your own environment. If you judge “it’s fine because it read back in the same CAD,” you may miss that proprietary elements didn’t restore to original functionality or that appearance differs in other environments. If possible, open the file in a different verification environment and check layers, text, line types, image references, dimensions, hatching, and so on. Verifying not just whether the look is the same but whether the next user will be able to work with it turns a simple display test into practical quality assurance. OCF During verification, avoid mixing checks intended for delivery with checks for work-in-progress. Published materials explain that delivery-targeted verification confirms overall consistency against P21 formats, while creation-stage checks can include SFC and other readable formats for individual confirmation. However, verification tool outputs may differ, and some tools may not flexibly handle additional layers introduced by agreement. Therefore, a verification warning doesn’t automatically mean noncompliance—you need to align which tool and which purpose the check serves in advance. Finally, close the flow by organizing the information for sending. Don’t stop at attaching files; provide recipient-friendly information such as “this is SFC for interim review,” “this is P21 for formal delivery,” “related files bundled,” or “image references included.” CAD staff’s role isn’t only to output drawings; it’s to prepare them so the recipient can accept and proceed to the next step without confusion. Workplaces that avoid confusion between SXF and SFC not only have knowledge of formats but also a habit of verbalizing handover conditions.
Summary
Summarizing the differences between SXF and SFC from a practical perspective: SXF is the name of the overall specification for CAD data exchange, and SFC is one of the file formats used within it. Therefore, the first step to correctly understanding “the difference between SXF and SFC” is not to treat the general term and the file format as the same category. In practice, you should also add axes like “for final delivery or interim exchange,” “intended for reuse or only visual confirmation,” and “a question of file format or drawing representation level.” Once you’ve organized it this far, you’ll be much less likely to be swayed by terminology alone. OCF OCF Also, in actual handovers the differentiator is not how many format names you can memorize but how carefully you check. Explicitly state the extension, confirm related files, understand the handling of empty layers and proprietary elements, and separate checks for delivery from checks for interim review. Just by covering these basics you can prevent many typical CAD data exchange confusions such as “it opens but can’t be accepted” or “it’s visible but not usable.” Correctly using SXF and SFC improves not only drawing quality but the overall quality of exchanges. OCF Even if handovers of drawing data are well organized, if on-site position information and measurement sharing remain ambiguous, recognition gaps can occur elsewhere. If you want to smooth not only drawing exchange accuracy but also on-site position confirmation and coordinate sharing, it’s effective to use iPhone-mounted GNSS high-precision positioning devices like LRTK to make the connection between drawings and field positions easier to understand. When CAD staff organize data exchange and field staff organize position sharing, together they make it easier to reduce mismatches between design and site.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.


