Realizing CIM/BIM Integration in Railway DX: Digital Construction Management Supported by LRTK

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Digital transformation (DX) is also sweeping the railway sector. Railway DX refers to efforts to introduce advanced IT technologies into railway construction and maintenance sites to dramatically improve productivity and safety. In fact, the railway infrastructure sector faces many challenges—labor shortages due to retirement of experienced technicians, rising maintenance costs for aging facilities, and repeated responses to natural disasters—making efficiency improvements and technological advancement urgent. Among these, the digitalization of on-site construction management, or "digital construction management," attracts particular attention. It requires rethinking traditional methods that relied on paper drawings and manual records, and leveraging BIM/CIM models and ICT (information and communication technology) to streamline the entire construction process. This article explains the effects BIM/CIM models bring to the design and construction of railway structures, considering national trends, and introduces cutting-edge digital construction management methods that utilize the smartphone RTK solution "LRTK."


What is Railway DX: National Trends and the Call for Digital Construction Management

The Ministry of Land, Infrastructure, Transport and Tourism (MLIT) is promoting DX in the construction industry, placing BIM/CIM use at its core. Starting with the digitalization initiative "i-Construction," the adoption of ICT technologies across all processes—from surveying and design to construction and maintenance—is accelerating. In fact, MLIT positions BIM/CIM as the "engine of the productivity revolution," and it is expected to be the key to improving efficiency and reducing manpower through digital technologies. Implementing BIM is also said to lead to workstyle reform on site and improved quality and safety, making DX an unavoidable challenge.


In response to this trend, from fiscal 2023 MLIT has made BIM/CIM use a principle for all MLIT-supervised design and construction (3D models are to be used unless there are special circumstances). Furthermore, full mandatory implementation of BIM/CIM for public works is scheduled by 2027, and adoption is already progressing for projects with an annual scale of about ¥2.5 trillion.


The railway sector is no exception, with BIM/CIM being adopted one after another in projects for new construction and improvements of railway facilities. Public agencies and general contractors responsible for railway construction have formulated "Construction DX Visions" and their own DX strategies, strengthening efforts to realize digital construction management such as remote site supervision and ICT construction. From clients to contractors, the entire industry is being strongly urged to move away from paper-centered traditional methods and toward smart, data-driven construction management. In fact, a DX roadmap for the railway construction sector has been developed, and technology development for the future—such as realizing unmanned construction and work support using MR (mixed reality)—is underway.


Effects of CIM/BIM Models on Design and Construction of Railway Structures

BIM (Building Information Modeling) is a method of centralizing and utilizing project information for buildings and civil engineering in a 3D model. In the railway sector, it is being introduced as CIM (Civil Information Modeling), enabling the creation of integrated 3D models that include everything from route design to civil structures such as bridges and tunnels, and station facilities. This digital model can be shared across all phases—from investigation and planning to design, construction, and maintenance—facilitating collaboration and information management among stakeholders.


Main benefits include:


• Consensus building and error reduction through 3D visualization: The shapes of structures that are hard to imagine from drawings alone become intuitive with 3D models. Because the finished image is easier to share among all stakeholders, consensus building during local briefings and internal meetings goes more smoothly. Performing clash checks on the model during the design phase also allows detection of design mistakes that might be overlooked in drawings, reducing rework during construction.

• Optimization of construction planning and improved safety: Construction steps can be simulated on the BIM model to consider work sequences and crane movements in advance. Even complex works are easier to understand for non-experts when construction sequences are visualized with animation. Since everyone can grasp the finished form and schedule in advance, setup mistakes decrease and site safety measures are enhanced.

• Centralized information management and sharing: The BIM model can store not only dimensions and spatial relationships of components but also material properties, strength, construction schedules, quantities, and related drawings or photos. Digitally integrating information that was previously scattered across paper drawings and ledgers eliminates the need to search for which document to consult. Clients, designers, and contractors can access a common, up-to-date dataset, enabling consistently synchronized information sharing.

• Shorter schedules and cost reduction: Thorough advance study reduces rework and troubles during construction. Concurrent construction, where some design and construction processes proceed in parallel, is also promoted, contributing to overall schedule compression and cost reduction. MLIT surveys report that many companies have experienced improved efficiency and fewer mistakes after adopting BIM.


BIM/CIM models also demonstrate strengths in post-completion maintenance. For example, if inspection results of bridges or tunnels are recorded in a 3D model, crack locations and repair histories can be managed centrally within the model. This eliminates the need to cross-check ledgers and drawings and streamlines maintenance planning. As a result, infrastructure life extension and life-cycle cost reduction can be achieved. In this way, BIM/CIM creates value across the entire lifecycle of railway infrastructure, contributing to improved quality and productivity.


Problems in Conventional Construction Management Processes (Discrepancy Between Drawings and Site, Analog Recording Methods)

Conventional, pre-digital construction management contained many inefficiencies. Typical issues include information gaps between drawings and the site and the disadvantages of survey and inspection data being managed primarily in analog form. Major problems are as follows:


• Drawings alone make it difficult to grasp the site: It is hard to accurately imagine complex structures from plans and sections, and less experienced engineers are more prone to misunderstandings or misreadings. As a result, rework occurs during construction with comments like "this wasn't how it was supposed to be."

• Gap between design information and site conditions: Even if design changes occur as work progresses, paper drawings are prone to omissions in updating to the latest information, creating a risk that the site will not receive accurate instructions. Also, if ground conditions or existing structures are not as indicated in the drawings, ad hoc responses are required on site that cannot be fully understood from the drawings, leading to construction mistakes or schedule disruptions.

• Recording work is analog and inefficient: Measurement values and test results are handwritten on paper forms and later re-entered into Excel—resulting in duplicated work. Photo logs and as-built management tables also need to be organized manually, requiring significant time and effort. Manual transcription is also a breeding ground for mistakes.

• Delayed information sharing and reliance on individuals: Progress and measurement data obtained on site are not shared with stakeholders in real time, so decision-making tends to lag. For example, if the survey team must return to the office to create drawings and report before the site’s as-built conditions can be confirmed, rapid responses are impossible. Data remaining in individual notebooks or PCs leads to knowledge being siloed and difficult for the whole team to use.


Comparison Checks and As-Built Verification Using Point Cloud Data with CIM/BIM

Advances in 3D scanning technology have made it possible to capture completed structures and terrain as high-density point cloud data and compare and verify them against CIM/BIM models. Using drone photogrammetry or terrestrial laser scanners, wide areas of as-built conditions can be measured thoroughly in a short time. For example, in land development work, overlaying pre-construction point cloud data of the existing terrain with the designed finished ground model allows accurate calculation of excavation and fill volume differences. Similarly, in road and railway works, longitudinal and cross sections can be automatically created from point clouds obtained after construction of roadbeds or tunnel interiors, enabling quality control by comparing as-built conditions with the design model.


Overlaying point cloud data with the 3D design model makes it possible to create heatmaps that color-code dimensional excesses and deficiencies in as-built conditions, or to automatically extract locations beyond specified tolerances. Inspections that used to be performed at a few manually measured points can now be conducted comprehensively and area-wise using point clouds, dramatically improving the accuracy and reliability of quality confirmation. In one project, drone surveying reduced the time required for as-built measurement work to one-fifth or less of conventional methods, and eliminating dangerous high-altitude measurements also improved safety. Thus, point cloud utilization is evolving as a speedy and advanced digital verification process for as-built management.


On-Site CIM Model Placement and Pre-Construction Verification Using Smartphone RTK and AR Display

Recently, approaches combining high-precision positioning with smartphone + RTK-GNSS and AR (augmented reality) technology have emerged to overlay and display design 3D models on-site. By holding up a smartphone fitted with a dedicated device, the CIM model’s finished form can be composited with the actual scenery on the screen. For example, displaying a bridge pier’s placement position in AR allows immediate confirmation of its relationship with surrounding existing structures and terrain. Since the completed image that was hard to grasp from paper drawings can be projected full-scale on site, it becomes easy to detect interferences and adjust layouts before construction. Previously, using AR on site required wearing dedicated goggles and converting models, but the ability to instantly check models with just a smartphone is also attractive.


This smartphone AR model placement verification is powerful even in the cramped sites and frequent nighttime work of railway construction. Being able to imagine the life-size finished object within limited working hours ensures thorough preparation, helping prevent construction mistakes and improving work efficiency. Sharing 3D models on site also smooths communication with on-site staff and subcontractors, reducing misunderstandings like "that’s not what we were told." Furthermore, AR visualization of the finished image is effective for local resident briefings and consensus building, contributing to project smoothness. The 3D model itself can function as a digital instruction manual, helping to seamlessly connect the process from pre-construction review to execution.


Cloudification of Measurement and Management Data and Collaboration with Remote Designers and Supervisors

Environments that allow immediate sharing of on-site data in the cloud are becoming established. For example, if point coordinates and site photos obtained by surveying are synced to the cloud from a tablet on the spot, designers at headquarters and clients can instantly review the results. Traditionally, there was a time lag—"survey team returns to office → creates drawings → reports → begins consideration"—but cloud integration makes rapid construction management of measure, show, communicate, and decide immediately a reality. Real-time sharing of progress and as-built conditions enables design change consideration and additional instructions to be made on the same day, accelerating the overall project schedule. The result should contribute to shorter schedules and cost reductions.


Remote experts monitoring sites—remote construction management—is also entering practical use. Based on live site video and cloud-stored measurement data, designers and supervisors located remotely can give instructions and advice on the spot. This enables appropriate supervision and inspection without having to visit the site each time, reducing travel time and increasing efficiency. Remote inspections for hazardous locations also help ensure technician safety. Cloud use that allows sharing of expertise beyond geographic constraints represents a new collaborative style in the era of railway DX.


Reflecting Recorded Data in the BIM Model and Automating As-Built Reports

To fully leverage BIM/CIM, it is important to feed recorded data obtained on site back into the design model so that data can be used consistently. This requires standardizing survey coordinate systems and data formats and creating mechanisms to directly import field-acquired information into the model. MLIT also recommends adopting open data formats such as LandXML and IFC, and efforts are underway to enable surveying instruments, design CAD, and construction machinery to handle the same data. This eliminates duplication of input and reinterpretation of drawings, smoothing data linkage between the field and the model. In this way, the need to write on paper drawings or create handwritten forms disappears, making paperless construction management realistic.


Point clouds and coordinate data obtained from as-built surveys during construction can be immediately reflected in design BIM models to visualize progress and verify as-built conditions. At completion, the model itself becomes an accurate as-built model (digital as-built drawings) and can be submitted as electronic deliverables. It is also possible to automatically generate as-built management tables and various inspection forms from the as-built information accumulated in the model. For example, differences between design values and measured values can be aggregated from the model into lists, or the aforementioned heatmap can be attached to visually indicate results at a glance—dramatically reducing the labor of creating inspection documents. Eliminating manual transcription of numbers greatly reduces human error, streamlining preparation for supervisory inspections.


By directly reflecting and utilizing recorded data in BIM/CIM models in this way, the design, construction, and inspection stages can be seamlessly connected by data. Because an accurate as-built model remains after construction, the digital data can be used for post-delivery maintenance and future renovation planning.


Practical Effects of Simple Surveying and CIM Integration with LRTK

For BIM/CIM and ICT technologies to be truly used on site, easy-to-use, high-precision positioning technology accessible to everyone is key. Finally, we introduce "LRTK," a solution attracting attention for dramatically simplifying on-site high-precision surveying and CIM integration. LRTK stands for "Local RTK" and is a positioning system centered on an ultra-compact RTK-GNSS receiver that attaches to a smartphone or tablet. What is revolutionary is that centimeter-level accuracy (half-inch accuracy) surveying that previously required specialized equipment and experienced technicians can now be achieved easily with a smartphone. The specific effects are summarized below.


• Improved portability and mobility: Surveying is completed with a small pocket-sized device and a smartphone. There is no need to carry heavy tripods and surveying equipment along the trackside, and a single person can quickly walk and survey wide areas, greatly enhancing field mobility.

• Real-time positioning and cloud integration: Measured point coordinates are displayed immediately on the smartphone screen and automatically saved to the cloud. Results can be checked or remeasured on site, and data can be shared with office designers immediately. Because measurements can be verified and shared right away, rework and waiting times decrease.

• Centimeter-class measurement accuracy: Using quasi-zenith satellites and network RTK correction information reduces positioning errors that were tens of centimeters (several inches) with just a smartphone to a few centimeters (a few inches). This provides sufficient measurement accuracy even for railway works that require millimeter-level precision management.

• Low cost and low barrier to entry: Because only an attachable device is added to an existing smartphone, you can start high-precision surveying today without assembling surveying equipment costing millions of yen. Being inexpensive and easy to handle allows on-site supervisors themselves to perform tasks that previously relied on surveying specialists, helping to address manpower shortages.

• Improved safety and reduced worker burden: Faster measurement work shortens work interruptions and exposure time related to train passages. It also reduces heavy labor in heat or at night, easing worker burden. On-site feedback includes comments like "it helps reduce workload on extremely hot sites." Intuitive dedicated apps allow use without special training, contributing to fewer surveying mistakes.


LRTK builds a high-precision data foundation that links BIM/CIM models and the site in real time. With one smartphone anyone can acquire accurate position information, and that data can be immediately shared with models and used in AR via the cloud, enabling the labor-saving and advanced construction management aimed for in railway DX to be realized at the field level. This is truly the realization of on-site DX. For example, immediately after a major disaster, LRTK could quickly measure and share damage to tracks and structures to aid safety confirmation—an application that was difficult under conventional methods. Expectations are high for LRTK’s future role as a trump card supporting next-generation, digitally driven railway construction management.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.