top of page

LRTK Revolutionizing Railway Construction: Achieving Labor Savings with High-Precision Positioning and AR Construction Support

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Labor-saving needs and challenges at railway construction sites (track, structures, maintenance)

At railway infrastructure sites, the need for labor savings (performing tasks efficiently with fewer personnel) has been growing in recent years. This trend stems from a serious shortage of workers and an increase in workload. For example, according to a JR East announcement, by fiscal 2035 maintenance work volume is expected to increase by about 20% compared with fiscal 2024, while the number of railway construction workers is expected to decrease by about 20%, making the continued staffing of field personnel and work efficiency improvements urgent. As the amount of renewal and maintenance of aging equipment increases while the workforce declines, productivity improvements through labor-saving technologies are unavoidable.


The labor shortage is particularly acute in track construction and maintenance work. Track work such as replacing or repairing rails and sleepers is physically demanding, and in many cases must be performed during late-night periods after train operations have ceased. Outdoor work at midnight and long working hours are unappealing to today’s younger workers, making securing young personnel difficult. Indeed, one survey reported that about 67% of railway maintenance personnel would prefer shifting nighttime work to daytime. In addition, the aging of skilled technicians has caused breaks in skill succession. There are concerns that veteran employees are reaching retirement age one after another and the know-how they have accumulated is being lost without adequate transfer to younger workers. These personnel issues have led the railway industry to consider accepting foreign trainee workers, but this is not a fundamental solution.


Furthermore, a railway-specific constraint is that site work—from track and civil structure construction to routine maintenance—must be performed in confined spaces and within limited time windows. Work in confined station areas, alongside tracks, or inside tunnels makes it difficult to introduce large machinery, forcing reliance on manpower-intensive methods. To prioritize safe train operations, many jobs are concentrated in the few hours between the last and first trains. In short nighttime work windows, even small setup errors can prevent completion and risk disrupting train operations, placing excessive tension and burden on field crews. Thus, railway construction sites face numerous challenges—staff shortages, skill succession, and working conditions—and fundamental efficiency gains through new technologies are required.


The personalization and inefficiency of surveying and staking (nighttime, confined spaces, reliance on skilled technicians)

Surveying and staking out (marking) work in railway construction has traditionally depended on the artistry of veteran craftsmen. For example, when marking the reference position of rails or staking out the installation position of structures, surveyors set up batter boards or drive stakes at measured points based on coordinates on drawings. These tasks require advanced skill and teamwork, and were usually done by two to three people over extended periods. This is a typical case of tasks being personalized to specific experts, creating the risk that work stalls or quality varies if that person is absent. Personalization turns processes into black boxes, raising concerns about productivity decline and overlooked mistakes.


Surveying at railway sites also suffers inefficiencies inherent to nighttime work and work in confined spaces. Setting up surveying instruments (tripods and total stations) and aiming at night on tracks is difficult, and measurement errors and human errors tend to increase in dark conditions. Poor footing and limited lighting near tracks make rapid pegging challenging even for veteran workers. Optical surveying instruments require straight-line sight for measurements, so curved tracks or obstacle-rich station areas often force repeated re‑setups. For example, when using a total station to mark stake positions, a site environment that makes maintaining line of sight between the instrument and prism difficult can bog down marking work and waste time. These factors combined mean that field surveying efficiency has not been high.


When personalization and inefficiency overlap, the workload tends to concentrate on a few experts nicknamed “surveying gods.” But those veterans are retiring, and transferring knowledge to younger workers is urgent. Improving productivity in railway construction requires a system that enables anyone to perform surveying and staking out easily and accurately. Technology is needed that allows efficient and accurate point marking even at night and in confined spaces, operable by non-experts.


How combining high-precision GNSS (RTK) and AR changes workflows

A promising solution to these issues is the combination of high-precision GNSS positioning and AR (augmented reality) technology. RTK (real-time kinematic) GNSS positioning enables real-time acquisition of centimeter-level position coordinates outdoors. AR overlays design drawings and 3D models on live site camera images, intuitively visualizing “what to install where.” Combining positioning and display is poised to significantly change railway construction workflows.


Traditionally, an analog process was required: reading numeric values from drawings and transferring points to the field using tape measures and surveying instruments. For example, to determine the placement of a catenary pole, a survey team would calculate offsets from reference points, drive stakes, and then the construction team would erect the pole at that location—each step divided among teams. With RTK-GNSS + AR, the design target positions can be digitally plotted in the field, dramatically simplifying this process. Specifically, the system calculates in real time the difference between the current position obtained by high-precision positioning and the design coordinates, displaying markers on AR such as “install here” or directional arrows for guidance. Workers can simply move according to on‑screen instructions to mark the designated position, eliminating complex measurement tasks. In wide sites or at night where maintaining line of sight is difficult, GNSS can still position as long as satellites are visible, so accurate positioning can be performed efficiently even in dark or obstructed conditions.


The RTK + AR combination can enable survey tasks that previously required multiple people to be completed by one person. Where staking was once performed by a surveyor plus at least one assistant, one person with an RTK receiver could potentially complete the job. AR displays also allow non-veterans to intuitively grasp the design positions, reducing the personalization of work quality. This prevents misreading drawings and communication losses, thereby reducing rework and errors. In short, combining the labor-saving of high-precision GNSS positioning with the visual information transfer of AR can fundamentally streamline the entire railway construction workflow.


Mechanism and accuracy levels of high-precision guidance using smartphones and compact GNSS

When you hear “high-precision GNSS,” you might imagine bulky dedicated equipment, but recently it has become easy to achieve using a smartphone combined with a compact RTK receiver. Antenna-integrated RTK-GNSS receivers that can be mounted on the top of smartphones have emerged; with these, a smartphone becomes a centimeter-class measurement device. In Japan, the quasi-zenith satellite “Michibiki” provides a centimeter-class augmentation service (CLAS), and with a compatible receiver it is possible to obtain cm-level corrections directly from satellites without installing a base station. Alternatively, a nationwide electronic reference station network provides correction data via mobile networks in network RTK, enabling high-precision positioning anywhere with smartphone connectivity.


Regarding positioning accuracy, RTK typically yields horizontal errors of about ±2~3 cm (±0.8~1.2 in) and vertical errors of about ±3~4 cm (±1.2~1.6 in). Small smartphone receivers can be expected to achieve cm-level accuracy (cm level accuracy; half-inch accuracy) under stable conditions. In practice, some compact RTK devices have achieved a standard deviation of about 12 mm (0.47 in) in standalone positioning, and averaging multiple measurements has improved accuracy to about 8 mm (0.31 in) in some cases. Centimeter accuracy is generally sufficient for laying out subgrade positions and installing structures in railway works (for track geometry adjustments that require millimeter-level precision, final fine tuning is still necessary, but ensuring cm accuracy in initial positioning greatly reduces labor). GNSS positioning basically completes by one person carrying a receiver while moving, eliminating inefficiencies like a three-person survey team operating a transit.


Figure: The ultra-compact RTK receiver “LRTK Phone” that attaches to a smartphone. Pocket-sized at about 125 g in weight and 13 mm (0.51 in) thick, it turns a smartphone into a centimeter-class measurement terminal.


The mechanism of smartphone + RTK guidance is simple. Design coordinate data are preloaded into a smartphone app, and in the field the receiver measures the current position and the system computes the difference to the target position in real time. The screen displays guidance such as “how many cm east/west/north/south to the target and how many cm up/down,” or arrows, so the worker needs only to move according to the instructions to reach the specified position. As the worker approaches the target, the guidance converges to zero, and staking or marking completes the task. This makes accurate point marking possible for anyone without reliance on a veteran’s intuition. Guidance can target not only ground points but also height, supporting tasks like catenary pole height adjustment and structure elevation alignment. GNSS positioning works at night as well, so positioning can be done at the same accuracy late at night as during the day. In confined areas where satellite visibility is insufficient and RTK fixes become unstable, auxiliary methods such as local positioning from known points or using IMU sensors can cover and ensure stable guidance.


Overall, combining a smartphone and a compact RTK receiver is making an era possible in which “one person can survey and be guided anywhere.” The ability to perform high-precision guidance on an everyday smartphone without expensive dedicated surveying equipment is a significant benefit for railway construction sites. The devices are intuitive to operate and designed so site personnel can master them in a short time without long-term specialized training. It’s the image of a pocket-sized surveyor that each worker can carry, and the way site work is done is beginning to change.


AR guidance for railway equipment and structures and as‑built confirmation

Coordinate information obtained by high-precision positioning can be used even more intuitively via AR (augmented reality) display to support construction. By superimposing design structure models and baseline lines on the real-world scenery through a smartphone or tablet screen, workers can visually confirm on the spot “what to install where.” In railway works, equipment around the track (signals, signs, catenary poles, cables, etc.) and civil structures (bridge components, retaining walls, tunnel linings, etc.) must be installed according to design positions, and AR is a powerful tool for this alignment work.


For example, when a tablet camera is pointed at an intended installation location beside the track, a full-size 3D model of a catenary pole can be rendered on-screen. Workers can reference the virtual model’s position and orientation when erecting the actual pole, enabling accurate planting without comparing drawings and the real object. Tasks that once required measuring against drawings can now be done by sight without error thanks to AR. In piping work, for instance, AR verification of the design model on-site can detect clashes or positioning mistakes before construction, leading to drastic reductions in rework. In a case at Shimizu Corporation, introducing a tablet AR system for piping allowed on‑screen comparison of drawing information and the real site, resulting in substantially reduced workload compared with paper drawings and fewer human errors. AR-based construction guidance is thus highly effective at preventing positional and dimensional mistakes.


Figure: A smartphone AR display overlaying an as-built heatmap based on the design model onto the site. Because GNSS positioning aligns absolute coordinates, simply pointing the camera at the site can color-code and display installation errors.


AR is also useful for post‑construction as‑built confirmation. As-built refers to the shape and dimensions indicating whether the completed structure or equipment has been built according to design, and is critical for quality control. Using AR, the completed object can be overlaid with the design model to visually check discrepancies on the spot. For example, in bridge work you can check through AR whether bolt positions are misaligned, or immediately verify track geometry after installation by comparing with the design overlay. If deviations are found, they can be rectified immediately at the site, preventing later discovery and rework. Recently, comparing measured 3D data (point clouds) with 3D design data to create color-coded as-built heatmaps has been adopted. An as-built heatmap conveys deviations from design in color—design-conforming areas in blue–green and areas with excessive or deficient fill or displaced components in red–yellow—making acceptability immediately apparent. Traditionally, identifying defective locations required comparing survey drawings and the site and marking them, but AR systems can overlay heatmaps on live video, making it much easier to locate deviations on the spot. For example, one system displays an as-built heatmap on a smartphone so that when the site is viewed, the colored virtual image aligns perfectly with the real object, intuitively conveying deviation locations and magnitudes and enabling immediate corrective work. Thus, AR supports a wide range of tasks from during construction to post-inspection, contributing to reduced human errors and quality assurance.


AR has other advantages. When explaining the finished appearance to clients or nearby residents, displaying the full-scale expected structure in AR at the site provides intuitive understanding. Sharing a visualized finished state between constructors, designers, and clients smooths communication and reduces misalignment of expectations. Displaying construction procedures and warnings in AR enables site workers to understand instructions at a glance, helping bridge image gaps between veterans and newcomers. Remote support is also possible: specialist technicians can view AR images and advise the site remotely, saving travel time while providing correct guidance. Given the geographically widespread and specialized nature of many railway projects, AR + communication–based remote presence can improve efficiency and safety. In short, AR digitalizes what used to rely on “intuition and experience,” supporting the site in an easily understandable way, drastically reducing mistakes and significantly improving efficiency.


Labor reduction and reduction of human error in nighttime work

Introducing high-precision RTK positioning and AR construction support has a major impact on labor reduction, especially for nighttime work. Railway track maintenance and construction are often performed late at night, and until now it was common to work in multi-person teams to ensure safety. But as described earlier, if a single person can perform accurate positioning with RTK and AR displays can prevent construction mistakes, the required workforce can be greatly reduced. Surveying and staking out tasks are already shifting from “three-person teams to one-person operations,” and digital tools will likely make more processes completable by one person.


Reducing personnel in nighttime work itself improves working conditions. Fewer people mean fewer shift replacements and less overtime, reducing individual burdens. Minimizing midnight shifts that young workers avoid can help with recruitment. JR West and others have proposed advancing the last train and shifting work to daytime, and digital technologies can support reductions in night shifts. Nighttime also increases the risk of poor visibility and mistakes, but AR visual support directly contributes to reducing human error. Following on-screen guidance is far less error-prone than relying on intuition in the dark for measurements and installations. For instance, an infrastructure company reported that visualizing underground utilities in AR drastically reduced excavation mistakes. In railway maintenance, scanning and AR visualization of hard-to-see cables and signaling equipment helps prevent accidental damage. Also, if as-built inspections can be performed via AR on the spot, mistakes discovered later are eliminated and corrections can be made the same day. In other words, errors can be eliminated on the same day, reducing the risk of major accidents caused by leaving quality defects unaddressed.


Labor reduction and error reduction also bring economic benefits. Fewer personnel reduce labor costs, and fewer mistakes and rework shorten schedules and compress costs. For example, overseas cases report eliminating waste equivalent to 7–11% of project budgets through AR-enabled mistake prevention and schedule shortening. Railway works have tended to adopt redundant processes for safety, but digital technologies can eliminate inefficiencies while enhancing safety, achieving both efficiency and safety. This directly contributes to the workstyle reforms of nighttime site staff, improving labor conditions and retention.


Of course, eliminating all personnel from nighttime railway sites is difficult for the time being. However, approaching work with a “small, elite team + digital tools” model can allow significant labor savings—for example, reducing five people needed for patrol inspections to two, or replacing a heavy machinery guide with AR-triggered automatic machine warnings. These are not merely headcount reductions but ways to complete tasks more safely and reliably with limited personnel. As a result, overtime and night shifts will be reduced, and the productivity and safety of railway sites will dramatically improve.


High-precision recording of as-built conditions through point cloud acquisition and cloud management

After streamlining field work with GNSS and AR, the next step is to obtain 3D point cloud data to record as-built conditions with high precision and manage them in the cloud. Modern smartphones include LiDAR sensors and high-performance cameras, and combining these with RTK positioning enables easy, high-precision point cloud measurements. For example, attaching an RTK receiver to an iPhone or iPad and scanning the site with a dedicated app tags each point in the point cloud acquired by camera or LiDAR with cm-level position coordinates, creating a digital 3D model (digital twin) that virtually copies the site.


The advantage of point cloud measurement is that it can capture as-built conditions over wide areas in a short time. In railway works, as-built management covers everything from large structures such as bridges and tunnels to terrain and equipment placement around tracks. Traditionally, various points were measured and drawn, but point clouds capture surface shapes in one go. The Ministry of Land, Infrastructure, Transport and Tourism promotes as-built management using 3D point clouds, and simple measurements using smartphone + RTK are being utilized in accordance with guidelines. For example, technologies have emerged that can create high-precision point clouds up to 60 m (196.9 ft) away simply by walking the site with a smartphone, without RTK-enabled drone imaging or expensive laser scanners. Some systems can scan large sites in under five minutes without training, and all acquired point clouds are given absolute coordinates, making them immediately usable as as-built deliverables. Even in areas where GNSS signals do not reach, such as the back side of a bridge, coordinates inside the structure can be derived by scanning from the outside and assigning control points, allowing the entire structure to be recorded in a unified coordinate system. The obtained as-built point cloud data are powerful when overlaid with the design 3D model; the aforementioned as-built heatmap is generated precisely by computing the difference between the design model and the point cloud.


Acquired point clouds and positioning data are increasingly managed centrally in the cloud. Uploading to a dedicated cloud allows 3D viewing of site as-built conditions from the office via a web browser. Cloud tools can measure distances between points, areas, and volumes; for example, earthwork volume calculations and deviation from height reference planes can be performed with a single click. Automatic difference checks between current point clouds and design data can be run in the cloud, generating color-coded heatmaps with a few clicks. Once large 3D datasets are uploaded to the cloud, heavy processing on local PCs is unnecessary, and data sharing and consensus building among stakeholders become easy. Systems that automatically generate drawings and photos for reports from the cloud are also emerging, further reducing the administrative burden of as-built management.


High-precision as-built recording in railway construction is also useful for future maintenance and asset management. For example, preserving point clouds of bridge piers or tunnels allows comparison with past data for displacement measurements or damage inspections. Having terrain data around tracks enables quick disaster response, such as comparing post‑heavy‑rain sediment runoff with historical data. Moreover, as-built point clouds can be incorporated into BIM/CIM completed models and used as digital twins. Railway companies are promoting 3D data conversion of infrastructure, and if precise point clouds can be easily obtained with a smartphone, this becomes a practical reality. In short, it is now possible to record on-site occurrences as high-precision digital records. Subtle deviations and shapes that paper records and 2D drawings could not express can be completely preserved in point clouds. This provides transparent quality proof for both clients and constructors and should ultimately improve the reliability of railway infrastructure.


Workflow of **LRTK** that achieves labor savings with smartphone RTK + AR + point clouds

The combined labor-saving workflow of smartphone RTK positioning, AR construction support, and 3D point cloud measurement described above is already being introduced in the field. A representative solution is the “LRTK” featured in this article. LRTK is a smartphone-mounted RTK-GNSS receiver and cloud service developed by Reflexia Inc., drawing attention as a next-generation tool that lets you complete positioning, guidance, scanning, and sharing with a single smartphone. Using LRTK, anyone at railway construction sites can readily perform advanced digital measurement and construction management. Its main features are summarized below.


• Centimeter-level high-precision positioning (horizontal error about ±2 cm, best-case 8 mm) Attaching an ultra-compact antenna-integrated receiver to a smartphone enables high-precision RTK-GNSS positioning. It supports Michibiki (QZSS) CLAS signals and can receive correction information even outside mobile network coverage, enabling cm-level positioning in mountainous or communication-unstable sites. The receiver has a built-in battery and is cordless; weighing only about 125 g and thus imposing minimal burden during work. The device configuration consists only of a dedicated smartphone case + a detachable receiver, requiring no complicated setup.

• Point cloud scanning and as-built management completed on a smartphone Scanning the surroundings with LiDAR-equipped iPhone/iPad acquires high-precision point cloud data with absolute coordinates. Earthwork calculations and cross-section creation can be performed immediately from the acquired data, allowing surveying to as-built inspection to be completed with a single smartphone. Scan range extends to a radius of several tens of meters, enabling clear point cloud capture of large structures such as bridges. Acquired point clouds and geotagged photos are automatically synchronized to the cloud, where they can be reviewed and analyzed in real time on office PCs. The system complies with the MLIT’s 3D as-built management guidelines and can be submitted as official as-built deliverables.

• Field guidance and visualization with AR Design BIM data and drawing information can be imported to the smartphone via the cloud and displayed on site in AR. Accurate AR projection aligns the design model with the real scene, indicating stake positions and structure installation locations in situ. Advanced functions include AR display of as-built heatmaps so defective areas can be visually identified on the spot. AR objects remain stable even while walking (thanks to high-precision position and orientation detection), making the system intuitive for anyone on site. Additional features include geotagged site photo capture and AR透視表示 of underground utilities, promoting site visualization.

• A labor-saving tool usable by anyone LRTK is designed so site personnel can use it without special training. The smartphone app is simple: start/stop positioning and save/upload data with one tap. Its pocketable weight and size make it readily available as a standard on-site tool, and pricing is set far lower than traditional surveying instruments, making one device per person realistic. LRTK has already been adopted for disaster investigations such as the Noto Peninsula earthquake and for civil surveying and infrastructure management across regions, demonstrating its effectiveness. As it can handle the on-site tasks of measuring, recording, and communicating in an all-in-one manner, deploying it can dramatically improve field productivity.


Solutions like LRTK—smartphone RTK + AR—are poised to transform how railway construction is performed. For sites struggling with staff shortages and nighttime work, a digital workflow that lets anyone measure accurately, construct without mistakes, and reliably record results is truly revolutionary. Tasks that once relied on veterans’ intuition are becoming feasible for newcomers with these tools. Labor-saving is not merely reducing personnel but the wisdom to accomplish safer, higher-quality work with limited staff. With high-precision positioning, AR, and point clouds reaching site practitioners via the familiar smartphone, railway construction DX (digital transformation) is beginning to deliver concrete results. Field engineers must proactively learn and master these new technologies to avoid being left behind. To connect railway infrastructure to the future, the labor-saving path opened by LRTK will only become more important.


(※ References: Detailed information on railway construction DX and LRTK is available from official announcements by JR companies, construction IT news sites, and Reflexia’s official pages. For those interested, see for example [JR East news release](https://railf.jp/news/2025/12/10/000000.html) and a [Construction IT blog article](https://ken-it.world/it/2025/07/lrtk-ar-as-built.html).)


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page