Smartening Railway Equipment Maintenance Inspections: Realizing Rapid and Reliable Field Response with AR and High-Precision Positioning

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

At railway equipment maintenance and inspection sites, efforts to support infrastructure continue daily under severe conditions: carrying out numerous tasks within the limited safety window late at night. In recent years, the increasing number of inspection targets due to aging equipment and workforce shortages have made it progressively difficult to cope with conventional methods. To overcome these field challenges, the railway industry is also experiencing a wave of digital transformation (DX). Particularly notable is the effort to smarten field operations by combining AR (augmented reality) technology with high-precision positioning technologies (such as RTK-GNSS). By visualizing on-site conditions in real time with a single smartphone and supporting work based on accurate location information, it is expected that maintenance and inspection tasks will be accelerated and made more reliable.


Below, we organize the field challenges in railway equipment maintenance and inspection and examine in detail how AR and high-precision positioning can solve them. We also explain labor reduction and automatic work-recording using smartphones, and report efficiency improvement and information assetization through cloud and GIS linkage. At the end of the article, we introduce a concrete workflow for simple surveying and AR support using the high-precision positioning tool LRTK.


Field Challenges in Railway Equipment Maintenance and Inspection

There are unique challenges at maintenance and inspection sites that support the safety of railway infrastructure, unlike other industries. The main points include the following problems surrounding the field.


• Night work burden: Because much railway equipment cannot be worked on during train operations, maintenance work is concentrated in the late-night hours after the last train and before the first train. Tasks must be completed quickly within a limited time (just a few hours), placing a heavy burden on workers. Working in darkness reduces visibility and increases the risk of mistakes and oversights. Noise and lighting issues also require consideration for the surrounding environment, and these constraints on night work themselves are a major challenge.

• Workforce shortages and skill transfer issues: Due to a declining birthrate and aging population and young people avoiding the field, it has become difficult to secure personnel engaged in railway maintenance. The harsh working environment with many night shifts has contributed to a declining number of field technicians. At the same time, as infrastructure ages, inspection and repair points are increasing; one estimate published by JR East predicts that by fiscal 2035 maintenance workload will increase by about 20% while the number of personnel will decrease by about 20% (see the [document](https://railf.jp/news/2025/12/10/000000.html) for the estimate). To maintain safety and quality with limited staff, it is urgently necessary to improve individual work efficiency and level out skills (eliminate dependence on specific individuals). Many tasks still rely on the experience and intuition of veterans, so transferring skills to newcomers and standardizing procedures are pressing challenges.

• Burden of reporting and documentation: After inspection work, it is necessary to compile inspection results and repair details into reports. Traditionally, this involved writing on paper checklists or later organizing photos taken with digital cameras, creating additional desk work after late-night operations. If report creation takes time, not only is timely information sharing delayed when problems occur, but the burden on workers also increases. If records remain on personal notes or paper, valuable inspection histories may not be fully utilized within the company and can become buried.

• Ensuring safety and preventing human error: At night sites, there is always a risk of human error due to worker fatigue and decreased attention. Working around live overhead wires carrying high voltage or on tracks where trains run can lead to serious accidents if a single mistake is made. Therefore, strict procedures prioritizing safety—such as pointing-and-calling or confirmation by multiple people—are required. However, safety management that depends solely on human attention has limits, and systems that use the latest technology to detect and avoid danger in advance are needed.


For these challenges, the key to solutions is expected to be the "visualization" and "automation" enabled by digital technologies. In the next chapter, we look at on-site support through the collaboration of AR and high-precision positioning (RTK), which is gaining attention as a concrete measure.


On-site Visual Support and Misidentification Prevention by Combining AR and High-Precision Positioning (RTK)

AR (augmented reality) is a technology that overlays digital information such as 3D models and text onto live images of the real world displayed through a smartphone or tablet camera. On the other hand, RTK-GNSS (real-time kinematic) is a positioning technology that corrects satellite positioning errors in real time and can determine positions with high precision on the order of several centimeters (centimeter-level accuracy (half-inch accuracy)). By combining this AR and high-precision positioning, a powerful visual support tool for railway equipment maintenance and inspection can be realized.


Typical smartphone AR requires marker placement or plane recognition for initial alignment, and virtual objects tend to drift from their real-world positions over prolonged use. However, by leveraging precise self-positioning via RTK, AR content can be directly tied to real-world geographic coordinates. In other words, you can overlay the desired information exactly on the intended railway equipment based on the worker’s current location. Stable AR displays that do not shift even when the user walks around can be achieved, eliminating troublesome on-site alignment work. For example, 3D models or markers can be displayed directly on the smartphone screen at the locations of signal equipment identified on maps or drawings, eliminating the need to search around the site for the equipment.


With AR + RTK visual support, the following effects can be expected on site:


• Accurate identification of target equipment: AR display based on high-precision location information allows inspectors to identify the equipment or parts to be inspected at a glance. For instance, even in areas with many cables and pipes, markings will appear only on the intended targets, preventing misidentification and oversights. This is especially useful at night when visibility is poor; AR markers can indicate the “next inspection point,” allowing workers to proceed without hesitation even in dark conditions. In railway track maintenance, there are proposals to display via AR the locations of parts scheduled for replacement and cable routes so that targets can be found accurately in the dark. Also, pointing a tablet could make a mark appear at the location of the “bolt to be tightened next”—such a scene in the near-future field is no longer far-fetched.

• Visualization of internal infrastructure: AR’s “see-through” effect can display infrastructure information that is normally invisible. For example, the route of buried cables can be drawn as a line on the ground, or the internal structure of signal devices and distribution boards can be visualized as if viewed through the casing. This allows you to identify underground wiring routes and quickly pinpoint fault locations without excavation, or to visualize the internal arrangement of devices without opening covers to better imagine inspection targets. Parts of the work that used to depend on comparing drawings with the site and intuition can be intuitively understood with AR, drastically speeding up response.

• Real-time display of safety warnings: AR also contributes to improving on-site safety. By highlighting warning messages and restricted areas directly in the worker’s field of view, it is possible to prevent approaches to hazardous areas in advance. For example, warnings such as “There is an overhead line pole 〇 m (〇 ft) ahead” or “High voltage ahead” displayed in AR ensure that critical safety information is not missed even in the dark. AR can also display the key points of inspection procedures on the spot, ensuring that workers reliably recognize the next steps. These functions help reduce human error and ensure thorough safety checks.


Thus, the combination of AR and high-precision positioning dramatically enhances on-site visualization and supports even inexperienced workers in handling equipment accurately. As a result, preventing missed inspections and reducing mistakes improves the reliability of maintenance work and leads to greater efficiency within the limited available work time.


Labor Reduction and Automatic Work Recording Using Smartphones

To easily enjoy the benefits of AR and high-precision positioning in the field, the key is the use of smartphones. Modern smartphones are equipped with high-performance cameras and sensors and, combined with compact external GNSS receivers, can function as multi-tools comparable to dedicated devices. Incorporating smartphones into railway equipment maintenance and inspection can yield the following labor-saving and automation benefits.


• Expansion of tasks that can be done by one person: Tasks that previously required teams of two or more people can increasingly be completed by fewer personnel using smartphones and apps. For example, distance and height measurements and layout tasks that previously required surveying instruments and divided labor can now be performed by a single person with a smartphone’s AR measurement functions. In civil engineering, there are already examples of AR apps on smartphones calculating excavation and embankment volumes on site to reduce labor. Also, in situations where workers used to carry paper drawings and seek instructions, being able to check instructions and drawings in real time on a smartphone eliminates the need for an experienced person to accompany them, allowing less experienced workers to handle certain tasks independently.

• Automation of data entry: With a smartphone, recording inspection results can be automated and simplified. By attaching QR codes or NFC tags to equipment and reading them with a smartphone, equipment information and inspection timestamps can be recorded automatically. Checking inspection items in the app can immediately update the database, eliminating the need to transcribe paper notes later. Photo documentation taken with a smartphone and shared to the cloud on the spot will be recorded together with location information. This enables “recording while working” and frees workers from being burdened with report creation after the job.

• Efficiency through tool consolidation: Using a smartphone as a general-purpose device makes it possible to consolidate the functions of measurement instruments, cameras, note-taking, and communication devices. Reducing the equipment carried on site not only lightens the load but also prevents data transcription errors between devices. For example, where workers used to carry paper drawings, a camera, a GPS device, and notebooks, replacing all of that with a single smartphone makes movement lighter and reduces work time. Using communications functions, it becomes easy to share the situation from the field via video call with the office or request remote assistance, enabling remote collaboration. As a result, you can make more effective use of limited personnel and speed up field responses.


By shifting to this smartphone-centered workflow, maintenance and inspection can be carried out with fewer people even on understaffed sites. Because data recording and sharing can occur simultaneously with fieldwork, the need for extra administrative tasks after work is reduced, contributing to improved working conditions for workers.


Reporting Efficiency and History Assetization through Cloud and GIS Integration

After digitizing field data with smartphones and AR, further efficiency and value creation can be achieved by centrally managing that data in the cloud and linking it with GIS (geographic information systems).


Cloud linkage for real-time sharing: Inspection data and photos collected on site are automatically uploaded to the cloud and can be viewed immediately by office staff and stakeholders. This eliminates the traditional hassle of handing over photos via USB or circulating paper reports and achieves real-time information sharing. For example, if an anomaly is found, reporting from the field with photos to the cloud enables managers to make judgments and issue instructions on the spot. If the data includes geographic coordinates, it can be automatically plotted on a cloud map, providing a high level of visibility of the status at multiple locations.


Streamlining reporting tasks: Data accumulated in the cloud can be used to greatly streamline the creation of daily and inspection reports. Because inspection items and results are in a database, values can be automatically filled into prescribed formats to generate reports, or images can be inserted into designated places in forms for immediate output. The person in charge only needs to review and add supplementary explanations, dramatically shortening the time required to prepare reports. Additionally, by circulating electronic approval workflows in the cloud, the waste of commuting to the office for paper signatures can be eliminated.


Making inspection history an asset: Digitized inspection histories become valuable assets rather than mere records. If past inspection results and repair histories are visualized on a GIS map, it becomes easy to analyze where certain issues frequently occur and which areas should be prioritized for repairs next. Past data can also be used directly in the field; for example, leaving an AR marker at the location of a previous repair allows the next inspection to identify “the same place as last time” at a glance and thoroughly check for re-deterioration. Inspectors can perform history-based inspections to ensure that recurring cracks have not reappeared or that previously replaced parts are functioning properly, preventing oversights and improving maintenance quality. The accumulated big data can also be analyzed by AI in the future to support degradation prediction and anomaly detection.


By linking cloud and GIS, the flow of information from the field to the cloud to management becomes smooth, accelerating the PDCA cycle for maintenance and inspection operations. Field inspection records themselves become management resources, helping to formulate strategic equipment investment and maintenance plans, among other secondary benefits.


Workflow for Simple Surveying and AR Support Using LRTK

Finally, we present a concrete procedure for using AR and high-precision positioning in the field, taking the smartphone high-precision GNSS solution LRTK as an example. LRTK is a system that attaches a compact RTK-GNSS receiver to a smartphone and links centimeter-class positioning with AR functions. Using this tool makes it possible to perform surveying through AR-supported inspection in an integrated manner. The general workflow is as follows.


• Pre-work preparation (data setup): Before work, load the data you want to reference on site into the smartphone app. For example, upload position information and drawing data for inspection targets, 3D models, and past inspection histories. Also set the positioning coordinate system to be used (global geodetic system or a proprietary coordinate system) and prepare RTK correction information (reference-station data via network or settings for receiving the quasi-zenith satellite QZSS CLAS signal). If necessary, verify the smartphone’s positioning accuracy at known points for reassurance.

• Equipment setup (attach smartphone + LRTK): Upon arrival at the site, attach the LRTK receiver to the smartphone and launch the dedicated app. Connect the smartphone and receiver via Bluetooth or similar and begin satellite positioning. In an environment with an open sky where satellites can be sufficiently captured, an RTK “Fix” solution (a high-precision fixed solution) can be obtained in a few tens of seconds, and the current position will be displayed on the smartphone screen with centimeter accuracy (half-inch accuracy).

• On-site confirmation in AR mode: Once positioning is stable, switch the app to AR display mode. Point the smartphone or tablet camera and the preloaded data will be overlaid in real time on the live image. For example, if a signal or substation equipment to be inspected is in front of you, the equipment name and inspection items will pop up above it. Where there are underground buried objects, their routes are displayed as lines on the ground. By compositing digital information into the real landscape, you can grasp both the site situation and necessary information simultaneously.

• Conduct inspections and measurements: Perform actual inspection work while confirming via AR. If an inspection procedure is displayed, follow the instructions and check off completed items on the screen. Perform measurement and recording tasks as needed. For example, if you find a “point of concern,” tap a button on the smartphone screen to save the 3D coordinates of that location. Taking a photo will automatically upload an image with position information (latitude, longitude, and altitude) to the cloud. If the LRTK receiver supports tilt compensation, it can automatically correct the coordinates of the point indicated by the tip even when the smartphone is tilted, making it easier to survey locations that cannot be accessed directly behind obstacles.

• Data sharing and utilization: Various data acquired on site are sent to the cloud in real time and can be immediately confirmed from office PCs and other terminals. Inspection data spanning multiple days are aggregated in a unified coordinate system, allowing later comparison of temporal changes by point or analysis of wide-area trends. Cloud data can be used directly for report creation, and it is possible to immediately share automatically generated reports with stakeholders after inspection completion.


With the smartphone + LRTK workflow described above, the entire process from surveying and inspection to recording can be completed rapidly on site. Seamless connectivity between the field and the cloud enables real-time on-site decision-making and feedback, greatly shortening the PDCA cycle for trouble response and work planning. Intuitive AR displays also help less-experienced technicians accurately identify key points, contributing to reduced reliance on veteran staff.


Conclusion

Smartening railway equipment maintenance and inspection is a powerful solution to the unavoidable issues of workforce shortages and aging infrastructure. By realizing on-site visualization and efficiency through AR and high-precision positioning, and transforming work styles via data linkage using smartphones and the cloud, it becomes possible to maintain railway infrastructure more safely and reliably with limited resources. By bringing technological power to the night-time sites that support railways, we can build a sustainable maintenance system for the next generation.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.