DX for Construction Management of Buried Underground Pipes: Determine Buried Pipe Positions with RTK×AR at 5 cm (2.0 in) Precision

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Invisible risks of buried pipes: you don’t know until you dig

As the saying goes, “you don’t know until you dig,” it is currently the case that pipes buried underground (water pipes, sewer pipes, utility ducts, agricultural drainage pipes, etc.) only reveal their exact positions and conditions once excavated. Because what is buried underground is not visible, construction sites are constantly exposed to unseen risks. In fact, accidents caused by accidental damage to buried pipes continue to occur. For example, while excavating with a backhoe, workers may snag and break an old water pipe not shown on the drawings, or mistakenly strike a gas pipe due to misjudged positioning—numerous such accidents occur nationwide every year. The Ministry of Land, Infrastructure, Transport and Tourism has reported that in some areas incidents involving underground buried objects have surged to five times the previous year, underscoring the increasing importance of safety measures.


If a buried pipe is damaged, it not only interrupts construction and increases repair costs but also has major impacts on the lifelines of nearby residents. A damaged water pipe causes water outages, a damaged gas pipe causes gas leaks, and a damaged communications cable causes service outages—each delivering severe blows to social life.


To reduce these accident risks, making the otherwise invisible buried pipes “visible” is essential. It is necessary to accurately determine positions before excavation and carry out error-free construction. However, on many sites the only available means to obtain buried pipe position information are still paper drawings and verbal instructions, and the uncertainty of such information is itself a risk factor.


Drawings don’t match the field: limits of paper drawing management

Conventional methods for managing buried pipe positions rely on paper as-built drawings and ledgers. Before construction, route drawings are requested from relevant parties (power companies, water bureaus, telecommunications companies, etc.) and checked, but it is common that the pipes are not actually buried as shown on the drawings. One cause is outdated drawings that do not reflect the latest updates. Even if routing was changed based on on-site decisions during past work, those changes may not have been recorded on the drawings. Differences in construction accuracy and surveying standards can also produce discrepancies of several tens of centimeters between the dimensions on drawings and the actual positions. Near manholes, pipes may curve or be buried shallower than indicated on the drawings, and the true situation often only becomes clear when the ground is excavated.


Information on paper drawings is thus limited and discrepancies with the field frequently occur. For this reason, more experienced personnel often advise, “Don’t take the drawings at face value—always trial-dig to confirm.” In many sites, before fully deploying heavy machinery, workers still perform test excavations with shovels to confirm the presence and location of buried pipes. However, test excavations require time and effort and reduce productivity.


Paper drawings are also difficult to view on site, and the task of cross-checking multiple drawings is cumbersome. Even if you carry drawings, it can be hard to grasp which point on the ground corresponds to which point on the drawing, and paper-based management makes real-time correlation with the field difficult. In addition, paper materials are subject to deterioration and loss, making them unsuitable for long-term maintenance management. Conventional buried pipe management has faced major challenges in terms of information accuracy and immediacy.


How DX changes buried pipe management: the value of digital location data

To address these challenges, digital transformation (DX) is expected to revolutionize buried pipe management. By recording and managing buried pipe positions as high-precision digital data, the era of “you don’t know until you dig” can be left behind, enabling safer and more efficient construction and maintenance. Digital location data offers many values that paper drawings cannot.


• Preventing misidentification during excavation and enabling pre-checks: With accurate coordinate data for buried pipes, you can compare drawings with the actual site in advance and greatly reduce the risk of digging in the wrong location. Collision checks and location marking can be performed on the data beforehand, preventing field troubles such as “the location differs from what I was told.”

• Improved accuracy of position records and reusability: Digital data can record positions with centimeter-level accuracy (half-inch accuracy), making it far more precise than paper. Once high-precision data has been obtained, it can be reused for future maintenance or other projects without having to remeasure each time. Position information accumulated as an asset is useful for future construction planning and emergency responses.

• Intuitive visualization with AR: Digitized buried pipe data can be overlaid on site images using AR (augmented reality) technology. This allows even those who cannot read drawings to intuitively grasp the position of underground pipes through a smartphone screen, leading to error-free work.

• Information sharing and efficiency through cloud sharing: Digital data can be shared on the cloud via the Internet. Stakeholders can access the same latest information at any time, avoiding the hassle of distributing and collecting paper. Records and report generation can be automated and simplified using the data, improving operational efficiency.


The Ministry of Land, Infrastructure, Transport and Tourism is promoting the digitization of construction records into three-dimensional data and the use of ICT through policies such as “i-Construction,” accelerating the trend toward digital management of underground buried objects. DX for buried pipes can be said to be the key to dramatically improving safety and creating lasting asset value.


Record with 5 cm (2.0 in) precision immediately after installation using high-precision RTK positioning

One of the technologies that enables digital management is high-precision positioning using RTK. RTK (Real Time Kinematic) is an augmentation technique for satellite positioning (GNSS) that uses correction information from a base station to improve positioning accuracy to within a few centimeters. In Japan, environments that make RTK positioning relatively easy to use have been established through centimeter-level augmentation services provided by the QZSS “Michibiki” (CLAS) and network-type reference station services (VRS, etc.) offered by both public and private sectors.


By utilizing RTK positioning on site, the position of a buried pipe can be recorded immediately after burial. Specifically, the upper parts or key points of installed pipes are measured with a GNSS receiver and saved as high-precision latitude, longitude, and elevation data. With RTK, errors are contained within about 5 cm (2.0 in), which represents an order-of-magnitude improvement over traditional visual estimates or tape-measure records. For example, while conventional records tended to be vague descriptions such as “buried about 2.5 m (8.2 ft) from the road edge,” RTK records can indicate the exact position in a global geodetic coordinate system. This allows creation of an “accurate map based on actual measurements” of buried pipes so that anyone can identify locations by the same standard.


High-precision GNSS surveying equipment might evoke images of large instruments and specialized knowledge, but in recent years compact, lightweight devices and smartphone-linked units have emerged, allowing single-person centimeter-accuracy positioning. If the site supervisor or survey personnel quickly measure with GNSS equipment during installation, there is no need to frantically estimate positions after backfilling. With a small amount of effort, a “high-precision construction record” that retains future value can be completed on the spot.


Point clouds and photos provide evidence that eliminates the need to dig

In addition to recording positions as point data, using three-dimensional point cloud data and photographs allows detailed shapes and surroundings of buried pipes to be visualized and preserved in records. Point cloud data is a collection of many points obtained by laser scanning or photogrammetry that represents the shape of an object in 3D with high precision. If the trench is scanned with the pipe installed, the routing, slope, and depth of the pipe can be digitally preserved as they are. For example, using a smartphone’s LiDAR sensor or a 360-degree camera, you can quickly scan around the piping and acquire a high-density point cloud. If color photographic information is overlaid on that point cloud, it becomes a visual piece of evidence that intuitively shows “what kind of pipe was buried there and in which orientation” when reviewed later.


Photographs alone can serve as construction records, but combining them with point cloud data creates strong evidence that lets you “know without digging.” Even after backfilling, piping that is no longer visible from the surface is reproduced in the digital space as it was, allowing detailed positional relationships that drawings might miss to be understood. For instance, distances to other facilities, the shape of pipe joints, and elevation differences relative to surrounding buried objects can be measured on the point cloud. While paper drawings and flat photos only retain two-dimensional information, 3D point clouds record the entire spatial context, allowing requests such as “want to check from another angle later” to be satisfied.


If such digital records exist, when future nearby work requires excavation, there is no need to rely on vague guesses based on experience or intuition. The peace of mind that comes from having objective data is a major benefit for both constructors and managers.


AR visualization of positions and its effect on preventing excavation errors

Recorded digital data can be used not only as office drawings but also in ways that can be “seen” directly on site. A prime example is AR visualization of buried pipes. With a dedicated app or compatible device, the position of buried pipes can be virtually overlaid on the live camera view of a smartphone or tablet. For example, after burial work is completed, pointing a smartphone at the paved road can make the route and depth of pipes buried beneath appear through the screen. It is as if a viewing window were created in the ground, allowing intuitive confirmation of underground piping.


AR visualization dramatically improves pre-checking and marking of excavation locations. Where workers once relied on intuition and experience with paper drawings to mark the ground roughly, AR aligns positions down to a matter of centimeters, enabling error-free instruction. Field workers can grasp locations from the imagery without needing to interpret drawing symbols, reducing communication errors. In areas with dense buried utilities, being able to view precise positional relationships on the spot with AR is key to safe operations. Near-miss cases such as “there was another pipe closer than expected and it was almost interfered with” can be noticed and avoided in advance with AR.


Another advantage of AR is that it is usable without special skills. Anyone can reproduce a 3D model of a buried pipe on site simply by following the on-screen guide and pointing the device. The ability for the entire site crew to share a visible representation means the team can have accurate situational awareness without relying on a veteran’s intuition or memory. As a result, the risk of pipe damage from excavation mistakes is greatly reduced, contributing to accident prevention. The reassurance of “seeing” with AR also reduces psychological burdens on the site and helps foster a stronger safety-first mindset.


High-precision location data can be reused for maintenance and inspection

Once high-precision buried pipe position data is recorded digitally, it becomes a valuable asset not only immediately after construction but also for future maintenance and inspection work. Infrastructure is not finished once installed; inspections, repairs, and replacements are required for decades afterward. Whether accurate buried position records exist greatly affects the efficiency and safety of those tasks.


For example, when replacing aging pipelines years after installation, having records from the time of installation allows precise planning of excavation areas and routes for new pipes. During replacement of deteriorated water pipes, it is common to dig directly above the existing pipe, but thanks to high-precision data, time spent on pre-buried-object verification (confirming what is where) is reduced. In emergency leak repairs or equipment failure responses, referencing the data minimizes rework on site and enables prompt action. Municipal water departments and management companies can more easily develop future maintenance plans by maintaining a reliable digital buried ledger.


Periodic inspections also benefit from easy comparisons with past data. For example, when a road collapses, buried pipe position data helps estimate the affected area and investigate causes. With 3D point cloud data, pipe deflection due to ground movement can also be detected digitally, advancing the sophistication of inspections. What once required opening covers and confirming on site can now be analyzed to a large extent at a desk.


Accumulated digital data is also excellent in that it can be reused for multiple purposes. It can be used to check for interference with other infrastructure during new road constructions or to list critical pipelines at risk during disasters—applications are wide-ranging. Having high-precision location information shifts facility management from ad hoc responses to planned, preventive approaches. Through DX, buried pipe data becomes a living information asset, contributing to reduced long-term maintenance costs and improved service reliability.


Documents and reports streamlined: record management through cloud sharing

Digitalized buried pipe information can be shared and managed in real time among stakeholders through the cloud, yielding major efficiencies in post-construction documentation and reporting. Traditionally, upon completion of buried pipe works, cumbersome paperwork such as drafting plan and profile drawings and attaching photo ledgers was required. With DX, these deliverables can be automatically generated from digital data and electronically submitted via the cloud.


For example, positioning points, point clouds, and photos acquired on site can be uploaded to the cloud immediately, allowing the office to review them at once. On a cloud platform, stakeholders can view 3D models and measurement data of buried pipes and, if necessary, measure distances and areas. Because 3D visualization can be done via a browser without specialized software, information sharing with clients and other departments is smooth. A single latest dataset can be made available to all stakeholders.


If records are stored in the cloud, searching past project data also becomes easy. When an excavation plan arises at a certain location, you can quickly look up “who buried what pipe how many years ago” without rummaging through paper files—accessing the required information via keywords or maps. Report creation can be semi-automated by aggregating and processing cloud data, reducing the burden on responsible staff.


Furthermore, cloud sharing smooths inter-organizational information coordination. If municipalities, infrastructure operators, and contractors use a common data platform, inquiries and update requests about buried objects can be centralized online. Inefficiencies such as requesting drawings by fax or phone are eliminated, and required information becomes available 24/7. DX-driven cloud record management realizes total efficiency gains not only in field operations but also in back-office administrative work.


What is LRTK: bringing high-precision GNSS surveying to anyone with a smartphone

You may wonder whether the RTK positioning, point clouds, AR, and cloud technologies introduced so far can really be used on your own sites. Lately introduced LRTK is an attention-grabbing solution that makes these advanced technologies easy for anyone to handle. LRTK is a system composed of a compact high-precision GNSS receiver that attaches to a smartphone and a dedicated app, enabling centimeter-level surveying that previously required specialized equipment to be performed with just a smartphone.


Specifically, a receiver (LRTK device) weighing about 125 g and about 1.3 cm (0.5 in) thick is mounted on an iPhone, for example, in a dedicated case and the app is launched. The receiver receives correction signals from Michibiki and GPS and performs high-precision positioning on the smartphone in real time. The typical accuracy is about 2–3 cm (0.8–1.2 in) horizontal error, and by averaging measurements in a stationary state, sub-centimeter accuracy of less than 1 cm (0.4 in) can even be achieved. It transforms a smartphone into a pocket-sized surveying instrument, distinctly superior to the coarse accuracy of built-in GPS.


The LRTK app integrates a variety of functions useful for buried pipe management. In addition to recording coordinates of positioned points and displaying them on a map, the app can acquire point cloud data using a smartphone’s LiDAR sensor or camera-based 3D scan functions. The acquired point clouds and photos are automatically linked to high-precision coordinates and can be reviewed immediately in the app. With one tap you can switch to AR mode to overlay saved 3D data onto the real scene. Because alignment is automatically based on high-precision coordinates, the overlay matches the real object without drifting. Cloud integration is also provided, making it easy to upload site data immediately and share it with the office or client.


Tasks such as as-built measurements and time-consuming buried-record workflows that used to be outsourced to surveying specialists can now be done by anyone with an LRTK-equipped smartphone—simple surveying with a phone in hand. The ease of measuring with a smartphone when needed, without investing in expensive dedicated equipment, is a major advantage for local governments and small to medium-sized contractors. LRTK is breaking down the cost and skilled-person barriers that have stood in the way of on-site DX.


Start small, change big: recommendations for introducing DX for buried pipe management with LRTK

Introducing DX into buried pipe management has the potential to greatly change how infrastructure is operated in the future. However, there is no need to replace everything at once. The important thing is to start small and steadily experience the benefits. For example, why not take a small first step by using LRTK to record the position and perform a point cloud scan for just a single buried pipe on your next job? Through the experience of measuring with a smartphone and storing data in the cloud, site staff themselves will notice the differences from traditional methods.


Even small-scale introductions produce data that can generate great value in the future. Even during trial operations, if one highly accurate buried-pipe dataset is added, it alone reduces risk for the next project and improves maintenance efficiency. Those accumulations will eventually lead to database construction across the company or jurisdiction, making a world where you can “understand the site without digging” a reality.


DX tools like LRTK, which are easy to adopt, are ideal for on-site trials. Because initial investment is low, you can begin with a “let’s just try it” attitude to improve site operations. Once you experience the benefits, you will gain concrete returns in the form of improved safety management and operational efficiency. DX for construction management of buried pipes is an unavoidable challenge for those of us charged with future infrastructure management. Take this opportunity to start high-precision, efficient buried pipe management with a smartphone and LRTK. A first step toward visualizing the unseen underground will be a major stride toward building safe, resilient infrastructure.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.