In cultural heritage preservation work, recording the current condition is an objective in itself, but it is equally important to prepare those records so they can be used for future repairs, investigations, public presentation, and transmission. However, on site there are often overlapping constraints—large target areas, complex shapes, many high or hazardous locations, difficulty allocating many days for work, and restrictions that allow work only on facility closed days—that can force investigation plans to proceed without sufficiently thorough records. UAV photogrammetry has therefore attracted attention. Because it can densely record the current condition from continuous images captured from above, it facilitates efficient wide-area understanding and visualization, enhancing the speed of initial responses and the ease of decision-making in cultural heritage practice. This article organizes concrete ways UAV photogrammetry can be used in cultural heritage preservation in ways that connect to on-site decision making.


Table of Contents

• Why UAV photogrammetry is gaining attention in cultural heritage preservation

• Use Case 1: Rapidly assess the current condition of wide-area sites

• Use Case 2: Improve recording accuracy of roofs and high-elevation details

• Use Case 3: Make before-and-after repair comparisons easier to document

• Use Case 4: Streamline initial recording after disasters or deterioration

• Use Case 5: Use as base data for drafting drawings and creating 3D materials

• Use Case 6: Help create materials for public use and exhibition preparation

• Use Case 7: Understand the preservation environment including surrounding topography and drainage conditions

• Use Case 8: Make it easier to continue multi-year monitoring

• How to proceed to successfully achieve efficiency gains

• Points to note when introducing UAV photogrammetry into cultural heritage preservation

• Conclusion


Why UAV photogrammetry is gaining attention in cultural heritage preservation

UAV photogrammetry is supported in cultural heritage preservation not simply because it can capture images from the air. Its value lies in the ability to quickly obtain an overview of a large area while producing records that are easy to use in later processes. From the ground alone, it is difficult to capture the same density of information about overall layout, relationships with surrounding topography, roof surface deformations, high-elevation damage, and conditions in areas that are hard to access. With appropriate flight planning, UAV photogrammetry can produce continuous areal image records, making it easy to generate multiple deliverables such as orthophotos, 3D models, point clouds, and cross-section reference materials.


In cultural heritage preservation, the purpose of records is not singular. The same site data may be used for current condition checks, damage assessment, reference for repair design, consensus building, creation of public materials, and temporal comparisons. Having different personnel repeatedly re-measure the same site increases time and burden. If UAV photogrammetry is used as the starting point to establish common base data, stakeholders are more likely to look at the same information, reducing mismatches in understanding among preservation staff, designers, contractors, and managers. This is an especially important aspect of efficiency: it is not merely labor-saving but directly contributes to workflows with fewer iterations.


Of course, conditions differ by cultural property. For targets where fine detail matters, like stone structures; for buildings where roofs and eaves are focal points; and for archaeological sites where broad topographic variation is important, required shooting methods and deliverables differ. Therefore UAV photogrammetry is not a universal standalone method; its true value emerges when combined with ground photography, close-range measurement, existing drawings, and supplementary observations. Even so, it is unquestionably a method that advances practical cultural heritage preservation by enabling a fast initial overview and making it easier to judge whether additional surveys tailored to site conditions are needed.


Use Case 1: Rapidly assess the current condition of wide-area sites

On sites with large coverage such as wide-area archaeological sites or historic parks, relying mainly on ground-based walking inspections can make current condition assessment time-consuming and prone to oversights by individual staff. Preservation concerns—microtopography of the surface, positions of paths, slope failures, vegetation spread, and interactions with visitor routes—are widely and diffusely distributed. UAV photogrammetry helps by enabling the site to be understood as a single surface rather than as fragmented points. Seeing the site as a connected wide area makes it easier to narrow down areas that should be prioritized for inspection.


For example, at sites with undulations such as burial mound clusters or castle ruins, walking the site can bias perception toward local impressions and make it difficult to grasp overall contours and continuity of elevation differences. Using aerial images and 3D data obtained from UAV photogrammetry allows you to overlook the grouping of terrain and the positional relationships of deformations, making it easier to decide where to concentrate ground checks. As a result, time on site can be used more effectively and variation due to differences in investigators’ experience can be reduced.


Furthermore, at wide-area archaeological sites it is very important to build shared understanding among stakeholders when explaining the site. Terrain conditions that are hard to convey with text or speech can be more readily shared with overhead images. When considering preservation plans, revising traffic flows, or prioritizing vegetation management, it becomes easier to organize which areas to target and why, reducing rework in coordination. In other words, UAV photogrammetry functions as the initial mapping for wide-area cultural properties and helps organize the overall sequence of preservation work.


Use Case 2: Improve recording accuracy of roofs and high-elevation details

For built cultural properties, areas that are difficult for people to approach—such as roof surfaces, ridges, gable ends, clerestory windows, and upper decorations—are often of high preservation importance. However, there are often circumstances where wide inspection is desired before erecting scaffolding, where excessive proximity to the structure should be avoided, or where the current condition needs to be recorded in a short time; as a result, recording of high-elevation areas tends to be postponed. UAV photogrammetry is effective for efficiently capturing the current condition of such high-level decorative elements and roofs. Continuous shooting from above and oblique angles makes it easier to document surfaces that are often in blind spots from the ground.


In historic buildings, top-of-roof tile displacement, surface material loss, failures in rainwater management, sinking of ridge areas, and deterioration of decorative elements can start at upper levels and lead to damage below. If the state of high areas can be identified early, it becomes easier to select locations that require close-range inspections, improving the accuracy of scaffolding plans and repair plans. Not everything is judged solely from aerial images, but their value as preliminary information is very high, helping to organize necessary on-site work without waste.


Moreover, roof and high-elevation details can be difficult to interpret in terms of continuity from planar photographs alone. When UAV photogrammetry enables three-dimensional understanding, it becomes easier to examine which surfaces concentrate deformation, whether problems align with drainage directions, and whether relationships with surrounding trees or adjacent structures create biases in sunlight or moisture conditions. Traditionally, recording high-elevation areas was often handled separately as part of specialist surveys, but using UAV photogrammetry makes it easier to understand them in the context of the building’s overall preservation condition.


Use Case 3: Make before-and-after repair comparisons easier to document

In cultural heritage preservation, it is required not only to carry out repairs but to leave records that can explain what the condition was before repair and how it improved after repair. In practice, pre-construction records are sometimes scattered across photos taken by different staff or taken from inconsistent positions, making later evaluation difficult. UAV photogrammetry standardizes the approach to photographing the entire target, making it easier to establish a basis for before-and-after comparison.


For example, for targets where areal deformations are problematic—such as stone walls, fences, roofs, slopes, and garden components—shooting with consistent orientation and density pays off for future explanations. Pre-repair records can be used to understand the distribution of deformations, and post-repair they can be used to confirm the treated areas and surface conditions. Because such records are useful for stakeholder reporting, explanations to managers, and references for future repairs, a single shoot that satisfies multiple purposes is advantageous.


Also, repairs are sometimes adjusted during construction in response to additional findings. If a comprehensive pre-construction record exists, it becomes easier to verify differences from initial judgments. Conversely, with only localized photos, it can be difficult to trace why certain decisions were made later. UAV photogrammetry, by broadly capturing surface information of the current condition, is also effective as a foundation for construction records. Leaving comparable photographic data is important not only for debating whether to proceed with repairs but also for accumulating a history of repairs as an asset.


Use Case 4: Streamline initial recording after disasters or deterioration

Cultural properties can change rapidly due to external factors such as wind and rain, earthquakes, frost damage, snow load, flooding, and fallen trees. Immediately after an abnormality occurs, safety measures, access restrictions, emergency response, and report preparation often run concurrently, and recording tends to be deferred. However, the initial state is extremely important for deciding subsequent countermeasures. UAV photogrammetry offers great value in cultural heritage preservation because it can quickly record wide-area conditions in that initial phase.


After damage, there may be areas that cannot be safely approached from the ground. When roof materials have fallen, slopes have collapsed, trees have fallen nearby, or outer paths are obstructed, the range that people can safely inspect is limited. In such cases, being able to grasp the overall situation from above makes it easier to chart the extent of damage while avoiding hazardous areas. Decisions about which areas require emergency response, where to approach from, and the priority for temporary protection can be made without relying solely on on-site intuition.


Additionally, after a disaster the authorities and stakeholders also need quick explanations and recovery planning. The overhead and three-dimensional information obtained from UAV photogrammetry is suitable for sharing damage conditions. Compared with a mere collection of photos, it makes understanding the connectivity of damage locations and relationships with surrounding topography easier, helping unify understanding among stakeholders. Detailed damage diagnosis and material investigations are still needed separately, but quickly assembling an overall record at the initial stage forms the foundation for conducting subsequent specialist surveys accurately. Since cultural properties can suffer secondary damage over time, the speed of initial recording itself should be regarded as directly tied to the quality of preservation.


Use Case 5: Use as base data for drafting drawings and creating 3D materials

Cultural heritage preservation often requires drawings and visualization materials such as current-condition maps, site plans, elevation reference materials, sectional studies, and materials for explaining repair plans. However, repeatedly conducting additional surveys on site from scratch for every drawing is burdensome and difficult to schedule. Data acquired by UAV photogrammetry are well suited as base data for such drawing work and 3D material creation, helping to streamline downstream preparations.


In particular, for cultural properties with multiple elements scattered across a large site, it is important to consistently organize overall layout and positional relationships of each element. Continuous aerial images and orthophotos make it easier to view buildings, stone walls, fences, approach paths, garden paths, tree belts, and waterways on a common base. Even when treating repair targets partially, it becomes easier to indicate where that element sits within the whole, making the drawings easier for the reader to understand.


Also, 3D materials are useful not only to specialists but also for sharing with managers and local stakeholders. Preservation planning can stall if results are presented only as specialist terminology. Materials that show spatial relationships make it easier to convey where issues exist and why certain measures are necessary. If UAV photogrammetry is prepared as base data, it is easy to expand into explanatory materials as needed, reducing the effort between investigation and explanation. This is a significant practical efficiency gain. Reducing the number of returns to the site solely for drafting also reduces the number of times the cultural property must be accessed, which is meaningful from a preservation standpoint.


Use Case 6: Help create materials for public use and exhibition preparation

Cultural heritage preservation does not end with preservation itself; it is deeply connected to how value is conveyed. For public opening, exhibition interpretation, education, and regional outreach, materials that clearly present the cultural property are necessary. UAV photogrammetry is also effective for creating materials used in such public-facing applications. Aerial perspectives easily show overall views that visitors normally cannot see, helping convey the property’s layout, scale, relationship to terrain, and connection with the surrounding environment intuitively.


For example, having overhead images makes a large difference in how easily one can understand the full extent of an archaeological site that is only partially visible from ground level or how multiple structures are arranged. When visual information suitable for display panels and interpretive materials is prepared, it becomes easier to return the results of preservation surveys to society. This is important for those responsible for cultural property: materials that help explain why preservation is necessary and why investigation or repair takes time play a major role.


Furthermore, if public-use materials are produced separately from preservation surveys, similar work may be duplicated on the same site. By planning UAV photogrammetry systematically within preservation work, data can be used across recording, analysis, explanation, and public presentation. Naturally, care must be taken in how information is presented to the public, and not all information should be released as is. However, with rich base data it becomes easier to re-edit for the appropriate scope, broadening options for how preservation outcomes are presented. The ability to draw value from the same data assets for both preservation and public use is an unmissable advantage of UAV photogrammetry.


Use Case 7: Understand the preservation environment including surrounding topography and drainage conditions

Damage to cultural properties does not always arise solely from deterioration of the object itself. The entire preservation environment—including surrounding topography, rainwater flow, surface gradients, vegetation growth, and relationships with adjacent facilities—can be influential. Thus, looking only at the cultural property itself may not reveal the cause. UAV photogrammetry is suitable for deepening understanding of the preservation environment because it makes it easy to capture the site and its surroundings as an areal whole.


For example, if moisture is concentrated in only part of a stone wall, nearby drainage routes or slight surface elevation differences may be involved. If damage appears around a building’s plinth, underlying causes might be missed unless surrounding pavement gradients and sources of rainwater accumulation are examined. The overhead information and terrain-capture materials provided by UAV photogrammetry offer clues to such background conditions. Rather than chasing individual damages alone, it becomes easier to organize what in the preservation environment is influencing the site.


Also, cultural properties may need to be preserved as part of the surrounding landscape. By broadly capturing views, circulation routes, relationships with adjacent facilities, and how slopes are seen, it becomes easier to consider directions for preservation and maintenance. Relationships across the whole site that are hard to see from the ground can be organized with aerial information. As environmental understanding advances, management can shift from reactive responses after damage occurs to preventive preservation management. This significantly improves the quality of cultural heritage preservation and, in the long term, reduces on-site response efforts.


Use Case 8: Make it easier to continue multi-year monitoring

Cultural heritage preservation is not completed by a single survey; watching the condition over multiple years is important. In reality, however, personnel and contracting arrangements often change year to year, and record-taking methods can vary. As a result, when trying to compare last year and this year, shooting positions and target ranges may differ, making it hard to detect changes. UAV photogrammetry is effective as a foundation for continuous monitoring because shooting plans are easy to standardize.


For example, by repeatedly collecting data over the same area, at similar times, and under similar shooting conditions, it becomes easier to compare slope failures, vegetation changes, roof surface degradation, and surface condition trends. Natural conditions will not be identical, of course, but at least variation in recording methods can be suppressed. This is important for separating actual change from differences in recording conditions. When changes are easier to detect, it becomes easier to judge the timing for repairs or the need for additional surveys.


Also, for monitoring tasks it is not realistic to arrange large-scale on-site operations every time. That is why a two-step approach—quickly confirming the overall situation, then closely inspecting only priority areas—is effective. UAV photogrammetry efficiently supports that initial overall check. In addition, because it is easier to review past-year data while discussing with stakeholders, the continuity of preservation policy is easier to maintain. Continuity is extremely important in cultural heritage preservation. Not only single high-precision records, but an operational system that can be sustained over time is what truly leads to on-site efficiency.


How to proceed to successfully achieve efficiency gains

To use UAV photogrammetry effectively in cultural heritage preservation, it is important not to leave the purpose vague at the outset. Shooting density and viewpoints depend on whether the main objective is current condition assessment, damage confirmation, base data for drafting, or including public use. Flying with an ambiguous purpose can increase image counts while producing data that do not match the key issues. Efficiency is not about increasing the quantity of images; it is about consistently obtaining the necessary data without undue effort.


Next, it is important to divide the roles of ground work and aerial work according to site conditions. If you organize from the start what can be captured well from the air and what requires close-range confirmation, you can avoid unnecessary duplication. Since cultural properties often require minimizing the number of contacts and access areas, the flow of grasping the overall situation from above and then closely inspecting only necessary locations is rational. Also, sharing which deliverables are required by preservation, design, construction, management, and public-use stakeholders reduces the risk of having to re-shoot later.


Data management also determines whether efficiency gains succeed. If you do not organize and preserve shooting date, area, target, intended use, presence of supplementary observations, and the relationship to comparative past-year data, the recorded assets become hard to use. Cultural heritage preservation may involve reviewing records years or decades later. Organizing data in a way future staff can understand—not just in a way only the current person understands—yields the greatest efficiency. Managing data in a usable form is more important than the shooting itself.


Points to note when introducing UAV photogrammetry into cultural heritage preservation

UAV photogrammetry is a convenient technique, but there are several points to be aware of when introducing it. First, do not be satisfied with high-resolution appearance alone in preservation. Even if images look good, if necessary positional relationships and comparison references are not captured, the results are difficult to use in practice. Attractive 3D displays and records that are usable for decision-making are not the same. Practitioners need to operate with awareness of what to compare, what to explain, and what to leave for the future.


Second, do not underestimate the influence of weather, lighting conditions, vegetation, and seasonal factors. Surface conditions of cultural properties and the visibility of the ground can change significantly by season. For example, during foliated seasons the terrain may be hard to see, and the appearance of deformations can differ between dry and wet periods. If you aim for multi-year comparisons, devise ways to continue under conditions as similar as possible. Hurrying efficiency while increasing data that cannot be compared due to differing conditions undermines the purpose.


Third, operations must be premised on not impairing the value of cultural properties. Being able to record from above does not justify neglecting consideration for the target or surrounding users. For public facilities, religious sites, occupied buildings, or locations overlapping tourist routes, adjusting shooting times and flight areas is indispensable. Furthermore, when detailed investigations are necessary, do not try to complete everything with UAV photogrammetry alone; combine it with ground checks and close-range measurements as needed. Avoid making the method an end in itself; position it as one tool to improve preservation quality.


Conclusion

UAV photogrammetry contributes to efficiency across a wide range of situations in cultural heritage preservation: wide-area assessment, high-elevation recording, before-and-after repair comparisons, disaster initial response, base data for drafting, public use, understanding the preservation environment, and continuing monitoring. Its essence is not merely that it can capture images from the air, but that it enables the assembly of base data in a single site operation that can be deployed for multiple purposes. Since preservation sites require consideration of survey time, access conditions, safety, accountability, and future use, methods that produce records linking to downstream processes while providing an overview have significant value.


On the other hand, to achieve practical results it is essential to set clear objectives, consider site conditions, operate with continuity for comparison, divide roles with ground surveys, and build data management systems. In cultural heritage preservation, neither accuracy alone nor speed alone is sufficient. It is important to accumulate the necessary information in a form that can be used in the future without undue burden.


To reliably implement such operations on site, it is important not only to utilize post-shooting data but also to establish a measurement infrastructure that includes handling of positional information. If you want to broadly understand current conditions and link ground confirmation results and various materials in a more practical way, combining UAV photogrammetry with iPhone-mounted GNSS high-precision positioning devices like LRTK can make it easier to organize and position on-site records. Enhancing the on-site measurement environment in this way—so UAV photogrammetry does not remain a one-off shoot but becomes a working foundation for preservation, investigation, and maintenance—will make future cultural heritage preservation more practical.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.