What are the benefits of using AR smartphones for buried pipe management? 6 points to avoid failure

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Table of contents

• Background for why AR smartphones are attracting attention in buried pipe management

• Easier to share positional relationships intuitively on-site

• Easier to share positional relationships intuitively on-site

• Easier to speed up pre-excavation checks and on-site inspection decisions

• Easier to speed up pre-excavation checks and on-site inspection decisions

• Easier to link maintenance records to the field

• Easier to link maintenance records to the field

• Easier to reduce recognition gaps during handovers

• Easier to reduce recognition gaps during handovers

• Easier to detect position shifts and missed updates

• Easier to detect position shifts and missed updates

• Easier to start small and improve operations

• Easier to start small and improve operations

• Common causes of failure during introduction

• How to proceed to achieve results in buried pipe management

• Summary


Background for why AR smartphones are attracting attention in buried pipe management

Managing buried pipes is no longer a matter of simply storing drawings. Facilities that exist underground—water and sewer, power, telecommunications, gas, on-site piping, etc.—cannot be visually inspected once buried. Therefore, in various situations such as replacement works, inspections, repairs, road occupation, excavation coordination, and disaster response, there is demand for systems that can quickly share what is buried where underground.


However, in practice information sources are often fragmented: paper drawings, old as-built drawings, the memories of personnel, past photos, and sketches without coordinates. Even when drawings exist, it can be hard to know which part of the site they refer to, and ultimately experienced staff often have to explain on-site for decisions to be made. This means that every time staff change, understanding must be reconstructed, increasing management costs.


This is why operations that overlay buried information on the site using a smartphone have attracted attention. By using AR, it becomes easier to link site images and buried information on the screen, making it simpler to share positional relationships that were hard to convey with drawings alone. The fact that you can check using a device you use every day, without carrying dedicated equipment, has great significance for on-site operations.


However, introducing AR smartphones does not complete buried pipe management by itself. If position accuracy, the state of source data, update rules, and on-site usage are not organized, the display may look convenient but will not be used in practice. The important thing is to correctly understand the benefits of AR smartphones and design operations with awareness of where they will be effective and where they are likely to fail.


This article organizes the benefits of using AR smartphones for buried pipe management from six perspectives and explains from a practical viewpoint how to avoid failure during introduction. It provides material for decision-making before introduction for those who want to judge whether it can be used on-site, reduce back-and-forth between drawings and the field, or review the operation of management ledgers and position information.


1. Easier to share positional relationships intuitively on-site

The clearest benefit of using AR smartphones for buried pipe management is that it makes it easy to share the correspondence between drawings and the actual site intuitively. With paper drawings or conventional plan views, understanding the location of pipelines, branches, burial depth, and relationships with nearby facilities often requires interpretation by someone familiar with reading them. What is obvious to an experienced person can take a long time for someone entering the site for the first time, even just to map a point on the drawing to the actual location.


With AR smartphones you can overlay buried information on the live site view, reducing the mental conversion of drawings into the actual site. For example, distance from the road edge, relationships with structures, connections to manholes or handholes, and the direction of lateral branches become easier to visualize on the spot. This makes it easier for both the explainer and the listener to align their understanding.


This effect is more than just improved visibility. It directly affects decision speed on-site. At pre-construction meetings or site inspections, it is meaningless if only one person understands. It is important that stakeholders—client, contractor, maintenance/operations teams, and partner companies—can confirm positional relationships while looking at the same scene. AR smartphones lower the barrier to that kind of shared understanding.


Also not having to rely solely on verbal explanations is significant. Traditionally, descriptions like "so many meters from that curb," "along the extension of that utility pole," or "slightly beyond the existing chamber" were common, and understanding varied with the listener’s experience. With AR smartphones, the same explanations can be visually supplemented on the screen without repeating them. This is a major advantage for training and handovers.


However, to maximize this benefit, the quality of the source data displayed is crucial. Simply overlaying old drawings can actually cause misrecognition. It is necessary to confirm the drawing’s datum, measurement method, update date, whether coordinates are included, and whether site repairs are reflected, and to use only data you can trust. AR smartphones are a means to make information easier to see; they do not eliminate uncertainties in the source information.


The advantage of making it easy to share positional relationships intuitively on-site is a very important entry point for buried pipe management. Reducing reliance on individual interpretation of drawings and suppressing recognition gaps makes subsequent inspections, repairs, replacements, and recordkeeping easier to carry out as a continuous workflow.


2. Easier to speed up pre-excavation checks and on-site inspection decisions

A major practical effect of AR smartphones in buried pipe management is the ability to speed up pre-excavation checks and decisions during site inspections. On-site, understanding what is buried before digging is extremely important—a small misunderstanding can lead to pipeline damage, re-excavation, schedule delays, impact on neighbors, and safety issues. Nevertheless, traditionally the process involved spreading drawings, comparing them with the site, checking the memory of those in charge, and performing trial excavations as needed, which could delay decisions.


AR smartphones help speed up this initial verification. If you hold up a smartphone on-site and overlay buried information to grasp the approximate positional relationships, it becomes clearer which areas need attention and which should be prioritized for checking. Especially at locations where interference with other trades is a concern, sections with many updates, or areas with a concentration of multiple buried objects, simply having a preliminary view can change the planning.


At site inspections this also shortens explanation time. On-site, stakeholders often want to finish confirmation quickly in a short window, and spending too much time reading drawings squeezes the time available for actual decisions. With AR smartphones you can first share the overall positional relationships, then discuss the need for detailed checks or additional investigations. This improves the quality of the conversation. With everyone sharing the same premise, abstract exchanges decrease and it becomes easier to move to concrete judgments.


There are also advantages in emergency response. When leaks, sinkholes, or incident reports occur, on-site confirmation is a race against time. Of course, final decisions require existing documents and additional investigations, but if AR smartphones can quickly convey the rough buried situation, initial prioritization becomes easier. It helps form a quick assessment of which facilities are likely involved, where to access them from, and what the surrounding impact might be.


Again, it is important not to treat AR displays as absolute. Buried pipes may not match documents due to construction tolerances, aging changes, or unreflected repair histories. AR smartphones are a tool to support on-site confirmation and should not be the sole basis for deciding whether to excavate. More realistically, use them to identify where uncertainty exists and where additional checks are necessary.


The benefit of speeding up decisions directly reduces on-site burden. Prolonged on-site confirmation leads to waiting for work or regrouping, consuming time across all stakeholders. Properly integrating AR smartphones can speed the entry point of confirmation and allocate time to the necessary detailed assessments. This is a key point for improving overall efficiency while reducing failures.


3. Easier to link maintenance records to the field

A frustrating issue in buried pipe management is that even when records exist, their linkage to the site is weak. Inspection records, repair histories, incident reports, photos, construction notes, and ledger update information stored separately are hard to reference when needed. Moreover, simply reading records does not make it easy to immediately understand where and what happened.


Using AR smartphones makes it easier to link these records to the site and understand them. For example, it becomes simpler to confirm on-site which sections have had past leaks, which joints have been replaced, and where repair history exists, together with the positional relationships. Because the tasks of reading records and viewing the site are less separated, the reusability of information increases.


This effect is especially useful for routine inspections and patrol duties. If a patrol officer can view the screen on-site and see previous issues or past repair locations, the inspection focus becomes clear. Instead of a vague check, they can confirm with a clear idea of where to pay attention, reducing missed observations. It also makes it easier to see whether repeated problems are occurring at the same location or are spreading to surrounding areas.


It also positively affects the quality of records. If you can record information on-site tied to location, the entries will be easier to understand when reviewed later. Even content that is hard to convey through text notes alone becomes comprehensible when saved alongside site positions, making it easier for third parties to understand. This helps records remain useful despite personnel changes.


Furthermore, tying maintenance to the field helps accumulate material for deciding when to update drawings. If confirmed on-site information is organized with positional data, it becomes easier to judge when to revise the ledger and which sections have low information reliability. While the update work itself remains a separate task, making it easier to find where updates are needed improves management accuracy.


Of course, be careful not to increase the number of record items too much. A common problem when introducing AR smartphones is that required on-site inputs become excessive, causing the system to fall out of use. To maintain continued operation in buried pipe management, it is realistic to start with minimum fields such as location, date, inspector, target facility, status, and necessary photos or comments. After building a system that is actually used, you can increase information as needed.


Connecting maintenance records to the site is not merely cosmetic improvement. It leads to essential improvements in management: easier search, easier understanding, and easier reuse of information.


4. Easier to reduce recognition gaps during handovers

Buried pipe management is long-term work, and staff changes, organizational restructuring, and partner replacements are unavoidable. A recurring problem is that although information remains, understanding is not handed over. Even when drawings, ledgers, and photos exist, issues arise such as not knowing which material is the latest, not knowing where to look on-site, or not conveying the context behind past decisions.


Incorporating AR smartphones into buried pipe management makes it easier to reduce recognition gaps during handovers. New personnel and external stakeholders can understand positional relationships by looking at the screen on-site, making it easier to share content that is hard to convey by voice alone. Especially for people not used to reading paper drawings or unfamiliar with site-specific quirks, being able to view the site and information simultaneously is a huge help.


What is important in handovers is not only handing over materials but also passing on the context of decisions. Why is this section considered a priority? Why did problems occur at this location in the past? Why is strict separation from other systems required? Such background can be hard to convey through ledger fields alone. With AR smartphones you can explain on-site, making it easier to pass on background together with concrete positional relationships.


There is also an educational benefit. Newcomer training often spends a lot of time on learning drawing symbols and equipment names, but AR smartphones help learners quickly understand the link between drawings and the site. This, in turn, fosters the ability to read drawings themselves. Because the information is learned with on-site experience, it tends to stick as understanding rather than rote memorization.


It is also effective for coordination with partner companies. In works involving buried pipes, mismatched premises between client and contractor cause re-dos and rework during inspections. If AR smartphones raise the level of pre-shared understanding, explanation omissions and misunderstandings can be reduced. This is especially valuable when many stakeholders enter the site for a short period and quick ramp-up is needed.


However, the quality of handovers is not determined by AR displays alone. Clear data names, update dates, target scope, and organized cautions are indispensable. Even if the screen is visually clear, messy management of source data can increase confusion. To make handovers easier, introduce AR smartphones while simultaneously reviewing rules for organizing information.


Even so, the ability to support on-site understanding means AR smartphones have significant potential to reduce handover burdens. They are an effective means of shifting buried pipe management from person-dependent work toward shareable processes.


5. Easier to detect position shifts and missed updates

In buried pipe management, more important than simply having information is how well that information aligns with the current site. Even if past drawings were correct, subsequent works, repairs, and changes in the surrounding environment alter how the site appears and the conditions for decision-making. If documentation is not updated sufficiently after works, discrepancies arise between the ledger and the site. As these discrepancies accumulate, the trustworthiness of management declines and documents cease to be used on-site.


AR smartphones also help make it easier to notice such position shifts and missed updates. By comparing the site and buried information on the screen, you can spot inconsistencies early. For example, you may notice that the assumed position does not match structural relationships, that a branch shown in past records does not align with site conditions, or that a repaired section is still shown as old in the ledger.


This value does not require perfect overlay accuracy. What matters is making it harder to miss irregularities. Discrepancies that were not obvious from desk review may become apparent when compared on-site. In other words, AR smartphones are more of a tool to raise the quality of verification than a device that simply displays answers.


Being able to spot position shifts and missed updates clarifies improvement priorities for management ledgers. If you can organize which sections are trustworthy and which require re-verification, you can address updates in order of priority within limited personnel and budgets. This prioritization is especially important for sites that cannot be fully maintained at once.


It also helps reconcile multiple documents. Buried pipe management involves a mix of as-built drawings, repair records, equipment ledgers, patrol histories, and construction photos. If AR smartphones help identify inconsistencies on-site, it becomes easier to trace which document is likely at fault. This contributes to improving data maintenance accuracy in the future.


However, caution is needed here as well. A discrepancy seen in AR does not necessarily mean the buried information is wrong. The perceived alignment can change due to device attitude, positioning correction conditions, surrounding environment, or differences in display reference. Therefore, when you notice an irregularity, do not immediately declare it an error; instead, use it as a trigger for additional checks. Practically, use AR smartphones to capture a sense of where anomalies may exist while assuming there is some measurement error.


The ease of detecting position shifts and missed updates is a major benefit for maintaining accuracy in buried pipe management. Management information is not a one-time task but something you cultivate while using it on-site. AR smartphones are an effective means to facilitate that cycle.


6. Easier to start small and improve operations

Even when the need to improve buried pipe management is recognized, a full-scale overhaul is often unrealistic. Re-measuring all facilities, reorganizing all ledgers, and changing procedures for all stakeholders requires significant cost and time. For that reason, many sites feel the need but hesitate to start.


One advantage of AR smartphones is that they are easy to start small. You can introduce them in a limited scope where results are likely—specific sites, sections with frequent replacements, locations prone to inquiries, or high-risk areas. Because smartphones are everyday devices, the psychological barrier to bringing them to the site and using them is usually low.


This small-start characteristic fits well with operational improvement. Early on, the goal should not be a perfect system but to identify which information is actually used on-site. For example, whether depth information needs to be checked every time, whether planar positional relationships are sufficient at first, whether photo integration is required, or whether viewing update history is important varies by site. A small-scale introduction allows you to observe such realities and refine the approach.


Also, it is easy to get user feedback. If you can quickly learn where field staff find value and where they find it cumbersome, it is harder to go wrong with the direction of introduction. A system used on-site cannot be created from desk-driven ideals alone. Actual verification actions, one-handed operation, outdoor visibility, communication environment, operability with gloves, and other fine details determine adoption. Because smartphone-based solutions can be iterated easily, such improvements can be cycled.


Moreover, it is practical to introduce AR smartphones without discarding existing management methods. They can start as an aid to make paper drawings and ledgers easier to use on-site rather than as a replacement. Introducing them to enhance the quality of on-site confirmation while relying on existing materials reduces organizational resistance. This phased introduction is important in infrastructure management, where cautious decisions are required.


Even when starting small, however, some things should be decided from the start. Clarify which operational issues you want to solve. Introducing a system solely because it looks easy to see will leave evaluation criteria ambiguous and hinder adoption. Narrowing the objective—do you want to reduce pre-excavation confirmation time, ease handovers, or create triggers for ledger updates—makes effect verification easier.


Being able to start small and iteratively improve operations is very important for on-site buried pipe management. Rather than installing a large system all at once, it is easier to achieve long-term adoption by improving while using and expanding once results are visible.


Common causes of failure during introduction

Even if you introduce AR smartphones for buried pipe management, expected effects may not materialize. In many cases the problem is not the technology itself but the approach taken at introduction. A common mistake is believing that if the AR display is correct, management will automatically be correct. In reality, if underlying buried information is old, coordinate management is ambiguous, or construction updates are not reflected, better visuals will not improve decision quality. Visibility and reliability are separate issues.


Another frequent mistake is introducing the system without understanding field operations. Even if the management or planning departments think it looks useful, it will not be used unless it considers what field personnel check and when. Usability in practice is critical: outdoor visibility, startup speed, number of operations, input burden, and dependency on communication environment.


Packing too much information from the start is also a cause of failure. It is tempting to display pipe types, burial depth, update history, photos, repair records, and cautions, but the more complex the display and input, the lower on-site usage rate. Start by narrowing to truly necessary information and create a state where it can be used as the starting point for on-site checks.


Also be careful about introducing without defined update rules. If it is unclear who updates what and when, information will be new at introduction but quickly become outdated. Systems that are not updated do not last. The mechanism used on-site should realistically design the update burden.


Finally, treating AR smartphones as a finished, standalone solution leads to failure. In practice, combining multiple verification methods—existing drawings, ledgers, on-site confirmation, trial excavations, and inspections—is basic. AR smartphones are one tool among these. Positioning them as an assistant to improve decision quality rather than an all-powerful substitute helps align expectations after introduction.


How to proceed to achieve results in buried pipe management

To effectively leverage AR smartphones in buried pipe management, first narrow the target tasks. For example, start with the scenario where results are most visible: pre-excavation checks, site inspection explanations, patrol inspections, or handover training. Trying to cover everything at once expands the data preparation and operational rules required and increases burden before adoption.


Next, organize the reliability of source data. Not all drawings and ledgers are equally trustworthy. Clarify creation year, measurement method, update history, presence of coordinates, and whether site confirmation has been done, and define the level of information to be used on-site. With this clarification, users are less likely to overtrust displayed information and can use it appropriately.


Then, specify on-site usage. If it is clear which screen to open, which information to prioritize, and what to record after confirmation, usage rates increase. Conversely, too much freedom leads to varied usage and unclear results. Simple operation at first tends to become established more easily.


Also, verify introduction effects with operational metrics rather than impressions. Measuring reductions in inspection time, reductions in handover explanation workloads, increases in detection of missed updates, or decreases in on-site inquiries makes it easier to share the value of introduction.


Furthermore, create a mechanism to collect field feedback and improvement requests. Buried pipe management is not complete once set up; you improve accuracy and rules while using it on-site. Complaints such as poor visibility, missing necessary information, or cumbersome input are important clues for operational refinement. A system is adopted only when it incorporates field voices.


Summary

The benefits of using AR smartphones for buried pipe management are not merely that they look advanced. They make it easier to intuitively share positional relationships on-site; speed up pre-excavation checks and on-site inspection decisions; link maintenance records to the field; reduce recognition gaps during handovers; help detect position shifts and missed updates; and allow starting small and improving operations incrementally.


On the other hand, introducing them with unclear source data accuracy or update rules will result in a system that looks neat but does not take hold in practice. The important thing is not to treat AR smartphones as an all-purpose substitute, but as a tool to bridge on-site confirmation and information management. If positioned as a system that connects drawings, ledgers, on-site confirmation, and record operations, AR smartphones can steadily raise the quality of buried pipe management.


What the field truly needs is not a complicated system but the ability to reach the necessary information on the spot and make sharing and decisions easier. If you want to improve the efficiency and reliability of buried pipe management, introducing AR smartphones is worth serious consideration. And if you want to handle position information more practically and make on-site confirmation and records more reliable, combining them with an LRTK-type iPhone-mounted GNSS high-precision positioning device can make it easier to raise operational accuracy for buried pipe management. Ensuring both what is visible on-site and the ability to handle positions correctly will become increasingly important in future buried pipe management.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.