PVSyst is a specialized simulation software used to predict the energy production of photovoltaic (PV) installations and to evaluate design conditions and loss factors. In practical PV work, simply determining the system capacity is not enough. Many conditions affect energy production, including the site’s solar irradiance, panel orientation and tilt, shading, temperature, wiring, equipment configuration, soiling, and aging. PVSyst helps by allowing you to input these conditions and check annual energy production, monthly generation, loss breakdowns, performance ratio, and more.


For practitioners searching for "What is PVSyst", the important thing is to first understand what the software can evaluate. Rather than looking only at the generation figures, you need to interpret the assumptions under which those figures were calculated, which losses reduce them, and how efficiently the entire system is generating. This article explains, from the basics, the main items that can be evaluated with PVSyst and how to read the performance ratio, which becomes particularly important in practice.


Table of Contents

• PVSyst is software for evaluating the performance of solar power generation from multiple angles

• Basic evaluation items available in PVSyst

• Annual and monthly energy production to review in generation assessment

• Use loss evaluation to identify reasons why energy production decreases

• Reevaluate design conditions by assessing shading, azimuth, and tilt

• The performance ratio is an important metric for interpreting the efficiency of a power generation system

• Notes when checking the performance ratio in PVSyst

• Causes to investigate when the performance ratio is low

• How to use PVSyst evaluation results for practical decision-making

• Combine PVSyst with on-site information to improve evaluation accuracy


PVSyst is software that evaluates the performance of photovoltaic (PV) power generation from multiple perspectives

PVSyst is software for not only predicting the energy production of photovoltaic installations but also for evaluating design conditions, loss factors, and the overall performance of the system from multiple perspectives. Beginners tend to think of PVSyst as "software that outputs generation estimates," but in practice that alone is insufficient. Of course it is important to know how much energy will be produced, but a major purpose of using PVSyst is to confirm why that amount is produced, which conditions affect the energy output, and whether the system is generating power efficiently.


Solar power performance is not determined by installed capacity alone. Even systems with the same capacity can produce different amounts of electricity depending on local solar irradiance, the orientation of the mounting surface, the tilt angle, shading from the surroundings, ambient temperature, wiring conditions, equipment configuration, and the installation method. Furthermore, even systems that produce a large amount of electricity are not necessarily generating efficiently relative to the available solar conditions. PVSyst enables evaluation by combining these multiple factors, allowing you to identify design characteristics that are not apparent from total energy production alone.


What PVSyst can evaluate is divided into items such as energy production, solar irradiation, losses, performance ratio, monthly trends, shading effects, temperature effects, and electrical losses. These are shown as individual figures, but in practice they must be interpreted in relation to one another. For example, if the annual energy production is lower than expected, it is necessary to distinguish whether the solar irradiation conditions are poor, shading is significant, temperature losses are large, or there are issues with the wiring or equipment configuration.


PVSyst’s evaluation results are used in a variety of situations, such as design studies, business planning, stakeholder briefings, pre-construction checks, and post-operation performance comparisons. Therefore, it is important not only to learn how to operate the software, but also to understand the meaning of the evaluation items. In particular, the performance ratio is an important indicator for assessing the overall efficiency of an installation. Because it makes it possible to evaluate installation performance in relation to solar irradiation conditions—something that is difficult to judge from annual energy yield alone—it is an item you should definitely understand if you use PVSyst.


Basic items that can be evaluated with PVSyst

The basic items that can be evaluated with PVSyst can be broadly divided into solar irradiation conditions, system conditions, energy production, losses, and performance indicators. These may appear to exist separately, but in reality they are connected in a single flow. PVSyst calculates this process step by step: the energy from the sun reaches the installation site, is incident on the panel surface, is converted into electricity by the panels, and then passes through wiring and equipment to become the final electrical energy output.


The evaluation of solar irradiation conditions determines how much solar energy is available at the installation site. In photovoltaic power generation, the local solar irradiance provides the basis for expected electricity output. Even with the same installed capacity, annual energy production will vary if irradiance conditions differ. Ambient temperature is also relevant to the assessment: when ambient temperature is high, panel temperatures tend to rise, which can cause output to decrease. In PVSyst, you can organize the assumptions about the energy the system receives based on irradiance and temperature.


In evaluating system conditions, we deal with panel orientation, tilt, system capacity, equipment configuration, circuit conditions, and installation methods. These affect how much solar radiation is received and how it is converted into electricity. If orientation or tilt changes, the irradiance on the panel surface changes. If system capacity or equipment configuration changes, the power generation and the way output limits manifest will change. PVSyst can also be used to compare the results when such conditions are varied.


In evaluating power generation, we check annual generation, monthly generation, and generation per unit capacity. Annual generation is an important figure directly linked to the business plan, but it alone cannot be used to judge equipment performance. By looking at monthly generation, you can identify seasonal generation trends and influencing factors. Paying attention to generation per unit capacity makes it easier to compare cases with different equipment sizes.


In loss assessment, you check at which stages and by how much energy has been lost from ideal conditions to the final energy production. There are various kinds of losses, such as shading, reflection, soiling, temperature, wiring, equipment conversion, and power curtailment. By reading PVSyst's loss diagram and loss breakdown, you can organize the causes of reduced energy production.


In evaluating performance indicators, you check the performance ratio and other related metrics. The performance ratio is an indicator of how effectively the installation generates electricity from the incident solar irradiance. It is important not only for judging whether the energy output is high or low, but also for determining whether the system is functioning efficiently as a whole. When using PVSyst, it is important to evaluate by combining energy production, losses, and the performance ratio.


Annual and Monthly Power Generation to Consider in Power Output Evaluation

The most closely watched evaluation metric in PVSyst is energy production. In particular, annual energy production is the figure that many practitioners check first, because it directly affects revenue forecasts for power generation projects and decisions about equipment planning. Understanding how much energy can be expected annually is indispensable for assessing the appropriateness of the system size and for reviewing business plans.


However, it's risky to conclude the evaluation based only on annual generation. Annual generation is the total for the year and does not reveal which seasons have higher or lower output. In solar power generation, conditions such as solar irradiance, temperature, shading, snow cover, and soiling change with the seasons. By checking monthly generation in PVSyst, you can understand the generation trends behind the annual total.


Monthly power generation is also useful for verifying the validity of design conditions. For example, if winter generation is extremely low, it may include not only a decrease in solar irradiance but also shading effects caused by the lower solar altitude. If generation does not rise sufficiently in summer, it is necessary to check for output reductions due to high temperatures or the effects of output limiting. Issues that are easy to miss when looking only at annual generation become easier to notice by examining monthly results.


In evaluating power generation, the relationship with installed capacity is also important. Larger installations tend to produce more power, but that alone does not mean they are more efficient. Checking how much generation is obtained relative to installed capacity makes it easier to assess the efficiency of a design. When comparing multiple design proposals in the same area, it is important to check not only simple annual generation but also generation per unit of capacity and the performance ratio.


Also, when evaluating energy yield you must confirm that the assumptions are realistic. If shading is not taken into account, loss conditions are overly optimistic, or the meteorological conditions do not match the site, the annual energy yield may be shown as high but will not be highly reliable in practice. PVSyst’s energy yield is a prediction based on the input conditions. You should check not only the numerical results but also the conditions from which they were derived.


When evaluating energy production, the basic approach is to grasp the overall picture from the annual energy production, check seasonal variations with the monthly energy production, and interpret the reasons through the loss breakdown and the performance ratio. Once you master this flow, you will be able to treat PVSyst results not as mere numbers but as information usable for design decisions.


Confirm the reasons why power generation decreases in loss evaluation

One of PVSyst’s major roles is to evaluate at which stages and by how much power generation is reduced. In photovoltaic power generation, the energy received from the sun does not directly become the final amount of electricity. Various losses occur due to the conditions before the energy reaches the panel surface, the conditions governing the panels’ conversion of sunlight into electricity, and the conditions as it passes through wiring and equipment. PVSyst’s loss assessment allows these factors to be examined step by step.


Losses include losses due to shading, reflection, soiling, temperature, wiring, equipment conversion, and output limitation. All of these affect power generation, but the reasons they occur are different. Shading loss is caused by surrounding obstacles and layout conditions, and temperature loss occurs when panel temperature rises. Wiring loss arises in the process of transmitting power, and equipment conversion loss occurs in the process of converting electricity.


What is important in loss assessment is not to simply think that smaller losses are always better. There are losses that are unavoidable due to site conditions. In regions with high temperatures, thermal losses tend to occur to a certain extent, and in locations surrounded by buildings or trees there may be shading losses. The important thing is to determine whether those losses are reasonable given the site conditions and whether they can be improved.


Reading PVSyst’s loss diagram reveals the flow from solar irradiance to the final energy yield. By identifying which stage has the largest losses, you can determine candidates for design improvements. If shading losses are large, consider revising the layout and installation area. If wiring losses are large, it makes sense to review wiring routes and equipment placement. If output limitations are large, you need to check the balance with equipment capacity.


Loss assessment is also useful for explaining things to stakeholders. If energy production is lower than expected, simply saying "energy production is low" does not reveal the cause. By checking the breakdown of losses in PVSyst, it becomes easier to explain which conditions are reducing the energy production. Loss assessment plays a very important role in demonstrating the basis for the energy production.


Reassess design conditions by evaluating shading, orientation, and tilt

PVSyst allows you to evaluate design conditions such as shading, azimuth, and tilt. These are important factors that determine how much solar irradiance reaches the panel surface. In photovoltaic power generation, even with the same installed capacity, energy output can vary greatly depending on panel orientation, angle, and the presence or absence of surrounding shading. By using PVSyst, you can compare energy production and losses under different conditions and use the results as a basis for revising design parameters.


In an orientation assessment, you check the differences in energy yield depending on which direction the panels face. Generally there are orientations that tend to produce more energy, but on actual sites you may not be able to choose orientation freely because of site shape, roof shape, surrounding obstacles, or construction constraints. By comparing multiple orientation scenarios in PVSyst, you can determine which of the orientations feasible on site is most advantageous in terms of energy production and monthly trends.


When evaluating tilt, we check the amount of solar irradiance captured and the energy yield when changing the panel angle. A small tilt angle can make it easier to utilize the installation area, but it can affect soiling, drainage, and the way inter-row shading forms. A large tilt angle can change generation trends depending on the season. By comparing tilt angles in PVSyst, you can understand not only the annual energy production but also the seasonal generation characteristics.


Shadow assessment is an item of particularly high practical importance. Shadows from surrounding buildings, trees, slopes, equipment structures, and between rows of panels affect power generation depending on the time of day and season. Simulations that do not account for shadows can appear to overestimate generation, and if there are shadows on site, they will not reflect reality. Reflecting shadows in PVSyst allows you to check shading losses and prompt a review of the layout plan.


When evaluating design conditions, it is important not to make a judgment based on a single condition. Changing the orientation can alter how shadows appear. Changing the tilt can affect inter-row shading and construction conditions. Changing the layout can also change wiring distances and maintenance access routes. PVSyst evaluation results need to be used in combination with practical judgment that includes not only energy production but also constructability and operability.


The performance ratio is an important indicator for understanding the efficiency of power generation facilities

The performance ratio is an important indicator that shows how effectively a photovoltaic (PV) system converts the solar irradiation it receives into electrical energy. In PVSyst, you can evaluate the overall efficiency of a system by checking the performance ratio in addition to the energy yield. While annual energy production is greatly affected by system capacity and solar irradiation conditions, the performance ratio helps assess how efficiently the system is operating.


For example, in locations with very high solar irradiation, the annual energy output may appear high even if losses are somewhat large. Conversely, in locations with low irradiation, the annual output can look modest even if the system is generating efficiently. For this reason, annual energy output alone makes it difficult to compare the equipment’s performance itself. Looking at the performance ratio makes it easier to judge system efficiency while taking differences in solar conditions into account to some extent.


The performance ratio also serves as an entry point for assessing the health of a power generation facility. If the performance ratio is extremely low, there may be issues such as shading, temperature, wiring, equipment configuration, soiling, or output limitations. Conversely, even if the performance ratio appears high, it may reflect overly optimistic loss assumptions or fail to fully account for shading or soiling. In other words, a high performance ratio is not unconditionally good; it needs to be interpreted together with the input conditions and the breakdown of losses.


When checking the performance ratio in PVSyst, you deepen your understanding by reviewing monthly variations as well as the annual value. Because solar irradiation, temperature, and shading patterns change with the seasons, the performance ratio also fluctuates. In summer, even with high irradiation, temperature-related losses can become large, and in winter the low sun angle and shading can have a stronger effect. By examining the monthly performance ratio, you can identify which periods are more likely to see a drop in system efficiency.


Performance ratio is a useful indicator when explaining system performance to stakeholders. Compared with showing only annual energy production, it can explain how efficiently the system is generating power relative to solar irradiation conditions, making it easier to share the validity of the design and the impact of losses. However, it is important not to judge the entire system solely by the performance ratio, but to check it together with energy production, losses, and input conditions.


Points to Note When Viewing Performance Ratio in PVSyst

When examining the performance ratio in PVSyst, it is important not to judge solely by the magnitude of the number. The performance ratio is a useful indicator of a system's efficiency, but its value is influenced by the input conditions and loss settings. If shading is not accounted for, soiling is underestimated, wiring losses are set lower than they are in reality, or temperature conditions do not match those on site, the performance ratio can appear higher than the actual situation.


When the performance ratio is high, the system may be designed efficiently. However, you should not be reassured by that alone. If the loss assumptions are overly optimistic, the performance ratio can appear high. If there are shading sources on site but shading losses are reported as almost none, the shading assessment may be insufficient. Likewise, if wiring distances are long but wiring losses are unrealistically small, the input conditions need to be checked. A high performance ratio is a good sign, but verifying the underlying assumptions is essential.


Even if the performance ratio is low, you should not immediately conclude that the design is bad. There may be unavoidable losses due to site conditions. Conditions such as many nearby obstructions, terrain constraints, susceptibility to high temperatures, and restrictions on equipment layout can cause the performance ratio to decrease. What is important is to verify from the loss breakdown why the performance ratio is low.


Also, the performance ratio can be used to compare power generation systems, but the comparison conditions must be aligned. Simply comparing systems in different regions, under different climatic conditions, or with different design parameters can lead to misunderstandings. When evaluating performance ratios, you need to understand how the installation location, orientation, tilt, system capacity, shading conditions, and loss conditions differ before making comparisons.


PVSyst's performance ratio is an important entry point for interpreting system efficiency, rather than merely an aid for evaluating energy yield. However, it is not a metric from which to draw conclusions on its own. By viewing the performance ratio together with energy yield, loss breakdowns, monthly trends, and input conditions, you obtain an evaluation that is usable in practice.


Causes to check when the performance ratio is low

When PVSyst results show a low performance ratio, the first thing to check is the breakdown of losses. A low performance ratio indicates that a smaller proportion of the incident solar irradiation is ultimately delivered as electrical energy. The cause is not necessarily a single factor: shading, temperature, wiring, system configuration, output limiting or curtailment, soiling, and mismatches in input conditions, among others, can combine to produce the effect.


Shading losses are a common cause of a reduced performance ratio. When there are shadows from surrounding buildings, trees, embankments, or between rows of panels, the solar irradiance reaching the panel surface is reduced and power generation decreases. Because the impact of shading varies by season and time of day, it is important to check not only annual values but also monthly generation and the breakdown of losses. If the performance ratio drops in winter or during the morning and evening, you should suspect the influence of shading.


Temperature losses are also important. In solar power generation, panel output tends to decrease as panel temperature rises. Even in seasons with high solar irradiance, if the ambient temperature is high and the panel temperature increases, the amount of power generated may not rise as much as expected. If the performance ratio is decreasing in summer, temperature losses may be having an impact. Because mounting configuration and ventilation conditions can affect temperature, it is necessary to check them together with site conditions.


Wiring losses and equipment conversion losses also affect the performance ratio. When wiring distances are long, equipment placement is impractical, or capacity balance is not appropriate, some of the generated power will be lost. If electrical losses are large in PVSyst’s loss breakdown, it may be necessary to review the wiring routes and equipment configuration.


Losses due to output limitation are also an item that should be checked. Depending on the balance between panel capacity and converter capacity, output may be curtailed during periods of high solar irradiance. If output limitation is large, some of the power that could have been generated cannot be fully utilized, which also affects the performance ratio. However, a certain amount of output limitation is not necessarily bad. It is necessary to check the impact on annual generation and the overall rationality of the system configuration.


When the performance ratio is low, also check the validity of the input conditions. If the azimuth or tilt differs from the actual site, shading conditions are set too high or too low, loss conditions do not match reality, or the meteorological conditions are misaligned with the installation location, the performance ratio evaluation will not be correct. In cause analysis, it is important not to look only at the numbers but to return to and verify the underlying assumptions.


How to Leverage PVSyst Evaluation Results for Practical Decision-Making

To leverage PVSyst evaluation results in practical decision-making, it is important not to view the results as isolated numbers but to interpret them in the context of the design conditions. Annual energy production, monthly generation, breakdown of losses, and performance ratio each have different meanings. By reviewing these together, you can organize the outlook for generation, the efficiency of the design, opportunities for improvement, and materials for explaining the results to stakeholders.


First, grasp the overall outlook from the annual energy production. Next, check seasonal trends using the monthly energy production. Then, review the loss breakdown to identify at which stages generation is being reduced. Finally, use the performance ratio to assess how efficiently the system is generating power relative to the solar irradiance conditions. Viewing the results in this sequence makes it easier to systematically understand PVSyst’s outputs.


In practice, it is common to compare multiple design proposals. By comparing cases with changed conditions — altering orientation or tilt, changing the layout, changing equipment capacity, changing equipment configuration, or reflecting shading conditions — you can check how energy output and the performance ratio change. However, when making comparisons it is important not to change too many conditions at once. If you change one condition at a time, it becomes easier to understand which factor is responsible for the differences in results.


PVSyst's evaluation results are also important as explanatory materials for stakeholders. Simply presenting the generation figures is unconvincing if it's not clear why those numbers were obtained. By using a breakdown of losses and the performance ratio to explain the flow from solar irradiance to final energy production, it becomes easier to share the rationale behind design decisions. In particular, the performance ratio is effective for explaining the system's efficiency.


However, you should not make a final decision based solely on PVSyst results. In power generation projects and equipment design, it is necessary to consider constructability, maintainability, safety, land conditions, the surrounding environment, connection conditions, and other factors. PVSyst is a powerful tool for evaluating energy yield and performance, but using it in combination with site conditions and practical constraints will lead to more realistic decisions.


Improving Evaluation Accuracy by Combining PVSyst with On-Site Information

PVSyst is analysis software for evaluating the energy production, losses, and performance ratio of photovoltaic power systems and for verifying the validity of design conditions. By looking at annual energy production you can grasp the broad outline of a business plan, and by looking at monthly energy production you can identify seasonal trends. Examining the loss breakdown lets you organize how shading, temperature, wiring, and equipment configuration affect energy production. By looking at the performance ratio you can interpret how efficiently the system is generating power relative to solar irradiation conditions.


There are many aspects that can be evaluated with PVSyst, but the accuracy depends on the input conditions. If on-site orientation and tilt, installation area, obstacles, terrain, elevation differences, wiring routes, and so on are inaccurate, assessments of energy yield and performance ratio can easily deviate from the actual situation. In particular, conditions related to shading and terrain tend to affect both energy yield and performance ratio, so it is important to obtain accurate on-site information.


When evaluating the performance ratio, the quality of site information is indispensable. If the performance ratio is low, you should suspect losses such as shading, temperature effects, wiring losses, or output limits, but correctly identifying their causes requires a clear understanding of the site conditions. Even when the performance ratio is high, if shading, soiling, or wiring losses are not fully reflected, the system may appear better than it actually is. To make PVSyst’s evaluation results reliable, it is important to clearly document the basis for the input conditions.


In designing solar power systems, it is important to bridge desktop simulations and actual site conditions. If position information and positioning data acquired on site can be incorporated into the design parameters, the input conditions in PVSyst will more closely reflect reality. Accurately understanding the installation area, azimuth, tilt, locations of obstructions, and elevation differences lends credibility to evaluations of energy yield and performance ratio.


If you want to streamline on-site position checks, determination of installation areas, and recording of obstructions, using an iPhone-mounted GNSS high-precision positioning device like LRTK makes it easier to reflect field information in designs and simulations. By combining PVSyst evaluations of energy yield and performance ratio with the high-precision positional data acquired on site, you can improve the design accuracy and explanatory power of solar power generation facilities and achieve more practice-oriented power generation forecasts.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page