What is PVSyst? 9 settings to know before using it
By LRTK Team (Lefixea Inc.)
PVSyst is simulation software used to predict the energy production of photovoltaic installations and to organize design conditions and loss factors. It is used not only to calculate the annual energy yield, but also as a tool to comprehensively check the site’s irradiance conditions, the orientation and tilt of the solar panels, shading, electrical configurations, losses, and how to interpret the output results.
On the other hand, PVSyst includes many configuration options, and for a practitioner using it for the first time it can be unclear which items to check and in what order. If input values are incorrect, you may produce a report that looks tidy but yields results that diverge from the actual power plant plan. In other words, the first step to mastering PVSyst is not memorizing screen operations, but understanding which configuration items influence the power generation forecast.
This article, aimed at practitioners searching for "What is PVSyst", organizes nine configuration items you should know before using it and explains the concepts to pay particular attention to in power generation simulations.
Table of Contents
• PVSyst is a tool for establishing the assumptions for power generation forecasting
• Configuration item 1: Installation site and meteorological data
• Configuration item 2: Azimuth and tilt angles
• Configuration item 3: Solar panel specifications
• Configuration item 4: Power conversion equipment specifications
• Configuration item 5: Circuit configuration and capacity ratio
• Configuration item 6: Shading conditions and surrounding obstructions
• Configuration item 7: Temperature conditions and thermal losses
• Configuration item 8: Wiring losses and electrical losses
• Configuration item 9: Soiling, degradation, and operating conditions
• Common mistakes in PVSyst settings
• The importance of linking configuration values to site conditions
• Summary
PVSyst is a tool for preparing the assumptions for power generation forecasting
PVSyst is simulation software for entering the design parameters of a photovoltaic power generation system and checking the expected energy yield and the breakdown of losses. It reflects the plant’s size, installation location, solar panel layout, electrical connections, shading effects, temperature-related output reductions, and is used to predict annual or monthly energy production.
In practice, it is used in a wide range of situations, such as estimating power generation at the planning stage, comparing design proposals, preparing documentation for financial institutions and internal approvals, checking conditions before construction, and comparing actual performance after completion. However, PVSyst does not automatically provide the correct answer. Because it calculates based on the conditions entered, if the settings are ambiguous, the results will be ambiguous as well.
For example, even for the same power plant, misjudging the azimuth by a few degrees, setting the tilt angle to a value different from the actual one, or underestimating shading conditions can change the outlook for annual power generation. In generation forecasting, a single configuration item can sometimes create a large difference, while small input discrepancies can accumulate into a difference that cannot be ignored.
Therefore, before using PVSyst, you need to understand the meaning of each configuration item one by one. Rather than merely filling in the on‑screen fields, it is important to be aware of what on‑site conditions those values represent, whether they contradict the design drawings or the results of on‑site surveys, and whether you have a basis that can be used to explain them later.
What practitioners are most likely to stumble over at first is not the large number of technical terms but the relationships between the configuration items. Changing the installation location alters the solar irradiation, and when the solar irradiation changes, the energy generation changes. Changing the tilt angle affects not only the amount of solar irradiation received but also how easily dirt accumulates and how shading appears. Changing the capacity of the power conversion equipment changes the conversion efficiency and the frequency of output limiting. In other words, PVSyst settings do not exist in isolation; they are linked to the overall design philosophy of the power plant.
If you had to describe PVSyst in one sentence, it is a practical tool for quantifying the conditions of a solar power plant and visualizing its energy production and losses. However, the accuracy of the results depends on the accuracy of the inputs. For that reason, understanding the main configuration settings before use is the quickest way to achieve accurate simulations.
Configuration Item 1: Installation Location and Meteorological Data
The first important configuration items are the installation location and meteorological data. The electricity output of a solar PV system varies greatly depending on how much solar radiation it receives. Therefore, it is essential to properly set the installation site's latitude, longitude, elevation, and surrounding weather conditions.
Information about the installation site forms the foundation of the entire power generation simulation. Changes in latitude alter the sun’s altitude and the seasonal angles of solar incidence, while differences in longitude and elevation also affect how meteorological conditions are treated. In particular, in mountainous areas, coastal zones, snowy regions, fog-prone locations, and urban high-temperature environments, simply using data from a nearby representative site may not reflect the actual local conditions.
In meteorological data, the main elements are horizontal irradiance, air temperature, and wind speed. Irradiance is a direct input for power generation, while air temperature is related to the temperature rise of solar panels. Wind speed influences panel cooling and, as a result, the degree of output reduction. In other words, meteorological data are important parameters not only for power generation but also for loss calculations.
In practice, attention must be paid to the period and representativeness of the meteorological data used. Data for a single year make it difficult to judge whether that year had higher or lower solar radiation than the long-term average. Whether to use data close to the long-term mean or to adopt a more conservative dataset depends on the approach taken in the business plan.
Also, when setting the site location, the exact coordinates of the planned site may not completely match those of the weather data point to be used. In such cases, it is necessary to judge the validity of the data by taking distance and topographic differences into account. In flat areas and for nearby points, large differences are less likely to occur, but in regions separated by mountains or with large elevation differences, solar radiation and temperature can differ even within the same municipality.
Before using PVSyst, it is important to confirm what information will be used to obtain the installation site's coordinates, which meteorological data will be adopted, and whether there is an explainable basis for that combination. If you want to improve the accuracy of power generation forecasts, the first things to review are the basic conditions—namely the installation site and the meteorological data—rather than flashy detailed settings.
Configuration Item 2: Azimuth and Tilt Angle
The next important items are the azimuth and tilt angles of the solar panels. The azimuth angle indicates which direction the panels face, and the tilt angle indicates how much they are inclined relative to the horizontal plane. These two directly affect the amount of solar radiation the panels receive, making them central configuration parameters for power generation forecasting.
When setting the azimuth, the power plant’s layout policy—such as south-facing, east–west-facing, southeast-facing, or southwest-facing—is reflected. In general, the more a site faces a direction that is favorable relative to the sun’s movement, the more its annual power generation tends to increase; however, due to the shape of the land, site development conditions, the locations of roads and drainage, and the placement of grid connection equipment, it is not always possible to achieve the ideal azimuth.
The tilt angle likewise cannot be determined solely by the theoretically optimal angle. If prioritizing power generation, the angle should be examined with consideration of the sun’s elevation for each season. At the same time, wind loads, racking structure, snowfall, maintainability, and the inter-row spacing within the site are also relevant. Increasing the tilt angle can be advantageous for winter solar gain, but it can lengthen inter-row shadows and increase the required site area. Decreasing the tilt angle makes it easier to increase installation density, but it can also make it harder for dirt to wash off.
In PVSyst, when you enter the azimuth and tilt angles, the irradiance incident on the panel surface is calculated by combining them with meteorological data. Rather than using the irradiance observed on the horizontal plane directly for energy production, it is converted according to the panels’ orientation and angle; if this setting is off, the overall power output will be off.
In practice, what you need to watch for is whether the orientation shown on the drawings matches the orientation on site. If you enter data without confirming whether the drawings are based on true north, the coordinate-system north (grid north), or aligned with the on-site measurement direction, you may end up running a simulation in an unintended direction. Also, with respect to tilt angles, the values on the design drawings, the manufacturer’s specifications, and the measurements taken during construction may differ.
Before using PVSyst, it is important not to treat azimuth and tilt angles as mere input fields, but to confirm them as conditions that represent the plant’s layout plan itself. In particular, when there are multiple roof surfaces or multiple plots, you need to determine whether all of them can be grouped under the same conditions or should be treated as separate surfaces.
Configuration Item 3: Solar Panel Specifications
The specifications of solar panels are configuration settings that greatly affect the results of PVSyst simulations. Information such as the panel's nominal output, conversion efficiency, voltage, current, temperature characteristics, and output tolerance serves as the basis for energy yield calculations and electrical connection studies.
Solar panels can produce different amounts of electricity even with the same installation area depending on their specifications. Using panels with a higher rated output increases the system capacity even with the same number of panels. However, the amount of generation is not determined solely by the rated output. It is also important how much the output drops when the temperature rises, how the panels perform under low-irradiance conditions, and whether the voltage and current ranges are compatible with the power conversion equipment.
In PVSyst, power output is calculated based on the solar panel specifications, taking into account solar irradiance and temperature conditions. Therefore, using specifications that differ from the panels actually to be used reduces the reliability of the results. While preliminary studies may be conducted using provisional specifications, when approaching stages close to business decision-making or final design, it is necessary to update the conditions to reflect the specifications intended to be used.
Particularly important to watch is the panel's temperature coefficient. Solar panels experience a reduction in output as ambient temperature rises and panel temperature increases. Differences in temperature coefficients are more likely to affect annual energy production in hot regions or in locations with poor heat dissipation, such as rooftop installations. If you only look at the superficial nominal output, you can overlook this difference.
Also, the number and arrangement of panels are closely tied to the specifications. Considering the installable area, row spacing, maintenance aisles, tilt, orientation, and the effects of shading, determine how many panels can be installed. It is also important to confirm that the system capacity in PVSyst matches the actual layout plan and the single-line wiring diagram.
The specification settings for solar panels are the basic conditions that determine a power plant's capacity. Before using PVSyst, organizing the datasheets for the panels you plan to use, the number of panels to be installed, the layout plan, and the temperature characteristics will reduce input errors and rework.
Configuration Item 4: Specifications of the Power Conversion Equipment
Specifications of the power conversion equipment are also configuration items that must be checked in PVSyst. The direct current power generated by solar panels is not suitable for general transmission or use as is, so it is converted to alternating current power. Losses occur during this conversion process, and the estimated energy yield will vary depending on the capacity and efficiency of the equipment.
When configuring a power conversion device, check the rated capacity, input voltage range, maximum input current, conversion efficiency, multiple-input configuration, and the conditions for output limiting. If the power conversion device’s capacity is smaller than the solar panel side capacity, output may be limited during periods of strong solar irradiance. Conversely, if the capacity is given too much margin, other issues may arise when evaluating the overall system’s efficiency and economics.
PVSyst calculates how much of the DC power produced by the panels is converted to the AC side. The conversion efficiency is not constant and varies with the magnitude of the output. Efficiency can fall at low output, and at high output approaching the rated upper limit constraints (such as clipping) can occur. Therefore, rather than looking only at rated capacity, it is important to check the relationship between generation patterns and equipment characteristics.
A common checkpoint in practice is the ratio between the DC capacity of the solar panels and the AC capacity of the power conversion equipment. This ratio is closely related to the power plant’s design philosophy. Making the DC side larger makes it easier to boost generation during mornings, evenings, and cloudy conditions, whereas it also makes output clipping more likely at clear-sky peaks. How much of this is acceptable depends on the local solar irradiation conditions, equipment utilization rate, grid connection conditions, and the business plan.
Also, checking the input voltage range is important. Panel voltage rises at low temperatures and falls at high temperatures. If the number of panels in series is set improperly, you may exceed the maximum input voltage at low temperatures or fall below the operable voltage range at high temperatures. Even if PVSyst shows no issues, you need to verify based on the actual design conditions and the area's minimum and maximum temperatures.
Specification settings of the power conversion equipment affect not only the energy yield but also safety and the validity of the design. Before predicting energy yield with PVSyst, it is important to confirm that the specifications of the equipment to be adopted and the configuration of the solar panels are consistent.
Setting Item 5: Circuit Configuration and Capacitance Ratio
Circuit configuration and capacity ratios are among the settings in PVSyst for which consistency with the actual design drawings is particularly important. The number of solar panels connected in series, the number of strings connected in parallel, and which input they are connected to all affect voltage, current, output, losses, and control behavior.
Increasing the number of modules in series raises the voltage, and increasing the number of parallel strings increases the current. These must match the input range of the power conversion equipment. In PVSyst, by setting the circuit configuration you can verify the voltage variations, current conditions, and output characteristics under different temperature and irradiance conditions.
Capacity ratio is an important concept that indicates the relationship between the DC capacity of solar panels and the AC capacity of the power conversion equipment. It is common in practice to design the DC capacity larger than the AC capacity, but in such cases it is necessary to confirm the extent of output limitation that will occur. If output limitation is small, it can be an effective design, but if it is excessively large, it will mean discarding power during the periods when generation is possible.
What’s important here is that there isn’t a single correct capacity ratio. The appropriate approach varies depending on factors such as regions with strong solar irradiance, regions with low temperatures where generation efficiency tends to increase, layouts that prioritize morning and evening irradiation, grid-side output limits, and equipment operation policies. PVSyst allows you to compare multiple conditions, so you can check how annual energy production and losses change when the capacity ratio is altered.
What you should pay attention to in circuit configuration is whether the simulation settings match the actual construction plan. In the early stages of design you may enter provisional numbers of modules in series or numbers of circuits, but as you progress into detailed design you need to update these to match the actual connection plan. In particular, if orientation or tilt differs for each roof surface, if shading differs, or if the connection destinations differ by zone, simply averaging everything can deviate from reality.
Also, circuit-level mismatches affect power generation. Combining panels with different orientations into the same input, or treating circuits that experience different shading effects as having identical conditions, can fail to adequately represent actual power generation behavior. Before using PVSyst, organize the single-line wiring diagram, layout diagram, and the conditions for each section, and decide how detailed the modeling should be.
Circuit configuration and capacity ratios serve as a bridge to bring power generation simulations closer to practical design work. By setting these carefully, you can perform analyses that are not mere rough estimates but are closer to an actual power plant.
Configuration Item 6: Shadow Conditions and Surrounding Obstacles
Shading conditions are a very important setting when checking energy production in PVSyst. In solar power generation, even if only part of a panel is shaded, it can affect the output of the entire circuit. Therefore, how you reflect surrounding buildings, trees, utility poles, slopes, mountains, adjacent equipment, inter-row shading between panels, and so on is important.
Shading can be broadly divided into shading from distant terrain and shading from nearby obstacles. Shading from distant mountains and terrain can affect conditions at low solar altitudes near sunrise and sunset. Shading from nearby buildings and trees can strongly affect particular areas depending on the time of day or season. Shading between rows of panels depends on the tilt angle, inter-row spacing, and solar altitude.
In PVSyst, by setting the effects of shading you can check the reduction in energy production caused by solar irradiance being blocked. However, care is needed when modeling shading. If you underestimate obstacles that exist on site, you will overestimate energy production. Conversely, if you overstate obstacles that in reality have little effect, you will underestimate energy production.
What often happens in practice is that simulations are run in the early stages without fully accounting for surrounding obstructions, and only later does an on-site survey reveal the impact of shading. In particular, rooftop installations on existing buildings, trees near site boundaries, structures on adjacent properties, and plantings that will grow in the future are elements that are easy to overlook.
When configuring shading, determine which obstacles to reflect in the model based on on-site photographs, survey results, layout drawings, and surrounding topography data. You don't need to model every detail, but anything that clearly affects power generation should be included. In particular, because shadows lengthen at the low solar altitude in winter, do not underestimate their impact on annual power generation.
Also, the effects of shading relate not only to simple blocking of sunlight but also to electrical losses. If only some panels are shaded, the output of the same circuit may be limited. Design decisions such as which circuit to connect the shaded sections to, and whether to avoid mixing them with less-shaded sections, are also important.
Before using PVSyst, shadows should be treated not as mere supplementary settings but as a primary factor that influences the reliability of energy yield forecasts. Combining on-site inspections with drawing information to identify shadow risks as early as possible prevents rework in later stages.
Please translate the following input into English.
Configuration item 7: Temperature conditions and heat loss
Temperature conditions and thermal losses are essential settings when considering the actual power output of a photovoltaic system. Solar panels generate more electricity the more sunlight they receive, but at the same time the panel temperature rises. In many cases, higher panel temperatures lead to reduced output. Therefore, while increased solar irradiance raises generation, losses due to temperature rise also occur.
In PVSyst, panel temperature and temperature losses are taken into account based on ambient temperature, wind speed, installation method, ventilation conditions, and other factors. Cooling conditions differ between ground-mounted installations where air can flow easily behind the panels and installations mounted close to the roof surface. In poorly ventilated environments, panel temperatures tend to rise and temperature losses tend to increase.
When considering temperature conditions, regional characteristics are also important. In cold regions, panel temperatures tend to remain low, so relatively high output can be obtained even with the same solar irradiance. On the other hand, in hot regions or high-temperature summer environments, even with abundant solar irradiance, temperature-related losses may prevent output from increasing as much as expected.
Also, for roof-mounted installations, temperature conditions vary depending on the type of roofing material, the gap behind the panels, the installation height, and ventilation. Even for ground-mounted installations, the cooling conditions can differ depending on the racking height and the surrounding airflow. In PVSyst settings, you need to be mindful of how much these installation environments are reflected.
In practice, temperature losses tend to be underestimated. With a focus on increasing power generation, attention often falls on solar irradiance and equipment capacity, while temperature-induced output reductions can be overlooked. However, when examining the breakdown of annual generation losses, temperature losses frequently appear as a non-negligible item.
Before using PVSyst, it is important to organize the temperature characteristics of the solar panels to be used, the installation method, ventilation conditions, and the local ambient temperature conditions. By appropriately setting the temperature conditions, you can obtain power generation forecasts that are closer to actual operation.
Setting Item 8: Wiring Losses and Electrical Losses
Wiring losses and electrical losses are losses that occur on the way from generated power to usable power. The electricity generated by solar panels is transmitted through junction boxes, wiring, power conversion equipment, and substation/transformer equipment. In that process, losses occur due to electrical resistance and equipment characteristics.
In PVSyst, DC-side wiring losses, AC-side wiring losses, connection losses, and equipment conversion losses are taken into account. The longer the wiring, the more losses due to resistance tend to increase. In circuits with high current, the impact of conductor size and distance also becomes greater. Therefore, layout planning and electrical design are also related to power generation forecasting.
One important point about wiring losses is that, in the initial study stage the wiring route is often not yet finalized. Simulations may be carried out using provisional loss rates, but when moving into detailed design it is necessary to review them based on the actual wiring lengths and cable specifications. In particular, for large-scale power plants the distances from the panel arrays to the power conversion equipment, and from the power conversion equipment to the interconnection point, can become long enough that the impact of losses can no longer be ignored.
Electrical losses also include mismatch losses caused by differences in characteristics between solar panels. Not all panels produce exactly the same output; output differences arise from manufacturing variations, dirt, temperature differences, shading, and similar factors. If a lower-output panel is present in the same circuit, it can affect the output of the entire circuit.
Conversion losses in power conversion equipment are also important. When converting from DC to AC, a certain amount of loss will always occur. Furthermore, efficiency can vary during periods of low output or when operating close to rated capacity. By looking at PVSyst’s loss diagram, you can see how much wiring losses and conversion losses reduce energy production.
Before using PVSyst, it is advisable to organize as much as possible the wiring routes, expected wiring lengths, cable specifications, per-circuit current conditions, and equipment layout. To bring the energy yield prediction closer to practical design, it is necessary to appropriately account for losses not only in the power-generating parts but also in the parts that transport the power.
Configuration Item 9: Contamination, Degradation, and Operating Conditions
Soiling, degradation, and operating conditions are important parameters to consider when assessing long-term power generation. Because solar panels are installed outdoors, they are exposed to dust, pollen, bird droppings, fallen leaves, snow, salt, exhaust gases, and other effects. When these adhere to the panel surface, they block solar irradiance and reduce power generation.
Losses due to soiling vary greatly depending on the installation environment. In areas with frequent rain where natural washing is likely, soiling may not accumulate easily. On the other hand, in dry regions, around farmland, near construction sites, close to the coast, and along roads with heavy traffic, the impact of soiling can be significant. When the tilt angle is small, rain may also be less effective at washing away dirt.
In PVSyst you can reflect a realistic reduction in energy yield by setting losses due to soiling. While standard values may be used for preliminary assessments, in practice these need to be considered according to the local environment and maintenance policy. Appropriate settings will vary depending on the assumed cleaning frequency, how snow periods will be handled, and whether there are dust sources in the surrounding environment.
Degradation is also important. Solar panels gradually lose output over long-term use. In project planning, you need to consider not only the first-year generation but also the decrease in generation during long-term operation. When using simulation results from PVSyst, it is important to clarify whether they are assumed to be first-year values or treated as long-term averages.
Operational conditions also include equipment outages, inspections, output control, grid-side constraints, and shutdowns due to maintenance work. Power plants do not always operate under ideal conditions. In practice, inspections, incident responses, equipment shutdowns, communication failures, and similar issues can result in periods when power generation is temporarily unavailable. The extent to which these factors are reflected in simulations depends on the purpose of the analysis.
Soiling, degradation, and operational conditions are adjustment factors used to bring power generation forecasts closer to reality. If overly optimistic assumptions are applied, the divergence from actual results will become large. Conversely, if overly conservative assumptions are applied, the plan’s evaluation will be underestimated more than necessary. Before using PVSyst, it is important to prepare explainable settings that reflect the local environment and operational policies.
Common Mistakes in PVSyst Configuration
A common mistake in configuring PVSyst is treating the act of filling in the input fields as the goal itself. In power generation simulations, if every field contains a numerical value the results can appear plausible at first glance. However, if those numbers do not match the site conditions or the design drawings, the reliability of the results is low.
One common mistake is using weather data without verifying its validity. Even if you assume data from nearby locations is fine, solar radiation and temperature can actually differ due to variations in elevation and terrain. This is especially true in mountainous areas and along the coast, where conditions can vary greatly even under the same place name.
The next most common issue is confusing azimuth and tilt angles. If the angles on the drawings, the on-site orientation, and the reference for the design conditions are not aligned, calculations will be done in unintended directions. Even small differences can affect the results when there are multiple sections or an east–west arrangement.
Also, postponing consideration of shading conditions can lead to failure. In initial assessments it may be acceptable to ignore shading for rough estimates, but if those results are used directly for business decisions, expected power generation can end up being overestimated compared with reality. It is especially important for rooftop installations and narrow sites to check for mutual shading between equipment and shading from surrounding structures.
Furthermore, it is problematic to oversimplify the pairing of solar panels and power conversion equipment. Even if you only match the installed capacity, if the input voltage range, number of modules in series, number of parallel strings, capacity ratio, and the amount of output limiting that occurs are not appropriate, the outcome will deviate from the actual design.
Care should be taken not to underestimate loss items. Wiring losses, temperature losses, soiling, degradation, and operational downtime may each appear small on their own. However, when these accumulate, they can cause a large difference in annual energy production. On PVSyst's results screen, it is important to check the breakdown of losses and determine which losses are the largest.
To prevent failures in PVSyst, it is effective to document the basis for input values. Organizing which drawings were used as the basis, which survey results were applied, and which values are assumptions makes later review and explanation easier. Simulations are not created once and finished; they should be updated as the design progresses.
The Importance of Relating Set Values to On-Site Conditions
The most important thing when using PVSyst in professional practice is to link the input settings to the actual site conditions. The values in the software are meant to represent the local terrain, orientation, shading, equipment layout, wiring, and operational conditions. Even input values that look the same on the screen will not yield an informative simulation if the rationale behind them is unclear.
For example, the reliability of the coordinates for an installation location varies depending on whether the point was roughly selected on a map or determined from surveyed measurements. You should confirm whether the azimuth was read from the north direction on the drawings or measured on site. Shadow conditions also vary in accuracy depending on whether they were judged from photographs alone or based on three-dimensional spatial relationships.
Power generation forecasting is the task of integrating information from design documents, on-site surveys, electrical design, construction conditions, and maintenance policies. It is not something that can be completed with PVSyst alone; combining it with positioning, surveying, photographic records, and the preparation of drawings to accurately understand the site results in a more reliable assessment.
In particular, when planning a solar power plant, land boundaries, racking positions, equipment layout, surrounding obstructions, elevation differences, and drainage planning are indirectly related to energy output. If site conditions remain unclear, even if you configure settings precisely in PVSyst, the underlying information will contain errors. Conversely, if site information is organized, the rationale for the settings becomes clear, making internal explanations and consensus-building with stakeholders easier.
Recording on-site conditions is also useful when comparing actual post-completion power generation with simulation results. If generation is lower than predicted, it is necessary to determine whether the cause is a difference in solar irradiance, shading, soiling, equipment downtime, or deviations from design conditions. If the rationale for the initial settings remains, the accuracy of the root-cause analysis will improve.
Before using PVSyst, it is important not to treat input values as mere numbers but to be aware of which site information they reflect. The accuracy of the simulation is not determined solely by the software’s capabilities, but by how accurately you understand the site and how carefully you translate that information into the settings.
Summary
PVSyst is a practical simulation software for predicting the energy production of photovoltaic power systems and for organizing design conditions and loss factors. It is used not only to output numerical estimates of energy production but also to comprehensively evaluate the installation site, meteorological data, azimuth, tilt angle, solar panels, power conversion equipment, circuit configuration, shading, temperature, wiring losses, soiling, degradation, and operational conditions.
The nine configuration items you should know before use are installation location and meteorological data, azimuth and tilt angles, solar panel specifications, power conversion equipment specifications, circuit configuration and capacity ratio, shading conditions and surrounding obstacles, temperature conditions and thermal losses, wiring losses and electrical losses, and soiling, degradation, and operating conditions. These may appear to be independent, but in reality they influence one another.
To use PVSyst correctly, it is essential to understand the meaning of the input values and to cross-check them against site conditions and design documents. Merely filling in the configuration fields may produce a polished-looking report, but it will not produce an energy-yield forecast that can be justified in practice. It is important to know which values are supported by what evidence, which are assumptions, and which items should be reviewed when designs change.
In particular, site coordinates, equipment layout, surrounding obstacles, azimuth, elevation differences, and so on are prerequisites for PVSyst input values. To improve the accuracy of power generation simulations, it is important to accurately acquire site information and establish a workflow to reflect it in the design conditions.
If you want to streamline site inspections, positioning, and the recording of equipment locations, using an iPhone-mounted GNSS high-precision positioning device like LRTK makes it easier to conduct on-site verification of planned solar power plant sites, record equipment layouts, and assess surrounding conditions. By combining PVSyst simulations with accurate location information obtained in the field, desktop-based power generation forecasts can be turned into evaluations that are closer to practical, real-world conditions.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.