PVSyst is a simulation software used for forecasting the power output of photovoltaic power systems, evaluating losses, comparing design conditions, and creating reports. During the planning phase of a power plant, site solar irradiation conditions, azimuth, tilt angle, plant capacity, equipment configuration, shading effects, temperature conditions, and various losses are organized and used to assess how much annual energy generation can be expected. PVSyst is used by designers, power producers, construction companies, and technical evaluators as a representative tool for performing these assessments quantitatively.


However, for a practitioner who has just begun to look into what PVSyst is, it can be difficult to know what to input on the screen, in what order to check things, and which results to use for design decisions. It is important to understand the entire sequence—not simply entering numbers and generating a report, but organizing site conditions, assuming an equipment configuration, estimating losses, interpreting the results, and revising the conditions as necessary.


This article explains the flow of using PVSyst in design work by dividing it into six steps. To help even beginners grasp the overall picture, it organizes the process from pre-input preparation to simulation, result verification, condition comparison, and report utilization, all from a practical perspective.


Table of Contents

• What PVSyst is used for in solar power system design

• Step 1 Organize site conditions and design objectives

• Step 2 Set meteorological data and installation conditions

• Step 3 Assemble PV capacity and equipment configuration

• Step 4 Check shading, temperature, and electrical losses

• Step 5 Interpret simulation results and loss diagrams

• Step 6 Compare conditions and create reports to inform design decisions

• Key points for beginners to be aware of when using PVSyst

• The accuracy of on-site positioning data influences design quality

• Summary


What is PVSyst used for in solar power generation design

PVSyst is simulation software for predicting the energy production of photovoltaic power systems and comparing differences across design conditions. In solar power system design, you consider how many panels to install, which direction to orient them, what tilt to use, how to account for shading effects, whether the combination of equipment is feasible, and what the annual energy production will be. PVSyst is used to organize these considerations into a single design model and to calculate the energy output and the breakdown of losses.


The output of solar power generation is not determined simply by installed capacity. Even systems with the same capacity can yield different actual generation depending on site irradiance, surrounding terrain, shading from buildings and trees, panel tilt angle, azimuth, temperature rise, wiring losses, equipment conversion losses, soiling, and assumptions about long-term degradation. Therefore, in design work you should not assume "the same capacity means the same output"; instead, you need to be able to explain under which conditions, how much loss you are anticipating, and what level of generation you are assuming.


The role of PVSyst is not to fully automate a designer’s decisions. Rather, it is a tool to organize the assumptions set by the designer into a calculation model and to check what results will occur under those conditions. If the input conditions are inappropriate, even a report that looks well-presented will produce results that are difficult to use for practical decision-making. Conversely, if it is used after carefully organizing the site conditions and design intent, it is useful for energy production forecasting, explaining losses, comparing designs, internal review, customer explanations, and preparing technical documentation.


When trying to understand what PVSyst is, it is important to grasp where it fits within the design workflow before memorizing the detailed items on the user interface. First, confirm site conditions, determine the design objectives, set the meteorological data and installation conditions, configure the system layout, evaluate shading and losses, interpret the simulation results, and, if necessary, change the conditions and re-evaluate. Understanding this flow makes it much easier to see what you are entering into PVSyst’s screens and why those values are required.


Step 1 Organize on-site conditions and design objectives

The first step in using PVSyst is not to start entering data into the software immediately, but to organize the site conditions and design objectives. Solar power simulations return results based on the conditions entered. Therefore, if the information is unclear before input, the basis for the power generation forecast will also be vague. When using PVSyst for design work, you should first clarify what kind of location the target site is and what you are trying to decide by running the simulation.


Items to confirm as site conditions include the installation location, topography, surrounding obstructions, site shape, available area, elevation differences of the land, orientation, conditions of the connection point, and anticipated construction constraints. For rooftop installations, roof shape, pitch, orientation, load restrictions, rooftop equipment, handrails, and shading from adjacent buildings are important. For ground-mounted installations, confirm site development conditions, ground slope, surrounding trees and buildings, adjacent parcels, maintenance access routes, and the flexibility to arrange the mounting structures. Many items are treated as numerical inputs in PVSyst, but do not forget that these are based on on-site surveys and review of drawings.


Clarifying the design objectives is also important. For example, whether you want to know a rough estimate of power generation as an initial study, refine the annual generation for a feasibility assessment, compare equipment configurations, verify the impact of shading, or explain the results to stakeholders in a report will change the required input accuracy and the outcomes that need to be checked. In the early stages it is effective to compare multiple options using approximate conditions, but as you approach detailed design you need to carefully review on-site surveying, layout, equipment specifications, and loss conditions.


A common pitfall for beginners is treating PVSyst as software that will give the "correct answer." In reality, PVSyst performs calculations based on the input conditions, so the assumptions the designer adopts have a major impact on the results. Therefore, at the initial stage it is important to clarify and organize "what decision this simulation will be used for," "which conditions are fixed and which are assumptions," and "which items should be reviewed later."


When sharing within the company or among stakeholders, managing simulation names and analysis conditions is also important. If you try multiple conditions for the same project, it can become unclear which case is the latest and which case has been adopted as the proposal. From the early design stages, organizing case names so that orientation, tilt, capacity, loss conditions, shading conditions, and so on are clear will make verification in later stages easier. When incorporating PVSyst into design work, not only the calculations themselves but also the management of analysis conditions is part of design quality.


Step 2 Configure meteorological data and installation conditions

The next step is to configure the meteorological data and installation conditions. In forecasting photovoltaic power generation, the fundamental factor is how much solar irradiance reaches the target site. In PVSyst, based on site information and meteorological data, horizontal plane irradiance, tilted plane irradiance, temperature conditions, and other factors are handled and linked to the energy yield calculation. Because the meteorological conditions set here greatly affect the final annual energy yield, they must be treated carefully in design work.


When selecting meteorological data, check whether the data come from a location close to the target site, whether they represent long-term trends, and whether they have the granularity appropriate for the design purpose. Solar radiation and temperature vary greatly by region, and conditions can differ between coastal, mountainous, and urban areas even within the same prefecture. In practice, it is desirable to be able to justify the suitability of the meteorological data used according to the importance of the project and the design stage.


In the installation conditions, you set the panel surface's azimuth and tilt angles. The azimuth angle indicates which direction the panel faces, and the tilt angle indicates the angle relative to the horizontal plane. If you want to maximize power generation, you consider the direction and angle that receive the most sunlight, but in actual design you are subject to constraints such as roof shape, site geometry, racking constraints, wind loads, snow, maintenance access, and shading from nearby structures. Therefore, it is important to set values based not only on the theoretically optimal angle but also on conditions that are actually constructible.


Using PVSyst, you can compare differences in energy production when the azimuth and tilt are changed. For example, even with the same installed capacity, arranging arrays more toward the south versus splitting them east–west will alter the annual energy yield and the generation profile by time of day. On rooftop installations, the orientation and tilt can differ for each roof surface, which may require treating them as multiple sub-arrays. By carefully reflecting these conditions, the simulation becomes closer to the actual installation.


Site conditions also involve considerations such as elevation and ground-surface reflectance. The reflected component from the ground surface varies depending on the installation environment. Because reflection conditions differ for typical ground surfaces, bright paved surfaces, and areas with snow cover, this can affect power generation. At the beginner stage you do not need to be overly focused on fine settings, but it is important to maintain the mindset of asking why you are using those initial values and whether they need to be changed according to the project's characteristics.


The important thing at this step is not to treat meteorological data and installation conditions as items you can just enter "for the time being." Because PVSyst is a tool that calculates power generation based on input conditions, the initial meteorological and installation conditions form the foundation of the results. Even when you later review the results and feel something is off, you will often first return to this part to check.


Step 3 Assemble the solar panel capacity and equipment configuration

After configuring the meteorological data and installation conditions, the next step is to assemble the PV capacity and equipment configuration. In PVSyst, you set the PV modules, number of modules connected, string configuration, inverter (power conditioner) capacity, input circuits, and the relationship between the DC and AC sides, and verify whether the installation is viable. In design work, this step affects not only the expected energy yield but also the appropriateness of equipment selection and circuit design.


In photovoltaic installations, the DC output of solar cells is converted to AC for use. Therefore, it is necessary to appropriately consider the relationship between solar array capacity and the capacity of the conversion equipment. Increasing solar array capacity tends to increase annual energy production, but if it exceeds the converter’s capacity or input range, output clipping and losses occur. Conversely, if the conversion equipment’s capacity is too large relative to the solar array capacity, the utilization efficiency of the system can decrease. In PVSyst, design proposals are assembled while checking such capacity ratios and operating ranges.


String configuration is also important. The number of photovoltaic modules connected in series and the number connected in parallel determines the ranges of voltage and current. Because voltage rises at low temperatures and falls at high temperatures, you must verify that the equipment's input range is met throughout the year. PVSyst allows you to check electrically whether the equipment is being operated within its specifications, which helps detect design mistakes early.


What beginners should be careful about is not deciding the configuration based solely on the system capacity. Even with the same generation capacity, losses and generation patterns change depending on the string configuration, division by orientation, division by tilt, how shading affects the modules, and the assignment of input circuits. In particular, in designs with multiple roof surfaces or multiple orientations, how groups of solar cells under different conditions are combined is important. If surfaces with substantially different conditions are combined into the same input system, losses due to operating point mismatch may occur.


When entering the equipment configuration, check that the design drawings and the single-line wiring concept match the model in PVSyst. For example, if the drawings are divided into multiple systems but the simulation treats them as a single consolidated array, it may not adequately reflect actual losses or generation trends. Conversely, if you subdivide too much during the initial study phase, the work can become complicated and the purpose of comparison can become unclear. It is important to judge how detailed the modeling should be according to the design stage.


PVSyst is not only a tool for producing power generation figures but also a design support tool for verifying the consistency of equipment configurations. If warnings or inconsistencies appear on the input screen, do not simply dismiss them as operational messages; check whether there are problems with the equipment configuration or design conditions. This review is a very important step in practice because it leads to later construction drawings and equipment selection.


Step 4: Check shading, temperature, and electrical losses

Once the system configuration is established, check conditions such as shading, temperature, and electrical losses. In photovoltaic power generation, the presence of solar irradiance does not mean all of it can be extracted as electricity. In practice, various losses occur, including reductions in irradiance due to shading, output decreases from increases in solar cell temperature, wiring losses, conversion losses, mismatches between equipment, soiling, and degradation over time. In PVSyst, these are configured item by item, and the impact of losses is reflected in the calculations.


Shade assessment is a particularly important aspect of design work. When there are nearby buildings, trees, mountains, fences, rooftop equipment, adjacent installations, etc., the solar panels can be shaded depending on the time of day and the season. Shadows not only reduce irradiance; when part of a solar panel is shaded, electrical non-uniformities occur and can affect energy production more than they appear. In PVSyst, you can set conditions for surrounding obstacles and near shading and verify their impact on energy production.


However, caution is required when entering shadow inputs. If you assume the height or position of obstructions without sufficient on-site survey or drawing information, the assessment of shading losses may deviate from reality. In particular, rooftop equipment and obstructions near site boundaries can change how shadows fall with even slight shifts in position or height. During the design phase, it is important to decide which obstructions to model and which to ignore, and to record those assumptions.


Temperature losses also have a major impact on power generation. Solar cells have the characteristic that their output decreases as temperature rises. Even during periods of strong solar irradiance in summer, rising solar cell temperatures can cause output to fall short of expectations. In PVSyst, temperature-related output reductions are taken into account based on ambient air temperature, mounting method, ventilation conditions, and so on. Because temperature conditions differ for installations that are flush-mounted to the roof, installations with good ventilation, and ground-mounted racks, settings appropriate to the mounting configuration are required.


Electrical losses include DC wiring losses, AC wiring losses, conversion losses, mismatch losses, and soiling losses. Each of these may appear small when looked at individually, but together they can have a non-negligible impact on annual energy production. In practice, rather than using standard values as-is, you should confirm that they fit the project's design conditions. For projects with long cable runs, mixed orientations, environments prone to soiling, or regions where snow or dust are expected, it may be necessary to revisit the loss assumptions.


In this step, it is important neither to underestimate losses nor to overestimate them. If losses are estimated too low, the energy production forecast becomes overly optimistic and the discrepancy with actual performance may become a problem later. Conversely, if losses are overestimated, the system assessment may become unnecessarily conservative and lead to incorrect design decisions. The purpose of using PVSyst is not to produce convenient numbers, but to provide a reasonable estimate of energy production and losses for the design conditions.


Step 5 Interpreting Simulation Results and Loss Plots

Once the input conditions are set, run the simulation and interpret the results. On PVSyst’s result screens you can check the annual energy yield, monthly energy yield, performance ratio, specific yield, breakdown of losses, and the conversion process from solar irradiance to power output. Beginners tend to focus only on the final annual energy yield, but in design work it is necessary to look at multiple indicators together to judge the validity of the results.


Annual energy generation is an important indicator that shows how much electrical energy a facility is predicted to produce over one year. However, looking at that figure alone makes it difficult to judge whether the generation is reasonable. Checking it together with generation relative to installed capacity, local solar irradiation conditions, monthly trends, the magnitude of losses, and comparisons with similar projects makes it easier to spot irregularities in the results. For example, if generation is low despite being in an area with good solar irradiation, check for shading losses, orientation and tilt, temperature conditions, equipment configuration, input errors, and so on.


The performance ratio is a representative indicator used to assess how efficiently an installation generates electricity relative to solar irradiation energy. A high performance ratio is not simply always better, but it serves as a reference for understanding the design condition of the installation and the magnitude of losses. If the performance ratio is extremely high or low, check whether there are any inconsistencies in the input conditions. In design work, comparing the performance ratio with other projects is sometimes used to evaluate the appropriateness of loss settings and equipment configuration.


The loss diagram is a very important item to check when using PVSyst. By looking at the loss diagram, you can understand at which stages and how much loss occurs from when the solar irradiance reaches the PV surface, becomes DC power, and is output as AC power.


Because losses such as shading, reflection, temperature, mismatch, wiring, and conversion are displayed along the flow, it becomes easier to explain why the generated energy reached that value.


Beginners should be careful not to view a loss diagram merely as a table of results, but to read it in connection with the input conditions. For example, if temperature loss is large, check whether the installation method and ventilation conditions are appropriate. If shading loss is large, review the shading model inputs, the height and placement of obstacles, and the arrangement of the panels. If wiring loss is large, check the wiring distance, conductor cross-section, and the circuit configuration approach. The magnitude of the losses itself is not necessarily bad; what matters is whether you can explain the reasons.


Monthly results are also important. Even if the annual electricity generation is the same, seasonal generation trends can differ. A design that performs well in summer, a design that is more susceptible to shading in winter, or an east–west layout that spreads generation into the morning and evening — by examining monthly and time‑of‑day trends you can identify the characteristics of the installation. For project feasibility assessments and operation planning, checking not only the annual total but also seasonal generation and output trends leads to more practical decision‑making.


When interpreting simulation results, it is important not to overlook any inconsistencies. If the energy production is higher than expected, losses are unrealistically small, monthly trends look unnatural, there should be shading but shading losses are almost zero, or output limiting is excessively large relative to equipment capacity, recheck the input conditions. PVSyst’s results reflect the assumptions placed by the designer. Rather than stopping at simply viewing the results, it is important in design work to use the results to retroactively verify the validity of the input conditions.


Step 6: Use condition comparisons and report creation to inform design decisions

The final step is comparing conditions and preparing the report. PVSyst is effective not only for producing a single simulation result but also for comparing multiple design conditions to determine which option best meets the objectives. In design work, the initial result does not necessarily become the final proposal. While reviewing azimuth, tilt, system capacity, layout, equipment configuration, shading countermeasures, and loss conditions, you refine the design by comparing multiple options.


When comparing scenarios, it is important to be clear about what you change and what you keep fixed. For example, the meaning of the comparison differs depending on whether you fix system capacity and change only the orientation, alter the layout within the site, change the ratio of PV capacity to converter capacity, or reduce the number of modules installed to avoid shading. If you change multiple conditions at the same time, it becomes difficult to determine which factor is responsible for differences in power generation. In practice, it is important to clarify the purpose of the comparison and run simulations while recording the changes.


The option with the highest energy production is not necessarily the optimal one. If you increase energy production by using an overly dense layout, maintainability can decline, shading effects can increase, and constructability can worsen. Also, increasing installed capacity tends to boost annual energy production, but output limitations and losses may rise, reducing the marginal benefit of added capacity. When comparing PVSyst results, it is important to evaluate not only energy production but also losses, installation conditions, constructability, operability, and explainability.


When preparing a report, organize the input conditions, results, breakdown of losses, monthly energy generation, system configuration, and so on into a form that can be explained to stakeholders. PVSyst reports are useful as supporting materials for design studies, but simply submitting the output documents as they are is not sufficient. Be prepared to supplement which conditions were adopted, which conditions are assumptions, which items require on-site verification, and what has changed from the previous proposal so that design decisions are communicated more clearly.


Especially in internal reviews or customer presentations, explanations that rely only on technical terms may not be easily understood. Items such as annual energy production, performance ratio, loss diagrams, shading losses, and temperature losses should be explained in relation to design decisions. For example, "In this proposal, shading losses are significant, so we need to partially revise the layout," "In this proposal, increasing capacity will lead to greater constraints on the conversion side, so the additional effect is limited," "With this orientation, the annual total will decrease slightly, but it will be easier to secure the number of installable modules" — linking the figures to the decisions is important in practice.


PVSyst is not just software for producing reports; it is a tool for comparing design conditions and turning them into explainable decisions. Designers do not simply receive results; they are responsible for using those results to make subsequent design revisions and for explaining them in terms stakeholders can understand. In that sense, mastering PVSyst is not only about learning how to operate it, but about incorporating the flow of input, verification, comparison, and explanation into the design workflow.


Things Beginners Should Be Careful About When Using PVSyst

What practitioners who have just started using PVSyst should be careful about is checking the overall consistency before focusing on detailed settings. The software screen has many input fields, and when using it for the first time you can easily become overwhelmed just trying to understand the meaning of each item. However, what matters in practice is whether the entered conditions match the actual site conditions and the design intent of the project. Even if the on‑screen inputs are complete, if the relationships among orientation, tilt, capacity, shading, losses, and equipment configuration diverge from the actual design, the reliability of the results will be reduced.


The first thing to be careful about is confusing units and assumptions. Equipment capacity, power, electric energy, solar irradiance, loss rate, and similar terms may look alike but have different meanings. Capacity indicates the size of the equipment, while electric energy indicates the amount generated over a given period. Loss rate indicates the percentage decrease relative to a reference. Confusing these can lead to misreading the results. When reviewing PVSyst results, it is important to confirm not only the numbers but also what those numbers represent.


Next, don’t rely too heavily on default initial values. PVSyst includes standard settings and default values, but they are not necessarily optimal for every project. Standard values may be acceptable during preliminary studies, but as you move closer to detailed design, it becomes necessary to verify settings according to the conditions of each project. In particular, shading conditions, soiling, wiring losses, temperature conditions, and equipment configuration can vary depending on site conditions and design approach. Even when you use default values, you should be able to explain the reasons for doing so.


Also, it is important not to place too much trust in simulation results. The results from PVSyst do not guarantee future power generation; they are predictions based on the assumptions set. Actual power generation will vary due to weather, soiling, equipment downtime, maintenance conditions, changes in the surrounding environment, equipment degradation, and other factors. Therefore, during the design phase, forecast values should not be treated as absolute numbers but as technical projections conditional on the stated assumptions.


Additionally, careful management of multiple proposals is necessary. In design work, simulations are often run each time a proposal is revised. If file names or case names are ambiguous, results from outdated conditions can be used by mistake, or it may become unclear which proposal was adopted. It is important to organize and share information so that dates, conditions, changes, and the purpose of the review are all clear. In work using PVSyst, not only calculation accuracy but also meticulous data management affects the reliability of the deliverables.


Finally, do not underestimate the accuracy of on-site information. In PVSyst, position, azimuth, tilt, shading, and layout are treated as numerical values, but the sources of those numbers are site surveys, positioning measurements, drawings, photographs, and topographic information. If the on-site information remains coarse, no matter how carefully you operate the software, you may end up with a model that deviates from reality. Beginners in particular tend to focus on software operation, but it is important to keep in mind that a good simulation starts with good on-site information.


Accuracy of on-site positioning data determines design quality

When you understand the workflow of using PVSyst in design work, you realize that the accuracy of power generation simulations is not determined solely by the settings within the software. In particular, if on-site location information, site boundaries, the positions and heights of obstacles, orientation, tilt, or the assumptions behind the layout plan are inaccurate, they will affect shadow analysis and judgments about the feasible installation area. Even if the input values in PVSyst look well organized on the screen, if their source data is ambiguous, the basis for the results will be weak.


In solar photovoltaic system design, not only desk drawings but also on-site positioning data, photographs, point clouds, and topographic information are useful.


For example, even if the position of an obstacle is off by just a few meters (a few ft), the way shadows fall can change. On roofs and in narrow sites, slight errors in orientation or dimensions affect panel layout. For ground-mounted installations, accurately understanding elevation differences and slopes makes it easier to plan rack placement, site grading, and maintenance access routes.


As a means of streamlining the acquisition of such on-site information, leveraging an iPhone-mounted high-precision GNSS positioning device like LRTK makes it easier to carry out pre-design site checks and organize location data. If high-precision positioning data can be obtained on-site, it becomes easier to record site conditions, obstacle locations, and verification points, which leads to improved accuracy of the assumptions entered into PVSyst. Even if the power-generation simulation itself is performed in PVSyst, whether site conditions can be accurately understood in the preceding stage greatly affects the quality of the design.


PVSyst is a powerful tool for converting design conditions into a computational model. However, building an accurate model requires precise on-site information. Rather than treating site surveys, positioning, photographic records, drawing organization, and simulation as separate tasks, linking them as a continuous design process can enhance the explainability of power generation forecasts and the reliability of design decisions.


Summary

PVSyst is simulation software for predicting the energy yield of photovoltaic systems, evaluating losses, comparing conditions, and generating reports. When used in design work, it is important not just to enter numbers into the screen and obtain results, but to understand the whole workflow: organizing site conditions, setting meteorological data and installation parameters, considering equipment configurations, checking shading and losses, interpreting results, comparing conditions, and preparing reports.


Organized into 6 steps, first clarify the site conditions and design objectives, then set the installation conditions such as meteorological data, orientation, and tilt. Based on that, configure the PV capacity and equipment configuration, and confirm loss conditions such as shading, temperature, wiring, conversion, and soiling. After the simulation, interpret not only the annual generation but also the performance ratio, monthly generation, and loss diagram, and verify consistency with the input conditions. Finally, compare multiple proposals and organize them into a report that can be explained to stakeholders.


What is important when mastering PVSyst is not to accept the numerical results as they are, but to be able to explain which assumptions produced those numbers. If the input conditions are ambiguous, the results will be ambiguous as well. Conversely, if you carefully assess site conditions, set parameters in line with the design intent, and verify the reasons for losses, PVSyst becomes an effective tool to support design decisions.


In practice, the accuracy of on-site positioning data directly affects the input quality of PVSyst. Accurately capturing site boundaries, obstacles, orientation, tilt, and layout conditions increases the reliability of shading assessments and power generation forecasts. If you use PVSyst for solar power system design work, it is important to review not only the simulation operations but also the methods for acquiring on-site information. Incorporating an iPhone-mounted GNSS high-precision positioning device like LRTK into site surveys can smooth the workflow from positioning to design and simulation and make it easier to carry out evidence-based design evaluations.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page